About this file
This is a Request for Proposals (RFP) issued by the City of Orem, Utah, for qualified and licensed seal coat contractors to apply seal coating to various city-owned parking areas and trails. The project encompasses seven locations with a combined total of approximately 774,451 square feet, including Bonneville Park (10,950 sq ft), Public Works Parking & Facility (269,989 sq ft), Geneva Park (20,485 sq ft), IHC Fields Parking & Trail (53,332 sq ft), Sharon Park (10,299 sq ft), Cascade Park Basketball Court (3,389 sq ft), and Water Reclamation Treatment Facility (406,007 sq ft). Contractors must complete all work by September 30, 2026. Proposal documents are available beginning May 12, 2026, through the Utah.bonfirehub.com portal, with sealed proposals due by 4:00 PM on Tuesday, June 2, 2026. No bidders' conference or site visit requirements are specified in the RFP.
Contractors must provide pricing on a per-square-foot basis with a two-coat application at an application rate of 30 square feet per gallon, and all traffic control costs must be included in the price. Prior to seal coat application, contractors are required to remove all weeds, dirt, debris, and brush and clean all asphalt surfaces. Seal coat application is restricted to conditions where pavement and air temperatures are 55°F and rising, and work cannot occur within 24 hours of forecasted rain or during wet weather. The first coat must be applied by squeegee unless spray application is approved by the project manager, and contractors may determine the application method for the second coat. All proposals must include the seal coat specification to be used on the project. Contractors must provide payment and performance bonds upon notice of award and coordinate work schedules with city staff and the parks section manager to accommodate public events. Striping, red curbing, and thermoplastic heat tape are not required as part of this proposal. Pricing elements are not subject to confidentiality protection under Utah's Government Records Access and Management Act.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF OREM
REQUEST FOR PROPOSALS
DESCRIPTION OF WORK: The City of Orem is accepting sealed proposals from qualified and licensed Seal Coat Contractors for the application of a seal coat at various city owned parking and trail areas. The areas include approximately 10,950 square feet at Bonneville Park, approximately 269,989 square feet at Public Works Parking & Facility, approximately 20,485 at Geneva Park, approximately 53,332 square feet at the IHC fields parking & trail, approximately 10,299 square feet at Sharon Park, approximately 3,389 square feet at Cascade Park basketball court, and approximately 406,007 square feet at the Water Reclamation Treatment Facility. The total project area is approximately 774,451 square feet.
Contractor will be required to remove all weeds, dirt, debris, brush and clean off all asphalt areas prior to application of new seal coat. Application of the seal coat will only be allowed when pavement and air temperature is 55°F and rising. Do not apply within 24 hours of forecasted rain or in wet weather conditions. Contractor is required to complete this project before September 30, 2026. The application rate will be 30 square feet per gallon for a two-coat application. Seal coat costs will be per square foot, contractor to include all traffic control costs in this price.
Contractor is required to squeegee the first seal coat application unless spray is approved by Project Manager. The application method for the second coat will be determined by the contractor. All proposals must include a seal coat specification that the contractor will be using for this project. Striping, red curbing and thermoplastic heat tape is not required as part of this proposal. Contractor is required to coordinate work with city staff, parks section manager, etc. to work around any public events. Contractor is required to provide payment and performance bonds with notice of award.
PROTECTED INFORMATION: Under the Government Records Access and Management Act, Utah Code § 63G-2-101 et seq. (GRAMA), certain information in the proposal submitted may be open for public inspection. If the Applicant desires to have information contained in its proposal protected from such disclosure, the Applicant may request such treatment by providing a “written claim of business confidentiality and a concise statement of reasons supporting the claim of business confidentiality” with the proposal (See Utah Code § 63G-2-305 and 309).
Pricing elements of any proposal will not be considered protected. A business confidentiality claim form is available on the Utah State Records Committee website at:
http://archives.utah.gov/recordsmanagement/forms/GRAMA-business-confidentiality.pdf
OBTAINING PROPOSAL DOCUMENTS: Proposal documents will be available May 12, 2026 at utah.bonfirehub.com (select the search bar > enter “City of Orem” > Enter).
RECEIPT OF PROPOSALS: Sealed proposals will then be accepted online at Utah.bonfirehub.com or at Community Development, 56 North State Street, Orem, Utah 84057 until 4:00 pm on Tuesday, June 2, 2026. Proposals submitted after this deadline will be rejected.
Esri, NASA, NGA, USGS, FEMA
E as t
W est 860 South
750 East
680 South
200 North
800 South
Ea st
280 East
40 South
W es t
Ea st
W es t
Ea st
570 North
Ea st
W es t
W es t
970 North
675 North
100 W est
Ea st
50 West
650 South
W es t
1600 W est
W es t
760 W est
840 North
600 North
1000 North
1140 North
640 North
W es t 950 North
W est
E as t
350 North
Ea st
700 W est 47
W es t
Ea st
Ea st700 North
1060 South
40 North
W es t
Pa lis ad e
Dr iv e
W est
1160 West
E as t
5 50 We st
100 South
310 North
1000 South
East
W es t
East
90 North
W est
Ea st
1700 North
W est1325 W est
1300 North
1100 North
W es t
Ea st
Ca m pu s D riv e
205 North
1100 South
East
1340 North
N or th
0 South
Ea st
W es t
475 South
Ea st
Ea st
Paradise Drive
East
So ut h
E as t
255 South
East
W es t
Ea st
W es t
120 North
W es t
300 South
500 North
W est
100 North
E as t
600 South
Ea st
Ea st
900 South
Cascade Drive
920 North
M ou nt ai n W ay D riv e
Business Park Drive
180 South
State Street
I-15
W es t
800 North
State Street
Ge ne va Ro ad
400 North
1600 North
Center Street
400 South 400 South
I-
Ea st
800 South
1200 North 1200 North
University Parkway
400 North
1200 South
W es t
Ea st
Ea st
W es t
M ai n St re et
M ain
Street
800 South
Pr ovo
Ca ny on Ro ad
1600 North
Ea s t
2026 Seal Coat Project
3 4
2 5
Bonneville Park Parking 10,950 sqFt
Public Works Parking & Facility 269,989 sqFt
Geneva Park Parking 20,485 sqFt
IHC Fields Parking & Trail 53,332 sqFt
Sharon Park Parking 10,299 sqFt
Cascade Park Basketball Court 3,389 sqFt
Water Rec. Treatment Facility 406,007 sqFt
Name Area
Updated May 11, 2026
1500 North
W es t
Sources: Esri, Vantor, Airbus DS, USGS, NGA, NASA, CGIAR, N Robinson, NCEAS, NLS, OS, NMA, Geodatastyrelsen, Rijkswaterstaat, GSA, Geoland, FEMA, Intermap, and the GIS user community, Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, © OpenStreetMap contributors, and the GIS User
Asphalt to Seal
2026 Seal Coat Project
0 4020 US Feet 1
Bonneville Park Parking Lot
1 780 West
Ar te si an
R oa d
Springwater Drive
Sl ee py R id ge
D riv e
1000 South
Sources: Esri, Vantor, Airbus DS, USGS, NGA, NASA, CGIAR, N Robinson, NCEAS, NLS, OS, NMA, Geodatastyrelsen, Rijkswaterstaat, GSA, Geoland, FEMA, Intermap, and the GIS user community, Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, © OpenStreetMap contributors, and the GIS User
Asphalt to Seal
2026 Seal Coat Project
0 15075 US Feet 7
Water Reclamation Treatment Plant
File details come from the government source that posted it. Updated .