These are bid documents for the City of Holladay, Utah, for the Construction of Olympus Jr High Storm Drain Piping Project located at 2217 E Murray Holladay Road, Holladay, Utah. The work includes installation of PVC pipe (6-inch and 8-inch), precast concrete boxes, cleanout boxes, connections to existing pipes and structures, asphalt restoration, concrete flatwork, curb and gutter replacement, and tree removal, with all work performed around existing utilities and within a school zone. The project requires a mandatory pre-bid meeting on Thursday, April 16, 2026, at 1:30 p.m. at the north side of the Olympus Jr High parking lot. Bidders may submit written questions to Jared Bunch, P.E., Project Engineer, at jbunch@holladayUT.gov by 5:00 p.m. Monday, April 20, 2026. Bids will be received until 2:00 p.m. Thursday, April 23, 2026, at the Temporary Holladay City Hall, 3330 S 1300 E, Millcreek, Utah, and will be publicly opened and read aloud. Work may not commence until June 22, 2026, and must be substantially completed by August 7, 2026, as school begins August 12, 2026. The contract will be awarded to the lowest responsive and qualified bidder with favorable references.
Bids shall be submitted on a lump sum basis and must include the Bid Form, Bid Schedule, and Qualifications and References documents with all required signatures. No bonds are required; however, the selected contractor must provide proof of liability and workers' compensation insurance with minimum coverage limits including $2,000,000 in comprehensive general liability and $2,000,000 in automobile liability. The project is not federally funded and does not require prevailing wage payments or payroll submissions. Liquidated damages are assessed at $500 per day for late contract completion and $500 per day for any utility interruptions caused by the contractor without prior written authorization. All bids remain subject to acceptance for 45 days after the bid opening date. The contractor must obtain all necessary permits, comply with the 2025 Manual of Standard Specifications by the Utah Chapter of the American Public Works Association, and implement a Public Relations Plan addressing community notifications, complaint resolution, and documentation requirements.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Title Page
00 01 01 - 1
DOCUMENT 00 01 01
TITLE PAGE
Jared Bunch, P.E. – City Engineer
Holladay, UT 84117
Bids will be received at the TEMPORARY HOLLADAY CITY HALL, 3330 S 1300 E, MILLCREEK, UT, until 2:00 p.m.
Thursday, April 23rd, 2026.
CONSTRUCTION OF
OLYMPUS JR HIGH STORM DRAIN PIPING PROJECT
CONTRACT DOCUMENTS
Table of Contents
00 01 10 - 1
DOCUMENT 00 01 10
TABLE OF CONTENTS
Document
Number Title
INTRODUCTORY INFORMATION
00 01 01 Title Page
00 01 10 Table of Contents
PROCUREMENT REQUIREMENTS
00 11 16 Invitation to Bid
00 21 13 Instructions to Bidders
00 39 12 Notice of Intent to Award
00 39 13 Notice to Proceed
00 41 00 Bid Form
00 43 00 Bid Schedule
00 43 37 Qualifications and References
CONTRACTING REQUIREMENTS
00 52 00 Agreement
00 62 16 Certificate of Insurance Form
00 73 03 Modifications to the General Conditions
REVISIONS, CLARIFICATIONS, AND MODIFICATIONS
00 91 13 Addenda
00 92 45 Change Order Form
SPECIAL PROVISIONS AND AMENDED SPECIFICATIONS
01 11 00S Summary of Work
SCHEDULE – A: Civil Design Drawings
END OF TABLE OF CONTENTS
Invitation to Bid
00 11 16 - 1
PART 1 DOCUMENT 00 11 16
INVITATION TO BID
PART 2 GENERAL
2.1 CONSTRUCTION CONTRACT
A. Bidders are invited to bid on the Construction Contract known as Olympus Jr High
Storm Drain Piping Project.
B. The location of the work is: 2217 E Murray Holladay Road, Holladay, Utah
C. The Work generally includes, but is not limited to, the following: Installation of PVC pipe, cleanout boxes, connections to existing pipes and structures, and asphalt restoration. Also includes tree removal. Work will be around existing utilities and in a school zone.
2.2 QUESTIONS & ANSWERS
A. Email questions to Jared Bunch, P.E., Project Engineer at jbunch@holladayUT.gov
B. All questions to be submitted by 5:00 p.m. Monday, April 20, 2026.
2.3 PREBID MEETING
A. A mandatory pre-bid meeting will be held on Thursday, April 16, 2026, at 1:30 pm. The meeting location will be at 2117 E Murray Holladay Road at the north side of the
Olympus Jr High parking lot near the work site. The Project Engineer will be on site to answer questions regarding the work.
2.4 BIDS
A. Bids will be received until 2:00 p.m. Thursday, April 23, 2026, at the TEMPORARY
HOLLADAY CITY HALL, 3330 S 1300 E, MILLCREEK, UT, at which time and place all bids will be publicly opened and read aloud. Bids received after 2:00 p.m., as conclusively established by the clock at the Bid opening location, will not be accepted.
Bids may be submitted electronically to jbunch@holladayut.gov.
B. Submit all documents listed in Document 00 21 13 Instructions to Bidders, Section 2.5.
2.5 BASIS OF BIDS
A. Bids shall be on a Lump Sum basis. Unsealed or segregated Bids will not be accepted.
Invitation to Bid
00 11 16 - 2
B. Bids shall be evaluated based on the lowest bid amount that meet the minimum qualifications and have favorable references. Contractor must also meet the minimum requirements in Document 00 21 13 Instruction to Bidders, Part 3
2.6 CONTRACT TIME
A. Work may not commence until June 22, 2026.
B. The Work will be Substantially Complete by August 7, 2026. Substantial completion may not be pushed back; school begins August 12, 2026.
2.7 BONDS
A. No Bonds are required.
2.8 RIGHT TO REJECT BIDS
A. City of Holladay reserves the right to reject any or all bids or to waive any informality or technicality in any bid if deemed to be in the best interest of City of Holladay.
2.9 GOVERNING LAWS AND REGULATIONS
A. This project is not federally funded and does not require the payment of specific wage rates. Payroll submittal will not be required.
B. Bidders on this Work will be subject to the applicable provisions of all federal rules, laws and regulations or orders.
END OF DOCUMENT
Instructions to Bidders
00 21 13 - 1
DOCUMENT 00 21 13
INSTRUCTIONS TO BIDDERS
PART 1 GENERAL
1.1 DEFINED TERMS
A. Terms used in the Bid Documents that are defined in Article 1.1 of the General
Conditions will have the meanings indicated in the General Conditions.
B. General Conditions: as published in Document 00 72 00 in the 2025 Manual of
Standard Specifications by the Utah Chapter of the American Public Works
Association.
1.2 COPIES OF BID DOCUMENTS
A. Bidders must use complete sets of Bid Documents in preparing Bids. OWNER and
ENGINEER assume no responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bid Documents.
B. Bid Documents are made available to bidders only for the purpose of obtaining Bids on the Work. No license or grant for any other use is given.
C. Bidding Document copyrights shall remain with the OWNER.
D. All provisions of the current edition of the 2025 Manual of Standard Specifications and
Manual of Standard Plans published by the Utah Chapter of the American Public Works
Association that are applicable to the Work are hereby made a part of the Contract
Documents by reference. The publications may be downloaded for free at https://utah.apwa.org/education/utah-standard-plans-specifications/.
1.3 PRE-BID COMMUNICATION
A. All communications must be made in writing as instructed in Document 00 11 16
Invitation to Bid.
1.4 PHYSICAL CONDITIONS
A. In General: Prior to submitting a Bid, each Bidder is responsible to review all available explorations, tests and data concerning surface conditions, subsurface conditions and Underground Facilities at or contiguous to the site, or otherwise, which may affect cost, progress, performance or furnishing of the Work in accordance with the time, price and other terms and conditions of the Contract Documents.
B. Additional Explorations and Tests: If feasible as determined by OWNER, the
OWNER will provide each Bidder access to the site to conduct any explorations and tests as each Bidder deems necessary for submission of a Bid. Bidder shall obtain permits, fill all holes, clean up and restore the site to its former condition upon completion of such explorations. by requesting such an exploration or test, Bidder
00 21 13 - 2 agrees to release, indemnify, defend, and save the OWNER harmless from all costs damages and liabilities an any kind whatsoever, including reasonable attorneys' fees, that may arise in connection with or as a result of the performance of such explorations or tests.
1.5 COMPENSATION AND QUANTITIES
A. In General: The bid price for any lump sum or unit price contract includes all labor, materials, and incidental work to fully complete the Work in a satisfactory manner under the terms of the Contract Documents. Bidders are responsible to inform themselves of the character of the Work to be performed.
B. Lump Sum Work: If the Work is to be paid for on a lump sum basis, the lump sum will be the only sum paid.
C. Unit Price Work: If any portion of the Work is to be paid for on a unit price basis, payment will cover only work actually performed and materials actually supplied at the unit prices bid and on the terms set forth in the Contract Documents, irrespective of any quantity approximations in the Bid Documents. Any quantity approximations in the
Bid Documents are stated as a basis for determining bids, and the do not fix the amount of Work to be done or materials to be furnished. Stated quantities are estimates for the purpose of doing the class of work required. Actual quantities will vary. The OWNER may deviate in either direction from any indicated quantities. The Bidder shall have no claim for any variation in quantity, except to the extent permitted in the General
Conditions.
1.6 EXAMINATION OF SITE AND CONTRACT DOCUMENTS
A. In General: The OWNER shall not be bound by any statements, representations, conclusions, or assumptions made by any party, whether oral or written, except for written statements that are issued in an Addendum.
B. Access: The Contract Documents designate the site for performance of the Work.
Bidder is responsible to investigate the site and understand all access requirements. The only time the site is available for site visits is during the pre-bid meeting called for in
Section 2.4 of the INVITATION TO BID. All additional off site lands and access thereto required for temporary construction facilities or storage of materials and equipment are to be provided by Bidder.
C. Contract Documents: The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this
Article 1.4; that without exception the Bid is premised upon performing and furnishing the Work required by the Contract Documents; and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.
D. Bidder's Obligations: In addition to Bidder's other responsibilities and obligations in connection with submitting a Bid, it is the responsibility of the Bidder before submitting a Bid, to:
00 21 13 - 3
1. Examine the Contract Documents thoroughly;
2. Investigate all applicable construction and labor conditions, quantities, and the character of the Work as they affect cost, progress, performance, or furnishing of the Work;
3. Consider federal, state and local Laws and Regulations that may affect cost, progress, performance or furnishing of the Work;
4. Study and carefully correlate Bidder's observations with the Contract Documents;
5. Review all available explorations and data concerning surface and subsurface conditions as set forth in Section 1.4 above; and
6. Identify and notify ENGINEER in writing in the manner set forth in article 2.1 below of all specific conflicts, omissions, errors, or discrepancies in the Contract
Documents, or if Bidder doubts their meanings.
The failure or omission of any Bidder to take any of the foregoing actions shall not in any way relieve Bidder of its Bid, or its obligation to furnish all material, equipment, labor and services necessary to carry out the provisions of the Contract Documents and to complete the contemplated Work for the consideration set forth in its Bid.
Submission of a Bid shall constitute prima facie evidence of compliance with these instructions.
E. Deviations from the Terms of the Contract Documents: OWNER will not accept any deviations whatsoever from the printed terms of the Agreement and the Contract
Documents, except by Addendum or Change Order.
1.7 EFFECT OF SUBMITTING BID.
A. Bidders are responsible to carefully examine the Contract Documents, visit the site, and fully inform themselves so as to include in the Bid a sum to cover the cost of all items.
Bidder’s failure or omission to receive or examine any form, instrument, addendum or other document, visit the site and become acquainted with existing conditions, or attend any pre-Bid Conference, shall in no way relieve Bidder from any obligations with respect to Bidder’s Bid or the Construction Contract.
B. By submitting a Bid, Bidder represents that Bidder has complied with all requirements of the Bid Documents; that the Bid is premised on properly performing and furnishing the Work required by the Contract Documents within the times specified; that the
Bidder is informed of the conditions to be encountered and the character, quality and quantities of the Work; and that the Bidder believes the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.
C. Submission of a Bid constitutes a promise that the Bidder will enter the Contract
Documents in the form presented in the Contract Documents. Bidders should carefully examine all Contract Documents, including the required Bonds and insurance to be provided by the Bidder.
00 21 13 - 4
1. The Performance Bond is a guarantee of faithful performance of the requirements of the Contract Documents, including all applicable warranties. The Payment Bond is a guarantee of payment of all labor, materials, or supplies used directly or indirectly in the prosecution of the Work provided in the Construction Documents.
2. The sum of the Performance Bond and the Payment Bond shall be increased or decreased during the course of the Work in the event that Contract Modifications, Change Orders or Addenda increase or decrease the total contract price. The sum of each bond shall be in an amount equal to the completed contract price at the completion of the Work.
3. OWNER does not provide any release of Performance Bonds or Payment Bonds.
The bonds are in effect throughout all periods during which a suit may be brought under the provisions of applicable law.
D. By submitting a Bid, Bidder represents that the matters stated therein are true and correct.
PART 2 BIDDING PROCEDURES
2.1 INTERPRETATIONS AND ADDENDA
A. All requests for interpretation of the Contract Documents shall be made in writing and delivered to the ENGINEER vie email no later than seven (7) calendar days prior to opening of Bids. In the ENGINEER's discretion, ENGINEER will send the written interpretation to all persons receiving a set of Bid Documents in the form of an
Addendum. If the ENGINEER does not respond to a Bidder's request for interpretation the Bidder shall comply with the intent and terms of the Contract Documents.
B. No oral interpretations shall be made to any Bidder. The OWNER shall not be responsible for or bound by any statements, interpretations, explanations, representations, conclusions or assumptions made by any party, whether oral or written, except for written statements that are issued in an Addendum by the ENGINEER to all prospective bidders.
C. Each statement made in an Addendum is part of the Contract Documents at the location designated in the Addendum. A statement issued in an Addendum shall have the effect of modifying a portion of the Bid Documents when the statement in the Addendum specifies a particular section, paragraph or text and states that it is to be so modified.
Only the specified section, paragraph or text shall be so modified, and all other portions of the Bid Documents shall remain if effect.
D. Bidders shall sign to acknowledge their receipt of all Addenda issued. Bidders shall also acknowledge receipt of all Addenda in the space provided in the Bid.
E. Except to postpone the Bid opening, no Addenda shall be issued within 48 hours of the
Bid opening.
00 21 13 - 5
2.2 EQUIPMENT AND MATERIAL OPTIONS PRIOR TO BID OPENING
A. If a Bidder or Supplier wishes to supply a product other than that identified in the
Contract Documents, said Bidder or Supplier shall submit a written request for approval to the ENGINEER at least ten (10) calendar days prior to the date set for opening of bids.
B. The procedure for submission of any such product option shall be as set forth in Article
6.4 of the General Conditions. It is the sole responsibility of the Bidder or Supplier to submit complete descriptive and technical information so that ENGINEER can make a proper appraisal.
C. ENGINEER's failure to act upon such a request within five (5) days after receipt shall be deemed a denial thereof.
D. Any such approval is at the sole discretion of the ENGINEER and will be in the form of an Addendum issued to all Bidder's holding Bid Documents indicating that the additional equipment or materials are approved as equal to those specified for the
Project.
E. The Construction Contract, if awarded, will be on the basis of materials and equipment specified in the Drawings and Specifications and any changes permitted in any
Addenda.
2.3 COMPLETING BID DOCUMENTS
A. The General Conditions identify all forms comprising the Bid Documents. Additional copies may be obtained from the ENGINEER. The Bidder shall make no stipulations or alterations on the Bid forms. The Bidder must use and execute only the Bid form and
Bid Schedules bound in the Contract Documents. The complete Contract Documents
(excluding the Drawings) should be submitted as the Bidder's Bid, and Bidder shall complete and submit all forms included in the Bid Form, Document No. 00 41 00.
B. The Bidder must fill in all items in the Bid form in ink or electronically. If applicable, furnish both the unit and total costs for each item. The total Bid price is the full price for the performance of all Work under the Contract Documents. Bidder shall initial in ink any corrections, interlineations, alterations, or erasures made by the Bidder on
Bidder’s entries in the Bid Documents.
C. Any work or material which is specified in the Contract Documents or which is necessary because of the nature of the Work, but which is not listed separately in the
Bid Schedule shall not be measured or paid for separately. The cost of such work or material shall be considered as included in the Contract Price.
D. Bids by corporations must be executed in the corporate name by a corporate officer authorized to sign, and must be properly attested to as an official act of the corporation.
At the OWNER's request, authority to sign shall be submitted.
E. Bids by partnerships or joint ventures must be executed in the partnership or joint venture name and signed by a partner or joint venture whose title and official address must be shown. If a partnership or joint venture is the low bidder, the partnership or
00 21 13 - 6 joint venture must also submit evidence to the OWNER of the responsibility of the partnership or joint venture as a bidder in the manner directed by the ENGINEER.
F. Where the Bidder is wholly owned subsidiary of another company, the Bid must so state, and the owner or parent corporation also must agree to sign and be bound with the
Bidder.
G. All names must be typed or printed under or near the signature. Signatures shall be in longhand.
H. The Bid shall contain an acknowledgment of receipt of all Addenda. The Addenda numbers must be filled in on the Bid form.
I. The Bidder's address, telephone number, and email for communications regarding the
Bid must be shown on the first page of the Bid form.
J. The divisions and sections of the specifications, and the identifications of any
Drawings, shall not control Bidder in dividing the Work among subcontractors or suppliers, or delineating the Work to be performed by any specific trade.
K. The base Bid and alternates shall include all Work required to be performed by the
Contract Documents.
2.4 CONFLICT OF INTEREST, SUBCONTRACTORS
A. Conflict of interest pertaining to Subcontractors is described in paragraph 6.5H of the
General Conditions (Document 00 72 00).
B. Bidder shall not subcontract more than 75 percent of the dollar value of the total contemplated Work (exclusive of the supply of materials and equipment to be incorporated in the Work) without OWNER's prior written approval.
2.5 SUBMISSION OF BIDS
A. Bids shall be submitted at the time and place indicated in the Invitation to Bid and should be enclosed in an opaque sealed envelope, marked with the Construction
Contract name, the name and address of the Bidder, and the date and the opening time for Bids. If the Bid is sent through the mail or other delivery system the sealed envelope should be enclosed in a separate envelope with the notation "BID
ENCLOSED" on the face of it. Bids may be submitted electronically to jbunch@holladayut.gov. It is the sole responsibility of the Bidder to deliver the Bid before the scheduled time.
B. Bidder will make no recapitulations, stipulations, alterations, alternate submissions, or modifications in any manner to any of the Contract Documents.
C. All bidders shall include the following Bid Form documents with required signatures and notarized when designated:
1. Bid Form (Document 00 41 00)
2. Bid Schedule (Document 00 43 00)
3. Qualifications and References (Document 00 43 37)
00 21 13 - 7
Failure to include any of these documents will result in Bid being considered non-responsive and may be disqualified.
D. Alternate bids, other than those called for in the Bid form, will not be considered.
E. No oral, telegraphic, telephonic, facsimile or modified bids will be considered.
2.6 MODIFICATION AND WITHDRAWAL OF BIDS
A. At any time prior to the opening of Bids, Bids may be modified or withdrawn if a written notice of modification or withdrawal is signed by Bidder and delivered to the place where Bids are to be submitted.
B. Within 24 hours after Bids are opened, any Bidder may file written notice with
OWNER that there was a substantial mistake made in the preparation of its Bid. Bidder must thereafter promptly demonstrate Bidder's mistake. The OWNER has sole discretion to determine whether to permit any modification or withdrawal.
C. When it appears a mistake has been made, or when the OWNER desires an assurance of any matter, the OWNER may request a Bidder to confirm the Bid in writing.
2.7 OPENING OF BIDS
A. Bids will be opened and read aloud publicly unless obviously non-responsive. An abstract of the amounts of the base schedule of prices and any alternate schedules will be made available for review after the opening of Bids.
B. Any Bids received after the time specified in the Invitation to Bid will be returned unopened.
2.8 BIDS SUBJECT TO ACCEPTANCE FOR 45 DAYS
A. All bids remain subject to acceptance for 45 days after the day of the Bid opening.
OWNER may, in its sole discretion, release any Bid and return the Bid security prior to that date.
PART 3 EVALUATION AND AWARD
3.1 EVALUATION OF BIDDER'S QUALIFICATIONS
A. Bids shall be evaluated based on the lowest Bid amount that meet the minimum qualifications and have favorable references.
B. If the minimum qualifications and references are in doubt, the Owner may request additional qualifications. Upon request, the Bidder is to submit, within seven (7) calendar days of ENGINEER's request, the following information for the Bidder.
ENGINEER may also request like information on Bidder's Subcontractors, Bidder's
Suppliers or any other information the ENGINEER may require.
1. A current financial statement for the Work (as provided to bonding company);
00 21 13 - 8
2. A chronological list of "in progress" and "completed" construction work done by
Bidder during the last 3 years; including project name, address, owner, contract name, and current telephone number;
3. Present construction commitments other than items listed in paragraph 2 above;
4. Proposed organizational structure such as firm ownership, project manager, progress scheduler, and superintendent for the Work of this Project;
5. Owned and rented equipment which is to be used to do the Work;
6. Investigations, arbitration, litigation or claims which are pending, threatened, settled or otherwise disposed of within the last three (3) years;
7. Evidence of ability to perform and complete the Work in a manner and within the time limit specified. As a minimum, identify specific experience on projects similar to the Work in physical size, cost, and commercial nature. If the work experiences of the project manager and superintendent designated to construct this project are different than that of the company, provide resumes of their work history. Include their actual project titles and indicate their actual responsibilities on each given project;
8. All matters consistent with federal, state and local Laws and Regulations; and
9. Such other data as may be called by the ENGINEER.
C. If Bidder believes any information should be held confidential for business reasons, Bidder must submit a written claim of business confidentiality for that particular information and include a specific statement of the reasons supporting the claim pursuant to Utah Code Ann. § 63-2-308.
D. Untimely response or failure to provide the requested information by Bidder will release
OWNER of any obligation to further consider the Bidder's Bid.
3.2 EVALUATION OF BIDS
A. OWNER reserves the right: to reject any and all Bids or any part thereof; to waive any informalities in the Bid Schedule and elsewhere; to negotiate and agree to contract terms with the successful Bidder; to disregard non-conforming, non-responsive, unbalanced or conditional Bids; and to withhold the award for any reason deemed in the best interests of the OWNER.
B. OWNER reserves the right to reject any Bid if OWNER believes that it would not be in the best interest of the Project or the OWNER. Without limitation, such rejection may be because the Bid is not responsive, or the Bidder is unqualified or of doubtful ability or the Bid or Bidder fails to meet any other pertinent standard or criteria established by
OWNER.
C. If the OWNER intends to make an award to a Bidder, a Notice of Intent to Award will be issued.
D. OWNER may consider all information which OWNER believes is relevant when evaluating a Bid, including, without limitation:
00 21 13 - 9
1. The qualifications and experience of the Bidder and of the Subcontractors, Suppliers, and other persons and organizations proposed (whether or not the Bid otherwise complies with the prescribed requirements).
2. Such alternates, unit prices and other data, as may be requested in the Bid Form, Bid Schedule, or written requests issued prior to OWNER's Notice of Intent to
Award the Construction Contract.
3. Operating costs, maintenance requirements, performance data, and guarantees of ability to provide the required materials and equipment.
4. Corporate organization and capacity for any party.
5. Ability to perform and complete the Work in the manner and within the time specified.
6. Pending litigation.
7. The amount of the Bid.
8. Proper licensing to do the Work in compliance with licensing laws of the State of
Utah for contractors and subcontractors.
9. All other relevant matters, consistent with OWNER's procurement code and administrative rules, OWNER's ordinances and program policies.
E. To establish qualifications of Bidder, OWNER may request such data indicated in the
Bid Documents, conduct such investigations as OWNER deems appropriate, and consider any other information (whether obtained from the Bid, the Bidder, or any other source).
F. If the Construction Contract is to be awarded, it will be awarded to the most responsive, qualified, and responsible Bidder as determined by the OWNER. Alternates may be accepted depending upon availability of OWNER's funds and as determined by the
OWNER. Accepted alternates will be considered in determining the most responsive, qualified, and responsible Bidder.
G. Bid Schedules will be evaluated as follows:
1. Discrepancies in the multiplication of quantities of Work items and unit prices will be resolved in favor of the unit prices. OWNER may correct Bid Schedule calculation errors accordingly.
2. Prices written out in words shall govern over prices written out in numbers.
3. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
4. Bids shall not contain any recapitulations of or changes in the work to be done.
H. The OWNER, in the OWNER’s sole discretion, shall make determinations as to disqualification of Bidders or rejection of Bids. Such matters may include, without limitation, submission of more than one Bid by the Bidder (whether under the same or different names); among Bidders; other commitments of Bidder which, in the
OWNER’s sole judgment, might hinder the Work; previous defaults, Bid irregularities when not waived in the best interests of the OWNER, delays or poor performance by
00 21 13 - 10
Bidder on any project; official action against Bidder; and any other cause which, in the
OWNER’s sole discretion and judgment, is sufficient to justify disqualification of a
Bidder or rejection of a Bid.
3.3 ADJUSTMENTS TO THE COST OF THE WORK AFTER OPENING OF BIDS
A. The Contract Price identified in the Agreement represents the cost of the work which is to be paid by the OWNER to the CONTRACTOR.
B. Adjustments to the Contract Price which are agreed to between the OWNER and the successful Bidder shall be effected by signing an Agreement Supplement.
3.4 SUBSTITUTIONS
A. The Construction Contract, if awarded, will be on the basis of materials and equipment described in the Drawings, Specifications and any Addenda.
B. After the Effective Date of the Construction Contract, the procedure for submitting an application for substitution is set forth in Article 6.4 of the General Conditions.
3.5 SUBMITTALS REQUIRED FOR AWARD OF CONTRACT
In order to execute the contract, the following documents shall be submitted to OWNER within seven (7) calendar days of the receipt of the NOTICE OF INTENT TO AWARD.
A. Certificate of Insurance: The OWNER's requirements as to insurance are as set forth in the Modifications to General Conditions (Document 00 73 03).
B. Other Information: When a determination has been made to award the Construction
Contract, Bidder is required, prior to the award or after the award, or both, to furnish such other information as the ENGINEER requests.
3.6 SIGNING OF AGREEMENT
A. Within seven (7) calendar days after OWNER issues Notice of Intent to Award the
Construction Contract to the successful Bidder, the Bidder shall pick up, sign and return to OWNER, the required number of copies of the Agreement (Document 00 52 00), bonds, and insurance. One executed original will be returned to the Bidder. Bidder shall comply with all execution requirements.
B. All of Bidder’s executions and submittals must be delivered to the OWNER before
OWNER will execute the Construction Contract. The Construction Contract will not be deemed awarded and shall not be binding on the OWNER until it has been approved and executed by the OWNER, and a fully executed copy is formally delivered to the
CONTRACTOR. The OWNER reserves the right to rescind its Notice of Intent to
Award without liability, at any time before the Construction Contract has been fully executed by all parties and delivered to the CONTRACTOR.
C. Transfers, delegations or assignments of interests in the Contract Documents are prohibited, unless prior written authorization is received from the OWNER.
00 21 13 - 11
D. At the time of Bidding, and the signing of the Agreement, and at all times during the
Work, Bidder shall be properly licensed to do the Work and shall be in compliance with the license laws of the State of Utah, City of Taylorsville, and Salt Lake County. The
Bidder shall also require all Subcontractors to do the same.
E. If a Bidder fails to fully and properly execute the Construction Contract and provide all submittals required therewith within seven (7) calendar days after the date of the Notice of Intent to Award, the OWNER may elect to rescind the Notice of Intent to Award. In the OWNER’s sole discretion, a Notice of Intent to Award may then be provided to another bidder whose Bid is most advantageous to the OWNER, price and other factors considered.
Notice of Intent to Award
00 39 12 - 1
DOCUMENT 00 39 12
NOTICE OF INTENT TO AWARD
PROJECT DESCRIPTION: Olympus Jr High Storm Drain Piping Project.
The OWNER has considered the BID submitted by you for the above described WORK in response to its Advertisement for Bids called: Olympus Jr High Storm Drain Piping Project.
You are hereby notified that your BID has been accepted for items in the amount of:
In order to execute the contract, all documents as specified in Document 00 21 13 – 3.6 shall be submitted to the OWNER within seven (7) calendar days of the receipt of this NOTICE OF
INTENT TO AWARD.
You are required to return an acknowledged copy of this NOTICE OF INTENT TO AWARD to the OWNER. Dated this ____ day of ___________, 2026.
CITY OF HOLLADAY
Owner
By
Jared Bunch, P.E.
Title City Engineer
ACCEPTANCE OF NOTICE
Receipt of the above NOTICE OF INTENT TO AWARD is hereby acknowledged
By __________________________________________ this the _______day of ___________________ , ______
By __________________________________________
Title _________________________________________
To:
Notice to Proceed
00 39 13 - 1
DOCUMENT 00 39 13
NOTICE TO PROCEED
To:
Date:
PROJECT DESCRIPTION: Olympus Jr High Storm Drain Piping Project.
You are hereby notified to commence work in accordance with the Agreement dated
________________________ on or before______________________ and you are to substantially complete the WORK on or before August 7, 2026. The date of completion of all
WORK is therefore August 14, 2026.
CITY OF HOLLADAY
By
Jared Bunch, P.E.
Title City Engineer
ACCEPTANCE OF NOTICE
Receipt of the above NOTICE TO PROCEED is hereby acknowledged
By __________________________________________ this the _______day of _____________________ , ____
By __________________________________________
Title _________________________________________
Bid Form
00 41 00 - 1
DOCUMENT 00 41 00
BID FORM
PART 1 GENERAL
1.1 BID PROPOSAL
A. After having personally and carefully examined all conditions surrounding the Work and the Contract Documents, the undersigned proposes to furnish all labor, equipment, tools and machinery and to furnish and deliver all materials not specifically mentioned as being furnished by the OWNER, which is required in and about the construction of the Construction Contract known as Olympus Jr High Storm Drain Piping Project.
B. The undersigned proposes to complete the Work for the price or prices listed in the Bid
Schedule (Document 00 43 00) and understands that quantities for Unit Price Work are not guaranteed.
C. The undersigned proposes to furnish bonds with the Contract, signed by a surety company satisfactory to the OWNER, in an amount equal to the Contract amount conditioned to insure compliance with all requirements of the Contract Documents.
D. The undersigned proposes to execute the attached contract within seven (7) days after the Notice of Intention to Award, and to begin work within seven (7) days after being notified to do so by the OWNER.
E. The undersigned agrees the Bid is genuine. The Bid is not made in the interest of or on behalf of any undisclosed person, firm or corporation. The undersigned agrees that they have not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid: that they have not solicited or induced any person, firm or corporation to refrain from bidding: and that they have not sought by collusion to obtain for itself any other advantage over any separate Bidder or over OWNER.
F. If OWNER finds it necessary to further define the Work, Contract Price, Contract Time or some other portion of the Construction Contract, after Bid opening, the Bidder promises to execute an Agreement Supplement prior to or concurrent with the execution of the Agreement, if the Agreement Supplement is acceptable to the Bidder.
G. It is understood that the OWNER has the right to reject this proposal or to accept it at the prices listed in the Bid Schedule.
PART 2 EXECUTION
2.1 BIDDER
A. The Bidder is as follows
Name: _________________________________________________________________
Bid Form
00 41 00 - 2
Address: _______________________________________________________________
Telephone number: _______________________________________________________
Email address: __________________________________________________________
Tax identification number: _________________________________________________
B. Bidder holds license number _______________________________________, issued on the _____ day of ____________________, ________, by the Utah State Department of Commerce, Division of Occupational and Professional Licensing. Bidder is licensed to practice as a ___________________________ Contractor. License renewal date is the ___________ day of ________________, _______.
C. The undersigned hereby acknowledges receipt of the following Addenda.
(list Addenda numbers here)
2.2 BIDDER’S SUBSCRIPTION
A. Date: _______________________
B. Bidder’s Signature: _______________________________________________________
C. Print Bidder’s name here: __________________________________________________
D. Title: __________________________________________________________________
Bid Schedule 00 43 00 - 1
DOCUMENT 00 43 00
BID SCHEDULE
PART 1 GENERAL
1.1 DOCUMENT INCLUDES
A. Price schedules.
B. Measurement and payment provisions.
1.2 CONSTRUCTION CONTRACT
A. The Construction Contract is known as Olympus Jr High Storm Drain Piping Project.
1.3 REFERENCES
A. APWA 01 29 00: Payment Procedures.
B. Document 00 52 00: Agreement.
1.4 SCHEDULES TO BE ADDED TO THE AGREEMENT
A. This document will be added to the Agreement by reference.
1.5 QUANTITY VARIANCES
A. Estimated quantities are for bidding purposes only. Actual quantities will be determined by the ENGINEER. Quantities may be reduced, deleted, or increased beyond the bid quantities listed in Schedule A. Actual quantities will be paid at the contract unit price.
1.6 TESTING
A. CONTRACTOR shall be responsible to provide compaction and material testing.
1.7 CONSTRUCTION SURVEY AND STAKING
A. CONTRACTOR shall be responsible to provide construction survey and staking.
00 43 00 - 2
PART 2 PRICE SCHEDULES
2.1 BID SCHEDULE
Engineer’s quantity estimates are:
Item
No.
Description Unit QTY
1 Sawcut LF 470
2 Asphalt demo & pave SF 720
3 Concrete gutter demo & replace LF 10
4 6" PVC pipe LF 10
5 8" PVC pipe LF 300
6 Precast box - 2' x 2' EA 4
7 Concrete flatwork SF 240
Bidder will complete the Work in accordance with the Contract Documents for the following lump sum price.
Lump Sum Bid Price: $ .
MEASUREMENT AND PAYMENT
2.1 GENERAL
A. Units of measurement are listed above in the price schedule(s).
B. See measurement and payment procedures in APWA Section 01 29 00.
C. ENGINEER will take all measurements and compute all quantities.
D. CONTRACTOR will verify ENGINEER’s measurements and computations.
E. CONTRACTOR will provide all equipment, workers, and survey crews to assist ENGINEER in making measurements.
F. Frames and covers damaged by CONTRACTOR will be replaced at no additional cost to OWNER.
G. If ENGINEER determines an existing frame or cover needs to be replaced, a new frame or cover will be either provided by OWNER or CONTRACTOR. A frame and cover supplied by CONTRACTOR will be paid for by using prices agreed to in a Change Order.
00 43 00 - 3
H. CONTRACTOR responsible for the preservation of neighboring facilities not being demolished, if damage occurs during construction proper restoration of all damage is required at no additional cost. All shall be included in the Bid Item.
Agreement 00 52 00 - 1
DOCUMENT 00 52 00
AGREEMENT
PART 1 GENERAL
1.1 CONTRACTOR
A. Name: _________________________________________________________________
B. Address: _______________________________________________________________
C. Telephone number: _______________________________________________________
D. Email: _________________________________________________________________
1.2 OWNER
A. The name of the OWNER is City of Holladay.
1.3 CONSTRUCTION CONTRACT
A. The Construction Contract is known as Olympus Jr High Storm Drain Piping
Project.
1.4 ENGINEER
A. Jared Bunch, P.E. is the OWNER's representative and agent for this Construction Contract who has the rights, authority and duties assigned to the ENGINEER in the Contract Documents.
1.5 REPRESENTATION REGARDING ETHICAL STANDARDS FOR CITY
OFFICERS AND EMPLOYEES AND FORMER CITY OFFICERS AND
EMPLOYEES
A. CONTRACTOR represents that it has not:
1. Provided an illegal gift or payoff to a City officer or employee or former City officer or employee, or his or her relative or business entity.
2. Retained any person to solicit or secure this contract upon an agreement or understanding for a commission, percentage, or brokerage or contingent fee, other than bona fide employees or bona fide commercial selling agencies for the purpose of securing business.
00 52 00 - 2
PART 2 TIME AND MONEY CONSIDERATIONS
2.1 CONTRACT PRICE
A. The Contract Price includes the cost of the Work specified in the Contract Documents, plus the cost of all bonds, insurance, permits, fees, and all charges, expenses or assessments of whatever kind or character.
B. The Schedules of Prices awarded from the Bid Schedule (Document 00 43 00) are as follows.
1. Schedule A
C. An Agreement Supplement (is/is not) attached to this Agreement.
D. Based upon the above awarded schedules and the Agreement Supplement (if any), the Contract Price awarded is: dollars and cents. ($____________________).
2.2 CONTRACT TIME
A. Work may not begin until June 22, 2026.
B. Substantial Completion of the Work shall occur:
1. by August 8, 2026
C. Any time specified in work sequences in the Summary of Work shall be a part of the Contract Time.
D. The OWNER anticipates that a Notice to Proceed will be given on the following date, but reserves the right to change such date:
Anticipated date of Notice to Proceed: May 4, 2026
2.3 PUNCH LIST TIME
A. The Work will be complete and ready for final payment within 14 days after the date CONTRACTOR receives ENGINEER's Final Inspection Punch List unless exemptions of specific items are granted by ENGINEER in writing or an exception has been specified in the Contract Documents.
B. Permitting the CONTRACTOR to continue and finish the Work or any part of the Work after the time fixed for its completion, or after the date to which the time for completion may have been extended, whether or not a new completion date is established, shall in no way operate as a waiver on the part of the OWNER of any of OWNER's rights under this Agreement.
2.4 LIQUIDATED DAMAGES
A. Time is the essence of the Contract Documents. CONTRACTOR agrees that OWNER will suffer damage or financial loss if the Work is not completed on time or within any
00 52 00 - 3 time extensions allowed in accordance with Part 12 of the General Conditions.
CONTRACTOR and OWNER agree that proof of the exact amount of any such damage or loss is difficult to determine. Accordingly, instead of requiring any such proof of damage or specific financial loss for late completion, CONTRACTOR agrees to pay the following sums to the OWNER as liquidated damages and not as a penalty.
1. Late Contract Time Completion: Five hundred dollars and zero cents ($500.00) for each day or part thereof that expires after the Contract Time until the Work is accepted as Substantially Complete as provided in Article 14.5 of the General Conditions.
2. Late Punch List Time Completion: 50% of the amount specified for Late Contract Time Completion for each day or part thereof if the Work remains incomplete after the Punch List Time. The Punch List shall be considered delivered on the date it is transmitted by email, hand delivery or received by the CONTRACTOR by certified mail.
3. Interruption of Public Services: No interruption of public services shall be caused by CONTRACTOR, its agents or employees, without the ENGINEER's prior written approval. OWNER and CONTRACTOR agree that in the event OWNER suffers damages from such interruption, the amount of liquidated damages stipulated below shall not be deemed to be a limitation upon OWNER's right to recover the full amount of such damages. Five hundred dollars and zero cents ($500.00) for each day or part thereof of any utility interruption caused by the CONTRACTOR without the ENGINEER's prior written authorization.
B. Deduct Damages from Moneys Owed CONTRACTOR: OWNER shall be entitled to deduct and retain liquidated damages out of any money which may be due or become due the CONTRACTOR. To the extent that the liquidated damages exceed any amounts that would otherwise be due the CONTRACTOR, the CONTRACTOR shall be liable for such amounts and shall return such excess to the OWNER.
00 52 00 - 4
PART 3 EXECUTION
3.1 CONTRACTOR’S SUBSCRIPTION AND ACKNOWLEDGMENT
A. CONTRACTOR’s signature: _______________________________________________
B. Please print name here: ___________________________________________________
C. Title: __________________________________________________________________
D. CONTRACTOR’s Utah license number: ______________________________________
E. Notary Acknowledgement: In the Country of ______________________________, State of_________________, on the ________day of ____________________, 20___, the foregoing instrument was acknowledged before me
(person acknowledging and the title or representative capacity, if any).
Notary’s signature
Residing at
My commission expires: Notary’s seal
00 52 00 - 5
3.2 OWNER’S SUBSCRIPTION AND ATTESTATION
A. OWNER: City of Holladay
(City Manager’s Signature)
B. Attest
(SEAL)
C. Address for giving notices:
City of Holladay 3330 S 1300 E Millcreek, UT 84117
Recommended for approval:
(Public Services Director)
3.3 EFFECTIVE DATE
OWNER and CONTRACTOR execute this Agreement and declare it in effect as of the ___ day of ______________________________, _______.
Certificate of Insurance
00 62 16 - 1
DOCUMENT 00 62 16
CERTIFICATE OF INSURANCE
PART 1 GENERAL
1.1 PROCEDURE
A. For filing purposes, add Certificates of Insurance to the Contract Documents following this page.
B. Certificates of Insurance must include all requirements in Section 5.2 of the
Modifications to General Conditions (Supplementary Conditions) (Document 00 73 02).
Modifications to General Conditions 00 73 03 - 1
DOCUMENT 00 73 03
MODIFICATIONS TO GENERAL CONDITIONS
(Supplementary Conditions)
This document changes provisions specified in the General Conditions in the 2017 Manual of Standard Specifications published by the Utah Chapter of the American Public Works Association.
Add the following paragraphs to Article 2.2 (page 20).
2.2 COPIES OF DOCUMENTS
B. OWNER shall not furnish to CONTRACTOR published Contract Documents which include the Manual of Standard Plans and the Manual of Standard Specifications. Such documents shall be purchased separately by the CONTRACTOR.
Modify Article 5.1 (page 28) to read as follows.
5.1 PERFORMANCE, PAYMENT AND OTHER BONDS
A. Prior to OWNER executing the Agreement, CONTRACTOR shall file with the OWNER a good and sufficient performance Bond and a payment Bond, each in the sum of not less than 100 percent of the Contract Price.
B. The Bonds shall be executed by the CONTRACTOR and secured by a company duly and regularly authorized to do a general surety business in the State of Utah and either
(i) named in the current U.S. Treasury Department's listing of approved sureties (Department Circular 570) (as amended) with an underwriting limitation equal to or greater than the Contract Price which the Bond guarantees, or (ii) with a current "A-" rating or better in A.M. Best Co., Inc's. Best Insurance Reports, Property and Casualty Edition.
C. The Performance Bond shall guarantee the faithful performance of the Construction Contract by the CONTRACTOR and the payment Bond shall guarantee the payment of labor and materials. The Bonds shall inure by their terms to the benefit of the OWNER.
Neither this nor any other provision requiring a performance Bond shall be construed to create any rights in any third party Claimant as against the OWNER for performance of the Work under the Construction Contract.
D. All Bonds required by the Contract Documents to be purchased and maintained by CONTRACTOR shall be obtained from surety companies that are duly licensed or authorized in the jurisdiction in which the Project is located to issue Bonds for the limits so required. Such surety companies shall also meet such additional requirements and qualifications as may be provided in the Supplementary General Conditions.
E. If the surety on any Bond furnished by CONTRACTOR is subject to any proceeding under the Bankruptcy Code (Title 11, United States Code) or becomes insolvent or its right to do business is terminated in the State of Utah or it ceases to meet the
Modifications to General Conditions 00 73 03 - 2 requirements of this Article, CONTRACTOR shall, within 15 days thereafter, substitute another Bond and surety, both of which must be acceptable to OWNER.
F. The OWNER shall hold a minimum 5% of the bond amounts during the correction period described in Article 13.7.
Modify Article 5.2 (page 28) to read as follows.
5.2 INSURANCE
A. Contractor shall provide the following minimum insurance coverage from companies holding a General Rating of “A” or better as set forth in the most current issue of Best’s Key Rating Insurance Guide written for not less than the following, or greater if required by law and all such insurance to be primary to any insurance maintained by Owner, shall name Owner as additional insured with waiver of subrogation:
1. The Contractor’s Worker’s Compensation Insurance shall be written for not less than the statutory limits for the locale of the Project and the Contractor’s Employer’s Liability Insurance shall be written for not less than $2,000,000.
2. The Contractor’s Comprehensive Automobile Liability Insurance shall be written with combined single limits of not less than $2,000,000 each occurrence.
3. The Contractor’s Comprehensive General Liability Insurance with contractual liability coverage on occurrence form with limits not less than $2,000,000 each occurrence. Completed Operations insurance must be kept in effect for 2 years after completion of work.
4. The Contractor shall not commence Work under this Agreement until all of the insurance required herein shall have been obtained by the Contractor. The Contractor shall furnish to the Owner Certificates of Insurance verifying that such insurance has been obtained. Such certificates will provide that Owner will receive at least thirty (30) days prior written notice of any material change in, cancellation of, or non-renewal of such insurance.
5. If applicable, professional liability (errors & omissions) Insurance coverage for a limit of $2,000,000. Insurance shall be carried for two years after the work has been completed.
6. If Contractor uses any subcontractors, Contractor will provide for subcontractors or require the same insurance provisions for its subcontractors.
Addenda
00 91 13 - 1
DOCUMENT 00 91 13
ADDENDA
PART 1 GENERAL
1.1 PROCEDURE
A. For filing purposes, add Addenda and Modifications to the Contract Documents following this page.
Change Order Form 00 92 45 - 1
DOCUMENT 00 92 45
CHANGE ORDER FORM
CHANGE ORDER No._______ Project: Olympus Jr High Storm Drain Piping Project
Date of Issuance:
Owner: City of Holladay
Contractor:
Owner's Rep:
Contact For: Jared Bunch, P.E. – City Engineer
You are directed to make the following changes in the Contract Documents:
Description:
Purpose of Change Order:
Attachments:
Change in Contract Price:
Original Contract Price: $
Prior Change Orders No. to No.________
Contract Price with all approved Change Orders: $_______________
Change to CONTRACT TIME:
The CONTRACT TIME will be…