This is a comprehensive specification and drawing set for the City of Westerville Parks & Recreation Department's 2026 Community Center Roof Replacement project located at 350 North Cleveland Avenue, Westerville, Ohio 43082. The project involves the removal and replacement of roofing systems across five roof areas (Roofs B, E, F, H, and H1), installation of new walk pads, removal and replacement of sheet metal components, modification of roof drainage systems, installation of ladder-up safety systems, guard railings, access stairs, masonry restoration with new through-wall flashing, sealant work, lightning protection system replacement, and mechanical and electrical modifications. The base bid scope encompasses Roofs B, F, and H, while alternate bid items include Roofs E and H1. The specifications detail specific square footage quantities for each roof area, including membrane removal and installation, deteriorated steel deck replacement (ranging from 5 to 300 square feet depending on roof area), and rust inhibitive coating application (ranging from 10 to 3,000 square feet). The project is scheduled for completion by December 4, 2026, with a bid date of April 17, 2026.
The Engineer's Estimate for the Base Bid is $2,718,000, with an Alternate Bid estimate of $250,200. The project specifications impose stringent performance requirements including maintenance of a completely weathertight building envelope throughout construction despite weather conditions, continuous occupancy of the buildings during work, daily debris cleanup, completion of roofing on each section before moving to another roof area, manufacturer technical representative inspections, and quality control protocols including daily seam probing and testing. The specifications emphasize coordination between multiple trades including roofing, mechanical, electrical, plumbing, masonry, and lightning protection contractors, with the general contractor bearing full responsibility for site protection, weatherproofing, coordination with occupied spaces, and insurance against weather delays. Funding source and specific payment terms are not detailed in the construction documents, though the contract documents are dated April 30, 2026, indicating a formal agreement timeline.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3-Project Manual.pdf | ||
| 2-Prevailing Wage Rates - DEL County.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G001 TITLE SHEET, DRAWING INDEX
A001 SPECIFICATION HIGHLIGHTS
A002 SPECIFICATION HIGHLIGHTS
A003 SPECIFICATION HIGHLIGHTS
A004 SPECIFICATION HIGHLIGHTS
A101 SITE
A102 ROOF B
A103 ROOF E
A104 ROOF F
A105 ROOF H
A201 DETAILS
A202 DETAILS
A203 DETAILS
A204 DETAILS
E101 ELECTRICAL ROOF PLAN
M001 MECHANICAL LEGEND, SCHEDULES, AND GENERAL NOTES
M101 MECHANICAL ROOF PLAN
COMM. NO.
SCALE
DATE
DRAWING TITLE
FEBRUARY 2026
101-26
PROJECT TEAM
CITY OF WESTERVILLE
PARKS & RECREATION
DEPARTMENT
COMMUNITY CENTER
2026 ROOF
REPLACEMENT PROJECT
350 NORTH CLEVELAND AVENUE
WESTERVILLE, OH 43082
NTS
ISSUES AND REVISIONS
CONSTRUCTION RESOURCES, INC.
33900 STATION STREET
SOLON, OH 44139
T: 440-248-9800
MAKARICH STRUCTURAL
ENGINEERING, LLC
P. O. BOX 1389
WILLOUGHBY, OH 44096
T: 440-283-7252
BID SET 04-17-2026
2026 ROOF REPLACEMENT PROJECT
CITY OF WESTERVILLE
PARKS & RECREATION DEPARTMENT
DRAWING INDEX
G-001
SITE
BASIC BUILDING DATA
TYPE OF CONSTRUCTION TYPE 2B
USE GROUP A3
ROOF B - SQ. FT. 26,402
ELEVATION 32
ROOF E - SQ. FT. 2,226
ELEVATION 16
ROOF F - SQ. FT. 3,658
ELEVATION 16
ROOF H - SQ. FT. 2,934
ELEVATION 24
ROOF H
GROUND SET-UP AREA ENCLOSED BY 6' METAL FENCE. EXIT MUST REMAIN OPEN
FOR EMERGENCY EGRESS
STORAGE AREA - ADDITIONAL STORAGE TO BE
ENCLOSED BY 6' METAL FENCE
CONTRACTOR PARKING
TEMPORARY CRANE SET-UP LOCATION
GROUND SET-UP - DUMPSTER, PORTABLE TOILETS, AND AREA ENCLOSED BY 6'
METAL FENCE. INSTALL CONCRETE BARRIERS ON TRAFFIC SIDES OF SET-UP AREA.
ALL GROUNDS, CONCRETE, PAVEMENT, AND TREES DAMAGED ONSITE BY CONTRACTOR TO BE REPAIR
TO BETTER THAN NEW CONDITIION AND THE OWNERS SATISFACTION
DRIVE MUST REMAIN OPEN AT ALL
TIMES . COORDINATE CLOSURE
FOR CRANE ACTIVITIES WITH
OWNER.
ROOF F
ROOF E
ROOF B
AutoCAD SHX Text
SECTION 01 31 70 SPECIAL PROJECT CONDITIONS
A. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL VEGETATION,
PERSONS AND PROPERTY ON THE SITE AND THE ADJOINING RIGHTS-OF-WAY FROM
THE WORK ASSOCIATED WITH THIS PROJECT. ANY DAMAGED ITEMS SHALL BE
REPLACED OR REPAIRED TO THE SATISFACTION OF THE OWNER. THE CONTRACTOR
SHALL DOCUMENT CURRENT SITE CONDITIONS WITH DIGITAL PHOTOGRAPHS AND
SUPPLY THEM TO THE OWNER PRIOR TO THE COMMENCEMENT OF ONSITE
ACTIVITIES.
B.THE CONTRACTOR IS RESPONSIBLE FOR DAILY CLEAN-UP OF ALL DEBRIS AND
PROTECTION OF ALL PERSONS AND PROPERTY IN AND AROUND THE WORK AREAS.
ANY SOILING OF OR DAMAGE TO VEHICLES, PEDESTRIANS, PERSONAL PROPERTY
OR REAL PROPERTY FROM THIS PROJECT WILL BE THE RESPONSIBILITY OF THE
CONTRACTOR.
C. THE CONTRACTOR SHALL NOT DISCONTINUE THIS PROJECT ONCE WORK HAS
COMMENCED. A FULL CREW MUST BE ON SITE PERFORMING APPROPRIATE
CONTRACT WORK ANY DAY DURING WHICH WORK CAN BE PERFORMED.
D.UNAPPROVED SUBCONTRACTORS OR JOINT VENTURES CANNOT BE USED ON THIS
PROJECT. THE PRIME CONTRACTOR MUST HAVE PERSONNEL ON SITE TO
SUPERVISE ALL SUBCONTRACTING WORK AT ALL TIMES. ALL SUBCONTRACTORS
ARE SUBJECT TO THE OWNER'S APPROVAL, AT THEIR SOLE DISCRETION.
E.WHEN WORK OCCURS; THE CONTRACTOR MUST PERFORM THE FOLLOWING AT A
MINIMUM:
1. THE ENTIRE EXTERIOR ENVELOPE MUST STAY COMPLETELY WEATHERTIGHT AT ALL
TIMES THROUGHOUT THE PROJECT AND THE CONTRACT NEEDS TO ENSURE, NO
MATTER WHAT THE WEATHER FORECAST SAYS, THAT THE BUILDING IS 100%
WEATHERTIGHT BEFORE LEAVING EACH AND EVERY DAY OF THE PROJECT.
WEATHERTIGHT MEANS NO RAIN, SNOW, HAIL, WIND, INSECTS, BIRDS, ANIMALS,
ETC., MAY ENTER FROM THE EXTERIOR TO THE INTERIOR. FURTHER, THE
BUILDING MUST BE COMPLETELY SECURE EACH DAY WHEN THE CONTRACTOR
LEAVES THE SITE, FOR WHICH THE CONTRACTOR IS SOLELY RESPONSIBLE AND
LIABLE.
F.THE WORKDAY IS LIMITED TO THE CITY OF WESTERVILLE CITY ORDINANCE
REQUIREMENTS.
G. THE BUILDINGS WILL BE OCCUPIED DURING THE PROJECT. THEREFORE, THE
CONTRACTOR IS FULLY AND SOLELY RESPONSIBLE FOR THE SAFETY AND
PROTECTION OF ALL OCCUPANTS GOING INTO, LEAVING OUT OF, OR OCCUPYING
THE INTERIOR OF THE BUILDINGS, TO THE OWNER'S SATISFACTION AT THE OWNER'S
SOLE DISCRETION. ALL COSTS ASSOCIATED WITH PROVIDING THIS PROTECTION
SHALL BE INCLUDED IN THE BASE BID AND ALTERNATE BID AMOUNTS. THIS
INCLUDES BRIDGING SCAFFOLDING OVER EGRESSES, CREATING SCAFFOLD TUNNEL
PROTECTION AT EGRESSES WITH LIGHTING IF NEEDED, AND OTHER SUCH
PROTECTION AS DEEMED NEEDED BY THE OWNER TO THE OWNER'S SATISFACTION.
PROTECTION MUST CREATE A PATHWAY EQUAL TO OR GREATER THAN THE WIDTH
CREATED BY ALL THE DOORS FOR THE ENTIRE AREA PROTECTED.
H.THE CONTRACTOR SHALL GAIN ACCESS TO THE AREAS OF WORK FOR ALL
RESTORATION AND INSTALLATION FROM THE BUILDING EXTERIOR ONLY. MEANS OF
ACCESS TO THESE AREAS IS TO BE SUPPLIED BY THE CONTRACTOR WITHIN THE
BASE AND ALTERNATE SCOPES OR WORK. INTERIOR ACCESS WILL ONLY BE
ALLOWED FOR NECESSARY WORK, WITH PRIOR OWNER APPROVAL. FURTHER, ALL
INTERIOR WORK NEEDS TO BE COORDINATED WITH THE OWNER. THE CONTRACTOR
MUST BE FULLY COOPERATIVE WITH THE NEEDS OF THE OWNER. NO ADDITIONAL
FUNDS WILL BE PAID FOR THIS COORDINATION EFFORT.
I. WEATHER DELAYS MAY NOT EXTEND THE SCHEDULE, AS DEFINED IN THE TERMS OF THE
CONSTRUCTION DOCUMENTS, UNLESS SPECIFICALLY APPROVED BY THE OWNER, AT
THE OWNER'S SOLE DISCRETION.
J. INCONSEQUENTIAL TO OTHER STATEMENTS MADE WITHIN THE CONSTRUCTION
DOCUMENTS, THE COST OF MATERIALS MAY ONLY BE BILLED TO THE OWNER ONCE
THEY HAVE BEEN PROPERLY INSTALLED IN ACCORDANCE WITH THE
CONSTRUCTION DOCUMENTS, WHICH WILL NOT NECESSARILY DENOTE THE
OWNER'S APPROVAL OR ACCEPTANCE OF THE MATERIALS INSTALLED OR OTHER
WORK PERFORMED.
