This Request for Proposals (RFP) is issued by Utah County Public Works Department seeking qualified engineering firms to provide general engineering services for various construction projects on an as-needed, on-call basis. The scope includes roadwork, bridges, parkways, trails, drainage improvements, and stream rehabilitation projects of varying complexity. Utah County intends to select one or more engineering firms to complete projects over a five-year period as funding and constraints allow. Proposals must be submitted through the State U3P website using the Bonfire (EUNA) eProcurement platform by November 25, 2026, at 3:00 p.m. Mountain Time. Site visits to work sites are the responsibility of prospective contractors before submitting proposals. The initial contract term is five years commencing January 2027, with an option to renew for an additional five years, though the County reserves the right to terminate for convenience at any time. The evaluation committee will score proposals based on the proposer's statement of qualifications (25 points), project experience (20 points), proposed work plan (30 points), and fee schedule (25 points), for a total of 100 points.
The fee proposal must include hourly rates, unit costs, and all services applicable to potential projects. Proposers may request annual price increases not to exceed three percent based on the Consumer Price Index by providing written notice on or before November 1 of any contract year. The County will not entertain changes to its Standard Terms and Conditions, and the County reserves the right to waive minor irregularities or reject any or all proposals. Contractor compensation will be determined based on the approved fee schedule, with payment normally occurring within thirty days of invoice receipt or service completion. All proposals must include a completed Proposal Information Form, Certificate of Non-Collusion, current local business license, and a termination or debarment certification. Contractors must maintain Commercial General Liability insurance of at least three million dollars per occurrence and Workers' Compensation insurance. No set-asides are identified in this procurement.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UTAH COUNTY
PUBLIC WORKS DEPARTMENT
2855 South State Street
Provo, Utah 84606
(801) 851-8600
REQUEST FOR PROPOSAL
for
GENERAL ENGINEERING SERVICES
RFP # 2026-18
CLOSING DATE
FOR RECEIPT OF PROPOSALS: Wednesday, November 25, 2026
TIME: 3:00 p.m. (Mountain Time)
PLACE: Proposals are to be submitted through the State
U3P website, using the Bonfire (EUNA) eProcurement platform.
NOTE: The Contractor is responsible for reading the contents of this bid, including but not limited to, the Scope of Work, General Requirements, Specifications, the Drawings and
Agreement. The Contractor is also responsible to visit the work sites before presenting a bid.
Privacy Notice: Pursuant to Section 63A-19-402 of Utah Code, personal data collected in documents that would be classified as a public record may be made available to the public as provided by Section 63G-2-201.
RFP for General Engineering Services Page i
Utah County
TABLE OF CONTENTS
REQUEST FOR PROPOSALS
Intent
Procedure
Rules of Procurement
Proposal Submission
Proposal Organization
Proprietary Information
Questions and Clarifications
Acceptance of Proposal
Disqualification of Proposal
Disposition of Proposal
Interpretation of RFP
Evaluation of Proposals
Award of Contract
General
Annual Price Increase
GENERAL REQUIREMENTS
Alterations of Plans or Character of Work
Cooperation
Insurance
Keys
Legal
License
Payment
Safety Requirements
Supervision of Work
SPECIFICATIONS .......................................................................................................... S-1
Scope of Work ........................................................................................................... S-1
Scope of Services ...................................................................................................... S-1
Additional Services ................................................................................................... S-1
Description of Services ............................................................................................. S-2
FEE PROPOSAL .................................................................................................. Attachment B
PROPOSAL INFORMATION FORM ........................................................................Exhibit A
CERTIFICATE OF NON-COLLUSION ..................................................................... Exhibit B
SAMPLE AGREEMENT WITH STANDARD TERMS & CONDITIONS ............... Exhibit C
RFP for General Engineering Services Page 1
1. REQUEST FOR PROPOSALS
1.1 INTENT
Through this Request for Proposals (RFP), Utah County is seeking proposals from qualified Engineering Firms to provide general engineering services for various construction projects, which may vary in complexity, on an as-needed, on-call basis and include but not be limited to roadways, bridges, parkways and trails, drainage improvements, stream rehabilitation, etc. The intent is to select one or more engineering firms to complete selected projects over the next five-year period as constraints allow and funding becomes available. Based upon the evaluation of the proposals, Utah County may choose at its discretion to award to multiple Engineering
Firms an ongoing contract.
Responses to this RFP should include details about experience, key personnel, subcontractors and reference contacts as described herein. Utah County intends to compare and evaluate all qualifying submittals and select the most qualified firms based on proposal content.
This is a Request for Proposals only and should not be interpreted as a solicitation for services or as a contract for services. Submittals should be comprehensive, concise, and directly responsive to the goals and format as outlined in this RFP.
If a firm or individual is recommended pursuant to this RFP, an agreement will be executed with Utah County, a sample copy of which is included herein as Exhibit C. The
County will not entertain changes to its Standard Terms and Conditions. The agreement is expected to have an initial term of five (5) years beginning January 2027 with an option to renew for another five (5) years. However, the County has the right to terminate the contract for its convenience at any time.
1.2 PROCEDURE
A. The procedure for response to this RFP, evaluation of proposals, and selection will be as follows:
1. Interested entities will prepare and submit their proposals prior to the specified
Closing Date for Receipt of Proposals.
2. Utah County and/or its representatives will evaluate all submitted proposals as described herein.
3. The selected firm or individual will enter into an agreement with the County.
1.3 RULES OF PROCUREMENT
A. This procurement shall conform to and is governed by The Utah County Division of
Purchasing, Procurement Policy.
B. For this procurement, all proposals must be submitted in the proposal format outlined herein.
RFP for General Engineering Services Page 2
C. All prospective Proposers must meet the required criteria as of the date of submission.
Respondents must provide all information requested in the Proposal Information
Form.
D. Utah County has established certain requirements with respect to proposals to be submitted by respondents. The use of "shall", "must", or "will", in this RFP indicates a requirement or condition from which a material deviation will not be approved by
Utah County.
1.4 PROPOSAL SUBMISSION
Each respondent must submit its proposal digitally through the U3P website using the
State of Utah’s Bonfire (EUNA) account. The proposal must be submitted by
Wednesday, November 25, 2026, at 3:00pm.
1.5 PROPOSAL ORGANIZATION
A. The proposal must include the following information in a form not to exceed 25 pages:
1. Proposer’s Statement of Qualifications
a. Each Proposer shall provide a statement of qualifications. This shall be a short document that indicates the experience and qualifications of the Proposer and key personnel that will be performing the specified services herein to help ensure the project’s success. It should include resumes of the key personnel, copies of applicable licenses and certifications of the key personnel.
b. If applicable, each Proposer shall include a list of subcontractors expected to be used and their expertise and references for similar situations where the subcontractors provided services.
2. Proposer’s Project Experience
a. Each Proposer shall include a minimum of three (3) examples of similar projects that have been completed by the Proposer and the key personnel as they relate to the Scope of Services Section S.2, Additional Services Section
S.3, and Description of Services Section S.4. Information about similar projects should include starting and completion dates, project size, who the work was performed for at the time including name, address, telephone number and contact person, and what the responsibility of the Proposer was on the project.
3. Proposed Work Plan
a. Provide a detailed and comprehensive description of how the Proposer intends to provide the services requested in this RFP. This description shall include, but not be limited to: how the project(s) will be managed and scheduled, how and when data will be delivered to the County, communication and coordination, the working relationship between the Proposer and County staff, and the Proposer’s general philosophy in regards to providing the requested services.
RFP for General Engineering Services Page 3
4. Fee Proposal
Each Proposer shall attach a complete Fee Schedule listing hourly rates, unit costs, etc., for all services provided by the Proposer which may be applicable to this RFP.
5. Completed Proposal Information Form (Exhibit A).
6. Completed Certificate of Non-Collusion (Exhibit B).
7. A copy of the Proposer’s current local business license.
8. Termination or Debarment Certification
Each Proposer must submit a certification that neither it nor its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from soliciting work by any governmental department or agency. The Proposer must also certify that neither it nor its principals have been terminated during the performance of a contract or withdrew from a contract to avoid termination. If the Proposer cannot certify these two statements, the Proposer shall submit a written explanation of the circumstances for review by Utah County.
1.6 PROPRIETARY INFORMATION
The Proposer shall mark proprietary information contained in the proposal which is not to be disclosed to the public or used for purposes other than the evaluation of the proposals.
Pricing and service elements of the successful proposal will not be considered proprietary. Notwithstanding the foregoing, Utah County may disclose any information or record as required by law.
1.7 QUESTIONS AND CLARIFICATIONS
All questions regarding this RFP must be submitted through the Utah Procurement Place
(U3P) Bonfire website or to the Utah County Purchasing Manager, Robert Baxter, at
Purchasing@utahcounty.gov. All questions and answers will be posted to the Bonfire website to allow all prospective proposers to have access to the same information. The deadline for submission of questions is seven (7) business days prior to the closing date.
1.8 ACCEPTANCE OF PROPOSAL
A. Utah County reserves the right to reject any or all proposals or waive minor irregularities when to do so would be in the best interests of Utah County. Minor irregularities are those which will not have a significant adverse effect on overall competition or performance levels.
B. The responding party agrees that Utah County may terminate this procurement procedure at any time, and Utah County shall have no liability or responsibility to the responding party for any costs or expenses incurred in connection with this RFP, or such party's response.
RFP for General Engineering Services Page 4
1.9 DISQUALIFICATION OF PROPOSAL
The occurrence of any of the following may result in disqualification of a proposal:
A. Failure to respond within the established timetable.
B. Failure to completely answer all questions presented in the RFP.
C. Use of any type of form or format other than those indicated in the RFP.
D. Failure to provide requested documentation at the time of proposal submission.
E Illegible responses.
F. If the Proposer adds any provisions reserving the right to accept or reject an award or to enter into an agreement pursuant to an award, or any other unauthorized conditions, limitations or provisions.
G. If the Proposer is unable to evidence a satisfactory record of integrity.
H. If the Proposer is not qualified legally to contract.
I. If the proposal at the opening does not contain a signed proposal, and a signed certificate of non-collusion.
J. Utah County reserves the right to reject any or all proposals.
1.10 DISPOSITION OF PROPOSALS
A. All proposals (and the information contained therein) shall become the property of
Utah County. No proposal shall be returned to the respondent regardless of the outcome of the selection process.
B. The County reserves the right to use any or all ideas presented. Selection or rejection of the proposal does not affect this right.
C. The proposal may be withdrawn upon request by the respondent, without prejudice, prior to, but not after, the time fixed to receive proposals.
1.11 INTERPRETATION OF RFP
The invalidity of any portion of this RFP shall not prevent the remainder from being carried into effect. Whenever the context of any provision shall require it, the singular number shall be held to include the plural number, and vice versa, and the use of any gender shall include all genders. The paragraph and section headings in this RFP are for convenience only and do not constitute a part of the provisions hereof.
1.12 EVALUATION OF PROPOSALS
A. All proposals will be evaluated by authorized representatives of Utah County (the
Evaluation Committee). The following criteria will be used by the Evaluation
Committee in creating a score for each of the proposals:
Proposer’s Statement of Qualifications: 25 points
Proposer’s Project Experience: 20 points
Proposed Work Plan: 30 points
Fee Schedule: 25 points
RFP for General Engineering Services Page 5
TOTAL: 100 points.
B. Evaluation Committee members shall not confer with any Proposer. If information or clarification is needed regarding the RFP, the prospective Proposers are to contact the
Purchasing Manager as herein defined.
C. All proposals received shall be evaluated and scored independently by each member of the Evaluation Committee through the Bonfire platform. The evaluation criteria will be based on the information described in the RFP.
D. The award recommendation will be based on the best evaluated proposal and shall constitute only a recommendation to the Board of County Commissioners.
E. Committee members may discuss the proposals together, but each committee member will privately score and/or rank their selection. Once the individual committee members have completed their evaluations, the Evaluation Committee will meet together to finalize their scoring.
1.13 AWARD OF CONTRACT
A. After taking into consideration the Evaluation Committee’s recommendations, tabulations, and rankings, the Board of Utah County Commissioners shall either award the contract to the top-ranked Proposer(s) or may elect to reject all proposals.
B. The Board of Utah County Commissioners may make the awarding of a contract subject to further negotiations and modifications deemed to be in the best interest of the County, and the award of contract shall be subject to the County and the Proposer entering into a contract acceptable to the County. An individual contract will be required for the selected Proposer.
1.14 GENERAL
A. Utah County will award a contract in reliance upon the information contained in proposals submitted in response to the RFP. Utah County will be legally bound only when and if there is a signed agreement entered into between Utah County and the awarded Proposers. Responding to the RFP does not obligate Utah County to enter into any agreements or contracts.
B. It is vitally important that any person who signs a proposal or agreement on behalf of a respondent certifies that he or she has the authority to so act. The Proposer who has its proposal accepted may be required to answer further questions and provide further clarification of its proposal and responses.
C. Receiving this RFP or responding to it does not entitle any entity to participate in services or transactions resulting from or arising in connection with this RFP. Utah
County shall have no liability to any person or entity under or in connection with this
RFP, unless and until Utah County and such person have executed and entered into an agreement pursuant to the terms of this RFP.
D. By responding to this RFP each responding party acknowledges that neither Utah
County nor any of its representatives is making or has made any representation or warranty, either express or implied, as to the accuracy or completeness of any portion of the information contained in this RFP. The responding party further agrees that neither Utah County nor any of its representatives shall have any liability to the
RFP for General Engineering Services Page 6 responding party or any of its representatives as a result of this RFP process or the use of the information contained in this RFP. Only the terms and conditions contained in an agreement when, as, and if executed, and subject to such limitations and restrictions as may be specified therein, may be relied upon by the respondent in any manner as having any legal effect whatsoever.
1.15 ANNUAL COST INCREASE
Proposers may, upon written notice delivered to Utah County on or before November 1 of any year of the Agreement term, request an increase to the contract price by a percentage equal to the percentage increase which occurred in the Consumer Price Index
(defined as the Consumer Price Index, All Urban Customers (CPI-U) U.S. City Average, All Items, or a similar index if this index is discontinued) during the preceding one year period, not to exceed three percent (3%) per year, to be effective not sooner than
January 1 of the following year of the Agreement term.
RFP for General Engineering Services Page 7
GENERAL REQUIREMENTS
Alteration of Plans or Character of Work
The County reserves the right to make at any time during the progress of any particular service, such increases or decreases in quantities and such alterations in the details of the service, and the elimination of one or more items as may be found necessary or desirable. The Contractor agrees to accept the service as altered the same as if it had been a part of the original agreement. The
Contractor shall proceed with the service alterations when ordered in writing from the County.
Financial increases to the various service must be approved in writing through an amendment or a change order to the specific service and/or through an additional approved Utah County
Purchase Order in the amount of the additional service before the service is authorized and can be completed.
Cooperation
Utah County intends to encourage cooperation with any Owner, Architects, Engineers, Supplier, Contractor and its subcontractors. The objectives are effective and efficient agreement performance, intended to achieve completion within budget, on schedule, and in accordance with the Drawings and Specifications.
Alternative dispute resolution (ADR) methodologies will be encouraged in place of the more formal dispute resolution procedures. ADR in this context is intended to be a voluntary, nonbinding procedure available for use by the parties to this Agreement to resolve any dispute that may arise during performance.
Insurance
The insurance required by the Utah County Standard Terms and Conditions shall name "Utah
County, 100 East Center, Provo, Utah 84606" as a Certificate Holder.
The Contractor shall file as requested any and all required certificates of insurance with the Utah
County Public Works Department in a timely manner prior to commencing any work.
Keys
If it becomes necessary for the County to issue the Contractor a key to County locks, final payment to the Contractor will be held until the key has been returned and documented. It is illegal to duplicate
County keys.
Legal
The Contractor shall be responsible to provide all legal support for the project including but not limited to the preparation of contracts with subcontractors.
License
The Contractor shall have a current "Business License", issued by the county or city in which the
Contractor's business is located, and shall provide proof of such license prior to the commencement of said work.
RFP for General Engineering Services Page 8
The Contractor and subcontractors shall have the appropriate licenses needed to perform the services in this State. The Contractor shall provide proof of such license prior to the commencement of said work.
Payment
Payment shall be required in the manner prescribed in the Utah County Standard Terms and
Conditions. All bills must be signed and dated by both the Contractor and an authorized representative from the County as designated by the County Public Works Director before the payment process can commence. Each bill shall itemize the work performed in accordance with the approved bid schedule. Actual payment will be based upon verification by the County who will certify that the work has been performed.
The County will decide all questions which may arise as to the quality, quantity, and acceptability of materials furnished and work performed. The County will also decide all questions which may arise as to the acceptable fulfillment of the Agreement on the part of the Contractor.
Payments may be withheld from the Contractor by the County in order to protect or offset the County from loss due to:
1. Defective work not remedied.
2. Liens or claims filed or reasonable evidence of probable filing.
3. The Contractor's failure to promptly pay subcontractors for labor and/or materials accepted by the Contractor.
4. The County's reasonable doubt that the project can be completed for the unpaid balance of the contract price.
5. Damage to another contractor.
6. Failure to maintain scheduled progress.
7. Any other failure of the Contractor which results in liability for the County.
Safety Requirements
In order to protect the life and health of employees and the general public in the performance of this
Agreement, the Contractor shall comply with the general safety orders covering Utah industries, issued by the Industrial Commission of Utah and Occupational Safety and Health Act of 1970.
Nothing in the Agreement shall relieve the Contractor of responsibility assigned in the Specifications, State Industrial Commission's requirements, or state and local laws and ordinances.
The Contractor agrees to hold Utah County and the County's Engineer free and harmless from any and all damages/claims that may occur during the construction operations of this Agreement. The
Contractor shall assume sole liability for any injuries or damages caused to a third party as a result of fulfillment of any Agreement and construction operations.
The County Public Works Director or the County Project Manager will have the authority by written order to suspend work wholly or in part due to the failure of the Contractor to correct conditions unsafe for the workmen or general public; for failure to carry out provisions of the Agreement; for failure to carry out orders; for such periods as he may deem necessary due to unsuitable weather, for conditions considered unsuitable for the progress of the work, or for any other condition or reason deemed to be in the public interest. Written orders shall state the reason for suspension.
RFP for General Engineering Services Page 9
Supervision of Work
The County Public Works Director shall have full supervisory powers in determining the extent of the construction on the project. Compensation shall be based upon log books maintained by the County
Project Manager as a percentage of work completed and payment terms described under General
Requirements. All decisions concerning the extent and acceptability of the work and the quality of all materials shall rest solely with the County Public Works Director.
RFP for General Engineering Services Page S-1
SPECIFICATIONS
S.1 SCOPE OF WORK
Utah County is seeking proposals from qualified Engineering Firms to provide general engineering services for various construction projects, which may vary in complexity, on an as-needed, on-call basis and include but not be limited to roadways, bridges, parkways and trails, drainage improvements, stream rehabilitation, etc.
S.2 SCOPE OF SERVICES
A. Civil engineering and consulting services for construction projects varying in complexity, for a portion of the project or the project in its entirety. Services may include preliminary plans and cost estimates, necessary field work, drafting, design, surveying, bid assistance, construction inspection, and project management. All specifications shall comply with applicable federal, state, and local codes.
B. Civil design consultant services for small projects based on hourly rates of contract and upon submission and approval of proposed number of hours.
C. Provide construction drawings and specifications. All specifications shall comply with applicable federal, state, and local codes. All drawings and specifications shall be in sufficient detail to obtain fixed construction bids, apply for permits, and construct the project.
D. Assistance in gaining necessary approvals that may be required for obtaining permits and approvals.
E. Bid administration, construction management, and inspection services for improvement projects.
F. Construction administration and engineering including, but not limited to, review and approval of material submittals, daily construction observation and documentation, coordinating contractor’s work, and preparation of engineer’s certificates.
G. Coordination, facilitation, and/or attendance of project-related meetings, such as pre-bid, preconstruction, project progress meetings, and final inspections.
H. Construction observations for general conformance with project specifications.
I. Construction documents in compliance with applicable local, state, and federal laws, ordinances, codes, regulations, and professional standards.
J. Preparation of reproducible record drawings showing significant changes in the work during construction based on marked-up prints, drawings and other data furnished to the Engineer.
K. Review of correspondence from state and federal permitting agencies that require response or action from County Engineer or County Staff.
L. General, technical consultation to County staff involved in design review and construction overview of capital projects including recommendation for preliminary design, project design, and bidding.
S.3 ADDITIONAL SERVICES
• Parking lot design
• Survey
• Utility design and/or relocation
• Drainage
RFP for General Engineering Services Page S-2
• Structural design
• Geo-technical evaluation and design
• Right of way acquisition services, including all documents needed for right of way
• Due diligence and feasibility services
• Conceptual and preliminary planning
• Entitlement documents
• Stormwater management and drainage design
• BMP systems design
• Erosion and sedimentation control plans
• Hydraulic/Hydrologic studies
• Floodplain studies
• Traffic control plans
• Traffic studies
• Traffic operations planning and design
• Landscape and streetscape design
• ADA/FHA compliance
• Expert Witness Testimony
S.4 DESCRIPTION OF SERVICES
A. The services shall include but are not limited to the following items:
• Field Reconnaissance
• Preliminary Engineering
• Right-of-Way Acquisitions Documents
• Final Design
• Construction Documentation
• Bidding and Negotiation
• Construction Administration & Staking
• Project Meetings
• Public Involvement
1. Field Reconnaissance
The Engineer shall conduct a topographic survey of the proposed project and the affected areas. The survey shall provide sufficient information as to design the proposed project. The survey shall include locating existing conditions and showing all elevations, observable landmarks such as existing ground, edge of pavement, shoulders, sidewalks, curbs & gutters, buildings, trees, fences, mail boxes, sewer and water manholes, water values, drainage issues and other miscellaneous hazards, irrigation structures and ditches, existing drainage features associated to storm water, general utilities including utility poles, driveways and other access approaches, intersections, traffic control devices such as signs within the project limits, and any other utilities information whether above or below ground which may impact project.
The field reconnaissance should be thorough enough to establish horizontal and vertical control and to create cross sections of the existing project area to help in evaluation and design. Also, the field reconnaissance should include geotechnical
RFP for General Engineering Services Page S-3 services such as core samples to evaluate sub-surface soil conditions and groundwater conditions and to obtain native soil samples for laboratory testing and any other testing needed to evaluate the existing surface and sub-surface conditions to provide appropriate recommendations for treatment and construction of the new roadway throughout the project. Once field reconnaissance is complete, a digital terrain model shall be completed of existing conditions and data shall be mapped in AutoCAD.
The Engineer shall conduct required studies and associated coordination meetings with appropriate state and local personnel. Once studies are complete, the Engineer shall provide the results and recommendations for implementation.
2. Preliminary Engineering
The Engineer shall prepare preliminary plans for the construction of the project. The preliminary set of plans shall be distributed in both electronic pdf format along with two full set paper copies to Utah County for review which shall include the following services:
1) Title sheet, index of plans and other standard drawings.
2) Develop the initial layout of the project including:
a. Edges of pavement, edge of shoulder, fill and cut slope catch points, right of way lines, project limits.
3) Develop typical sections.
4) Plan and profile sheets.
5) Utility and ATMS sheets.
6) Existing Right of Way Base map.
7) Hydraulic, Drainage and Irrigation sheets (concept level).
8) Traffic signals, signing, striping and lighting (concept level).
9) Construction materials (concept level)
10) Structure situation and layout sheets.
11) Engineer’s Estimate
a. Utility Research
The Engineer shall obtain plans from private and public utilities within the project limits and plot the information on the prepared engineered drawings and incorporate into construction drawings and contract documents.
b. Right-of-Way Research
The Engineer shall investigate and research deeds, subdivision plats, surveys, and right of way plats within the project limits for information regarding parcel ownership, deed restrictions, utility easements, etc. Information obtained through
ROW research shall be incorporated into a Right of Way Base map along with the prepared engineering drawings to identify the extents of easements or right-of-way needed for the project.
c. Preliminary Estimate
The Engineer shall prepare a probable construction cost estimate which shall
RFP for General Engineering Services Page S-4 include itemized bid items for use in prioritizing improvements and helping determine which improvements shall be addressed in the final design and construction process based on available funds.
3. Right-of-Way Actions
The Engineer shall prepare all legal descriptions and right of way documents for use in acquisitions and recordings of the impacted parcels within the project limits. The
Engineer will also obtain preliminary title reports from a title company, which shall be approved by Utah County, for the impacted parcels. The engineer shall provide preliminary documents for all property takes and easements and deliver to Utah
County for review and approval. After Utah County has completed review of said documents, the engineer shall gather and implements comments in preparing final documents and submit final documents to the County for acquisition.
The Engineer shall prepare a Right-of-Way Plan with exhibits to identify and define the limits of work along each property required to construct the proposed improvements.
The Engineer shall obtain copies of the deeds for properties affected by the necessary acquisitions for the project.
The Engineer shall be available throughout the acquisition and the design phase for field survey support. This includes joint meetings with Utah County and affected property owners. It also includes staking lines, corners, right of way or easements needed in clarifying impact to said properties.
The Engineer shall prepare a Right-of-Way Entry Form for each property where construction is required outside the project limits. The Engineer shall prepare any and all needed right-of-way forms in order to complete project. Utah County will utilize these forms to procure said right-of-way or easements as needed.
4. Final Design / Construction Documentation
The Engineer shall proceed with Final design/Construction documentation for the project as outlined below.
Final Design – Plans and Specifications
The Engineer shall prepare a 30%, 60% and 100% Design Submissions for review and comment by Utah County. The design submissions shall be distributed in both electronic PDF format and along with two full set paper copies to Utah County.
Design drawings shall be in AutoCAD format but shall be submitted in a pdf format for review. The Engineer shall also schedule and conduct a design development plan review meeting with each design submission. During these meetings the engineer shall take notes of comments which shall be considered and incorporated into the final design. In the development of the final design documents and the preparation of the Contract Plans and Specifications, the Engineer shall incorporate the comments from design development review meetings and the environmental document findings
RFP for General Engineering Services Page S-5 when performing the following:
a. Design – Provide design plans and calculations for:
• Title sheet, index of plans and other standard drawings.
• Pavement Design
• Construction/Materials layout
• Cross Sections
• Plan and Profile
• Grading
• Hydraulic, Drainage and Irrigation
• Traffic Signal and ATMS
• Street Lights
• Roadway signing, Pavement markings
• Minor and Major Structures
• Utilities location identification and relocation
• Prepare Design exceptions and Special provisions
• Right-of-Way
• Final Engineers estimate
b. Utilities – coordinate with municipal and private utility companies to establish relocation and/or modification procedures and schedule for existing utilities to be compatible with proposed improvements such as providing plans and/or letters describing the project and its schedule to public or private utility companies.
4. Construction Documentation
The Engineer shall work with Utah County and other project stakeholders to design and prepare a complete bidding package with full size plans (11x17) in both electronic and paper form to include: specifications, schedules, and documents to include; pavement design, construction/materials layout sheets, cross sections sheets, plan and profile sheets, grading sheets, hydraulic, drainage and irrigation sheets, traffic signal and ATMS sheets, street light sheets, roadway signing and pavement markings sheets, minor and major structure sheets, utility design sheets, design exceptions and special provision sheets, ROW sheets and descriptions, and any other detailed drawings, as well as an engineer’s estimate for the construction of the project. Electronic drawing sheets to be submitted in AutoCAD and pdf format.
5. Bidding and Negotiation
The Engineer shall aid the County with contractor procurement including advertising the project and preparing addendums and answering questions as necessary to interpret and/or clarify the bidding documents. The Engineer shall assist Utah
County in determining the acceptability of alternatives proposed by contractors, attend the pre-bid meetings, attend the bid opening, prepare bid tabulation sheets, and assist in evaluating bids or proposals.
RFP for General Engineering Services Page S-6
6. Construction Administration:
The County shall require Engineer’s services during construction of the project. The
Engineer shall provide a cost estimate to implement and construct said improvements.
Services shall include but not be limited to survey staking, material testing such as compaction testing, concrete testing, HMA testing and lab work, quality assurance inspections, a field inspector for quality control and to ensure work is being carried out as design dictates, contract administration services such as verifying contractor payments, creating and processing change orders, reviewing contractor submittals, providing field engineering support, providing redlined record drawings showing as-built conditions, and holding weekly project meetings. Once project is complete, the
Engineer shall provide a complete set of as built drawings in an electronic and paper form with all electronic drawing sheets being in AutoCAD and pdf format.
7. Project Meetings
The Engineer shall conduct, hold, and attend project meetings with Utah County and other project stakeholders as required for the project. This would include preparation, travel, attendance, supporting graphics and documentation in the form of meeting notes.
8. Public Involvement Coordination Plan
The Engineer shall provide a plan for providing public information to communities involved and to the general public. The Engineer shall attend public meetings/hearings with Utah County as required. The Engineer will meet with Utah
County and the public to educate them of the proposed project along with any anticipated impacts to personal property or disruption to regular travel routes. The
Engineer will assist Utah County in discussing with the impacted property owners about the right of way acquisition process and how the cost to restore disturbed areas is determined.
ATTACHMENT B
FEE PROPOSAL
This form, and all associated documentation required as part of this form, shall be included in the RFP submittal.
Company Name: _________________________________________________________
Address: _________________________________________________________
City, State, Zip: _________________________________________________________
Phone: _________________________________________________________
B.1 COMPLETE FEE SCHEDULE
Each Proposer shall also attach a complete Fee Schedule listing hourly rates, unit costs, etc., for all services provided by the Proposer which may be applicable to various potential projects.
B.2 CERTIFICATION
I hereby certify that I have read, understand, and agree to all sections, Exhibits, and Attachments of this Request for General Engineering Services. I further certify that the information submitted by me/my firm in response to this RFP, including the pricing and other information, is true and accurate.
I understand that Utah County has the right to reject any or all proposals, to waive minor irregularities when to do so would be in the best interests of Utah County, and to negotiate a price for the proposed services as determined to be in the best interest of Utah County.
Signature Name (please print)
Title
Date
EXHIBIT A
PROPOSAL INFORMATION FORM
In order to receive consideration, submitted proposals must contain responses to all questions.
Failure to respond to all questions may result in disqualification of the proposal.
COMPANY NAME & ADDRESS: ________________________________________________
Is this an Office:_________, Home:__________, Shop:___________, Other:____________
Telephone Number: (____) _______________, Emergency Number: (____) ______________.
Answering Machine: (____) _______________, Fax Number: (____) __________________ .
COMPANY OWNER: ___________________________________________________________
COMPANY PRESIDENT: _______________________________________________________
CONTACT PERSON: ______________________________________ Phone:______________
EMAIL ADDRESS: ____________________________________________________________
Type of Company (Partnership, Corporation, Venture etc.): ____________________________
If a Corporation, in what State Incorporated: _________________________________________
Business License Number: _______________________________________________________
State of Utah Architect License Number: ___________________________________________
Federal Tax Identification Number: ________________________________________________
SAM.gov UEI Number: _________________________________________________________
How long has this company been in business: _____________Years, and ___________ Months.
Officers authorized to execute contracts: _____________________________________________
What would happen to your company in the event of the owner’s absence or death?
Brief History of the Company: ____________________________________________________
Are there any judgments, suits or claims pending YES NO against your company? If Yes, attach a written explanation. □ □
Has your company operated under any other name (s)? YES NO
If Yes, attach a written explanation. □ □
PROPOSAL INFORMATION FORM Page 2
Has your firm failed to complete a contract within the last five years? YES NO
If "yes" attach explanation. □ □
Has your firm or any partner or officers ever been involved in any YES NO bankruptcy action? If "yes" attach explanation. □ □
Has your firm ever been listed on the Excluded Parties List System? YES NO
Are any of your firm's owners, officers, employees, or agents also YES NO employees of Utah County or related to any employees of Utah County □ □
If "yes" attach explanation.
FINANCIAL REFERENCES
1. Bank Name & Address ________________________________________________________
Manager ____________________________________________ Phone ____________________
2. Bank Name & Address ________________________________________________________
Manager ____________________________________________ Phone ____________________
CLIENT REFERENCES
1. Name: ___________________________, Contact: __________________________________
Address: ______________________________________________, Phone: _________________
2. Name: ___________________________, Contact: __________________________________
Address: ______________________________________________, Phone: _________________
3. Name: ___________________________, Contact: __________________________________
Address: ______________________________________________, Phone: _________________
4. Name: ___________________________, Contact: __________________________________
Address: ______________________________________________, Phone: _________________
EXHIBIT B
CERTIFICATE OF NON-COLLUSION
STATE OF UTAH ) Request for Proposals
)SS for
COUNTY OF UTAH ) General Engineering Services
AFFIDAVIT
The undersigned of lawful age, being first duly sworn, disposes and says:
That as a condition precedent to the award of the Utah County project as above captioned, I___________________________________________________________________________
(owner, partner, officer or delegate) of__________________________________________________________________________do
(company) solemnly swear that neither I, nor to the best of my knowledge any member or members of my firm have either directly or indirectly restrained free and competitive bidding on this project by entering into any agreement, participating in any collusion, or otherwise taking any action unauthorized by Utah County, with regard to this bid or potential agreement resulting therefrom.
Signature
By: _____________________________________
Title: ___________________________________
Subscribed/sworn to before me this ____ day of __________ 2026 A.D.
My Commission Expires __________________________
Residing at _________________________________
_________________________________ Seal
By:__________________________________________
Notary Public
EXHIBIT C
SAMPLE AGREEMENT WITH STANDARD TERMS AND CONDITIONS
AGREEMENT No. 20___-_____
AGREEMENT
THIS AGREEMENT is made and entered into by and between Utah County, a political and corporate body of the State of Utah, located at 100 East Center Street, Provo, Utah 84606, and the following CONTRACTOR:
Name: Contact Person:
Address: Phone #:
City: State: Zipcode: Email:
Legal Status of Contractor: Sole Proprietor Non-Profit Corporation
Partnership For-Profit Corporation
Government Department: __________________________
1. PURPOSE OF CONTRACT
This agreement is to obtain the following products, services, or products and services (be specific):
2.
3.
4.
CONTRACT COSTS
Contractor will be:
paid a maximum of $_______________________ for costs authorized by this agreement;
compensated in accordance with ATTACHMENT B: CONTRACTOR’s Proposal.
CONTRACT PERIOD
The term of this agreement shall commence on: ________________, or the date of execution of this agreement.
This agreement shall terminate on _______________ unless terminated early or performance has been completed.
ATTACHMENTS
The following indicated attachments are fully incorporated into this agreement:
A: Utah County Standard Terms and Conditions B: CONTRACTOR’s Proposal C: Special Provisions D: Utah County Procurement Compliance E: General Liability and Workers Compensation Certificate
F: ______________________________________ G: ______________________________________ H: ______________________________________
Except as explicitly modified by ATTACHMENT C: Special Provisions, any ambiguities or conflicting terms will be resolved by granting deference to the terms of ATTACHMENT A: Utah County’s Standard Terms and Conditions.
IN WITNESS WHEREOF, the parties have executed this agreement on ______ of _____________ 20____.
ATTEST:
AARON R. DAVIDSON
Utah County Clerk
By: _____________________________________ Deputy Clerk
APPROVED AS TO FORM AND LEGALITY:
JEFFREY S. GRAY
Utah County Attorney
By: _____________________________________ Deputy Utah County Attorney
BOARD OF COUNTY COMMISSIONERS,
UTAH COUNTY, UTAH
By: _____________________________________ SKYLER BELTRAN, Chair
CONTRACTOR
By: _____________________________________ Its: _____________________________________
Revised 1/2024
Limited Liability Company (LLC)
ATTACHMENT A:
UTAH COUNTY STANDARD TERMS AND CONDITIONS FOR PRODUCTS AND SERVICES
1. DEFINITIONS. The following terms shall have the meanings set forth below:
(A) The “Agreement” consists of the following documents:
(i) The Utah County Agreement cover page, which contains the signatures of Utah County and
Contractor, or, an unsigned Purchase Order (PO);
(ii) This Attachment A: Utah County Standard Terms and Conditions for Products and Services; and
(iii) Any other express written attachments that are incorporated by reference on the Utah County
Agreement cover page.
(B) “Contractor” means the individual or entity delivering the Products and Services identified in the
Agreement. The term “Contractor” shall include the individual’s or entities’ agents, officers, employees, and partners.
(C) The “County” means Utah County, a political subdivision of the State of Utah, as directed and managed by a majority vote of the Board of County Commissioners of Utah County.
(D) “Products” means any products to be delivered to the County by Contractor as described in the Utah
County Agreement cover page, including any products described in any attachments that are incorporated by reference on the Utah County Agreement cover page.
(E) “Services” means any services to be performed for the County by Contractor as described in the Utah
County Agreement cover page, including any services described in any attachments that are incorporated by reference on the Utah County Agreement cover page.
(F) “Subcontractors” mean subcontractors or subconsultants that are under the direct or indirect control or responsibility of Contractor, and includes all independent contractors, agents, employees, or authorized resellers.
2. EXTRA WORK.
(A) Extra work shall be undertaken only when previously authorized in writing by the County and is defined as additional work which is neither shown nor defined in the Agreement or the attached Contractor’s proposal (if any) but determined by the County to be necessary to the project. Extra work is also defined as that additional effort necessary by reason of changed conditions which are radical and unforeseeable.
After written prior authorization of the Board of County Commissioners of Utah County, payment for authorized extra work will be made in the previously authorized amount only.
(B) Miscellaneous items normally associated with the major work items included in the Agreement, but which may not be specifically identified, shall be furnished by Contractor as if they had been included in the Agreement, without additional cost to the County.
3. PAYMENT. Payments from the County are normally made within thirty (30) days following the date an order is delivered, service is performed, or the date a correct invoice is received, whichever is later. All payments for the Agreement will be remitted electronically, by mail, or as otherwise determined by the
County. Contractor shall accept payment by check or by Purchasing Card without any additional fees.
4. OWNERSHIP IN INTELLECTUAL PROPERTY. The County and Contractor each recognize that each has no right, title, interest, proprietary or otherwise in the intellectual property owned or licensed by the other, unless otherwise agreed upon by the parties in writing. The County will have all rights, title, and ownership of all websites and social media accounts, including any passwords, usernames, or other pertinent login information or hosting credentials; advertising materials, including any content or work product; images; newsletters; and intellectual property, including derivative works, created, or arising out of the performance of the Agreement, unless otherwise indicated in the Agreement. Contractor will give the County a list of all current passwords, usernames, and any other relevant information or credentials necessary for access and control of any property under the Agreement upon completion of the Agreement or upon the County’s request.
5. INSURANCE.
(A) Contractor agrees to carry Commercial General Liability insurance coverage equal to or greater than three million dollars ($3,000,000) per occurrence, or in a lesser amount if explicitly authorized and identified on the Utah County Agreement cover page. This coverage shall provide liability insurance to cover the activities of Contractor and its subcontractors, all equipment and vehicles, public or private, used in the performance of the Agreement. Prior to commencement of work, Contractor shall furnish a
Certificate of Insurance to the County evidencing that Contractor has this insurance in place. An umbrella policy may be used to supplement the Commercial General Liability insurance coverage if needed to reach the coverage requirement.
(B) Prior to commencement of Services, Contractor shall furnish and maintain a Certificate of Insurance to the County evidencing that Contractor has Workers Compensation Insurance for the Contractor and
Subcontractors or a waiver of coverage that complies with the Utah Code Title 34A, Chapter 2, Workers’ Compensation Act, as amended.
(C) If Contractor will have County network access, provide software, hardware or data hosting services, or receive, store, or use High Sensitivity Data in connection with this Agreement, Contractor shall maintain cyber liability insurance for the term of this Agreement or for as long as Contractor has access to the County network or High Sensitivity Data, whichever is longer. High Sensitivity Data for the purposes of this Agreement refers to (i) protected health information regulated by the Health Insurance
Portability and Accountability Act (HIPAA), (ii) patient identifying information regulated by 42 CFR
Part 2, (iii) Utah Criminal Justice Information System…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .