1-Substitution_Request_(1).pdf

PDF 40 KB Posted

Attached to
Culinary Arts Modernization Project
Solicitation number
WSH2511A
Issued by
Los Angeles County, San Francisco City, California

About this file

This document is a Substitution Request form for the Hart High School Infrastructure - Phase 2A project by the William S. Hart Union High School District, with the project number WSH18-01. The form provides a standardized template for contractors to request approval of an alternative product or material to those originally specified in the project documents. The form requires detailed documentation about the proposed substitution, including product descriptions, specifications, drawings, photographs, performance data, and an explanation of any changes required for proper installation.

The substitution request form includes a comprehensive warranty section where the contractor must affirm that the proposed substitute material will perform equivalently to the specified product, assume responsibility for any modifications or additional costs, and provide signatures from the manufacturer/supplier, subcontractor, and primary contractor. The form emphasizes that the General Contractor is responsible for any testing costs and must ensure that the substituted materials meet all original specification requirements without adversely affecting other trades, construction schedules, or warranty conditions.

View the file

Other files

File Type Posted
Culinary_Arts_Modernization_Project.pdf PDF
(11)_Workers_Compensation_Exemption_Declaration_Construction_(1).pdf PDF
13283_Cullinary_Arts_Drawings_9-26-25.pdf PDF
DOJ_Rev._5.08.25_Certification_of_Employee_Background_Check.pdf PDF
(10)_PWC100_DIR_INFO_(1).pdf PDF
(11)_Workers_Compensation_Exemption_Declaration_Construction_(1).pdf PDF
(4)_Drug_and_Tobacco_(1).pdf PDF
(10)_PWC100_DIR_INFO_(1).pdf PDF
(2)_Perfomance_Bond_(1).pdf PDF
(3)_Payment_Bond_Blank_(1).pdf PDF
(4)_Drug_and_Tobacco_(1).pdf PDF
(6)_Safety_Program_A_(1).pdf PDF
DOJ_Rev._5.08.25_Certification_of_Employee_Background_Check.pdf PDF
(2)_Perfomance_Bond_(1).pdf PDF
(3)_Payment_Bond_Blank_(1).pdf PDF
(4)_Drug_and_Tobacco_(1).pdf PDF
(5)_Company_Guarantee_to_Owner_(1).pdf PDF
(6)_Safety_Program_A_(1).pdf PDF
13283_Culinary_Arts_Specifications_9-26-25.pdf PDF
(2)_Perfomance_Bond_(1).pdf PDF
(5)_Company_Guarantee_to_Owner_(1).pdf PDF
13283_Culinary_Arts_Specifications_9-26-25.pdf PDF
13283_Cullinary_Arts_Drawings_9-26-25.pdf PDF
DOJ_Rev._5.08.25_Certification_of_Employee_Background_Check.pdf PDF
(11)_Workers_Compensation_Exemption_Declaration_Construction_(1).pdf PDF
(5)_Company_Guarantee_to_Owner_(1).pdf PDF
13283_Cullinary_Arts_Drawings_9-26-25.pdf PDF
2-Certification_of_Safety_Program_(1).pdf PDF
(10)_PWC100_DIR_INFO_(1).pdf PDF
(1)_Asbestos-Free_Materials.pdf PDF
GC_Construction_Services_Agreement_2019.pdf PDF
(7)_Lead_Containing_176349_(1).pdf PDF
3-Conditional_Waiver_and_Release_(upon_Progress_Payment).pdf PDF
Agree__Hart__Front_End_CM-MP__General_Provisions_OCIP_Rev_6.26.23JF_(Rev_6.21.24_Added_Blue_Beam_Illustration_Method).pdf PDF
Agree__Hart__Front_End_CM-MP__General_Provisions_Rev_6.26.23JF_(Rev_6.21.24_Added_Blue_Beam_Illustration_Method_&_Insurance).pdf PDF
Agree__Hart__Front_End_GC__General_Provisions_Rev_6.26.23JF_(Rev_6.21.24_Added_Blue_Beam_Illustration_Method_&_Insurance).pdf PDF
CM-MP_Construction_Services_Agreement_2019_informal_and_formal_bids_CUPCCAA.pdf PDF
(7)_Lead_Containing_176349_(1).pdf PDF
(7)_Lead_Containing_176349_(1).pdf PDF
3-Conditional_Waiver_and_Release_(upon_Progress_Payment).pdf PDF
4-Unconditional_Waiver_and_Release_(Upon_Progress_Payment).pdf PDF
6-Unconditional_Waiver_and_Release_(Upon_Final_Payment).pdf PDF
Agree__Hart__Front_End_CM-MP__General_Provisions_OCIP_Rev_6.26.23JF_(Rev_6.21.24_Added_Blue_Beam_Illustration_Method).pdf PDF
Agree__Hart__Front_End_GC__General_Provisions_OCIP_Rev_6.26.23JF_(Rev_6.21.24_Added_Blue_Beam_Illustration_Method).pdf PDF
Blank_IRS_W-9_(2024).pdf PDF
GC_Construction_Services_Agreement_2019.pdf PDF
3-Conditional_Waiver_and_Release_(upon_Progress_Payment).pdf PDF
5-Conditional_Waiver_and_Release_(Upon_Final_Payment).pdf PDF
6-Unconditional_Waiver_and_Release_(Upon_Final_Payment).pdf PDF
GC_Construction_Services_Agreement_2019.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FE 12

Project Forms

SUBSTITUTION REQUEST

TO:

PROJECT:

BID PACKAGE:

SPECIFIED ITEM: ____________________________________________________________________

SPECIFICATION SECTION PAGE PARAGRAPH DESCRIPTION

The undersigned requests for your consideration the following product instead of the specified item above:

PROPOSED SUBSTITUTION(S):

REASON FOR PROPOSED SUBSTITUTION:

Attached data includes product description, specifications, drawings, photographs, and performance and test data adequate for evaluation of the request. Applicable portions of the data are clearly identified.

Attached data also includes a description of changes to the Contract Documents which the proposed substitution will require for its proper installation.

The undersigned certifies that the following paragraphs, unless modified by attachments are correct.

1. The proposed substitution does not affect dimensions shown on drawings:

2 The undersigned will pay for changes to the building design, including Architect’s and engineering design, detailing, and construction costs caused by the requested substitution.

3. The proposed substitution will have no adverse effect on other trades, the construction schedule or specified warranty requirements.

4. Maintenance and service parts will be locally available for the proposed substitution.

5. Attach all cost data with explanations if different from Specified or Drawing item. Include in that explanation a discussion on quality or proposed substitution and cost differential.

6. The undersigned will pay for any subsequent changes in incorporating the proposed substitution that were not apparent at the time of approval into the Work, including compensation to the Architect as described in item 2 above.

The undersigned further states that the function, appearance, and quality of the proposed substitution are equivalent or superior to the specified item.

Submitted by: For use by the design consultant:

Signature: Accepted Accepted as noted

Firm: Not Accepted Received too late

Address: By:

Remarks:

Date:

Date:

Telephone:

Fax:______________________________

Attachments: _____________________________

William S. Hart Union High School District Project Number

HART HIGH SCHOOL INFRASTRUCTURE - PHASE 2A

William S. Hart Union High School District Project Number WSH18-01

FE 12

Project Forms

SUBSTITUTION REQUEST

(continued)

SUBSTITUTION WARRANTY

In addition to other requirements, the General Contractor shall warrant in writing that substituted materials shall perform as specified, and assume complete responsibility for same, including responsibility and costs required for modifications to building or other materials or equipment, and any additional coordination with work of other trades. Testing, if required, shall be paid by the General Contractor. The following is an example of the type of Substitution warranty, which shall be executed by the Contractor, on his own letterhead.

SUBSTITUTION WARRANTY

We propose to provide

(Describe items being proposed for substitution) for _______________________________________________________ in lieu of and as (List project name) an equivalent to _________________________________________________________.

(Describe specified product)

As indicated on the drawings and described in Section ____________________________of the Specifications.

We agree to assume the cost of any modifications to other portions of the work as necessary to accommodate our material (s) and system(s).

We hereby warrant that ___________________________________________________ (Provide description) is the equivalent of ________________________________________________________ (Specified product)

In every respect and will perform satisfactorily under the conditions and use indicated on the Drawings and described in the Specifications

Signed: ________________________________ Date __________________________ (Manufacturer/Supplier/Other)

(Subcontractor)

(Contractor)

NOTE: Affix Corporate Seal over Signatures.

SPECIFIED ITEM 1:
SPECIFIED ITEM 2:
SPECIFIED ITEM 3:
SPECIFIED ITEM 4:
SPECIFIED ITEM 5:
PROPOSED SUBSTITUTIONS:
Firm:
Address:
By:
undefined_2:
Date:
Date_2:
Telephone:
Remarks 1:
Remarks 2:
Attachments:
is the equivalent of:
Signed:
Date_3:
Signed_2:
Date_4:
Signed_3:
Date_5:
Text4:
Project Name:
Text7:
Check Box11: Off
Check Box13: Off
Check Box14: Off
Check Box15: Off
Bid Package No:

File details come from the government source that posted it. Updated .