K.THE DUMPSTER MUST BE TIGHTLY COVERED THROUGHOUT THE PROJECT TO
CONTROL DUST AND DEBRIS. AN ENCLOSED CHUTE MUST BE USED, IF NEEDED,
THAT IS ALSO COMPLETELY ABLE TO CONTROL DUST AND DEBRIS.
L.NO RADIOS, LOUD TALKING, PROFANITY, OR COMMENTS TO ANY PERSONNEL, VISITORS,
OR PATRONS ON SITE ARE PERMITTED.
M. THE OWNER WILL SUPPLY POTABLE WATER AT THE CLOSEST AVAILABLE EXTERIOR
POINT THAT ALREADY EXISTS.
N.THE CONTRACTOR SHALL COVER AND PROTECT ALL VENTS AND OPENINGS IN THE
BUILDING TO INHIBIT ENTRY OF DUST AND DEBRIS. INSTALL INTERIOR PROTECTION
AS NECESSARY. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR MEANS AND
METHODS.
O. WHEN ROOF HATCH REMOVAL AND REPLACEMENT, AND/OR DECK
REPLACEMENT/INSTALLATION OCCURS; THE CONTRACTOR MUST PERFORM THE
FOLLOWING AT A MINIMUM:
1. CORDON OFF THE AREA FOR ON/OFF DECK REPLACEMENT.
2. HAVE AN EMPLOYEE IN THE INTERIOR DURING ALL DECK REPLACEMENT ACTIVITY.
3. INSPECT THE UNDERSIDE OF THE DECK FOR OBSTRUCTIONS OR ATTACHMENTS
PRIOR TO BEGINNING THE REPLACEMENT PROCESS. BELOW ROOF G IS HARD
CEILING IN THE BATHROOMS AND THE ROOFER CAN PULL THE CAN LIGHT
FIXTURES TO SEE ABOVE THE HARD CEILING FOR CONDUIT THAT MAY BE IN THE
UPPER DECK FLUTE.
4. RELOCATING OR OTHERWISE DEALING WITH BELOW DECK OBSTRUCTIONS OR
ATTACHMENTS.
FURTHER STEPS SHALL BE TAKEN, AS NECESSARY, TO ELIMINATE ALL SAFETY
CONCERNS.
P.ALL ROOFING, INCLUDING SHEET METAL INSTALLATION, MUST BE COMPLETED PRIOR
TO BEGINNING WORK ON ANOTHER ROOF AREA, AS DEFINED ON THE DRAWINGS.
Q. ALL AREAS OF ROOF APPLICATION MUST BE PERFORMED IN A WAY THAT ENSURES
THAT ALL ROOF AREAS HAVE PROPER AND UNRESTRICTED DRAINAGE. DIRECT,
FREE FLOWING ACCESS, TO A PROPERLY OPERATING AND ACTIVE ROOF DRAIN
ASSEMBLY, WITHOUT ELEVATION CHANGE OR RESTRICTION OF ANY KIND, MUST BE
MAINTAINED AT ALL TIMES.
R.ALL DEBRIS MUST BE REMOVED FROM THE INTERIOR OF THE BUILDING, PRIOR TO
THE INSTALLATION OF NEW DECK MATERIALS. CLEAN-UP OF DEBRIS MUST BE
COMPLETE IN NATURE AND TO THE OWNER'S SATISFACTION.
S.A “RHINO” ROOFING REMOVAL MACHINE MAY NOT BE USED FOR ROOF REMOVAL ON
ANY TYPE OF DECK.
T. THE CONTRACTOR IS FULLY AND SOLELY RESPONSIBLE TO MAP OUT ALL
ELECTRICAL COMPONENTS OR OTHER ATTACHMENTS OR OBSTRUCTIONS SECURED
TO THE UNDERSIDE OF THE DECK. THESE COMPONENTS WILL NEED TO BE MOVED
OR RESECURED TO THE STRUCTURAL STEEL MEMBERS AS APPROPRIATE AND THE
CONTRACTOR MUST ENSURE THAT THEY ARE NOT DAMAGED DURING ROOF
SYSTEM, WOOD NAILER INSTALLATION, AND ROOF DECK INSTALLATION. IF THESE
COMPONENTS NEED TO BE DISCONNECTED TO REPLACE DECK, IT MUST BE DONE
BY A LICENSED, OWNER APPROVED AND CERTIFIED ELECTRICIAN, HVAC
CONTRACTOR, ETC. AND ALL APPLICABLE SAFETY STANDARDS FOLLOWED.
U.THE GROUND SET-UP AREA AND STAGING AREA, AS APPROVED BY THE OWNER, IS
TO BE ALWAYS ENCLOSED BY A TEMPORARY CHAIN LINK FENCE AROUND THE
SET-UP AREA.
V. THE CONTRACTOR SHALL INCLUDE ALL COSTS ASSOCIATED WITH RAISING OF
ROOFTOP UNITS, GAS LINES, SOIL STACKS, CONDUITS, ETC.; OR WITH
REPOSITIONING THE SAME TO ENSURE DESIGNED AND PROPER FLASHING HEIGHTS
AND ROOF SYSTEM INSTALLATION IN THE CONTRACT AMOUNT. THIS INCLUDES
COSTS INVOLVED IN EVACUATING AND CHARGING HVAC, AND GAS LINES. NOTE
THAT WORK MAY NEED TO BE PERFORMED OFF-HOURS TO ACCOMMODATE THE
OWNER. NO ADDITIONAL COST WILL BE INCURRED BY THE OWNER. THE
CONTRACTOR MUST ALSO USE OWNER APPROVED AND LICENSED
SUBCONTRACTORS FOR ALL WORK OF THIS TYPE.
W. A LIFT IS TO BE PROVIDED, BY THE CONTRACTOR, TO SUPPLY OSHA SAFE ACCESS
TO ALL ROOF AND WALL AREAS BEING WORKED ON IN THE AWARD SCOPES OF
WORK THROUGHOUT THE PROJECT FOR THE OWNER AND THEIR
REPRESENTATIVES.
X. THE FOLLOWING IS A LIST OF CORE RESULTS. THESE RESULTS ARE FOR
INFORMATIONAL PURPOSES ONLY. THE ACCURACY OF THE RESULTS IS NOT
GUARANTEED. THE CONTRACTOR IS ENCOURAGED TO VERIFY ANY AND ALL
RESULTS AS THEY DEEM NECESSARY. THERE WILL BE NO ADDITIONAL MONEY
ALLOCATED IN THE EVENT THAT THE STATED RESULTS ARE INACCURATE.
1. ROOF B
MEMBRANE: FIRESTONE 60 MIL BALLASTED EPDM
INSULATION: 2-LAYERS OF 1.5” POLYISOCYANURATE
PLUS TAPERED POLYISOCYANURATE
VAPOR RETARDER: VISQUENE
LONG SPAN GALVANIZED STEEL
2. ROOF E - NO TEST OPENING PERFORMED DRAWINGS STATED
MEMBRANE: FIRESTONE 60 MIL BALLASTED EPDM
INSULATION: 2-LAYERS OF 1.5” POLYISOCYANURATE
VAPOR RETARDER: VISQUENE
GALVANIZED STEEL
3. ROOF F
MEMBRANE: FIRESTONE 60 MIL BALLASTED EPDM
INSULATION: 2-LAYERS OF 1.5” POLYISOCYANURATE
VAPOR RETARDER: VISQUENE
GALVANIZED STEEL
4. ROOF H
MEMBRANE: FIRESTONE 60 MIL BALLASTED EPDM
INSULATION: 2-LAYERS OF 1.5” POLYISOCYANURATE
VAPOR RETARDER: VISQUENE
GALVANIZED STEEL
5. ROOF H1 - NO TEST OPENING PERFORMED
SECTION 04 01 20 MAINTENANCE OF UNIT MASONRY
D.AREA OF WORK:
1. BASE BID: F-1 AND F-2
2. ALTERNATE BID: E-1, E-2, AND H1-1
E.SCOPE OF WORK:
1. ALL SPECIFIED TESTS ARE TO BE PERFORMED BY THE CONTRACTOR, AT THE
CONTRACTOR'S EXPENSE. RESULTS OF THE TESTS MUST BE SUBMITTED TO THE
CONSULTANT PRIOR TO WORK COMMENCING AND FINAL MORTAR MIXTURE
APPROVAL.
2. SAMPLES OF MORTAR MUST BE INSTALLED WITHIN ENOUGH LEAD TIME TO ALLOW IT
TO PROPERLY CURE SO THAT THE OWNER HAS THE ABILITY TO PROPERLY
CHOOSE A COLOR. IF THE CHOSEN COLOR CHANGES AS A RESULT OF
IMPROPER CURING TIME OR OTHER ANOMALY PRIOR TO THE OWNER'S
APPROVAL, THE INSTALLED MORTAR MAY BE REQUIRED TO BE REMOVED AND
REPLACED AT NO ADDITIONAL COST.
3. SUPPLY OWNER WITH AT LEAST THREE BOARDS OF BRICKS FOR EACH TYPE OF
BRICK TO BE REPLACED SHOWING FULL RANGE OF COLOR FOR EACH BOARD.
OWNER SHALL CHOOSE THE BEST FROM THESE OR ASK FOR ADDITIONAL
SAMPLES. AFTER THE OWNER HAS CHOSEN FROM A SAMPLE BOARD THE
CONTRACTOR WILL INSTALL THE FIRST 12 UNITS OF EACH TYPE OF BRICK AND
ASK THE OWNER TO REAFFIRM THE COLOR CHOICE IN WRITING. IF THE OWNER
REJECTS THE BRICK COLOR AFTER SEEING THE INSTALLED SAMPLE THE
PROCESS WILL BE REPEATED UNTIL THE OWNER APPROVES THE WALL SAMPLE
AT NO ADDED COST TO THE OWNER.
4. DUSTLESS GRINDERS ARE TO BE USED THROUGHOUT THE PROJECT FOR ALL
CUTTING.
5. THE CONTRACTOR SHALL COVER AND PROTECT ALL VENTS AND OPENINGS IN THE
BUILDING TO INHIBIT ENTRY OF DUST AND DEBRIS. INSTALL INTERIOR
PROTECTION AS NECESSARY. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR
MEANS AND METHODS.
6. ALL MASONRY COMPONENTS WILL BE CLEANED PER SPECIFICATION
7. REMOVE AND REPLACE MASONRY TO INSTALL NEW THROUGH-WALL-FLASHING ON
a. BASE BID: F-1 AND F-2
b. ALTERNATE BID: E-1, E-2, AND H1-1
8. ALL NEW MORTAR AND BRICK MUST BE KEPT DAMP THROUGHOUT THE CURING
PROCESS TO ALLOW THE MORTAR TO COME TO STRENGTH AND CREATE A
PROPER BOND.
9. FULLY POINT ALL MORTAR JOINTS.
10. THE CONTRACTOR IS RESPONSIBLE TO SET UP AN AUDIT WITH BUD GRIFFITH, OR
HIS DESIGNEE, FOR EACH WALL FOR THE FOLLOWING
a. EACH SECTION OF THROUGH-WALL-FLASHING PRIOR TO THE INSTALLATION OF
NEW BRICK.
b. PREPARE ALL MORTAR JOINTS PRIOR TO THE INSTALLATION OF NEW MORTAR OR
SEALANT.
11. ALL NEW MORTAR AND BRICK MUST BE KEPT DAMP THROUGHOUT THE CURING
PROCESS TO ALLOW THE MORTAR TO COME TO STRENGTH AND CREATE A
PROPER BOND.
12. NO POWER WASHERS WITHOUT GAGES TO SHOW THE PRESSURE OF THE WATER
CREATED MAY BE USED DURING THE PROJECT FOR ANY SCOPE OF WORK.
13. MASONRY CLEANING IS TO BE DONE PRIOR TO REMOVING BRICK AND MORTAR OR
INSTALLING WALL FLASHING. FINAL CLEANING IS NOT MASONRY CLEANING AS
DEFINED IN THE SCOPE OF WORK.
PART 3 - EXECUTION
CLEAN MASONRY BEFORE FLASHING INSTALLATION OR MORTAR/BRICK REMOVAL.
RETAIN VENTS IF WALL IS DESIGNED ON RAIN-SCREEN PRINCIPLE WITH VENTS ACTING TO
EQUALIZE AIR-PRESSURE DIFFERENTIAL BETWEEN CAVITY AND EXTERIOR. INDICATE
SPACING OF VENTS AND BLOCKING ON DRAWINGS. SEE EVALUATIONS.
3.1 PREPARATION
A. GENERAL: COMPLY WITH CHEMICAL CLEANER MANUFACTURER'S WRITTEN
INSTRUCTIONS FOR PROTECTING SURFACES AGAINST DAMAGE FROM EXPOSURE TO
THEIR PRODUCTS.
B.PROTECT PERSONS, MOTOR VEHICLES, SURROUNDING SURFACES OF BUILDING
BEING RESTORED, BUILDING SITE, PLANTS AND SURROUNDING BUILDINGS FROM
INJURY RESULTING FROM MASONRY RESTORATION WORK.
1. PREVENT CHEMICAL CLEANING SOLUTIONS FROM COMING INTO CONTACT WITH
PEDESTRIANS, MOTOR VEHICLES, LANDSCAPING, BUILDINGS, AND OTHER
SURFACES THAT COULD BE INJURED BY SUCH CONTACT.
2. DO NOT CLEAN MASONRY DURING WINDS OF SUFFICIENT FORCE TO SPREAD
CLEANING SOLUTION TO UNPROTECTED SURFACES.
3. NEUTRALIZE AND COLLECT ALKALINE AND ACID WASTES FOR DISPOSAL OFF
OWNER'S PROPERTY.
4. DISPOSE OF RUNOFF FROM CLEANING OPERATIONS BY LEGAL MEANS AND IN A
MANNER THAT PREVENTS SOIL EROSION, UNDERMINING OF PAVING AND
FOUNDATIONS, DAMAGE TO LANDSCAPING, AND WATER PENETRATION INTO
BUILDING INTERIORS
5. ERECT TEMPORARY PROTECTION COVERS OVER PEDESTRIAN WALKWAYS AND AT
POINTS OF ENTRANCE AND EXIT FOR PERSONS AND VEHICLES THAT MUST
REMAIN IN OPERATION DURING COURSE OF MASONRY RESTORATION WORK.
C. PROTECT ADJACENT SURFACES FROM CONTACT WITH CHEMICAL CLEANERS BY
COVERING THEM WITH A LIQUID STRIPPABLE MASKING AGENT OR POLYETHYLENE
FILM AND WATERPROOF MASKING TAPE. APPLY MASKING AGENT TO COMPLY WITH
MANUFACTURER'S WRITTEN INSTRUCTIONS. DO NOT APPLY LIQUID MASKING AGENT
TO PAINTED OR POROUS SURFACES.
3.2 MASONRY REMOVAL AND REPLACEMENT
A. CAREFULLY REMOVE BY HAND AT LOCATIONS WHERE NEW FLASHING IS SCHEDULED
TO BE INSTALLED. CUT OUT FULL UNITS FROM JOINT TO JOINT AND IN A MANNER TO
PERMIT REPLACEMENT WITH FULL-SIZE UNITS WITHOUT DAMAGING SURROUNDING
MASONRY.
B.SUPPORT AND PROTECT REMAINING MASONRY THAT SURROUNDS REMOVAL AREA.
MAINTAIN FLASHING, REINFORCEMENT, LINTELS, AND ADJOINING CONSTRUCTION IN
AN UNDAMAGED CONDITION.
C. CLEAN REMAINING BRICK AT EDGES OF REMOVAL AREA BY REMOVING MORTAR,
DUST, AND LOOSE PARTICLES IN PREPARATION FOR REPLACEMENT.
D.INSTALL NEW UNIT TO REPLACE REMOVED UNIT AFTER THROUGH WALL FLASHING
INSTALLATION. FIT REPLACEMENT UNITS INTO BONDING AND COURSING PATTERN
OF EXISTING BRICK. IF CUTTING IS REQUIRED, USE A MOTOR-DRIVEN SAW
DESIGNED TO CUT MASONRY WITH CLEAN, SHARP, UNCHIPPED EDGES.
E.LAY REPLACEMENT BRICK WITH COMPLETELY FILLED BED, HEAD, AND COLLAR
JOINTS. BUTTER ENDS WITH SUFFICIENT MORTAR TO FILL HEAD JOINTS AND SHOVE
INTO PLACE. MAINTAIN JOINT WIDTH FOR REPLACEMENT UNITS TO MATCH EXISTING
UNITS.
1. TOOL EXPOSED MORTAR JOINTS IN REPAIRED AREAS TO MATCH JOINTS OF
SURROUNDING EXISTING BLOCKWORK.
2. RAKE OUT MORTAR USED FOR LAYING MASONRY BEFORE MORTAR SETS AND POINT
NEW MORTAR JOINTS AREA TO COMPLY WITH REQUIREMENTS FOR POINTING
EXISTING MASONRY.
F.IF A WALL TIE IS REMOVED DURING RESTORATION INSTALL A NEW WALL TIE AT THE
SAME LOCATION BUT SPACED NOT LESS THAN 16” O.C. BOTH HORIZONTALLY AND
VERTICALLY. SECURE WALL TIES TO MASONRY BACKUP WITH SPECIFIED MASONRY
SCREW ANCHOR AND PROPERLY PREDRILLING HOLES WITH SPECIFIED DRILL BIT.
3.3 CONSTRUCTION TOLERANCES
A. COMPLY WITH TOLERANCES IN ACI 530.1/ASCE 6/TMS 602 AND THE FOLLOWING:
1. FOR CONSPICUOUS VERTICAL LINES, SUCH AS EXTERNAL CORNERS, DOOR JAMBS,
REVEALS, AND EXPANSION AND CONTROL JOINTS, DO NOT VARY FROM PLUMB
BY MORE THAN 1/4 INCH IN 20 FEET, NOR 1/2 INCH MAXIMUM.
2. FOR VERTICAL ALIGNMENT OF EXPOSED HEAD JOINTS, DO NOT VARY FROM PLUMB
BY MORE THAN 1/4 INCH IN 10 FEET, NOR 1/2 INCH MAXIMUM.
3. FOR CONSPICUOUS HORIZONTAL LINES, SUCH AS EXPOSED LINTELS, SILLS,
PARAPETS, AND REVEALS, DO NOT VARY FROM LEVEL BY MORE THAN 1/4 INCH IN
20 FEET, NOR 1/2 INCH MAXIMUM.
3.5 INSTALLATION, GENERAL
A. THICKNESS: BUILD CAVITY AND COMPOSITE WALLS AND OTHER MASONRY
CONSTRUCTION TO FULL THICKNESS SHOWN. BUILD SINGLE-WYTHE WALLS TO
ACTUAL WIDTHS OF MASONRY UNITS, USING UNITS OF WIDTHS INDICATED.
B.BUILD CHASES AND RECESSES TO ACCOMMODATE ITEMS SPECIFIED IN THIS AND
OTHER SECTIONS.
C. LEAVE OPENINGS FOR EQUIPMENT TO BE INSTALLED BEFORE COMPLETING
MASONRY. AFTER INSTALLING EQUIPMENT, COMPLETE MASONRY TO MATCH THE
CONSTRUCTION IMMEDIATELY ADJACENT TO OPENING.
D.USE FULL-SIZE UNITS WITHOUT CUTTING IF POSSIBLE. IF CUTTING IS REQUIRED TO
PROVIDE A CONTINUOUS PATTERN OR TO FIT ADJOINING CONSTRUCTION, CUT
UNITS WITH MOTOR-DRIVEN SAWS; PROVIDE CLEAN, SHARP, UNCHIPPED EDGES.
ALLOW UNITS TO DRY BEFORE LAYING UNLESS WETTING OF UNITS IS SPECIFIED.
INSTALL CUT UNITS WITH CUT SURFACES AND, WHERE POSSIBLE, CUT EDGES
CONCEALED.
E.SELECT AND ARRANGE UNITS FOR EXPOSED UNIT MASONRY TO PRODUCE A
UNIFORM BLEND OF COLORS AND TEXTURES.
1. MIX UNITS FROM SEVERAL PALLETS OR CUBES AS THEY ARE PLACED.
F.MATCHING EXISTING MASONRY: MATCH COURSING, BONDING, COLOR, AND TEXTURE OF
EXISTING MASONRY.
G. WETTING OF MASONRY: WET MASONRY BEFORE LAYING IF INITIAL RATE OF
ABSORPTION EXCEEDS 30 G/30 SQ. IN. (30 G/194 SQ. CM) PER MINUTE WHEN TESTED
PER ASTM C 67. ALLOW UNITS TO ABSORB WATER SO THEY ARE DAMP BUT NOT
WET AT TIME OF LAYING.
H.COMPLY WITH CONSTRUCTION TOLERANCES IN ACI 530.1/ASCE 6/TMS 602 AND WITH
THE FOLLOWING:
1. FOR CONSPICUOUS VERTICAL LINES, SUCH AS EXTERNAL CORNERS, DOOR JAMBS,
REVEALS, AND EXPANSION AND CONTROL JOINTS, DO NOT VARY FROM PLUMB
BY MORE THAN 1/8 INCH IN 10 FEET, 1/4 INCH IN 20 FEET, OR 1/2 INCH MAXIMUM.
2. FOR VERTICAL ALIGNMENT OF EXPOSED HEAD JOINTS, DO NOT VARY FROM PLUMB
BY MORE THAN 1/4 INCH IN 10 FEET, OR 1/2 INCH MAXIMUM.
3. FOR CONSPICUOUS HORIZONTAL LINES, SUCH AS LINTELS, SILLS, PARAPETS, AND
REVEALS, DO NOT VARY FROM LEVEL BY MORE THAN 1/8 INCH IN 10 FEET, 1/4
INCH IN 20 FEET, OR 1/2 INCH MAXIMUM.
4. FOR EXPOSED BED JOINTS, DO NOT VARY FROM THICKNESS INDICATED BY MORE
THAN PLUS OR MINUS 1/8 INCH, WITH A MAXIMUM THICKNESS LIMITED TO 1/2
INCH. DO NOT VARY FROM BED-JOINT THICKNESS OF ADJACENT COURSES BY
MORE THAN 1/8 INCH.
5. FOR EXPOSED HEAD JOINTS, DO NOT VARY FROM THICKNESS INDICATED BY MORE
THAN PLUS OR MINUS 1/8 INCH. DO NOT VARY FROM ADJACENT BED-JOINT AND
HEAD-JOINT THICKNESSES BY MORE THAN 1/8 INCH.
6. FOR FACES OF ADJACENT EXPOSED MASONRY UNITS, DO NOT VARY FROM FLUSH
ALIGNMENT BY MORE THAN 1/16 INCH EXCEPT DUE TO WARPAGE OF MASONRY
UNITS WITHIN TOLERANCES SPECIFIED FOR WARPAGE OF UNITS.
7. FOR EXPOSED BED JOINTS AND HEAD JOINTS OF STACKED BOND, DO NOT VARY
FROM A STRAIGHT LINE BY MORE THAN 1/16 INCH FROM ONE MASONRY UNIT TO
THE NEXT.
3.6 MORTAR BEDDING AND JOINTING
A. LAY HOLLOW MASONRY UNITS AS FOLLOWS:
1. WITH FULL MORTAR COVERAGE ON HORIZONTAL AND VERTICAL FACE SHELLS.
2. BED WEBS IN MORTAR IN STARTING COURSE ON FOOTINGS AND IN ALL COURSES OF
PIERS, COLUMNS, AND PILASTERS, AND WHERE ADJACENT TO CELLS OR
CAVITIES TO BE FILLED WITH GROUT.
3. FOR STARTING COURSE ON FOOTINGS WHERE CELLS ARE NOT GROUTED, SPREAD
OUT FULL MORTAR BED, INCLUDING AREAS UNDER CELLS.
4. LAY SOLID MASONRY UNITS WITH COMPLETELY FILLED BED AND HEAD JOINTS;
BUTTER ENDS WITH SUFFICIENT MORTAR TO FILL HEAD JOINTS AND SHOVE INTO
PLACE. DO NOT DEEPLY FURROW BED JOINTS OR SLUSH HEAD JOINTS.
5. AT CAVITY WALLS, BEVEL BEDS AWAY FROM CAVITY, TO MINIMIZE MORTAR
PROTRUSIONS INTO CAVITY. AS WORK PROGRESSES, TROWEL MORTAR FINS
PROTRUDING INTO CAVITY FLAT AGAINST THE CAVITY FACE OF THE BRICK.
6. TOOL EXPOSED JOINTS SLIGHTLY CONCAVE WHEN THUMBPRINT HARD, USING A
JOINTER LARGER THAN THE JOINT THICKNESS, UNLESS OTHERWISE INDICATED.
7. CUT JOINTS FLUSH FOR MASONRY WALLS TO RECEIVE PLASTER OR OTHER
DIRECT-APPLIED FINISHES (OTHER THAN PAINT), UNLESS OTHERWISE INDICATED.
3.7 FLASHING, WEEP HOLES, AND VENTS
A. GENERAL: INSTALL EMBEDDED FLASHING AND WEEP HOLES IN MASONRY WALLS
WHERE INDICATED.
B.EXPOSED EXISTING WALL FOR FLASHING INSTALLATION.
C. PREPARE MASONRY SURFACES SO THEY ARE SMOOTH AND FREE FROM
PROJECTIONS THAT COULD PUNCTURE FLASHING.
D.BEFORE COVERING SEAL PENETRATIONS IN FLASHING WITH ADHESIVE, SEALANT,
OR TAPE AS RECOMMENDED BY FLASHING MANUFACTURER.
E.INSTALL FLASHING AS FOLLOWS:
1. OVER INSTALL SPECIFIED STAINLESS STEEL WITH MINIMUM 6” UPTURN LEG ON THE
BACK SET IN A REGLET. ALL LAPS SHALL BE OVERLAPPED MINIMUM 1”, POP
RIVETED 2” ON CENTER AND FULLY SEALED. COVER INSTALL FLASHING WITH
SPECIFIED BITUTHENE FLASHING. EXTEND FLASHING A MINIMUM OF 3 INCHES
ABOVE TOP OF SHEET METAL FLASHING AND THREE INCHES TO EITHER SIDE.
a. ALL INSIDE AND OUTSIDE CORNERS SHALL BE CONTINUOUS.
b. END DAMS SHALL BE FORMED WITH 2” HIGH MINIMUM END TABS POP RIVETED 2” ON
CENTER AND FULLY SEALED.
2. SECURE BITUTHENE FLASHING WITH ALUMINUM TERMINATION BAR SECURED WITH
FASTENERS SPACED 8 INCHES ON CENTER.
3. EXTEND SHEET METAL FLASHING 1/2 INCH BEYOND FACE OF MASONRY AT EXTERIOR
AND TURN FLASHING DOWN TO FORM A DRIP.
F.INSTALL WEEP HOLES IN THE HEAD JOINTS IN EXTERIOR WYTHES OF THE FIRST COURSE
OF MASONRY IMMEDIATELY ABOVE EMBEDDED FLASHING AND AS FOLLOWS:
1. SPACE WEEP HOLES EVERY OTHER HEAD JOINT.
3.10 CLEANING MASONRY, GENERAL
A. PROCEED WITH CLEANING IN ORDERLY MANNER; WORK FROM TOP TO BOTTOM OF
EACH SCAFFOLD WIDTH AND FROM ONE END OF EACH ELEVATION TO THE OTHER.
WORK FROM BOTTOM TO TOP OF THE BUILDING FOR EACH SCAFFOLD DROP.
B.USE ONLY THOSE CLEANING METHODS INDICATE FOR EACH MASONRY MATERIAL
AND LOCATION.
1. USE NATURAL-FIBER BRUSHES ONLY.
2. USE SPRAY EQUIPMENT THAT PROVIDES CONTROLLED APPLICATIONS AT VOLUME
AND PRESSURE INDICATED, MEASURED AT SPRAY TIP. ADJUST PRESSURE AND
VOLUME TO ENSURE THAT CLEANING METHODS DO NOT DAMAGE MASONRY.
a. EQUIP UNITS WITH PRESSURE GAGES.
3. FOR CHEMICAL CLEANER SPRAY APPLICATION, USE LOW-PRESSURE TANK OR
CHEMICAL PUMP SUITABLE FOR CHEMICAL CLEANER INDICATED, EQUIPPED WITH
A FAN-SHAPED SPRAY TIP.
C. PERFORM EACH CLEANING METHOD INDICATED IN A MANNER THAT RESULTS IN
UNIFORM COVERAGE OF ALL SURFACES, INCLUDING CORNERS, MOLDINGS, AND
INTERSTICES, AND THAT PRODUCES AN EVEN EFFECT WITHOUT STREAKING OR
DAMAGING MASONRY SURFACES.
COMM. NO.
SCALE
DATE
DRAWING TITLE
FEBRUARY 2026
101-26
PROJECT TEAM
CITY OF WESTERVILLE
PARKS & RECREATION
DEPARTMENT
COMMUNITY CENTER
2026 ROOF
REPLACEMENT PROJECT
350 NORTH CLEVELAND AVENUE
WESTERVILLE, OH 43082
NTS
ISSUES AND REVISIONS
CONSTRUCTION RESOURCES, INC.
33900 STATION STREET
SOLON, OH 44139
T: 440-248-9800
MAKARICH STRUCTURAL
ENGINEERING, LLC
P. O. BOX 1389
WILLOUGHBY, OH 44096
T: 440-283-7252
BID SET 04-17-2026
A-001
SUMMARIZED
SPECIFICATIONS
3.11 POINTING MASONRY
A. RAKE OUT JOINTS AS FOLLOWS:
1. RAKE OUT MORTAR FROM JOINTS UNTIL SOUND UNWEATHERED MORTAR IS
EXPOSED BUT NOT LESS THAN A DEPTH EQUAL TO 2 1/2 TIMES THEIR WIDTHS,
OR NOT LESS 3/4 INCH WHICHEVER IS GREATER. IF THE MORTAR UNCOVERED IS
NOT SOUND CONTINUE TO REMOVE UNTIL THE MORTAR IS SOUND.
2. REMOVE MORTAR FROM MASONRY SURFACES WITHIN RAKED-OUT JOINTS TO
PROVIDE REVEALS WITH SQUARE BACKS AND TO EXPOSE MASONRY FOR
CONTACT WITH POINTING MORTAR. BRUSHES, VACUUM, OR FLUSH JOINTS TO
REMOVE DIRT AND LOOSE DEBRIS.
3. DO NOT SPALL EDGES OF MASONRY UNITS OR WIDEN JOINTS. REPAIR DAMAGED
MASONRY UNITS.
a. CUT OUT OLD MORTAR USING A CUTTING MACHINE, SUCH AS A CARBORUNDUM SAW
OR DIAMOND-CORE DRILL.
b. COMPLY WITH REQUIREMENTS OF APPLICABLE DIVISION 2 SECTIONS WHERE
CUTTING AND PATCHING REQUIRES EXCAVATING AND BACKFILLING.
c. WHERE SERVICES ARE REQUIRED TO BE REMOVED, RELOCATED, OR ABANDONED, BY-PASS UTILITY SERVICES, SUCH AS PIPE OR CONDUIT, BEFORE CUTTING.
CUT-OFF PIPE OR CONDUIT IN WALLS OR PARTITIONS TO BE REMOVED. CAP,
VALVES, OR PLUG AND SEAL THE REMAINING PORTION OF PIPE OR CONDUIT TO
PREVENT OF MOISTURE OR OTHER FOREIGN MATTER AFTER BYPASSING AND
CUTTING.
4. RINSE MASONRY-JOINT SURFACES WITH WATER TO REMOVE DUST AND MORTAR
PARTICLES. TIME RINSING APPLICATION SO, AT TIME OF POINTING, EXCESS
WATER HAS EVAPORATED OR RUN OFF AND JOINT SURFACES ARE DAMP BUT
FREE OF STANDING WATER.
5.DAMPEN THE MASONRY UNIT AND THE REMAINING MORTAR IN THE DEPTH OF THE
JOINT SO THAT THE NEW MORTAR DOES NOT HAVE ITS WATER CONTENT
ABSORBED INTO ADJOINING COMPONENTS QUICKLY AND NOT ALLOW THE
PORTLAND CEMENT CONTENT OF THE NEW MORTAR TO COME TO STRENGTH.
6. APPLY THE FIRST LAYER OF POINTING MORTAR TO MORTAR TO AREAS WHERE
EXISTING MORTAR TO DEPTHS GREATER THAN SURROUNDING AREAS. APPLY IN
LAYER NOT GREATER THAN 3/8 INCH (9 MM) UNTIL A UNIFORM DEPTH IS
FORMED. COMPACT EACH LAYER THOROUGHLY AND ALLOW IT TO BECOME
THUMBPRINT HARD BEFORE APPLYING THE NEXT LAYER.
7. AFTER JOINTS HAVE BEEN FILLED TO A UNIFORM DEPTH, PLACE REMAINING
POINTING MORTAR IN 2 LAYERS WITH FIRST AND SECOND LAYERS EACH FILLING
ABOUT TWO-FIFTHS OF JOINT DEPTH; THE REMAINING ONE-FIFTH. FULLY
COMPACT EACH LAYER AND ALLOW TO BECOME THUMBPRINT HARD BEFORE
APPLYING NEXT LAYER. WHERE EXISTING BRICKS HAVE ROUNDED EDGE,
SLIGHTLY RECESS FINAL LAYER FROM FACE. TAKE CARE NOT TO SPREAD
MORTAR OVER EDGES ONTO EXPOSED MASONRY SURFACES OR TO
FEATHEREDGE MORTAR. EACH LAYER MUST BE MISTED PRIOR TO
INSTALLATION OF THE NEXT LAYER.
8. WHEN MORTAR IS THUMBPRINT HARD, TOOL JOINTS TO MATCH ORIGINAL
APPEARANCE OF JOINTS, UNLESS OTHERWISE INDICATED. REMOVE EXCESS
MORTAR FROM EDGE OF JOINT BY BRUSHING.
9. CURE MORTAR BY MAINTAINING IN A DAMP CONDITION FOR AT LEAST 72 HOURS.
10. POINTING WORK MUST PROCEED FINAL CLEANING OF EXISTING MASONRY, ALLOW
MORTAR TO HARDEN AT LEAST 30 DAYS BEFORE CLEANING WORK.
11. ALL MORTAR NOT USED WITHIN 120 MINUTES AFTER MIXING IS TO BE DISCARDED.
3.12 FINAL CLEANING
A. AFTER MORTAR HAS FULLY HARDENED, THOROUGHLY CLEAN EXPOSED MASONRY
SURFACES OF EXCESS MORTAR AND FOREIGN MATTER; USE STIFF-NYLON OR FIBER
BRUSHES AND CLEAN WATER, SPRAY APPLIED AT A LOW PRESSURE.
B.DO NOT USE METAL SCRAPERS OR BRUSHES.
C. DO NOT USE ACIDIC OR ALKALINE CLEANERS.
END OF SECTION 04 01 20
SECTION 05 31 00 STEEL DECK
A. AREA OF WORK:
1. ROOFS B, E, F, H, AND H1
E.SCOPE OF WORK.
1.PRIOR TO WORK ON A ROOF AREA THE CONTRACTOR SHALL VIEW THE UNDERSIDE OF
THE DECK IN AS MANY AREAS AS NECESSARY TO ENSURE THAT THE
UNDERSIDE OF THE DECK CAN BE VIEWED TO LOCATE ANY ITEMS SECURED TO
THE UNDERSIDE OF THE DECK OR RUNNING ALONG THE UNDERSIDE OF THE
DECK. THESE ITEMS SHALL BE LOCATED TO ENSURE THEY ARE NOT DAMAGED
DURING THE PROJECT.
2. REMOVE ALL DETERIORATED DECKING. DETERIORATED STEEL DECK IS THAT DECK
THAT HAS HAD THE LOADING CAPACITY REDUCED TO BEYOND OBBC LIMITS
AND/OR HAS LOST ≥ 20% OF ITS ORIGINAL UNDAMAGED DECK THICKNESS. CUT
DECKING TO BE REMOVED OUT SO THAT THE RESULTING HOLE IS SQUARED OFF
AND SO THAT THE NEW PANELS WILL BE SUPPORTED BY AT LEAST THREE
PURLINS. INSTALL NEW SPECIFIED DECKING WITH SPECIFIED FASTENERS PER
THIS SPECIFICATION. WITHIN THE BASE BID, THE FOLLOWING QUANTITIES OF
DECK TO BE REMOVED AND REPLACED. THESE QUANTITIES WILL BE ADJUSTED
BY THE ADD/DEDUCT UNIT PRICE.
a. ROOF B - 300 SF
b. ROOFS E - 30 SF
c. ROOF F - 40 SF
d. ROOF H - 25 SF
e. ROOF H1 - 5 SF
3. THE CONTRACTOR IS FULLY AND SOLELY RESPONSIBLE FOR ALTERING ROOF DECK
OPENINGS AND THE FRAMING STEEL FOR SUCH OPENINGS AS REQUIRED IN THE
MEP SCOPE OF WORK.
PART 3 - EXECUTION
3.1 REMOVAL
A. CORDON OFF THE AREA OF SCHEDULED ROOF REMOVAL ON THE INTERIOR OF THE
BUILDING. AN OBSERVER MUST BE INSIDE AND IN CONSTANT CONTACT WITH THE
ROOF REMOVAL CREW DURING THE ROOF REMOVAL AND DECK REMOVAL AND
REPLACEMENT PROCESSES. CHECK WHAT IS ANCHORED TO THE BOTTOM OF THE
DECK AND DETACH AND SUPPORT THESE ITEMS AS NEEDED TO INSURE NO DAMAGE
OCCURS AND ALL COMPONENTS ARE SAFE AND OPERATIONAL PRIOR TO
PROCEEDING.
B.REMOVE ALL ABANDONED ITEMS, WHICH THE OWNER CONFIRMS ARE ABANDONED,
DOWN TO THE STRUCTURAL MEMBERS OR POINT OF ORIGIN.
C. REMOVE AREAS OF DETERIORATED DECK. CUT THE DECK SO THAT THE RESULTING
OPENING IS SQUARE AND SO THAT THE NEW PIECE OF DECK IS STRUCTURALLY
SUPPORTED AT THREE POINTS.
D.REMOVE ALL EXISTING FIBERGLASS ACOUSTIC INSULATION WHERE PRESENT
3.2 EXAMINATION
A. EXAMINE SUPPORTING FRAME AND FIELD CONDITIONS FOR COMPLIANCE WITH
REQUIREMENTS FOR INSTALLATION AND BUILDING CODE TOLERANCES AND OTHER
CONDITIONS AFFECTING PERFORMANCE.
3.3 INSTALLATION, GENERAL
A. INSTALL DECK PANELS AND ACCESSORIES ACCORDING TO APPLICABLE
SPECIFICATIONS AND COMMENTARY IN THE MANUFACTURER'S WRITTEN
INSTRUCTIONS, AND REQUIREMENTS IN THIS SECTION. DECKING SHALL BE
INSTALLED WERE EXISTING PROJECTIONS AND UNITS ARE REMOVED. IN ADDITION,
INSTALL DECKING WERE DETERIORATED DECKING IS REMOVED OR WHERE PROPER
DECKING DID NOT EXIST.
B.INSTALL TEMPORARY SHORING BEFORE PLACING DECK PANELS, IF REQUIRED TO
MEET DEFLECTION LIMITATIONS.
C. LOCATE DECKING BUNDLES TO PREVENT OVERLOADING OF SUPPORTING MEMBERS.
D.PLACE DECK PANELS FLAT AND SQUARE AND FASTEN TO SUPPORTING FRAME
WITHOUT WARP OR DEFLECTION.
E.CUT AND NEATLY FIT DECK PANELS AND ACCESSORIES AROUND OPENINGS AND
OTHER WORK PROJECTING THROUGH OR ADJACENT TO NEW DECK.
COORDINATE REINFORCING REQUIREMENTS OF OPENINGS IN PARAGRAPH BELOW WITH
OTHER DIVISION 5 SECTIONS.
F.PROVIDE ADDITIONAL REINFORCEMENT AND CLOSURE PIECES AT OPENINGS AS
REQUIRED FOR STRENGTH, CONTINUITY OF DECKING, AND SUPPORT OF OTHER
WORK.
G. LAY LAPS OF ALL ROOFING AWAY FROM PREVAILING WINDS WITH SHEETING
PROGRESSING INTO PREVAILING WINDS.
H.POSITION SHEETS SO THE FASTENERS PASS THROUGH THE END LAPS NO MORE
THAN 2 INCHES, AND NOT LESS THAN 1 INCH FROM THE END OF THE OVERLAPPING
SHEET. END LAPS SHALL NOT BE LESS THAN 3 INCHES.
I. ALL DECK PANELS SHALL BE SET IN PLACE AGAINST THE SUPPORTING STEEL, AND
SECURED WITH THE SELF-DRILLING FASTENERS INSTALLED PERPENDICULAR TO THE
DECK THROUGH BOTH THE DECK AND THE SUPPORTING STEEL SIMULTANEOUSLY.
J. THE THREADS OF SELF-DRILLING SCREWS SHALL PROJECT THROUGH SUPPORTING
METAL A MINIMUM OF ¼-INCH AND A MAXIMUM OF ¾-INCH.
K.SCREWS SHALL BE DRIVEN TO A SNUG FIT TO PROVIDE A WEATHERTIGHT SEAL.
POWER TOOLS SHALL BE USED WITH CARE TO AVOID DEFORMING THE DECK PANELS
BY OVER-TIGHTENING THE SCREWS. IF SELF-DRILLING SCREWS ARE REMOVED,
THEY SHALL NOT BE REUSED.
L.LAP SCREWS WITH STRIPPED THREADS SHALL BE REPLACED WITH A LARGER SCREW OF
THE SAME MATERIAL AND THREAD CHARACTERISTICS AS THAT SPECIFIED.
M. THE MAXIMUM SPACING OF SIDE LAP FASTENERS SHALL BE 12 INCHES.
3.4 DECK INSTALLATION
A. INSTALL DECKING IN ACCORDANCE WITH THE MANUFACTURER'S
RECOMMENDATIONS AS A MINIMUM, AND ADDITIONALLY AS SPECIFIED HEREIN.
1. FASTEN PANELS TO THE SUPPORTING MEMBERS AT ENDS AND AT INTERMEDIATE
SUPPORTS WITH SPECIFIED FASTENERS SPACED NOT MORE THAN TWELVE (12)
INCHES ON CENTER ACROSS THE WIDTH OF THE DECKING. ONE FASTENER
SHALL ALWAYS BE INSTALLED AT SIDE LAPS AT A MINIMUM.
2. END LAPS SHALL BE A MINIMUM OF TWO (2) INCHES AND SHALL ALWAYS OCCUR
OVER A SUPPORTING MEMBER.
3. SIDE LAPS SHALL BE FASTENED BY THE MANUFACTURER'S RECOMMENDED
METHODS AT NOT MORE THAN EIGHTEEN (18) INCHES ON CENTER.
4. ACCESSORY MATERIAL SHALL BE FASTENED BY SHEET METAL SCREWS AT NOT
MORE THAN TWELVE (12) INCHES ON CENTER. SUMP PANS SHALL BE SECURELY
FASTENED TO ADJACENT SHEETS TO PROPERLY REINFORCE THE OPENING.
B.ROOF DECK SHALL BE INSTALLED SO THAT ALL DECK SHEETS WILL LIE TRUE IN LINE
WITH ALL INTERLOCKING EDGES PARALLEL. WHEN THE EDGE OF A 4-FOOT LONG
STRAIGHTEDGE IS PLACED ON THE DECK PERPENDICULAR TO THE RIBS, THE
STRAIGHTEDGE MUST CONTACT ALL OR PART OF THE TOP SURFACES OF THE DECK.
C. ROOF DECK SHALL BE SET IN PLACE AGAINST THE SUPPORTING STEEL AND HOLES
SHALL BE INSTALLED PERPENDICULAR TO THE PANES, THROUGH BOTH THE PANELS
AND THE SUPPORTING STEEL SIMULTANEOUSLY.
D.ALL UNITS SHALL BE PLACED ON THE SUPPORTING MEMBERS AND ADJUSTED TO
THE FINAL POSITION BEFORE BEING PERMANENTLY FASTENED. HOISTING
ARRANGEMENTS MAY BE MADE WITH THE STRUCTURAL STEEL SUBCONTRACTOR.
E.PROVIDE DECK PANELS OF SUFFICIENT LENGTH TO EXTEND OVER A MINIMUM OF
THREE (3) FRAMING SPANS. NO DECK SECTION MAY BE INSTALLED THAT DOES NOT
BEAR ON THREE FRAMING SPANS.
F.ALLOW NO HANGING OR SUPPORTING OF ANY ITEMS OR EQUIPMENT FROM THE
UNDERSIDE OF THE METAL DECK, UNLESS SPECIFICALLY APPROVED BY THE OWNER.
G. WHERE LARGE PREDETERMINED OPENINGS ARE REQUIRED AND SHOWN ON THE
DRAWINGS, THE DECK SHALL BE ENGINEERED AND DETAILED ON THE SHOP
DRAWINGS TO FIT THESE CONDITIONS.
H.FIELD CUTTING OF OPENINGS SHALL BE PERFORMED BY EXPERIENCED AND
COMPETENT MECHANICS USING POWER SAWS OR ACETYLENE TORCHES. THE
CONTRACTOR SHALL PAY FOR COST OF ALL FIELD-CUTTING.
I. NO OPENING EXCEEDING SIX (6) INCHES IN WIDTH PARALLEL TO A PERMANENT
SUPPORT SHALL BE CUT IN THE DECK UNLESS SHOWN ON THE SHOP DRAWINGS OR
WITHOUT PROVIDING ADDITIONAL DECK SUPPORT WHICH HAS BEEN APPROVED BY
THE OWNER. THE ADDITIONAL SUPPORT MATERIAL SHALL BE PURCHASED AND
INSTALLED BY THE TRADES INVOLVED.
J. THE METAL DECK MANUFACTURER SHALL INSTRUCT THE CONTRACTOR AS TO THE
CAPACITY OF THE DECK PANELS WITH REGARD TO THE STORAGE OF MATERIALS
AND THE USE AS A WORKING PLATFORM. THE CONTRACTOR IS TO ENSURE THAT
THEY DO NOT EXCEED DESIGN LOADS OF THE STRUCTURE AT ANY TIME.
1. THE CONTRACTOR SHALL PROVIDE MEANS FOR ADEQUATE DISTRIBUTION OF
CONCENTRATED LOADS TO PREVENT THE OVER-STRESSING OF ANY SECTION OF
THE DECKING DURING THE CONSTRUCTION PERIOD.
3.5 ACOUSTIC INSULATION INSTALLATION
A. INSTALL NEW FIBERGLASS ACOUSTIC INSULATION IN THE LOWER RIBS OF ALL AREAS
WITH ACOUSTIC STEEL DECK.
3.6 REPAIRS AND PROTECTION
A. GALVANIZING REPAIRS: PREPARE AND REPAIR DAMAGED GALVANIZED COATINGS ON
BOTH SURFACES OF DECK WITH GALVANIZED REPAIR PAINT ACCORDING TO
ASTM A 780 AND MANUFACTURER'S WRITTEN INSTRUCTIONS.
B.PROVIDE FINAL PROTECTION AND MAINTAIN CONDITIONS TO ENSURE THAT STEEL
DECK IS WITHOUT DAMAGE OR DETERIORATION AT TIME OF SUBSTANTIAL
COMPLETION.
END OF SECTION 05 31 00
SECTION 06 10 00 ROUGH CARPENTRY
C. AREA OF WORK:
1. BASE BID: ROOFS B, F, AND H
2. ALTERNATE BID: ROOFS E AND H1
D.SCOPE OF WORK:
1. ALL EXISTING WOOD NAILERS AND BACKING MATERIALS ON VERTICAL WALLS ABOVE
ROOFLINE ARE TO BE REMOVED AND REPLACED WITH NEW PROPERLY TREATED
LUMBER.
2. ALL NEW WOOD MUST BE INSTALLED TO MATCH NEW ROOF SYSTEM INSTALLATION
HEIGHTS, TO CREATE ALL DETAILS, AND/OR TO ENSURE PROPER FLASHING
HEIGHTS. IF DUCTWORK, ELECTRICAL COMPONENTS, GAS COMPONENTS, ETC.
NEED TO BE MODIFIED, EXTENDED, ETC.; THIS WORK IS INCLUDED IN THIS
PROJECT'S SCOPE OF WORK AND WITHIN THE BASE BID.
3. CARE MUST BE TAKEN TO ENSURE THAT THE PERIMETER OF EACH INDIVIDUAL ROOF
ELEVATION IS LEVEL AND CONSISTENT. HIGH QUALITY CARPENTRY
WORKMANSHIP WILL BE REQUIRED BY THE CONTRACTOR TO ENSURE THIS
LEVEL AND CONSISTENT INSTALLATION EVERYWHERE WOOD IS INSTALLED.
4. ALL WOOD EXPOSED TO OCCUPIED SPACE SHALL BE FIRE RETARDANT TREATED
LUMBER. ALL OTHER LUMBER SHALL BE EXTERIOR GRADE.
5. PERIMETER NAILERS MUST RUN STRAIGHT AND TRUE FOR THE METAL-ERA
INSTALLATION. PLANE, CUT AND ALTER WOOD AS NEEDED TO INSTALL THE
WOOD STRAIGHT AND TRUE.
PART 3 - EXECUTION
3.0 REMOVAL/DEMOLITION
A. REMOVE ALL EXISTING WOOD COMPONENTS THAT ARE UNCOVERED DURING THE
ROOF AND SHEET METAL REMOVAL.
3.1 INSTALLATION, GENERAL
A. DISCARD UNITS OF MATERIAL WITH DEFECTS THAT IMPAIR QUALITY OF ROUGH
CARPENTRY AND THAT ARE TOO SMALL TO USE WITH MINIMUM NUMBER OF JOINTS
OR OPTIMUM JOINT ARRANGEMENT.
B.SET ROUGH CARPENTRY TO REQUIRED LEVELS AND LINES, WITH MEMBERS PLUMB,
TRUE TO LINE, CUT, AND FITTED. MAKE ALL WOOD PLUMB, TRUE AND LEVEL,
INCONSEQUENTIAL OF THE BUILDING COMPONENTS THEY ARE BEING ATTACHED TO.
C. FIT ROUGH CARPENTRY TO OTHER CONSTRUCTION; SCRIBE AND COPE AS
REQUIRED FOR ACCURATE FIT. CORRELATE LOCATION OF FURRING, NAILERS,
BLOCKING, GROUNDS, AND SIMILAR SUPPORTS TO ALLOW ATTACHMENT OF OTHER
CONSTRUCTION.
D.SECURELY ATTACH ROUGH CARPENTRY WORK TO SUBSTRATE BY ANCHORING AND
FASTENING AS INDICATED, COMPLYING WITH THE FOLLOWING:
1. SECURELY ATTACH CARPENTRY WORK AS INDICATED AND ACCORDING TO ALL
APPLICABLE CODES AND RECOGNIZED STANDARDS. ALL CARPENTRY SHALL BE
FASTENED AT A MINIMUM OF 8 INCHES ON CENTER WITH THE FASTENERS
STAGGERED, IF UNLESS OTHERWISE DENOTED.
2. WHEN SECURING TO CONCRETE OR MASONRY COMPONENTS, EACH LOCATION
MUST BE PRE-DRILLED.
E.ONCE WOOD HAS BEEN INSTALLED IT MUST BE IMMEDIATELY COVERED WITH
FINISHED ROOF FLASHING. ANY WOOD THAT BECOMES WET OR DAMP IN ANY WAY
SHALL BE REMOVED AND REPLACED.
F.NAILS MAY NOT BE USED AT ANY TIMES TO SECURE MATERIALS.
3.2 WOOD GROUNDS, NAILERS, BLOCKING, AND SLEEPERS
A. INSTALL WOOD GROUNDS, NAILERS, BLOCKING, AND SLEEPERS WHERE SHOWN OR
WHERE IT IS FOUND TO BE NEEDED FOR PROPER SYSTEM INSTALLATION AND
WHERE REQUIRED FOR SECURING OR ATTACHING OTHER WORK. FORM TO SHAPES
SHOWN OR AS NEEDED IF NOT SHOWN AND CUT AS REQUIRED FOR TRUE LINE AND
LEVEL OF ATTACHED WORK. COORDINATE LOCATIONS WITH OTHER WORK
INVOLVED.
B.ATTACH TO SUBSTRATES TO SUPPORT APPLIED LOADING. RECESS FASTENERS
FLUSH WITH SURFACES, UNLESS OTHERWISE INDICATED. EXISTING FASTENERS
CANNOT BE USED. NEW FASTENERS MUST BE USED TO ENSURE FASTENER DENSITY
AND SPACING IS EQUALED BUT NOT LESS THAN SPECIFIED.
C. USE SPECIFIED MASONRY ANCHORS FOR SECUREMENT OF THE BASE PIECE OF
LUMBER TO CONCRETE AND MASONRY SUBSTRATES. FASTENERS TO BE INSTALLED
EVERY 6 INCHES ON CENTER, MINIMUM, AND HAVE A MINIMUM 1-3/4” EMBEDMENT IN
SUBSTRATE. NOTE CELL OF MASONRY SHALL BE FILLED WITH NON-SHRINK GROUT
AS REQUIRED TO ENSURE A PROPER SUBSTRATE FOR SECUREMENT. NOTE ALL
LUMBER IN ASSEMBLY IS TO BE SECURED TO THE INSTALLED STAINLESS STEEL
THREADED ROD WITH A STAINLESS STEEL LOCKING WASHER AND A LOCKING
STAINLESS STEEL NUT, WHICH MUST BE COUNTERSUNK.
D.USE SPECIFIED FASTENERS FOR SECUREMENT IN WOOD OR TO SECURE WOOD
NAILERS TO EACH OTHER. FASTENER TO BE INSTALLED EVERY 6 INCHES ON
CENTER, STAGGERED AND HAVE A MINIMUM 1” EMBEDMENT.
E.USE SPECIFIED SELF-TAPPING FASTENER TO SECURE NAILER TO STRUCTURAL
STEEL COMPONENTS AT PERIMETER. NOTE NAILER SHALL BE SECURE THROUGH
DECK INTO UNDERLYING SUPPORT COMPONENT SPACING FASTENERS A MAXIMUM
OF 6 INCHES ON CENTER. THE THREADS OF THE FASTENER SHALL PROJECT
THROUGH SUPPORTING METAL A MINIMUM OF ¼-INCH AND A MAXIMUM OF ¾-INCH.
END OF SECTION 06 10 00
SECTION 07 13 36 KEE PRMA/IRMA
C. AREA OF WORK:
1. BASE BID: ROOFS B, E, F, AND H
D.SCOPE OF WORK:
1. REMOVE OF ALL EXISTING ROOF MATERIALS, ETC., DOWN TO THE DECK. ALL
MATERIALS ARE PROPERLY DISPOSED OF OFFSITE.
2. AREAS OF RUSTED BUT NOT DETERIORATED DECKING SHALL BE PREPARED AND
COATED PER THE SPECIFICATION. PROVIDE THE FOLLOWING SQUARE FEET OF
METAL DECK PREPARATION AND RUST INHIBITIVE PAINTING IN THE BID, WHICH
WILL BE INCREASED OR DECREASED BY THE UNIT COST WITH THE OWNER'S
PRIOR APPROVAL.
a. ROOF B - 3,000 SF
b. ROOF E - 290
c. ROOF F - 400 SF
d. ROOF H - 300 SF
3. REMOVE AND REPLACE DETERIORATED DECK PER SECTION 05 31 00 STEEL DECK.
WITHIN THE BID, THE FOLLOWING QUANTITIES OF DECK TO BE REMOVED AND
REPLACED. THESE QUANTITIES WILL BE ADJUSTED BY THE ADD/DEDUCT UNIT
PRICE.
a. ROOF B - 300 SF
b. ROOF E - 30 SF
c. ROOF F - 40 SF
E.ROOF H - 30 SF
4. ANY DAMAGE FROM FASTENER REMOVAL WILL BE REPAIRED AT THE CONTRACTOR'S
SOLE EXPENSE.
6. INSTALL THE NEW ROOFING SYSTEM AS DESIGNED. DURING INSTALLATION
TERMINATION BAR WITH WATER BLOCK SEALANT AND SEALANT AT THE TOP OF
THE MEMBRANE MUST BE INSTALLED EVERY DAY WHEN NEW MEMBRANE IS
INSTALLED.
7. SYSTEM MUST BE INSPECTED BY MANUFACTURER'S NON-SALES TECHNICAL
REPRESENTATIVE, INCLUDING THE PROBING OF ALL FIELD AND FLASHING
SEAMS, AND ALSO MUST PASS MANUFACTURER'S INSPECTION PRIOR TO
INSTALLATION OF OVERBURDEN. FURTHER, THE CONTRACTOR IS TO ARRANGE
FOR CRI TO INSPECT THE MEMBRANE AND FLASHING BEFORE ANY OVERBURDEN
IS INSTALLED AND TO BE PRESENT AT THE MANUFACTURER'S TECHNICAL
INSPECTION.
8. NO MATERIALS OR HUMAN TRAFFIC MAY OCCUR OVER INSTALLED MEMBRANE
EXCEPT FOR THE INSTALLATION OF THE ROOF SYSTEM OVERBURDEN AND
ASSOCIATED SHEET METAL COMPONENTS. FURTHER, NO STORING OF
MATERIALS WILL BE PERMITTED ON THE INSTALLED MEMBRANE WITH
PROTECTION TO THE MEMBRANE.
9. INSTALL A SINGLE WIDE PATH OF CONCRETE PAVERS AT PERIMETERS OF ROOF
WHERE SHEET METAL PANEL RETAINERS ARE NOT INSTALLED.
10. ADD A ONE-FOOT-WIDE MEMBRANE STRIPING COVER SHEET OVER ALL MEMBRANE
FIELD AND FLASHING SEAMS. ADD A ONE-FOOT-WIDE STRIP OF MEMBRANE AS
A COVER FLASHING OVER ALL FIELD SEAMS AND ALL FLASHING SEAMS TO
JUST BELOW THE TERMINATION BAR. HEAT WELD THE MEMBRANE STRIP
FLASHING FOLLOWING THE SAME PROCEDURES AS WAS USED FOR THE
MEMBRANE INSTALLATION. ENSURE THE FOREMAN AND MANUFACTURERS'
TECHNICAL REPRESENTATIVES CHECK ALL SEAMS BEFORE INSTALLING THE
STRIP FLASHING AND CHECK ALL SEAMS OF THE STRIP FLASHING AFTER ITS
INSTALLATION.
11. CONTRACTOR MUST ENSURE THAT ANYTHING THAT T CLEAR REQUIRES FOR
WARRANTY IS TO BE INCLUDED IN THE BID PRICE. NO EXTRAS WILL BE
CONSIDERED FOR T CLEAR WARRANTY REQUIREMENTS.
PART 3 - EXECUTION
3.1 EXAMINATION
A. EXAMINE SUBSTRATES, AREAS, AND CONDITIONS UNDER WHICH ROOFING SYSTEM
WILL BE APPLIED, WITH INSTALLER PRESENT, FOR COMPLIANCE WITH
REQUIREMENTS.
B.VERIFY THAT ROOF OPENINGS AND PENETRATIONS ARE IN PLACE, SET, AND BRACED
AND THAT ROOF DRAINS ARE REPLACED AND PROPERLY CLAMPED INTO POSITION.
BRACE DRAINS AND DRAINPIPES TO THE DECK OR SUPERSTRUCTURE STEEL AT ALL
LOCATIONS.
C. VERIFY THAT WOOD NAILERS ARE IN PLACE AND SECURED AND MATCH
THICKNESSES OF INSULATION REQUIRED. NOTE: ALL OLD NAILERS ARE TO BE
REMOVED AND REPLACED AND NAILERS MUST BE ADDED AS REQUIRED TO MATCH
THE NEW ROOF SYSTEM ELEVATION AND FOR SPECIFIED AND MANUFACTURER
RECOMMENDED INSTALLATION TO BE COMPLETE AND PROPER.
D.DO NOT PROCEED WITH INSTALLATION UNTIL UNSATISFACTORY CONDITIONS HAVE
BEEN CORRECTED.
3.2 PREPARATION
A. REMOVE ALL EXISTING ROOFING MATERIALS DOWN TO THE DECK.
B.CLEAN ALL SUBSTRATES OF DUST, DEBRIS, AND OTHER SUBSTANCES DETRIMENTAL
TO ROOFING INSTALLATION ACCORDING TO ROOFING SYSTEM MANUFACTURER'S
WRITTEN INSTRUCTIONS. REMOVE SHARP PROJECTIONS.
1. REMOVAL OF ALL PREEXISTING MATERIALS, ADHESIVES, FOREIGN MATERIALS,
DEBRIS AND FASTENERS AND FULL PREPARATION TO CLEAN DECK IF THE
PREEXISTING DECK IS TO REMAIN.
C. IF THE PREEXISTING DECK THAT IS TO REMAIN IS DAMAGED BY REMOVAL OF THE
EXISTING ROOF MATERIALS INCLUDING BUT NOT LIMITED TO CUTTING, RIPPING
FASTENERS OUT, AND/OR GOUGING, THE CONTRACTOR SHALL REPLACE THOSE
DECK SECTIONS AT NO COST TO THE OWNER IN ACCORDANCE WITH THESE
SPECIFICATIONS. THEREFORE, ALL EXISTING FASTENERS ARE TO BE BACKED OUT
AND NOT PULLED OUT OF THE DECK.
D.PREVENT MATERIALS FROM ENTERING AND CLOGGING ROOF DRAINS AND
CONDUCTORS AND FROM SPILLING OR MIGRATING ONTO SURFACES OF OTHER
CONSTRUCTION. REMOVE ROOF-DRAIN PLUGS WHEN NO WORK IS TAKING PLACE
OR WHEN RAIN IS FORECAST FOLLOWING ROOFING APPLICATION. THE OLD DRAINS
ARE TO BE REMOVED AND THE ROOF DRAINS NEED TO BE INSTALLED THE SAME DAY
AND TIED INTO THE NEW MEMBRANE TO ENSURE A WEATHERTIGHT INSTALLATION
THE SAME WORKING DAY. MAKE SURE TO REMOVE THE ROOF IN A MANNER THAT
ALL NEW ROOF APPLICATION AND ALL OLD ROOF THAT REMAINS IS ABLE TO
COMPLETELY DRAIN EACH AND EVERY DAY.
COMM. NO.
SCALE
DATE
DRAWING TITLE
FEBRUARY 2026
101-26
PROJECT TEAM
CITY OF WESTERVILLE
PARKS & RECREATION
DEPARTMENT
COMMUNITY CENTER
2026 ROOF
REPLACEMENT PROJECT
350 NORTH CLEVELAND AVENUE
WESTERVILLE, OH 43082
NTS
ISSUES AND REVISIONS
CONSTRUCTION RESOURCES, INC.
33900 STATION STREET
SOLON, OH 44139
T: 440-248-9800
MAKARICH STRUCTURAL
ENGINEERING, LLC
P. O. BOX 1389
WILLOUGHBY, OH 44096
T: 440-283-7252
BID SET 04-17-2026
A-002
SUMMARIZED
SPECIFICATIONS
ANY DAMAGE FROM FASTENER REMOVAL WILL BE REPAIRED AT THE CONTRACTOR'S
FOR CRI TO INSPECT THE MEMBRANE AND FLASHING BEFORE ANY OVERBURDEN
ARE TO BE REMOVED AND THE ROOF DRAINS NEED TO BE INSTALLED THE SAME DAY
E.COMPLETE TERMINATIONS AND BASE FLASHINGS AND PROVIDE TEMPORARY SEALS
TO PREVENT WATER FROM ENTERING COMPLETED SECTIONS OF THE ROOFING
SYSTEM AT THE END OF THE WORKDAY OR WHEN RAIN IS FORECAST. REMOVE AND
DISCARD TEMPORARY SEALS BEFORE BEGINNING WORK ON ADJOINING ROOFING.
3.3 RECEIVER BOARD INSTALLATION
A. COORDINATE INSTALLING ROOFING SYSTEM COMPONENTS SO RECEIVER BOARD IS
NOT EXPOSED TO PRECIPITATION OR LEFT EXPOSED AT THE END OF THE WORKDAY.
B.INSTALL THE 1/4-INCH BOARD OVER THE DECK AREA LOOSE LAID WITH NO GAPS
BETWEEN BOARDS, STAGGERED CENTER OF THE BOARD FASHION.
3.4 INSTALLATION OF MEMBRANE
A. QUALITY CONTROL
1. IT IS THE RESPONSIBILITY OF THE ROOFING CONTRACTOR TO INITIATE A QUALITY
CONTROL PROGRAM TO GOVERN ALL ASPECTS OF THE INSTALLATION OF THE
NEW ROOFING SYSTEM.
2. THE JOB FOREMAN AND OR SUPERVISOR WILL BE RESPONSIBLE FOR THE DAILY
EXECUTION OF THE QC PROGRAM WHICH WILL INCLUDE BUT IS NOT LIMITED TO
THE SUPERVISION AND INSPECTION DURING SUBSTRATE PREPARATION,
INSTALLATION OF SEPARATOR BOARDS, SEPARATOR SHEETS, INSULATION, THE
APPLICATION OF ADHESIVE(S), FASTENERS, BALLAST MATERIALS AND PROBING
OF ALL HEAT WELDING INCORPORATED WITHIN THE ROOF SYSTEM.
3. IF ANY INCONSISTENCIES, IN THE OVER ALL QUALITY OF THE INSTALLATION,
INCLUDING BUT NOT LIMITED TO THE QUALITY OF THE WELDS, ARE FOUND, ALL
WORK SHALL CEASE UNTIL CORRECTIVE ACTIONS ARE TAKEN TO INSURE THE
CONTINUITY OF ALL WORKMANSHIP.
4. A MANUFACTURER'S TECHNICAL REPRESENTATIVE MUST BE ON SITE FOR THE FIRST
TWO FULL DAYS OF MEMBRANE INSTALLATION AND THEN PERIODICALLY AS
REQUIRED BY THE MANUFACTURER TO ENSURE PROPER INSTALLATION
METHODS ARE BEING FOLLOWED BY THE INSTALLER.
B.GENERAL
1. ALL WORK SHALL BE COORDINATED TO INSURE THAT THE SEQUENCING OF THE
INSTALLATION WILL ALLOW FOR A 100% WATERTIGHT INSTALLATION AT THE END
OF EACH WORK DAY.
2. BALLASTED ROOFING SYSTEMS SHALL UTILIZE PRE-FABRICATED, NON-TABBED
CUSTOM ROLLS.
C. MEMBRANE
1. UNROLL AND POSITION THE MEMBRANE ONTO THE PROPERLY PREPARED
SUBSTRATE, SEPARATOR SHEET OR SEPARATOR BOARD.
2. INSTALL THE MEMBRANE IN A FLAT, RELAXED POSITION AVOIDING WRINKLES AND
STRETCHING. IF THE MEMBRANE DOES NOT LAY FLAT WITHOUT WRINKLES IT IS
TO BE DISCARDED AND NOT INSTALLED.
3. ADJOINING ROLLS SHALL OVERLAP A MINIMUM OF FOUR (4) INCHES, PROPERLY
SHINGLED WITH THE FLOW OF WATER WHEREVER POSSIBLE.
4. STAGER THE FACTORY SEAMS TO PREVENT ADJACENT FACTORY WELDS FROM
FALLING ON TOP OF ONE ANOTHER.
5. THE FIELD MEMBRANE SHALL BE PROPERLY AFFIXED TO THE DECK OR RESTRAINED
IN AN APPROVED MANNER AT ALL ROOF PERIMETERS, WALLS, EXPANSION
JOINTS, CURBS AND PENETRATIONS HAVING ANY ONE DIMENSION GREATER
THAN 24 INCHES IN LENGTH. (SEE CURRENT MANUFACTURER CONSTRUCTION
DETAILS)
D.HOT AIR WELDING
1. GENERAL
a. ALL FIELD SEAMS EXCEEDING 10 FT. IN LENGTH SHALL BE WELDED WITH A
MANUFACTURER APPROVED AUTOMATIC WELDER.
b. ALL FIELD SEAMS MUST BE CLEAN AND DRY PRIOR TO INITIATING ANY FIELD
WELDING.
c. REMOVE FOREIGN MATERIALS FROM THE SEAMS (DIRT, OILS, ETC.) WITH ACETONE, MEK, OR APPROVED ALTERNATIVE. USE CLEAN WHITE COTTON CLOTHS AND
ALLOW APPROXIMATELY FIVE MINUTES FOR SOLVENTS TO DISSIPATE BEFORE
INITIATING THE AUTOMATIC WELDER. DO NOT USE DENIM OR SYNTHETIC RAGS
FOR CLEANING.
d. ALL WELDING SHALL BE PERFORMED ONLY BY QUALIFIED PERSONNEL TO ENSURE
THE QUALITY AND CONTINUITY OF THE WELD.
2. HAND WELDING
a. THE LAP OR SEAM AREA OF THE MEMBRANE SHOULD BE INTERMITTENTLY TACK
WELDED TO HOLD THE MEMBRANE IN PLACE.
b. THE BACK "INTERIOR" EDGE OF THE MEMBRANE SHALL BE WELDED FIRST, WITH A
CONTINUOUS WELD TO CONCENTRATE HEAT ALONG THE EXTERIOR EDGE OF
THE LAP DURING THE FINAL WELDING PASS.
c. THE NOZZLE OF THE HAND HELD HOT AIR WELDER SHALL BE INSERTED INTO THE
LAP AT A 45° ANGLE TO THE LAP. ONCE THE POLYMER ON THE MATERIAL BEGINS
TO FLOW, A HAND ROLLER SHALL BE USE TO APPLY PRESSURE AT A RIGHT
ANGLE TO THE TIP OF THE HAND WELDER. PROPERLY WELDED SEAMS SHALL
UTILIZE A 1½'" WIDE NOZZLE, TO CREATE A HOMOGENEOUS WELD, A MINIMUM OF
1½" IN WIDTH.
d. SMALLER NOZZLES MAY BE USED FOR CORNERS, AND OTHER FIELD DETAILING, MAINTAINING A MINIMUM 1" WELD.
3. AUTOMATIC MACHINE WELDING
a. PROPER WELDING OF THE MEMBRANE CAN BE ACHIEVED WITH A VARIETY OF
AUTOMATIC WELDING EQUIPMENT. CONTACT FTCS FOR SPECIFIC
RECOMMENDATIONS.
b. FOLLOW ALL MANUFACTURERS' INSTRUCTIONS FOR THE SAFE OPERATION OF THE
AUTOMATIC WELDER.
c. FOLLOW LOCAL CODE REQUIREMENTS FOR ELECTRIC SUPPLY, GROUNDING, AND
SURGE PROTECTION.
d. THE USE OF A DEDICATED, PORTABLE GENERATOR IS HIGHLY RECOMMENDED TO
INSURE A CONSISTENT ELECTRICAL SUPPLY, WITHOUT FLUCTUATIONS THAT CAN
INTERFERE WITH WELD CONSISTENCY.
e. PROPERLY WELDED SEAMS SHALL UTILIZE A 1½'" WIDE NOZZLE, TO CREATE A
HOMOGENEOUS WELD, A MINIMUM OF 1½" IN WIDTH.
4. ADD ONE-FOOT-WIDE MEMBRANE STRIPING COVER SHEET OVER ALL MEMBRANE
FIELD AND FLASHING SEAMS.
a. ADD A ONE-FOOT-WIDE STRIP OF MEMBRANE AS A COVER FLASHING OVER ALL
FIELD SEAMS AND ALL FLASHING SEAMS TO JUST BELOW THE TERMINATION
BAR. HEAT WELD THE MEMBRANE STRIP FLASHING FOLLOWING THE SAME
PROCEDURES AS WAS USED FOR THE MEMBRANE INSTALLATION. INSURE THE
FOREMAN AND MANUFACTURERS' TECHNICAL REPRESENTATIVES CHECK ALL
SEAMS BEFORE INSTALLING THE STRIP FLASHING AND CHECK ALL SEAMS OF
THE STRIP FLASHING AFTER ITS INSTALLATION.
E.INSPECTION
1. THE JOB FOREMAN AND/OR SUPERVISOR SHALL INITIATE DAILY INSPECTIONS OF ALL
COMPLETED WORK WHICH SHALL INCLUDE, BUT IS NOT LIMITED TO THE PROBING
OF ALL FIELD WELDING WITH A DULL POINTED INSTRUMENT TO ASSURE THE
QUALITY OF THE APPLICATION AND INSURE THAT ANY EQUIPMENT OR
OPERATOR DEFICIENCIES ARE IMMEDIATELY RESOLVED. A MANUFACTURER'S
TECHNICAL REPRESENTATIVE MUST BE ON SITE FOR THE FIRST TWO FULL DAYS
OF MEMBRANE INSTALLATION AND THEN PERIODICALLY AS REQUIRED BY THE
MANUFACTURER TO ENSURE PROPER INSTALLATION METHODS ARE BEING
FOLLOWED BY THE INSTALLER.
2. INSURE THAT ALL ASPECTS OF THE INSTALLATION (SHEET LAYOUT, ATTACHMENT,
WELDING, FLASHING DETAILS, ETC.) ARE IN STRICT CONFORMANCE WITH THE
MOST CURRENT MANUFACTURER'S SPECIFICATIONS AND DETAILS.
3. EXCESSIVE PATCHING OF FIELD SEAMS BECAUSE OF INEXPERIENCED OR POOR
WORKMANSHIP WILL NOT BE ACCEPTED AT TIME OF FINAL INSPECTION FOR
WARRANTY ACCEPTANCE, WHICH WILL BE DETERMINED BY THE OWNER'S
REPRESENTATIVE AT THE OWNER'S REPRESENTATIVE'S SOLE DISCRETION.
4. ANY DEVIATION FROM PRE-APPROVED SPECIFICATIONS AND/OR DETAILS REQUIRES
WRITTEN AUTHORIZATION FROM THE FTCS PRIOR TO APPLICATION TO AVOID
ANY WARRANTY DISQUALIFICATION.
3.5 FLASHING
A. CLEAN ALL VENTS, PIPES, CONDUITS, TUBES AND STACKS TO BARE METAL. ALL
PROTRUSIONS MUST BE PROPERLY SECURED TO THE ROOF DECK WITH APPROVED
FASTENERS. REMOVE AND DISCARD ALL LEAD, PIPES AND DRAIN FLASHING. NEW
SPECIFIED DRAINS OR DRAIN INSERTS ARE TO BE INSTALLED FLASH ALL
PENETRATIONS ACCORDING TO MANUFACTURER AND SPECIFIED APPROVED
DETAILS.
B.REMOVE ALL CANT STRIPS AND OLD EXISTING FLASHING.
C. FLASH ALL CURBS, PARAPETS AND INTERIOR WALLS IN STRICT ACCORDANCE WITH
APPROVED DETAILS AND THE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .