1-Ignition Integration RFP 2026 FINAL.pdf
PDF 256 KB Posted
- Attached to
- Ignition SCADA Integration RFP
- Solicitation number
- JBID 253
- Issued by
- Salt Lake County, Salina City, Utah
About this file
This is a Request for Proposals (RFP) document issued by the Jordan Basin Improvement District, a wastewater infrastructure provider serving portions of Salt Lake County and Utah County, Utah. The District seeks qualified Ignition-certified integrators to transition its 15 MGD Jordan Basin Water Reclamation Facility (JBWRF) and district-owned lift stations from existing GE iFIX SCADA software to Inductive Automation's Ignition SCADA software. The scope includes integrating approximately 20,000 database tags (comprised of 7,200 Boolean tags, 9,600 integer/word/float tags, 2,000 alarm and callout tags, and 2,500 historized tags), building 150 screens with 12 navigation dropdown areas, configuring alarm and callout systems, establishing communications with 60 Emerson PLCs using GE Ethernet and 10 additional MODBUS TCP/IP devices, and providing staff training. The RFP was posted November 2, 2026, with bid inquiries due December 4, 2026, at 4:00 PM, and sealed electronic proposals due December 10, 2026, at 2:00 PM via Bonfire Software. The District requires completion of all integration work by November 30, 2027, with contract commencement on January 1, 2027, and term through December 31, 2027, with optional annual renewals not to exceed five years.
Pricing shall be submitted as a comprehensive cost estimate including all manhours, travel expenditures, and additional fees; software costs are excluded as the District has already purchased the Ignition software and licenses. Minimum qualifications require at least two Gold level Ignition-certified integrators with a physical office along the Wasatch Front, three project references demonstrating full system integration of Ignition SCADA for wastewater applications, and one reference for GE iFIX to Ignition migration. Responsive proposals will be scored on five criteria: Experience and Expertise (25 points), Team Qualifications (25 points, with an additional 5 points for active Premier Ignition Certification), Proposed Schedule (10 points), Local Presence/Resources (15 points), and Cost (25 points), for a total possible score of 100 points. Payment is based on verified work performed by District staff. The District reserves the right to accept or reject any submissions, waive informalities, and negotiate changes to the scope of services.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JORDAN BASIN IMPROVEMENT DISTRICT – PROCUREMENT DOCUMENTS
NOVEMBER 2, 2026
IGNITION SCADA INTEGRATION Page 1 of 11
PROCUREMENT DOCUMENTS
FOR
IGNITION SCADA INTEGRATION
JORDAN BASIN IMPROVEMENT DISTRICT
1253 West Jordan Basin Lane Bluffdale, UT 84065
(801) 571-1166
APPLICABLE DATES/DEADLINES:
Post Notice & Invitation to Bid: Monday, November 2, 2026 Bid Inquiries: Friday, December 4, 2026 @ 4:00 PM Bid Deadline and Opening: Thursday, December 10, 2026 @ 2:00 PM
NOTICES AND INQUIRIES TO BE POSTED AT: Utah Procurement Place (U3P)/Bonfire
IGNITION SCADA INTEGRATION Page 2 of 11
TABLE OF CONTENTS
A. The District 3
B. Description of Process – Request for Proposals 4
C. Scope of Services 5
D. RFP Minimum Qualifications, Requirements 8 and Scoring
E. Contract Documents: Procurement Agreement & General Conditions 12
IGNITION SCADA INTEGRATION Page 3 of 11
PART A
THE DISTRICT
The Jordan Basin Improvement District (the “District”) provides wastewater infrastructure and services for portions of Salt Lake County and Utah County, Utah. The District’s collection system is comprised of approximately 1,100 miles of sanitary sewer lines. The District owns and operates a 15 MGD membrane bioreactor wastewater treatment plant known as the Jordan Basin Water Reclamation Facility (JBWRF). The JBWRF is located at 13826 South Jordan Basin Lane, Riverton, Utah.
Jordan Basin Improvement District (JBID) is requesting proposals from qualified integrators to transition from the existing GE iFIX SCADA software to Inductive Automation’s Ignition SCADA software for operation of JBWRF and District-owned lift stations. JBWRF Operates 24/7, manned 10- 12 hours per day with on-call personnel responding to alarms overnight.
-- End of Part A; The District --
IGNITION SCADA INTEGRATION Page 4 of 11
PART B
DESCRIPTION OF PROPOSAL PROCESS AND
NOTICE REQUESTING PROPOSALS
SUBMITTAL PROCESS. This Request for Proposals invites proposals from qualifying integrators. Inquiries about this Request for Proposals may be submitted to the District through Utah.bonfirehub.com on or before 4:00 p.m. Friday, December 4, 2026. Vendors shall submit sealed electronic proposals via Bonfire Software on or before 2:00 p.m. on Thursday, December 10, 2026.
RECEIPT OF PROPOSALS. Electronic sealed proposals will be accepted via Bonfire until 2:00 p.m., on Thursday, December 10, 2026.
SUMMARY OF DATES & DEADLINES
DEADLINE ITEM DATE – NO LATER THAN
District Issues Notice and Invitation to Bid Monday, November 2, 2026 Bid Inquiries – (through Bonfire) Friday, December 4, 2026 – 4:00 PM Bid Deadline Thursday, December 10, 2026 – 2:00 PM
GENERAL DESCRIPTION OF WORK: The District seeks proposals from Ignition-certified integrators to assist in the transition from existing GE iFIX SCADA software to Ignition SCADA software. The successful integrator must meet the minimum qualifications contained in these procurement documents and be able to provide the required services outlined in the scope of work.
Work will include integration of current iFIX database, building screens and navigation in Ignition, configuring alarms and callout systems, building Ignition database, and providing training and support to District staff.
DELIVERY SCHEDULE: The District needs this integration to be completed no later than November 30, 2027. Interested integrators must be able to meet or possibly exceed this proposed schedule.
OWNER’S RIGHTS RESERVED. The District reserves the right to accept or reject any or all submissions, to waive informalities, to negotiate changes in the scope of services to be provided, and to otherwise waive any technicalities, in the best interest of the District.
-- End of Part B; Description of Bidding Process and Notice Inviting Bids --
IGNITION SCADA INTEGRATION Page 5 of 11
PART C
SCOPE OF SERVICES
The following section outlines the anticipated scope of services for this project. As stated earlier, Jordan Basin Water Reclamation Facility operates 24/7, manned 10-12 hours per day with on-call personnel responding to alarms overnight.
Inductive Automation’s Ignition and Kepware Drivers are already installed on the primary SCADA server. This is a virtual machine. Cost of software should not be included in the proposal, only the integration services.
The initial scope of work was outlined in Part B of these documents. The sections below provide more detail of what currently exists at JBWRF and what the anticipated scope of services includes.
INTEGRATE CURRENT iFIX DATABASE
• Current Database Tags: 18,780 ∙ Adding Fine Screen, Coarse Screen, Centrifuge, 2+ Lift Stations ∙ Expected Tags at time of integration: ≈20,000
• ≈7,200 Bool
• ≈ 9,600 Int, Word, Float, etc..
• ≈ 2,000 tags alarm and callout
• ≈2,500 Historized
BUILD SCREENS AND NAVIGATION IN IGNITION
• ≈150 total screens
• 12 Navbar Dropdown areas
• Popups included in most screens
• Additional lift stations are on the horizon but could be added to screens already in place
• Integrator will work with the District to determine screen layout/configuration
CONFIGURE ALARMS AND CALLOUT SYSTEM
• ≈2,000 tags are set to alarm and callout when active. Current callout system goes through Grandstreams to Century Link landlines
• Updating to either VOIP or cellular for callouts. Adding Airlink XR60 or similar device to add SMS capabilities
TRAINING AND STAFF PARTICIPATION/SUPPORT
IGNITION SCADA INTEGRATION Page 6 of 11
• Meeting with JBID operators and management throughout project to train staff on new SCADA layout and allow feedback
• JBID Instrumentation Technician and/or Network Administrator expected to participate in database and Ignition screen setup; process startup and testing: Communications setup
EXISTING INFRASTRUCTURE
• Communicating with 60 Emerson PLC’s using “GE Ethernet” communications.
• An additional ≈10 devices communicate MODBUS TCP/IP
• Virtual Machine hosts Proficy Historian, this device is expected to host Ignition Historian as well
Any questions regarding the scope or existing SCADA systems should be sent via Bonfire.
-- End of Part C; Scope of Services --
IGNITION SCADA INTEGRATION Page 7 of 11
PART D
RFP MINIMUM QUALIFICATIONS, REQUIREMENTS, AND SCORING
Integrators interested in submitting proposals on the project must meet the following minimum requirements to be considered responsive:
• 2 integrators with Gold level Ignition certification
• A physical office along the Wasatch Front and at least two integrators centered out of the local Utah office.
• Three project references of full system integration of Inductive Automation’s Ignition
SCADA software for wastewater applications.
• One project reference of integrating from GE iFIX to Ignition SCADA software.
Integrators and vendors must meet the above qualifications to be considered responsive. Project references must include name of the entity or business, time of project start and completion, and individual or organizational contact information for owners for reference checks.
REQUEST FOR PROPOSAL (RFP) REQUIREMENTS AND SCORING
Requirements and Scoring – Responsive proposals meeting minimum qualifications above will be evaluated by District staff against the criteria and information contained in this RFP.
Evaluated criteria and requirements are listed below:
1. Experience and Expertise: 25 points
List and describe at least 3 and up to 5 similar projects with comparable clients and scopes. Project can be the same projects listed in the minimum qualifications, but with more detail. Points will be awarded based on scope, scale, and similarity to the scope of work proposed on this project.
2. Team Qualifications: 25 points
Provide individual team member credentials/resumes for those who will be working on this specific project. Identify who will be the primary point of contact and indicate their level of licensure or certification required above in the minimum qualifications. Points will be based on number of team members and individual qualifications. An additional five (5) points will be awarded for active Premier Ignition Certification status.
IGNITION SCADA INTEGRATION Page 8 of 11
3. Proposed/Anticipated Schedule 10 points
Provide an anticipated or proposed schedule to complete the scope of work. The District intends to have this integration work completed in 2027. Utilize past projects to support execution of proposed timeframe. Also include availability and bandwidth of proposed project team.
4. Local Presence/Resources 15 points
Provide the location and proximity of the team members and projects indicated in the minimum qualifications and proposed project team. Points will be awarded based on Utah-based or regional local projects and local participating team members.
5. Cost 25 points
Provie a proposed budget or anticipated cost of completing the scope of work. Cost should include manhours, any anticipated travel expenditures, or any additional fees as part of the project. As noted before, the District has already purchased the Ignition software, so that cost has been handled by the District and should not be included in the cost.
Total Possible: 100 points
-- End of Part D; Qualifications, Requirements, and Scoring --
IGNITION SCADA INTEGRATION Page 9 of 11
PART D
RFP SUBMISSION
1. The undersigned Integrator hereby agrees, if this proposal is accepted, to enter a Procurement Agreement with the Owner substantially in the form of Part E of the Procurement Documents.
2. Integrator accepts all requirements, terms and conditions of the Procurement Documents, including without limitation those in the Notice Inviting Proposals and Minimum Qualifications, Requirements, Scoring, the Procurement Agreement and the General Conditions.
3. This proposal will remain open for the period stated in the Request for Proposals unless otherwise required by law. Integrator will enter the Procurement Agreement within the time and in the manner required in the Procurement Documents.
4. Integrator has familiarized itself with the nature and extent of the procurement Work, the location where the Product is to be delivered, the equipment where the Product will be utilized, all applicable legal requirements (federal, state and local laws, ordinances, rules, and regulations), and all conditions affecting cost, progress or performance of the Work, and has made such other independent investigations as Integrator deems necessary.
5. With respect to all the foregoing, and including all cost schedule(s) and information required of Integrator contained in these documents, the Integrator further agrees to complete the Work required under the Procurement Documents within the contract time stipulated in the Procurement Documents, and to accept in full payment the contract price based on the total price(s) named in the Cost Schedule submitted herewith.
Dated: ______________, 2026 Integrator: ___________________________ Signature: _________________________ By: ______________________________ Title: _____________________________
IGNITION SCADA INTEGRATION Page 10 of 11
PART E
CONTRACT DOCUMENTS
PROCUREMENT AGREEMENT
THIS PROCUREMENT AGREEMENT is dated and effective _______________, 2026, by and between the Jordan Basin Improvement District, (the “District”) and ___________________________(the “Integrator”). The District and the Integrator, in consideration of the mutual covenants hereinafter set forth and for other valuable consideration the receipt and adequacy of which is acknowledge, agree as follows:
ARTICLE 1: PRODUCT SUPPLY, DELIVERY AND TECHNICAL SERVICES
Integrator shall perform integration services from GE iFIX SCADA to Ignition SCADA software as specified or indicated in the Procurement Documents and in the Integrator’s proposal.
ARTICLE 2: POINT OF DELIVERY.
The location where the integration work is to be performed is he Jordan Basin Water Reclamation Facility 13826 South Jordan Basin Lane, Riverton, UT 84065
ARTICLE 3: COMMENCEMENT AND TERM OF CONTRACT – DELIVERY
CAPACITY AND REQUIREMENTS
Term and Renewal. The Integrator shall services commencing January 1, 2027 and continuing through December 31, 2027. The District may initiate annual renewals for added support and integration, not to exceed five (5) years.
ARTICLE 4: CONTRACT PRICE
The District shall pay Integrator for furnishing the SCADA integration services in accordance with the Procurement Documents in current funds as shown in the Proposal. The contract price shall include all charges for the scope of work.
ARTICLE 5: PAYMENT PROCEDURES
Payment for Product received shall be based on work performed. The amount shall be verified by District Staff.
ARTICLE 6: PROCUREMENT DOCUMENTS
The Procurement Documents comprise the entire agreement between District and Integrator concerning the Work, and those documents include this Agreement the General Conditions and all Procurement Documents as defined in the General Conditions. The Procurement Documents also include Change Orders which may be delivered or issued after the effective date of this
IGNITION SCADA INTEGRATION Page 11 of 11
Agreement.
There are no Procurement Documents other than those listed in this Article 6. The Procurement Documents may only be amended by written Change Order as provided in Article 6 of the General Conditions.
ARTICLE 7: MISCELLANEOUS
Terms used in this Agreement and throughout the Procurement Documents which are defined in Article 1 of the General Conditions will have the meanings there indicated.
No assignment by a party of any rights under or interests in the Procurement Documents will be binding on another party without the written consent of the party sought to be bound; and no assignment will release or discharge the assignor from any duty or responsibility under the Procurement Documents.
IN WITNESS WHEREOF, the District and the Supplier have caused this Agreement to be executed the day and year first above written.
Jordan Basin Improvement District:
By: _____________________________ Its: _____________________________
Attest:
District Clerk
Supplier:
By: _____________________________ Its: _____________________________
Address for Giving Notice:
Address for Giving Notice: