(6)_Safety_Program_A_(1).pdf

PDF 83 KB Posted

Attached to
Culinary Arts Modernization Project
Solicitation number
WSH2511A
Issued by
Los Angeles County, San Francisco City, California

About this file

This document is a Certification of Safety Program In-Place form for the William S. Hart Union High School District located in Santa Clarita, California. The form requires contractors to develop and fully implement comprehensive safety programs that comply with CAL-OSHA requirements before initiating any fieldwork. Contractors must certify that all required safety programs are in place and active as a condition for starting work on the project.

The form is a standardized contract document that mandates contractors to confirm their safety preparedness by providing their company name, an authorized signer's name, and a signature. It is designed to ensure workplace safety compliance and serves as a prerequisite for contractors to begin work on district projects, with the specific project and bid package details to be filled in by the contractor at the time of submission.

View the file

Other files

File Type Posted
Culinary_Arts_Modernization_Project.pdf PDF
Culinary_Arts_Modernization_Project.pdf PDF
(10)_PWC100_DIR_INFO_(1).pdf PDF
2-Certification_of_Safety_Program_(1).pdf PDF
(6)_Safety_Program_A_(1).pdf PDF
1-Substitution_Request_(1).pdf PDF
2-Certification_of_Safety_Program_(1).pdf PDF
1-Substitution_Request_(1).pdf PDF
13283_Culinary_Arts_Specifications_9-26-25.pdf PDF
(3)_Payment_Bond_Blank_(1).pdf PDF
(2)_Perfomance_Bond_(1).pdf PDF
(3)_Payment_Bond_Blank_(1).pdf PDF
(4)_Drug_and_Tobacco_(1).pdf PDF
(5)_Company_Guarantee_to_Owner_(1).pdf PDF
1-Substitution_Request_(1).pdf PDF
13283_Culinary_Arts_Specifications_9-26-25.pdf PDF
(2)_Perfomance_Bond_(1).pdf PDF
(5)_Company_Guarantee_to_Owner_(1).pdf PDF
13283_Culinary_Arts_Specifications_9-26-25.pdf PDF
13283_Cullinary_Arts_Drawings_9-26-25.pdf PDF
DOJ_Rev._5.08.25_Certification_of_Employee_Background_Check.pdf PDF
(11)_Workers_Compensation_Exemption_Declaration_Construction_(1).pdf PDF
(5)_Company_Guarantee_to_Owner_(1).pdf PDF
13283_Cullinary_Arts_Drawings_9-26-25.pdf PDF
5-Conditional_Waiver_and_Release_(Upon_Final_Payment).pdf PDF
Agree__Hart__Front_End_GC__General_Provisions_Rev_6.26.23JF_(Rev_6.21.24_Added_Blue_Beam_Illustration_Method_&_Insurance).pdf PDF
CM-MP_Construction_Services_Agreement_2019_informal_and_formal_bids_CUPCCAA.pdf PDF
(1)_Asbestos-Free_Materials.pdf PDF
4-Unconditional_Waiver_and_Release_(Upon_Progress_Payment).pdf PDF
5-Conditional_Waiver_and_Release_(Upon_Final_Payment).pdf PDF
(1)_Asbestos-Free_Materials.pdf PDF
Agree__Hart__Front_End_GC__General_Provisions_OCIP_Rev_6.26.23JF_(Rev_6.21.24_Added_Blue_Beam_Illustration_Method).pdf PDF
CM-MP_Construction_Services_Agreement_2019_informal_and_formal_bids_CUPCCAA.pdf PDF
Agree__Hart__Front_End_CM-MP__General_Provisions_Rev_6.26.23JF_(Rev_6.21.24_Added_Blue_Beam_Illustration_Method_&_Insurance).pdf PDF
6-Unconditional_Waiver_and_Release_(Upon_Final_Payment).pdf PDF
Agree__Hart__Front_End_GC__General_Provisions_OCIP_Rev_6.26.23JF_(Rev_6.21.24_Added_Blue_Beam_Illustration_Method).pdf PDF
Blank_IRS_W-9_(2024).pdf PDF
4-Unconditional_Waiver_and_Release_(Upon_Progress_Payment).pdf PDF
Agree__Hart__Front_End_CM-MP__General_Provisions_OCIP_Rev_6.26.23JF_(Rev_6.21.24_Added_Blue_Beam_Illustration_Method).pdf PDF
Agree__Hart__Front_End_CM-MP__General_Provisions_Rev_6.26.23JF_(Rev_6.21.24_Added_Blue_Beam_Illustration_Method_&_Insurance).pdf PDF
Agree__Hart__Front_End_GC__General_Provisions_Rev_6.26.23JF_(Rev_6.21.24_Added_Blue_Beam_Illustration_Method_&_Insurance).pdf PDF
Blank_IRS_W-9_(2024).pdf PDF
(7)_Lead_Containing_176349_(1).pdf PDF
3-Conditional_Waiver_and_Release_(upon_Progress_Payment).pdf PDF
4-Unconditional_Waiver_and_Release_(Upon_Progress_Payment).pdf PDF
6-Unconditional_Waiver_and_Release_(Upon_Final_Payment).pdf PDF
Agree__Hart__Front_End_CM-MP__General_Provisions_OCIP_Rev_6.26.23JF_(Rev_6.21.24_Added_Blue_Beam_Illustration_Method).pdf PDF
Agree__Hart__Front_End_GC__General_Provisions_OCIP_Rev_6.26.23JF_(Rev_6.21.24_Added_Blue_Beam_Illustration_Method).pdf PDF
Blank_IRS_W-9_(2024).pdf PDF
GC_Construction_Services_Agreement_2019.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CERTIFICATION OF SAFETY PROGRAM IN-PLACE

To: William S. Hart Union High School District 21380 Centre Pointe Parkway Santa Clarita, CA 91350

PROJECT: _______________________________________________________________________________________

Bid Package: ________________________

I understand that, prior to initiating any work in the field, each Contractor is required to develop and fully implement safety program(s), as required by law, to include but not limited to CAL-OSHA requirements.

I hereby certify, as a condition precedent to being allowed to start work in the field, that all required safety programs are, as of this date, in-place and active.

Company Name of Contractor (exactly as it appears on Contractor’s License)

Print or Type Name of Authorized Signer

Signature of Prime Contractor Dated

This Certification is to be provided by Contractor prior to start of any work in the field)

William S. Hart Union High School District Project __________________

Bid Package ______________

Required Contract Forms

Company Name of Contractor exactly as it appears on Contractors License:
Print or Type Name of Authorized Signer:
Dated:
Bid Package:
Project:

File details come from the government source that posted it. Updated .