This file contains construction plans for the Solar Pedestrian Crosswalks project (CIP #ST2403) for the Town of Prescott Valley, Arizona, prepared by Lyon Engineering & Surveying, Inc. The project involves constructing sidewalk ramps, installing rectangular rapid flashing beacons (RRFB), signage, and striping at two locations: Skoog Boulevard at the Civic Center and Robert Road/Nace Lane intersection. Key work items include 210 linear feet of sawcut pavement removal, 105 square yards of pavement removal, 96 square yards of curb and sidewalk removal, 81 square yards of 6-inch asphaltic concrete installation, 116 linear feet of curb and gutter, 652 square feet of sidewalk, 5 sidewalk ramps, 4 RRFB assemblies, various striping and crosswalk markings totaling 1,932 linear feet, and associated signage and traffic control measures.
The project specifications indicate that the Town of Prescott Valley will furnish sign posts, signs, and majority of RRFB materials, with contractor bid prices to include only foundations, miscellaneous materials, equipment, and labor for installations. The plans include detailed technical specifications requiring compliance with ADOT standards, MAG specifications, and Town Design and Construction Standards (TDCS), with construction requiring various permits including right-of-way permits and traffic control plans. The RRFB systems feature solar arrays at 45-degree tilt facing south, vandal-resistant ADA compliant button stations, and fluorescent yellow-green pedestrian crossing signs, with different lamp configurations specified for each location (Type 2 dual lamps for Skoog location and Type 4 dual lamps for Robert/Nace location).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3-Submission Instructions - PW250824.pdf | ||
| 2-ST2403 Solar Pedestrian Crosswalks BID Proposal Packet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT
PROJECT
G.01
VICINITY MAP
NOT TO SCALE
PROJECT
A
L
T
A
L
T
ALT
M
O
H
A
V
E
C
O
C
O
N
I
N
O
N
A
V
A
J
O
A
P
A
C
H
E
Y
A
V
A
P
A
I
M
A
R
I
C
O
P
A
Y
U
M
A
G R
E E
N L E
E
P
I
N
A
L
P
I
M
A
SANTA
CRUZ
C
O
C
H
I
S
E
G
R
A
H
A
M
G
I
L
A
L
A
P
Z
LOCATION MAP
NOT TO SCALE
DATE
ACCEPTED BY
GENERAL NOTES
CONTRACTOR CAUTION NOTE
A THOROUGH ATTEMPT AND COORDINATION HAS BEEN COMPLETED WITH THE DRY UTILITY
PROVIDERS TO IDENTIFY EXISTING LOCATIONS AND POTENTIAL CONFLICTS. ALL IDENTIFIED
LINES AND CONFLICTS ARE SHOWN IN THE IMPROVEMENT PLANS. CONTRACTOR TO USE
EXTREME CAUTION REGARDING UNIDENTIFIED EXISTING DRY UTILITY LINES AND CONFLICTS.
PUBLIC WORKS DIRECTOR
EXPIRATION DATE:
THESE PLANS ARE THE COPYRIGHT OF LYON ENGINEERING &
SURVEYING, INC. AND ARE NULL AND VOID 2 (TWO) YEARS AFTER
THE DATE SHOWN ON THE AFFIXED ENGINEERS STAMP OR, IF ANY
ONE OF THE MUNICIPAL, COUNTY, STATE OR FEDERAL CONSTRUCTION
PERMITS EXPIRES. LYON ENGINEERING PRODUCED THESE PLANS
PURSUANT TO THE STANDARD OF CARE AT THE DATE OF THE
ENGINEERS STAMP ON THIS PAGE. ANY EXTENSION TO THE
EXPIRATION DATE OF THESE PLANS IS AT THE SOLE DISCRETION
OF LYON ENGINEERING & SURVEYING, INC.
SHEET INDEX
DESCRIPTION
DWG NO.SHEET NO.
GENERAL
CIVIL
DETAILS
SIGNAGE & STRIPING
A TRAFFIC PHASING PLAN AND A TRAFFIC CONTROL PLAN ARE REQUIRED TO
BE PROVIDED BY THE CONTRACTOR TO THE TOWN FOR REVIEW AND APPROVAL
PRIOR TO THE NTP BEING ISSUED. TOWN OF PRESCOTT VALLEY
RIGHT-OF-WAY PERMITS ARE ALSO REQUIRED PRIOR TO CONSTRUCTION.
A TEMPORARY CONSTRUCTION RIGHT OF ENTRY DOCUMENT IS REQUIRED
FROM PRIVATE PROPERTIES PRIOR TO ANY DISTURBANCE OR CONSTRUCTION.
EFFECTIVE FEMA FIRM IS 04025C2077H, DATED 8/24/2021.
THE PROJECT IS LOCATED IN FEMA FLOOD ZONE X (UNSHADED).
CONTRACTOR IS TO USE EXTREME CAUTION WHEN WORKING NEAR
UNDERGROUND POWER LINES, GAS MAINS, AND OTHER DRY UTILITIES.
ALL EASEMENTS CALLED OUT IN THESE CONSTRUCTION DRAWINGS SHALL
BE DEDICATED BY A RECORDED LEGAL DESCRIPTION UNLESS
OTHERWISE SHOWN AS EXISTING.
SOLAR PEDESTRIAN CROSSWALKS PROJECT
CIP # ST2403
ARIZONA REGISTRATION NO.
DATENAME
TITLE
SUBMITTED BY
47997
CONTACT TELEPHONECOMPANY
UTILITY INFORMATION
(928) 308-1902
(928) 443-6794
(928) 776-2510
2971 Willow Creek Road, Bldg. 2, Prescott, Arizona 86301
Phone: (928) 776-1750, Fax: (928) 776-0605
(928) 759-3070
CENTURYLINK
1445 MASONRY WAY
PRESCOTT, AZ 86301
NEIL WADSWORTH
MAYOR
TOWN COUNCIL
(928) 759-3070
BRIAN A. BUCHOLTZ, P.E., CFM
UNISOURCE ENERGY SERVICES
6405 WILKINSON DRIVE
PRESCOTT, AZ 86301
SPARKLIGHT
3201 TOWER ROAD
PRESCOTT, AZ 86305
KAYLA SAVAGE
MATT ZURCHER
TOWN OF PRESCOTT VALLEY
UTILITIES DEPARTMENT
7501 E. SKOOG BOULEVARD
PRESCOTT VALLEY, AZ 86314
TOWN OF PRESCOTT VALLEY
PUBLIC WORKS DEPARTMENT
7501 E. SKOOG BOULEVARD
PRESCOTT VALLEY, AZ 86314
ARIZONA PUBLIC SERVICE CO.
6672 CORSAIR AVENUE
PRESCOTT, AZ 86301
Contact Arizona 811 at least two full working days before you begin excavation
Call 811 or click Arizona811.com
KELL PALGUTA
MATT ZURCHER
KEN FREUND
PROJECT MANAGER
(928) 759-9062
ETHAN BEYEA
TOWN OF PRESCOTT VALLEY
UTILITIES CONTRACT
OPERATIONS COMPANY:
JACOBS
HEATHER RUDER
KENDALL SCHUMACHER
MICHAEL GREER
JANELL KIEHL
KYMBERLI LOPEZ
LESLIE WARD
(928) 771-7234
SAMANTHA MEYER
(LUMEN)
JULY 2025
DATE
ACCEPTED BY
GENERAL NOTES
CONTRACTOR CAUTION NOTE
A THOROUGH ATTEMPT AND COORDINATION HAS BEEN COMPLETED WITH THE DRY UTILITY
PROVIDERS TO IDENTIFY EXISTING LOCATIONS AND POTENTIAL CONFLICTS. ALL IDENTIFIED
LINES AND CONFLICTS ARE SHOWN IN THE IMPROVEMENT PLANS. CONTRACTOR TO USE
EXTREME CAUTION REGARDING UNIDENTIFIED EXISTING DRY UTILITY LINES AND CONFLICTS.
PUBLIC WORKS DIRECTOR
EXPIRATION DATE:
THESE PLANS ARE THE COPYRIGHT OF LYON ENGINEERING &
SURVEYING, INC. AND ARE NULL AND VOID 2 (TWO) YEARS AFTER
THE DATE SHOWN ON THE AFFIXED ENGINEERS STAMP OR, IF ANY
ONE OF THE MUNICIPAL, COUNTY, STATE OR FEDERAL CONSTRUCTION
PERMITS EXPIRES. LYON ENGINEERING PRODUCED THESE PLANS
PURSUANT TO THE STANDARD OF CARE AT THE DATE OF THE
ENGINEERS STAMP ON THIS PAGE. ANY EXTENSION TO THE
EXPIRATION DATE OF THESE PLANS IS AT THE SOLE DISCRETION
OF LYON ENGINEERING & SURVEYING, INC.
G.01
G.02
G.03
G.04
C.01
C.02
ST.01
ST.02
D.01
D.02
COVER SHEET
GENERAL NOTES
ABBREVIATION AND SYMBOL LEGEND, PROJECT QUANTITIES
SURVEY CONTROL MAP
SKOOG BLVD. CROSSWALK PLAN
ROBERT ROAD / NACE LANE CROSSWALK PLAN
SKOOG BLVD. SIGNAGE & STRIPING PLAN
ROBERT ROAD / NACE LANE SIGNAGE & STRIPING PLAN
SKOOG BLVD. CROSSWALK BLOW-UP PLAN
ROBERT ROAD / NACE LANE CROSSWALK BLOW-UP PLAN
C O
V E
R
S
H E
E T
G E
N E
R A
L
11 D.03 DETAILS
2020 UPDATED TOWN OF PRESCOTT VALLEY BENCHMARKS RP_16 & RP_24
MODIFIED ARIZONA STATE PLANE CENTRAL ZONE 0202 (NAVD88)
RECORDED
RP_16 N: 1,304,718.308 E: 576,808.425 EL: 5108.009 (R)
RP_24 N: 1,307,088.943 E: 574,385.792 EL: 5121.684 (R)
MEASURED
RP_16 N: 1,304,718.308 E: 576,808.425 EL: 5108.009 (M)
RP_24 N: 1,307,088.941 E: 574,385.774 EL: 5121.639 (M)
BENCHMARK
TOWN OF PRESCOTT VALLEY
PUBLIC WORKS DEPARTMENT
DATE
DRAWING NUMBER
SHEET
LYON PROJECT #
OF
523-32
1 64 52 3
REUSE OF DOCUMENTS:
THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF LYON ENGINEERING &
SURVEYING, INC. AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF LYON ENGINEERING & SURVEYING, INC.
JULY 2025
E L
EST. 1995
LYON
E
N G
IN
E
ERING&SURV
E Y
IN
G
,INC.
2971 Willow Creek Road
Bldg. 2
Prescott, AZ 86301
(928) 776-1750 www.LyonEngineering.com
NOT
TO
SCALE
D
C
A
B
N O
D R
A W
N
C H
E C
K E
D
A P
P R
O V
E D
B Y
A P
V D
D E
S I G
N
D A
T E
R E
V I S
I O
N
S A
L
B A
B
B A
B
G
S M
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"
IF NOT ONE INCH ON
THIS SHEET, ADJUST
SCALES ACCORDINGLY
7/8/2025
47997
BRIAN A.
BUCHOLTZ
A
R
I
Z
O
N
A, U
S
A
D a t e
S i g n e d .
C
E
R
T
I
F
ICA
T
E
N
O
BRIAN A. BUCHOLTZ, P.E.
R e g i s t e r e d
P r o f e s s i ona l
E n g i n e e r
C i v i l
C I
S
T
S O
L A
R
P
E D
E S
T R
I A
N
C R
O S
S W
A L K
S
P R
O J E
C T
DATE
DRAWING NUMBER
SHEET
LYON PROJECT #
OF
523-32
1 64 52 3
REUSE OF DOCUMENTS:
THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF LYON ENGINEERING &
SURVEYING, INC. AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF LYON ENGINEERING & SURVEYING, INC.
JULY 2025
E L
EST. 1995
LYON
E
N G
IN
EE
RING&SURV
E Y
IN
G
,INC.
2971 Willow Creek Road
Bldg. 2
Prescott, AZ 86301
(928) 776-1750 www.LyonEngineering.com
NOT
TO
SCALE
D
C
A
B
N O
D R
A W
N
C H
E C
K E
D
A P
P R
O V
E D
B Y
A P
V D
D E
S I G
N
D A
T E
R E
V I S
I O
N
S A
L
B A
B
B A
B
G
S M
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"
IF NOT ONE INCH ON
THIS SHEET, ADJUST
SCALES ACCORDINGLY
7/8/2025
47997
BRIAN A.
BUCHOLTZ
A
R
I
Z
O
N
A, U
S
A
D a t e
S i g n e d .
C
E
R
T
I
F
ICA
T
E
N
O
BRIAN A. BUCHOLTZ, P.E.
R e g i s t e r e d
P r o f e s s i ona l
E n g i n e e r
C i v i l
C
T
S O
L A
R
P
E D
E S
T R
I A
N
C R
O S
S W
A L K
S
P R
O J E
C T
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
ALL STRIPING SHALL BE IN COMPLIANCE WITH THE ADOT SIGNING AND
MARKING STANDARD DRAWINGS AND THE 2009 EDITION OF THE
MANUAL ON THE UNIFORM TRAFFIC CONTROL DEVICES (MUTCD)
INCLUDING THE ARIZONA SUPPLEMENT.
THE PAVEMENT MARKING DRAWINGS ARE SCHEMATIC ONLY AND NOT
TO SCALE. THE CONTRACTOR SHALL FOLLOW ALL DIMENSIONS AND
DETAIL WHEN INSTALLING PAVEMENT MARKINGS AND MARKERS.
THE DIMENSIONS SHOWN TO PAVEMENT MARKING ARE TO THE CENTER
OF THE STRIPING OR IN THE CASE OF DOUBLE STRIPING TO THE
CENTER OF THE DOUBLE STRIPING AND ARE TO THE FACE OF CURB OR
EDGE OF PAVEMENT, UNLESS OTHERWISE NOTED.
THE CONTRACTOR SHALL CLEAN THE ROADWAY SURFACE TO THE
SATISFACTION OF THE ENGINEER, BY SWEEPING AND AIR-JET
BLOWING. IMMEDIATELY PRIOR TO THE PLACEMENT OF ALL PAVEMENT
MARKINGS, THE ROADWAY SURFACE SHALL BE DRY AND THE AIR AND
PAVEMENT TEMPERATURES SHALL NOT BE LESS THAN 40°FOR THE
PLACEMENT OF DUAL COMPONENT (EPOXY) STRIPING. THE AIR AND
PAVEMENT TEMPERATURES SHALL NOT BE LESS THAN 60°FOR THE
PLACEMENT OF TYPE I PAVEMENT MARKINGS.
THE INTERIM STRIPING SHALL BE PAVEMENT MARKING PAINT IN
ACCORDANCE WITH SECTION 708 OF THE ADOT STANDARD
SPECIFICATIONS. THE STRIPING SHALL BE INSTALLED ON THE
ROADWAY SURFACE AFTER THE INSTALLATION OF THE FINAL
PAVEMENT SURFACE AND MAINTAINED UNTIL APPLICATION OF FINAL
STRIPING.
INTERIM STRIPING AND ARROWS SHALL BE 15 MIL (0.015 INCH) THICK
PAINT.
THE CONTRACTOR SHALL APPLY ONE APPLICATION OF WHITE
STANDARD REFLECTORIZED TRAFFIC PAINT AS A TEMPORARY STOP
BAR ON THE SAME DAY THE FINAL SURFACE COURSE COVERS AN
EXISTING STOP BAR.
ALL LEGENDS AND PAVEMENT ARROWS SHALL BE TYPE I PREFORMED
PAVEMENT MARKING TAPE IN ACCORDANCE WITH SECTION 705 OF THE
ADOT STANDARD SPECIFICATIONS.
THE FINAL STRIPING SHALL BE DUAL COMPONENT (EPOXY) MARKING IN
ACCORDANCE WITH SECTION 709 OF THE ADOT STANDARD
SPECIFICATIONS PLACED OVER NEW PAVEMENT 30 CALENDAR DAYS
AFTER COMPLETION OF THE FINAL PAVEMENT SURFACE, AS DIRECTED
BY THE ENGINEER. ALL OTHER MARKINGS SHALL BE APPLIED AT THE
SAME TIME.
ALL FINAL STRIPING OF YIELD LINES AND STOP BARS SHALL BE 90 MIL
(0.090") EXTRUDED TERMOPLASTIC IN ACCORDANCE WITH SECTION 704
OF THE ADOT STANDARD SPECIFICATIONS.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE LAYOUT AND
INSTALLATION OF PERMANENT MARKINGS ON THE FINAL SURFACE
COURSE FOLLOWING CONTROL POINTS THAT HAVE BEEN SET NO
MORE THAN 50 FEET APART ALONG THE LINES TO BE STRIPED. THE
LAYOUT SHALL BE APPROVED BY THE ENGINEER PRIOR TO STRIPING.
THE PERMANENT PAVEMENT MARKING PLANS MAY BE MODIFIED AS
DIRECTED BY THE ENGINEER.
LEGENDS AND PAVEMENTS ARROWS SHALL CONFORM TO THE DETAILS
OF ADOT STD. DWG. M-10 LEGENDS AND PAVEMENT ARROWS SHALL BE
INSTALLED IN ACCORDANCE WITH ADOT STD. DWG M-11.
FOR PAINTED BULL NOSES, SEE ADOT STD. DWG. M-1.
WHEN STRIPE OBLITERATION IS NECESSARY, IT SHALL BE
ACCOMPLISHED BY APPROVED METHODS. PAINTING OVER STRIPING
DOES NOT CONSTITUTE STRIPE OBLITERATION.
ALL RECESSED PAVEMENT MARKERS SHALL HAVE AN
ABRASION-RESISTANT COATINGON THE FACE OF THE PRISMATIC
REFLECTORS AND SHALL CONFORM TO THE DETAILS OF ADOT STD.
DWG. M-19. THEY SHALL BE INSTALLED WITH A BITUMINOUS ADHESIVE
WHICH IS ON THE ADOT APPROVED PRODUCTS LIST.
ALL RECESSED PAVEMENT MARKERS SHALL BE INSTALLED SO THAT
THE REFLECTIVE FACE OF EACH MARKER IS FACING THE DIRECTION OF
TRAFFIC AND IS PERPENDICULAR TO THE DIRECTION OF TRAFFIC
FLOW. TYPE C AND TYPE E PAVEMENT MAKERS SHALL BE INSTALLED
SO THAT THE RED FACE OF EACH MARKER IS FACING AWAY FROM
APPROACHING TRAFFIC. RECESSED PAVEMENT MARKERS SHALL BE
INSTALLED PER ADOT STD. DWG. M-18.
RECESSED PAVEMENT MARKERS SHALL BE INSTALLED 30 DAYS AFTER
COMPLETION OF THE FINAL PAVEMENT SURFACE, OR AS DIRECTED BY
THE ENGINEER.
WHERE RECESSED PAVEMENT MARKERS ARE PLACED ALONG SOLID
STRIPING, THE NEAREST EDGE OF EACH MARKER SHALL BE OFFSET
TWO INCHES FROM THE NEAREST EDGE OF THE STRIPING.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE FINAL
SURFACE COURSE IS PLACED SO THAT THE STRIPING IS OFFSET ONE
FOOT (1'-0") CLEAR OF THE CONSTRUCTION JOINT, UNLESS OTHERWISE
DIRECTED BY THE ENGINEER.
THE CONTRACTOR SHALL PRESERVE ALL EXISTING PAVEMENT
MARKINGS AND RECESSED PAVEMENT MARKERS THAT ARE TO REMAIN,
EXCEPT WHERE NOTED OTHERWISE, AND SHALL REPLACE ANY
PAVEMENT MARKINGS AND RECESSED PAVEMENT MARKERS DAMAGED
AS A RESULT OF THE CONSTRUCTION AT THE CONTRACTOR'S
EXPENSE.
DESCRIPTION OBSERVED SAG
8" to 12" Dia. Pipe
8" to 12" Dia. Pipe
12" to 24" Dia. Pipe
12" to 24" Dia. Pipe
Greater than 24" Dia. Pipe
Pipe entering or exiting manhole
Less than or equal to ½"
Greater than ½" but less than or equal to 1"
Less than or equal to 1"
Greater than 1" but less than or equal to 1 ½"
Greater than 1 ½"
Any Yes
Yes
Yes if longer than 20' or more than 6 occurrences in 100'
None
None
Yes if longer than 10' or more than 3 occurrences in 100'
103.20 Utility Testing
Water, gravity sewer, forced sewer, reclaimed water and storm line testing shall not be accepted unless testing occurs after all underground disturbances and construction is complete. Pre-completion tests are allowed, if the contractor desires such activity, but the Town will not recognize the validity of said tests.
103.21 Utility Adjustments
All frames, covers, valve boxes, and manholes inside the paved surface shall be adjusted to finished grade upon completion of paving or related construction per applicable QCSD. All frames, covers, and valve boxes outside a paved surface shall be adjusted between 6 and 8 inches above finished grade upon completion of related construction per applicable QCSD.
103.22 Defective Materials
All work and materials which do not conform to the required standards, codes and agreements are subject to removal and replacement at no expense to the Town.
103.23 Inspections-
Inspection shall be performed by a qualified representative of an engineer licensed in the State of Arizona. The degree of inspection will be determined at the pre-construction conference. Inspection must meet all requirements set forth by ADEQ, the
State of Arizona, the Town and shall be certified by the EOR. The Town will complete oversight inspection only. The EOR shall provide all certifications and other documentation to the Town prior to acceptance by the Town.
103.24 Plan Expiration
All plans signed/approved by the Town are null and void one year from date of signature if construction has not started unless otherwise approved by the Town.
103.25 Construction Staking
The contractor shall make no claim against the owner, the EOR or surveyor regarding the inaccuracy of construction stakes set forth by the EOR or surveyor, unless all survey stakes set by the EOR or surveyor are maintained intact and can be verified as to their origin. If, in the opinion of the EOR, the stakes are not maintained intact and cannot be verified as to their origin, any remedial work required to correct any item shall be performed at the sole expense of the responsible contractor or subcontractor.
103.26 Warranty
The contractor and/or developer shall provide a warranty for any public project or any project that will be given to the public per agreement(s). The Town’s definition of a warranty includes any workmanship, labor, materials, equipment, sales tax, etc. required to restore a project to acceptance criteria as defined by the plan. The warranty period lasts for a minimum of two (2) years from the date of Town final acceptance of project.
All warranty work shall also conform to all portions of the applicable TDCS, QCSD and project specifications.
103.27 Project Quantities
Quantities and site conditions depicted in these plans are for informational purposes only and may be subject to errors and omissions. Contractors shall satisfy themselves as to actual quantities and site conditions prior to bidding the work for the construction covered by these plans. If any discrepancies in quantities or site conditions are found, the contractor shall notify the EOR. The Town does not warrant any quantities shown on the plans.
103.28 Notifications -
Contractor shall notify the EOR and/or surveyor two working days (48 hours) in advance of any construction to schedule staking.
103.29 Construction Schedule
The contractor shall provide sufficient personnel and equipment on the job at all times during construction to comply with the construction schedule, and specifications to complete work.
103.30 Construction Contract
Nothing contained in the construction contract documents shall create, nor shall be construed to create, any contractual relationship between the EOR and the contractor or any subcontractor.
103.31 Means and Methods
Neither the Town nor the EOR will be responsible for construction means, methods, techniques, sequences, procedures, safety precautions or programs utilized in connection with the work. Neither the Town nor the EOR will be responsible for the contractor’s failure to carry out the work in accordance with the contract documents.
103.32 Existing Utilities
The EOR will not guarantee any elevations or locations of existing underground utilities shown on these plans. Field verification by the contractor will be the sole responsibility of the contractor and shall be verified as deemed necessary by the contractor. Damage resulting from failure to adequately locate utilities, and take necessary precautions to protect them, will be the contractor’s responsibility to correct at no expense to the Town of Prescott Valley.
103.33 Deficiencies or Discrepancies
Failure of the Town to detect deficiencies or discrepancies in the design or construction of these plans shall in no way relieve the developer, EOR or the contractor from their responsibility to conform to all Town requirements. Prior to bidding the work, the contractor shall thoroughly satisfy himself as to the actual conditions, earthwork quantities, requirements of work and deficiencies in earthwork quantities should they exist. No claim shall be made against the Town or EOR for any excess or deficiency therein, actual or relative.
103.34 Plan Interpretation
These plans are subject to interpretation of intent by the EOR. All questions regarding these plans shall be presented to the EOR for clarification in concordance with the
TDCS.
103.35 Construction Water
The contractor must request a hydrant meter from the Town for site construction, filling and testing of waterlines. The meter should be ordered 2 working days prior to the start of construction. The unlawful removal of water from a fire hydrant or any other source is a violation of the Municipal Code, punishable by fine and/or imprisonment.
103.36 As-Built
“As-Built” drawings, certified by the EOR, shall be submitted and approved prior to issuance of a building “Certificate of Occupancy”.
103.37 Landscape
All existing landscape including trees, shrubs and irrigation systems that are designated to remain or are not part of this project, and are damaged during construction, will be replaced in like kind at the expense of the contractor.
103.38 Portable Toilets
No construction material, including portable toilets shall be stored on any portion of any street, sidewalk, right-of-way or easement; or within 50’ of any drainage way.
TOWN OF PRESCOTT VALLEY - GRADING & DRAINAGE NOTES
201.1 Permits
The following apply:
-An on-site grading permit is required.
-A separate permit is required for any off site grading.
201.2 Inspections
Prior to final acceptance, the contractor shall be responsible for cleaning, visual and/or
TV inspection of storm drainage infrastructure per applicable QCSD. The Town and
EOR shall receive copies of applicable documentation for review.
The EOR shall:
-Determine if the required procedures and subsequent documentation were complied with
-Review all documentation and findings for compliance with Town Standards
-Submit a report to the Town with regard to disposition.
The Town will review the EOR supplied report to determine if the product is acceptable prior to project final acceptance.
201.3 On Site Materials
The grading contractor shall designate a location for wasting spoil materials and a letter from the property owner giving permission for said disposal prior to starting on-site construction.
201.4 Easements
No structure of any kind shall be constructed and/or any vegetation planted or allowed to grow within, on or over any drainage easement which would obstruct or divert the flow of storm water.
601.15 Pressure Reducing Valve -
A Pressure Reducing Valve / Pressure Regulator is required for all domestic services if pressure in the public main is 80 psi or higher. Valves / regulators are considered as private property and shall be maintained by the owner. It shall be located on private property, out of easement, downstream of the meter and prior to branching / entry to the property’s plumbing supply.
601.16 Separate Tap -
Domestic and fire lines to a structure must be separately tapped to the water distribution main.
601.17 Backflow
Backflow Prevention requirements are noted per AAC, Town code and applicable
QCSD.
601.18 Testing
Per AAC R18-5-508, all quality control testing shall be performed by the Contractor and observed by the Engineer of Record including but not limited to microbiological, pressure and disinfection testing.
601.19 Water Isolation Valves
1. Valve boxes shall comply per applicable QCSD and be fitted with a Debris Cap per
MAG detail. Handles shall be colored based on AWWA code.
2. Valves shall be Mueller 2360 Series Resilient Wedge Gate Valve, Clow Resilient
Wedge Gate Valve Series 2639-2640 or American Flow Control Series 2500 Resilient
Wedge Gate Valve or an approved equal. Valves shall be new, gate type, bonded resilient seat, non-rising stem, mechanical joint, fuse bonded epoxy coated inside and out, 2 inch operating nut and open counter-clockwise.
TOWN OF PRESCOTT VALLEY - SEWER CONSTRUCTION NOTES
631.1 ADEQ -
ADEQ requirements must be complied with. A specific note referencing AAC R18-5-
502, latest revision, must be on plans that will be approved by ADEQ or their delegated reviewer (Yavapai County).
631.2 Clearance -
Utility clearances shall be maintained in accordance per applicable QCSD.
631.3 Separation -
Water, reclaimed water, and sanitary sewer separation / protection shall be in accordance per applicable QCSD.
631.4 Crossings -
At locations where water/sewer/reclaimed utilities cross, reference AAC and any applicable QCSDs for guidance.
631.5 Air Tests -
Sewer line low pressure air tests shall be done on all lines pursuant to American Society for Testing and Materials (ASTM) Standards.
631.6 Vacuum Tests -
Sewer manhole vacuum testing is required on all new or replacement manholes in accordance with applicable QCSD.
631.7 Deflection Tests -
Sewer line deflection tests shall be done on all PVC lines according to manufacturer’s recommendations.
631.8 Bury Depth -
DIP must be used for bury depth greater than 10 feet.
631.9 Trace Wire -
Trace wire, continuity test and detectable tape required per applicable QCSD.
631.10 ASTM -
PVC sewer pipe and fittings shall be installed pursuant to ASTM standards.
631.11 Manhole Construction
Sewer manhole construction shall be in accordance per applicable QCSD and AAC regulations.
631.12 Sewer Line Sag
Allowable sewer line sag (SAG) is specified per Table 1 - Corrective Action
Requirements for SAG.
Table 1 - Corrective Action Requirements for SAG
631.13 Paving Restrictions -
No paving, road-base, cover, etc shall occur until sewer infrastructure meets SAG and vacuum / low pressure air testing requirements.
631.14 Cleaning and TV Inspection -
Prior to final acceptance, the contractor shall be responsible for cleaning and TV inspection of sewer infrastructure per applicable QCSD. TV inspection shall include both mainline and service laterals. All joints shall require a full 360 degree camera inspection.
Videos submitted without lateral inspection or 360 degree joint inspection shall not be accepted. The Town and EOR shall receive copies of applicable documentation for review. The EOR shall:
1. Determine if the required procedures and subsequent documentation were complied with
2. Review the documentation and findings for compliance with Town Standards
3. Submit a report to the Town with regard to disposition. The Town will review the
EOR supplied report to determine if the product is acceptable prior to project release.
631.15 Groundwater -
If groundwater or other unsuitable conditions are encountered during construction, the
EOR and the Town must be notified and a resolution acceptable to all parties must be agreed on before work continues.
631.16 Manhole Taps -
No sewer service taps will be allowed into a manhole.
631.17 Roach Control -
All new, replacement or refurbished manholes shall be coated with Insecta ® Contact
Pesticide, or approved equal, per pesticide manufacturer’s instructions.
631.18 Con
mic
Shield
New or replacement manholes and appurtenances shall be constructed with
Con mic
Shield
, a liquid antibacterial additive. Specifics concerning Con mic
Shield are noted per applicable QCSD.
631.19 Sewer Connections and Taps
All service lines shall have a separate tap to the main and be in accordance with the applicable MAG and QCSD. For service lines installed on existing mains, the drilled hole shall have smooth rounded edges and be the same size as the service connection such that no ledge or protrusions catch wastewater. All taps shall be inspected by the Town prior to final permanent attachment of the saddle.
631.20 Fittings
Service taps and service lines on new construction shall utilize manufactured fittings; no saddles allowed.
631.21 Electronic Ball Markers
Service lines must include electronic ball markers per MAG and detectable tape per applicable QCSD.
ENGINEER NOTES
TOWN OF PRESCOTT VALLEY - GENERAL CONSTRUCTION NOTES
103.1 Standard Documents
All work to complete the construction covered by these plans shall be in accordance with the latest revision and supplements to:
-The Town Design and Construction Standards (TDCS)
-Specific Development Agreements
-Town Code
-Quad City Standard Detail (QCSD), 2016 Version
-Maricopa Association of Governments (MAG) Standards, 2024 Revision to the
2020 Edition
-Other Standards Listed In The TDCS.
103.2 Laws & Licenses
The contractor must:
-Comply with all local, county, state, and federal laws and regulations applicable to the construction covered by these plans and possess a current Town of Prescott Valley
Business License.
Section 209
103.5 Permits
The owner is responsible for obtaining and complying with all permits required to complete all work covered by these plans. A separate permit will be required for any construction extending beyond the construction site property boundary. A Town
Right-of-Way (ROW) permit and Traffic Control Plan per Section 103.8 will be required for all construction within public ROW and easements.
103.6 Quantities
Any quantities shown on plans are not verified by the Town.
103.7 Plan Revisions
All revisions to original plans must be approved by the Engineer of Record (EOR) and the Town prior to construction. Decisions regarding changes which can be made in the field or at the discretion of the EOR in consultation with the Town versus those which require formal approval by Town engineering staff shall be discussed during the pre-construction conference. Any work not based on approved revisions is subject to removal and/or replacement at no expense to the Town.
103.8 Traffic Control Plan
Contractor is responsible for submitting a traffic control plan to the Town as needed to perform construction activities. Submittal shall be made at least five Town working days
(excluding holidays) prior to commencement of construction. Construction cannot begin until Town approval of the plan is granted. The dynamic nature of traffic related activities may require modification of an approved plan based on Town analysis. If so, the contractor will modify the traffic control plan at no expense to the Town.
103.9 Dust Control
The contractor shall keep suitable equipment on hand at the job site for maintenance and dust control, and shall control dust as directed by the appropriate agencies, including the Town at no expense to the Town.
103.10 Site Cleanliness
The contractor shall keep all roadway pavement, curb and gutter, and sidewalk surfaces free of debris, construction materials, etc during construction and at completion of construction. The site shall at all times remain free of loose trash and debris.
Appropriately sized covered waste receptacles shall be provided onsite and stored a minimum of 50’ from any drainage way or drainage inlet.
103.11 Site Safety
The contractor is responsible for ensuring that construction trenches, holes, depressions, etc. are not left exposed at the end of a work shift. Traffic plates, or other security measures, must be utilized to ensure safe passage over or around all hazards.
The contractor shall barricade the construction site when the site is unattended.
103.12 Excess Materials
Contractor is responsible for all project generated excess. This includes, but is not limited to:
-The removal, transport, permitting, disposal, etc. of any excess vegetation, spoils, materials, debris, etc. generated by a project and any associated costs.
-Spoils must also be cleared from roadways, pathways, open ground, etc. at the end of a work shift if they inhibit conveyance or if safety within the project limits would be compromised.
-Expenses related to excavation and spoil services are the responsibility of the contractor.
103.13 Utility Conflicts
Contractors are responsible for verifying all utilities and underground conflicts in accordance with Arizona Administrative Code (AAC) regulations. This includes:
-Excavation of existing infrastructure to ensure location, size, fittings, depth, alignment, etc.
-Excavation of areas for new infrastructure to ensure location, size, fittings, depth, alignment, etc.
-Excavation of areas to determine conflicts with other utilities or infrastructure, etc.
103.14 Blue Stake
Blue Stake locating services must be performed in advance of any construction and contractor shall observe all possible precautions to avoid any damage to such. The contractor shall contact Arizona Blue Stake two full working days (48 hours) prior to commencement of construction. Dial 8-1-1 or 1-800-STAKE-IT (782-5348). The EOR and/or owner will not guarantee any locations as shown on these plans or those omitted from same. Should any location or elevation differ from that shown on these plans, the contractor shall contact the owner’s agent for coordination.
103.15 Utility Abandonment
Abandonment in place of public utility lines shall be at the discretion of the Town and shall be in accordance per applicable QCSD for Abandoned Utilities.
103.16 Asbestos Cement Pipe
Maintenance, repair or replacement of existing Asbestos Cement Pipe shall be in accordance per applicable QCSD.
103.17 Sewer Inspections
For any construction adjacent to or crossing existing sewer lines, the contractor shall complete a pre and post DVD video inspection per applicable QCSD. Adjacent in this section is defined as less than a 2 foot horizontal separation from new construction. The video inspection shall occur from the next adjacent upstream and downstream manholes beyond all construction activity. If evidence of debris or damage is found, contractor shall make all necessary repairs and additional video inspection shall be completed, as determined by the Town.
103.18 Utility Repairs
The contractor is responsible for repairing damage to existing utilities and/or facilities incurred during any construction operations.
103.19 Inspections
The contractor shall notify the EOR and Town Public Works Department (928-759-
3070) at least two working days (48 hours) in advance of construction for inspection.
TOWN OF PRESCOTT VALLEY - TRANSPORTATION NOTES
301.1 Sweeping
No project will be considered ready for final acceptance until all curb, roadways, medians, sidewalks and any other impacted ROW areas have been swept clean of all dirt and debris.
301.2 Subgrade Inspection
Base course shall not be placed on subgrade until subgrade requirements have been inspected and accepted by the EOR.
301.3 Utility Work
No ABC placement or paving construction shall be started until all underground utilities work within the roadway prism are completed and tested.
301.4 Asphalt Concrete
All AC shall be per applicable MAG Specifications or identified by EOR, unless another specification is approved by the Town. Mix design shall be submitted prior to start of construction.
TOWN OF PRESCOTT VALLEY - WATER CONSTRUCTION NOTES
601.1 ADEQ Requirements -
ADEQ requirements must be complied with for all aspects of construction as minimum standards. Town standards may impose additional or more strict requirements. A specific note referencing AAC R18-5-502, latest revision, must be on plans that will be approved by ADEQ or their delegated reviewer (Yavapai County).
601.2 Clearance -
Utility clearances shall be maintained in accordance per applicable MAG/QCSD.
601.3 Separation -
Water and sanitary sewer separation / protection shall be in accordance per applicable
MAG/QCSD. Concrete encasement of water lines is not allowed unless approved by the
Town.
601.4 Connections -
The contractor shall be required to install a connection at night between 10 pm and 5 am, Monday thru Thursday, excluding holidays, for any new waterline that will affect existing service. No service interruption shall last longer than 4 hours without approval of the Town and a minimum of 48 hours’ notice is required prior to any service interruption. Shutdowns shall be coordinated with the Town and its water operations contractor.
601.5 ANSI / NSF -
All components that come into contact with potable water will meet ANSI / National
Sanitation Foundation (NSF) Standard 61 and bear the ANSI / NSF Standard 61 seal as required by AAC.
601.6 Disinfection -
Disinfection and testing of components not applicable to ADEQ Engineering Bulletin No.
8 shall be disinfected and flushed as follows:
1. Swabbing of all components is required. A 25 Parts per Million (PPM) Sodium
Hypochlorite Free Chlorine solution must be applied to all interior surfaces including valves, flex couplings, pipe segments or other infrastructure just prior to their installation.
2. System flushing shall be conducted from the nearest fire hydrant, BOA, or similar appurtenance.
3. Discharge in accordance with AZPDES regulations.
601.7 Pressure and Leakage Test -
Water mains and appurtenances shall be subject to a pressure and leakage test in accordance with MAG and American Water Works Association (AWWA) standards.
However, test pressure shall be a minimum of 200 psi or 150% of the working pressure in the pipe whichever is greater. The working pressure will be based on the lowest elevation/highest pressure point in the main, whichever is greater.
601.8 Trace Wire -
Trace wire, continuity test, and detectable tape required per applicable QCSD.
601.9 Asbestos Cement Pipe -
Removal or replacement of existing Asbestos Cement Pipe (ACP) shall be in accordance per applicable QCSD.
601.10 Hot Tap -
Hot taps are an exclusive function of the Town and performed by the Town’s Contract
Operations Company. Contractor is responsible for trenching / clearance per applicable
QCSD.
601.11 Valve Operation -
Existing system valves shall be operated by Town authorized personnel only.
601.12 Water Meter Installation -
A water meter shall be approved for installation only after the following conditions have been met:
1. New subdivisions: ATO or ADEQ documentation submitted to the Town from the
EOR that states that an ATO is not required.
2. New subdivisions: Water infrastructure must have been inspected and approved by the EOR and Town.
3. Water meter and water service request fees must be paid.
4. Water meter boxes and line setters must receive a building inspection approval through the building permit process. The water service line between the meter and the structure must extend a minimum of 5 feet away from the meter in order to receive the inspection.
5. Once the water meter has been set, no disturbance of the meter, line setter, box or ground within 5 feet shall occur. Any disturbance to the meter, meter box or line setter will result in damage and/or tampering fee per Town Customer Accounts Regulations.
6. Approved backflow protection has been installed if required per Town code and applicable QCSD.
601.13 Waterline Services
Waterline services up to and including the meter, meter box and the transition fitting on the discharge/customer side of the setter (tailstock) are public facilities and must be placed in easement or ROW per applicable QCSD.
601.14 Water Meters -
All water meter boxes not surrounded by or immediately adjacent to paved surface or curb shall be at least 3 inches above any finished grade within 3 feet of the box. Boxes immediately adjacent to paved surfaces or curbs shall be the same height as the adjacent pavement or curb.
G.02
G E
N E
R A
L
N
O T
E S
G E
N E
R A
L
The following Arizona Department of Environmental Quality (ADEQ) requirements shall be complied with: -A Storm Water Pollution Prevention Plan (SWPPP) is required under
The Arizona Pollutant Discharge Elimination System General Permit (AZPDES) for all projects that involve disturbance of an area that is more than 1 acre and shall be submitted to the Town for review. This should include a list of Best Management
Practices (BMPs) and should be in book/binder form. -A Notice of Intent (NOI) must be submitted to ADEQ that references the SWPPP. -A Notice of Termination (NOT) shall be submitted to ADEQ once 70% of disturbed land has been successfully re-vegetated following project completion. The Town shall receive notification and copies when the
NOI and NOT have been submitted to ADEQ.
ENGINEER'S PAVEMENT MARKING GENERAL NOTES
CORRECTION ACTION REQUIRED
The SWPPP required per of the TDCS shall be submitted by the Operator of the construction site according to guidelines set forth by ADEQ. The Operator can be the owner, developer, general contractor or individual contractor responsible for operational control. The SWPPP and any erosion control plans shall be amended as necessary during the course of construction to resolve any problem areas, which become evident during construction, routine inspections, and/or periods of rainfall. If it is determined that current controls are not effective at minimizing pollutant discharges from the site, immediate efforts shall be made to correct the problem within 72 hours and/or prior to the next rain event. The amended plan shall be maintained on- site.
103.4 SWPPP
103.3 Environmental Controls - A. Pavement shall include a Chip Seal Coat installed per MAG and the following: -For
Arterial and Collector streets, chip seal shall be “High Volume Single Chip Seal” using modified asphalt binder containing crumb rubber, polymer or combination of the two or approved equal spread at 0.50 gal/sy with ½ inch High Volume chip at 32 lbs/sy. -For
Local, commercial and residential streets, chip seal shall be “Low Volume Single Chip
Seal” using CRS-2P spread at 0.40 gal/sy with 3/8 inch Low Volume Chip at 25 lbs/sy.
B. All streets shall be swept the same day as application. Curbed streets require a pickup broom to remove excess chips. Use of a kick broom is acceptable on streets without curbs upon approval of the Town.
C. All survey monuments, boxes, manholes, frames, valve, lids, etc. shall be protected from chip seal operations and shall be adjusted to finished asphalt or curb grades after placement of surface course and prior to chip seal by the contractor per applicable
QCSD.
D. No chip seal construction will be allowed between September 1st and May 30th.
E. Chip seal shall be placed only when the roadway surface is dry and there is no threat of rain. The ambient temperature must be 70 degrees F and rising before chip seal operations begin.
F. Fog seal coat shall be applied to chip seal after sweeping is completed. The material to be used for fog seal coat shall be SS-1H, CSS-1H, or CQC-1H, diluted at a 1:1 ratio, and applied at a rate of 0.10 gal/sy, or as directed by EOR.
G. No chip seal operation shall be considered complete or acceptable for payment until inspected and accepted by the Town.
A Traffic Control Plan shall be submitted to the Town’s Traffic Engineer. Traffic Control shall meet approval prior to construction per Section 103.8.
301.5 Chip Seal
301.6 Traffic Control
NO GEOTECHNICAL REPORT HAS BEEN COMPLETED FOR THIS PROJECT.
THE INTENT OF THE SIDEWALK RAMP DESIGNS IS TO BE FULLY COMPLIANT
WITH ADA GRADES AND SLOPES. COORDINATE WITH ENGINEER IF RAMP
REDESIGNS ARE NECESSARY.
EXISTING VEGETATION AND/OR LANDSCAPING SHOULD BE REMOVED
WITHIN PROJECT IMPROVEMENT LIMITS. CONTRACTOR TO REPLACE
ANY IRRIGATION LINES/EMITTERS BROKEN OR DAMAGED DUE TO
PROJECT IMPROVEMENTS.
EACH “YIELD TRIANGLES” QUANTITY SHALL BE CONSIDERED AS THE
AMOUNT REQUIRED TO BE INSTALLED PER PLAN AT EACH LOCATION
CALLED OUT, REGARDLESS OF THE NUMBER OF LANES COVERED.
THE YIELD TRIANGLES SHALL BE 24” X 36” WITH A 12” GAP.
THE TOWN OF PRESCOTT VALLEY WILL FURNISH THE SIGN POSTS,
SIGNS, AND THE MAJORITY OF RRFB MATERIALS FOR THIS PROJECT.
THE BID UNIT PRICE SHOULD ONLY INCLUDE FOUNDATIONS AND
MISCELLANEOUS MATERIALS, EQUIPMENT, AND LABOR FOR
INSTALLATIONS. SEE THE PROJECT TECHNICAL SPECIFICATIONS
FOR DETAILS.
UNITSDESCRIPTION OF ITEM
PROJECT QUANTITIES
TOTAL
QUANTITY
ROADWAY
REMOVALS
MISCELLANEOUS
PAY ITEM
SPEC. NO.
MAG 336
MAG 350
MAG 350
MAG 321
MAG 340
MAG 340
MAG 340
SW 901
ADOT 704
MAG 401
MAG 106
1,932
LF
SY
SY
SY
LF
SF
EA
LF
LF
LF
LS
BID
ITEM NO.
SIGNAGE & PAVEMENT MARKINGS
Sawcut Existing Pavement
Remove Pavement
Remove Existing Curb and Sidewalk
6" Asphaltic Concrete, Type C 3/4"
6" Vertical Curb & Gutter
Sidewalk
Sidewalk Ramp
Trench Grate
High-Visibility Thermoplastic Crosswalk Marking (4" Equiv.)
Thermoplastic No Parking Striping (4" Equiv.)
Traffic Control
Quality Control
SW 902 RRFB Assembly 4 EA
ADOT 607 Sign Post 4 EA
MAG 310 81 SY10" Aggregate Base
ADOT 608 10 EA
ADOT 701 Obliterate Existing Striping (4" Equiv.) 398 LF
19 2 LS
ROBERT-NACE
LOCATION
1,065
SKOOG
LOCATION
ADOT 705 22(Type IV)
285 LFStandard Thermoplastic Crosswalk Marking (4" Equiv.) 2850
ADOT 704
ADOT 704
Sign
Preformed Thermoplastic Symbol for Yield Triangles EA SET
DATE
DRAWING NUMBER
SHEET
LYON PROJECT #
OF
523-32
1 64 52 3
REUSE OF DOCUMENTS:
THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF LYON ENGINEERING &
SURVEYING, INC. AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF LYON ENGINEERING & SURVEYING, INC.
JULY 2025
E L
EST. 1995
LYON
E
N G
IN
E
ERING&SURV
E Y
IN
G
,INC.
2971 Willow Creek Road
Bldg. 2
Prescott, AZ 86301
(928) 776-1750 www.LyonEngineering.com
NOT
TO
SCALE
D
C
A
B
N O
D R
A W
N
C H
E C
K E
D
A P
P R
O V
E D
B Y
A P
V D
D E
S I G
N
D A
T E
R E
V I S
I O
N
S A
L
B A
B
B A
B
G
S M
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"
IF NOT ONE INCH ON
THIS SHEET, ADJUST
SCALES ACCORDINGLY
7/8/2025
47997
BRIAN A.
BUCHOLTZ
A
R
I
Z
O
N
A, U
S
A
D a t e
S i g n e d .
C
E
R
T
I
F
ICA
T
E
N
O
BRIAN A. BUCHOLTZ, P.E.
R e g i s t e r e d
P r o f e s s i ona l
E n g i n e e r
C i v i l
C
T
S O
L A
R
P
E D
E S
T R
I A
N
C R
O S
S W
A L K
S
P R
O J E
C T
G.03
A B
B R
E V
I A
T I O
N S
S Y
M B
O
E G
E N
D
P R
O J E
C
Q
U A
N T
I T
I E
S
PLANS SYMBOL LEGEND
NOTE:
ALL QUANTITIES SHOWN ON THE PLANS ARE
APPROXIMATE, ARE NOT VERIFIED BY THE
PUBLIC WORKS DIRECTOR, AND ARE
FURNISHED SOLELY FOR THE CONTRACTOR'S
CONVENIENCE. THEY DO NOT NECESSARILY
CORRESPOND TO ALL BID SCHEDULE ITEMS.
PAYMENT SHALL BE BASED ON BID SCHEDULE
ITEMS FOR ACTUAL QUANTITIES PROVIDED
AND INSTALLED. THE CONTRACTOR SHALL
NOT BE RELIEVED OF HIS RESPONSIBILITY
FOR INDEPENDENTLY ESTIMATING WORK
QUANTITIES PRIOR TO BIDDING.
ROAD, DRAINAGE, WATER, & SEWER
DRAINAGE CULVERT
HEADWALL
HYDROSEED
RIPRAP
GROUTED RIPRAP
EROSION MATTRESS
BARBED WIRE FENCE
UTILITIES
A.B.C. AGGREGATE BASE COURSE
AC ACRE
ADOT ARIZONA DEPARTMENT OF TRANSPORTATION
APPROX. APPROXIMATELY
APS ARIZONA PUBLIC SERVICE
ARV AIR RELEASE VALVE ASSEMBLY
BK. BOOK
BO BLOW OFF
BOC BACK OF CURB
C CONCRETE ELEVATION
CMP CORRUGATED METAL PIPE
CO CLEAN OUT
CONC. CONCRETE
CY CUBIC YARDS
DET. DETAIL
DIP DUCTILE IRON PIPE
DS DRAINAGE SLOPE
DVWY DRIVEWAY
DWG DRAWING
EL ELEVATION
EOP EDGE OF PAVEMENT
ESMT EASEMENT
EX. EXISTING
FG FINISH GRADE ELEVATION
FH FIRE HYDRANT
FL FLOW LINE ELEVATION
G.V.B.&C. GATE VALVE BOX & COVER
HW HEADWALL
IE INVERT ELEVATION
L LENGTH
LF LINEAR FEET
LS LUMP SUM
LT LEFT
MAG MARICOPA ASSOCIATION OF GOVERNMENTS
MAX. MAXIMUM
MH MANHOLE
MIN. MINIMUM
P PAVEMENT GRADE
PG. PAGE
PL PROPERTY LINE
ROW RIGHT-OF-WAY
RIM RIM GRADE
ROW RIGHT-OF-WAY
RT RIGHT
S SEWER
SD STORM DRAIN
SF SQUARE FOOT
SPEC SPECIFICATIONS
STD STANDARD
SW SIDEWALK
SY SQUARE YARDS
TYP TYPICAL
VG VALLEY GUTTER
W POTABLE WATER
W/ WITH
ABBREVIATION LEGEND
STRIPING
EXISTING WATER
EXISTING SEWER
EXISTING OVERHEAD POWER
EXISTING UNDERGROUND POWER
EXISTING GAS
EXISTING TELEPHONE
EXISTING CABLE
EXISTING FIBER OPTIC
SHORT LINE PAVEMENT MARKINGS
LONG LINE PAVEMENT MARKINGS
SYMBOL PAVEMENT MARKINGS
G E
N E
R
F
T
N
E
PT. NO.: 41023
DESC: FOUND CENTERLINE MONUMENT
N:1,308,699.665
E:574,886.817
EL=5,101.092
F
T S
W
F
T
S
E
F
T
S
E
CENTER OF SECTION 14
PT. NO.: 24
DESC: RP-24/FBC
N:1,307,088.943
E:574,385.793
EL=5,121.684
PT. NO.: 41002
DESC: FOUND NAIL
N:1,308,835.707
E:574,671.138
EL=5,104.404
QUARTER
SECTION
LINES
PT. NO.: 16
DESC: RP-16/BASE
N:1,304,718.309
E:576,808.426
EL=5,108.009
14 13
PT. NO.: 2560
DESC: FOUND PK NAIL & WASHER, RCE 53890
N:1,310,380.415
E:578,282.723
EL=5,057.872
F
T
S
W
F
T
S
W
F
T
S
W
F
T
S
W
PT. NO.: 5002
DESC: FOUND CAPPED REBAR, RCE 12005
N:1,310,191.424
E:577,776.077
EL=5,063.053
NORTH LINE
OF SECTION 14
PT. NO.: 24
DESC: RP-24/FBC
N:1,307,088.943
E:574,385.793
EL=5,121.684
PT. NO.: 16
DESC: RP-16/BASE
N:1,304,718.309
E:576,808.426
EL=5,108.009
14 13
DATE
DRAWING NUMBER
SHEET
LYON PROJECT #
OF
523-32
1 64 52 3
REUSE OF DOCUMENTS:
THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF LYON ENGINEERING &
SURVEYING, INC. AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF LYON ENGINEERING & SURVEYING, INC.
JULY 2025
E L
EST. 1995
LYON
E
N G
IN
E
ERING&SURV
E Y
IN
G
,INC.
2971 Willow Creek Road
Bldg. 2
Prescott, AZ 86301
(928) 776-1750 www.LyonEngineering.com
D
C
A
B
N O
D R
A W
N
C H
E C
K E
D
A P
P R
O V
E D
B Y
A P
V D
D E
S I G
N
D A
T E
R E
V I S
I O
N
S A
L
B A
B
B A
B
G
S M
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"
IF NOT ONE INCH ON
THIS SHEET, ADJUST
SCALES ACCORDINGLY
7/8/2025
47997
BRIAN A.
BUCHOLTZ
A
R
I
Z
O
N
A, U
S
A
D a t e
S i g n e d .
C
E
R
T
I
F
ICA
T
E
N
O
BRIAN A. BUCHOLTZ, P.E.
R e g i s t e r e d
P r o f e s s i ona l
E n g i n e e r
C i v i l
C
T
0 10050
DRAWING SCALE
1" = 100 ft
(This scale is valid for
22"x34" sheets only)
S O
L A
R
P
E D
E S
T R
I A
N
C R
O S
S W
A L K
S
P R
O J E
C T
G.04
S K
O O
G
B
L V
D
R O
B E
R T
R
D
N
C
E
L N
S U
R V
Y
N
T R
M
P
G E
N E
R A
L
SKOOG BLVD.
ROBERT RD. & NACE LN.
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
S
S
G
G
T
T
T
T
T
T
T
T
T
T
T
20' WATER EASEMENT
BK 4821 O.R., PG 872, YCR
REMOVE
CURB &
GUTTER
SEE "SEE "SKOOG BLVD. - SOUTH"
BLOW-UP ON DWG. D.01
SEE "SKOOG BLVD. - NORTH"
BLOW-UP ON DWG. D.01
EX. 8' PUE
BK 4821 O.R., PG 872, YCR
132 SF
SIDEWALK
WARNING PANEL
50 LF
SAWCUT
SIDEWALK RAMP
7 LF
CURB & GUTTER
14A
9 LF
TRENCH GRATE
20 LF
TRENCH GRATE
98 SF
SIDEWALK
SIDEWALK RAMP
7 LF
CURB & GUTTER
14A
CONSTRUCT
6" CURB
20 LF
SAWCUT
REMOVE EX.
SIDEWALK &
INSTALL NEW
5 LF
CURB & GUTTER
14A
R=18.5'
2 LF
CURB & GUTTER
14A
3 LF
CURB & GUTTER
14A
RIGHT-OF-WAY
RIGHT-OF-WAY
R=4'
R=10'
R=7'
REMOVE EX.
SIDEWALK AT
EX. JOINT
REMOVE EX.
SIDEWALK AT
EX. JOINT
SIDEWALK RAMP
REMOVE SPANDREL & REPOUR MONOLITHICALLY
W/ C&G, DOWEL IN EXISTING GUTTER PAN W/ 2~
#4 REBAR 18" LONG EPOXIED INTO GUTTER PAN
(EVENLY SPACED)
CONSTRUCT SIDEWALK
PER QUAD CITY STD. DET. 230Q;
MATCH EXISTING GRADES
INSTALL DETECTABLE
WARNING PANELS
PER QUAD CITY STD. DET. 231Q;
MATCH EXISTING GRADES AT
EDGE OF PAVEMENT
ROADWAY & DRAINAGE
IMPROVEMENT KEY NOTES
SAWCUT & REMOVE 2' WIDE
STRIP OF EX. PAVEMENT &
PREP FOR 10" AB & 6" AC FOR
THESE PATCH AREAS
PER PVT-1 ON DWG. NO. D.03
CONSTRUCT SIDEWALK RAMP
PER GRADES & GEOMETRY
AS SHOWN ON DWG. D.01
INSTALL EVERGRATE T-14
TRENCH GRATE OR APPROVED
EQUAL OVER FORMED
CONCRETE TRENCH DRAIN,
ENSURING POSITIVE FLOW
14A
CONSTRUCT CURB & GUTTER
TYPE A PER QUAD CITY STD.
DET. 220Q-1
CONSTRUCT LOCAL STREET
SIDEWALK RAMP PER QCSD
STD. DET. 231Q & GRADES
& GEOMETRY AS SHOWN ON
DWG. D.01
NOTES:
AERIAL IMAGE AND 1' EXISTING
TOPOGRAPHY (NAVD 1988) ARE
FROM LYON ENGINEERING'S
DRONE FLIGHT COMPLETED
ON SEPTEMBER 26, 2024.
A THOROUGH ATTEMPT HAS
BEEN MADE TO ACCURATELY
PRESENT EXISTING WATER,
SEWER, AND DRY UTILITY LINES
FOR THE PROJECT AREA.
DATE
DRAWING NUMBER
SHEET
LYON PROJECT #
OF
523-32
1 64 52 3
REUSE OF DOCUMENTS:
THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF LYON ENGINEERING &
SURVEYING, INC. AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF LYON ENGINEERING & SURVEYING, INC.
JULY 2025
E L
EST. 1995
LYON
E
N G
IN
E
ERING&SURV
E Y
IN
G
,INC.
2971 Willow Creek Road
Bldg. 2
Prescott, AZ 86301
(928) 776-1750 www.LyonEngineering.com
D
C
A
B
N O
D R
A W
N
C H
E C
K E
D
A P
P R
O V
E D
B Y
A P
V D
D E
S I G
N
D A
T E
R E
V I S
I O
N
S A
L
B A
B
B A
B
G
S M
0 10
DRAWING SCALE
1" = 10 ft
(This scale is valid for
22"x34" sheets only)
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"
IF NOT ONE INCH ON
THIS SHEET, ADJUST
SCALES ACCORDINGLY
7/8/2025
47997
BRIAN A.
BUCHOLTZ
A
R
I
Z
O
N
A, U
S
A
D a t e
S i g n e d .
C
E
R
T
I
F
ICA
T
E
N
O
BRIAN A. BUCHOLTZ, P.E.
R e g i s t e r e d
P r o f e s s i ona l
E n g i n e e r
C i v i l
C
T
S O
L A
R
P
E D
E S
T R
I A
N
C R
O S
S W
A L K
S
P R
O J E
C T
C.01
S K
O O
G
B
L V
D
V
N
T E
R
C R
O S
S W
A L
K
P
L A
N
C I V
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
E
E
E
E
E
E
E
E
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
T
T
T
T
T
T
T
T
T
T
SEE "ROBERT RD. - WEST"
BLOW-UP ON DWG. D.02
SEE "ROBERT RD. - EAST"
BLOW-UP ON DWG. D.02
47 LF
SAWCUT
10 LF
CURB & GUTTER
14A
5 LF
CURB & GUTTER
14A
22 SF
SIDEWALK
44 SF
SIDEWALK
75 SF
SIDEWALK
SIDEWALK RAMP
REMOVE CURB
& GUTTER
REMOVE SIDEWALK
R=28.5'
RIGHT-OF-WAY
RIGHT-OF-WAY
SIDEWALK RAMP
ADD LANDSCAPEING
PER PROJECT SPECS.
ADD LANDSCAPEING
PER PROJECT SPECS.
REMOVE EX.
SIDEWALK AT
EX. JOINT
REMOVE EXIST.
SIDEWALK AT
EX. JOINT
REMOVE EXIST.
SIDEWALK AT
EX. JOINT
TRIM ALL VEGETATION
TO 6" BEYOND BACK
OF CURB
PROPOSED
EASEMENT LINE
PROPOSED EASEMENT LINE
CROSSWALK
62 LF
SAWCUT
15 LF
CURB & GUTTER
14A
15 LF
CURB & GUTTER
14A
REMOVE CURB
& GUTTER
REMOVE SIDEWALK
R=18.5'
REMOVE EX. SIGN
EX. "STOP" /
STREET NAMES
SIGN TO REMAIN
S
ENSURE POSITIVE
FLOWLINE
NOTES:
AERIAL IMAGE AND 1' EXISTING
TOPOGRAPHY (NAVD 1988) ARE
FROM LYON ENGINEERING'S
DRONE FLIGHT COMPLETED
ON SEPTEMBER 26, 2024.
A THOROUGH ATTEMPT HAS
BEEN MADE TO ACCURATELY
PRESENT EXISTING WATER,
SEWER, AND DRY UTILITY LINES
FOR THE PROJECT AREA.
ROADWAY & DRAINAGE
IMPROVEMENT KEY NOTES
CONSTRUCT SIDEWALK
PER QUAD CITY STD. DET. 230Q;
MATCH EXISTING GRADES
SAWCUT & REMOVE 2' WIDE
STRIP OF EX. PAVEMENT &
PREP FOR 10" AB & 6" AC FOR
THESE PATCH AREAS
PER PVT-1 ON DWG. NO. D.03
CONSTRUCT LOCAL STREET
SIDEWALK RAMP PER QCSD
STD. DET. 231Q & GRADES
& GEOMETRY AS SHOWN ON
DWG. D.02
DATE
DRAWING NUMBER
SHEET
LYON PROJECT #
OF
523-32
1 64 52 3
REUSE OF DOCUMENTS:
THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF LYON ENGINEERING &
SURVEYING, INC. AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF LYON ENGINEERING & SURVEYING, INC.
JULY 2025
E L
EST. 1995
LYON
E
N G
IN
E
ERING&SURV
E Y
IN
G
,INC.
2971 Willow Creek Road
Bldg. 2
Prescott, AZ 86301
(928) 776-1750 www.LyonEngineering.com
D
C
A
B
N O
D R
A W
N
C H
E C
K E
D
A P
P R
O V
E D
B Y
A P
V D
D E
S I G
N
D A
T E
R E
V I S
I O
N
S A
L
B A
B
B A
B
G
S M
0 10
DRAWING SCALE
1" = 10 ft
(This scale is valid for
22"x34" sheets only)
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"
IF NOT ONE INCH ON
THIS SHEET, ADJUST
SCALES ACCORDINGLY
7/8/2025
47997
BRIAN A.
BUCHOLTZ
A
R
I
Z
O
N
A, U
S
A
D a t e
S i g n e d .
C
E
R
T
I
F
ICA
T
E
N
O
BRIAN A. BUCHOLTZ, P.E.
R e g i s t e r e d
P r o f e s s i ona l
E n g i n e e r
C i v i l
C
T
S O
L A
R
P
E D
E S
T R
I A
N
C R
O S
S W
A L K
S
P R
O J E
C T
C.02
R O
B E
R
D
C
E
L
N
C R
O S
S W
A L
K
P
L A
N
C I V
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .