1-Exhibit F - HSP Quick Checklist.pdf
PDF 239 KB Posted
- Attached to
- Muntz Library Stair Renovation State and local contract opportunity
- Solicitation number
- RFP No. 750/25/26-006
- Issued by
- Sterling County, Texas
About this file
This file is a HUB Subcontracting Plan (HSP) Quick Checklist designed to guide respondents to the University of Texas at Tyler's Muntz Library Stair Renovation project in Texas. The checklist provides a streamlined reference tool to assist bidders in identifying which sections of the HSP form they must complete based on their subcontracting approach. The project encompasses supervision, materials, equipment, and labor for replacement of the existing open stair handrail system and stair finishes, along with related flooring replacement in Robert R. Muntz Library, as detailed in the construction documents issued with the RFP.
The HSP Quick Checklist outlines four distinct completion pathways depending on the bidder's subcontracting strategy: (1) awarding all subcontracting work exclusively to Texas certified HUB vendors requires completion of Sections 1, 2a-c, and 4 plus Attachment A; (2) awarding subcontracting work to both HUB and Non-HUB vendors while meeting or exceeding the agency's HUB Goal requires Sections 1, 2a-d, and 4 plus Attachment A; (3) awarding subcontracting work to HUB and Non-HUB vendors or only Non-HUB vendors while failing to meet the HUB Goal requires Sections 1, 2a-b, 2d marked "No," and 4 plus Attachment B; and (4) performing the entire contract with internal resources requires Sections 1, 2a marked "No," 3, and 4. The document emphasizes that respondents must adhere to the instructions in the full HSP form and the contracting agency's guidelines.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 9-Exhibit C - Sample Payment Bond.pdf | ||
| 7-Exhibit G - Respondents Pricing and Delivery Proposal.docx | DOCX document | |
| 3-Compiled Specs - Muntz Library Stair Renovation.pdf | ||
| 15-Library Stairs - RFP Agenda.pdf | ||
| 10-Exhibit B - Sample Performance Bond.pdf | ||
| 5-Exhibit D - Campus Map.pdf | ||
| 11-Exhibit A - Sample Agreement Between Owner and Contractor.doc | DOC document | |
| 6-Exhibit I - Uniform General Conditions.docx | DOCX document | |
| 8-Exhibit H - Owners Special Conditions.docx | DOCX document | |
| 4-RFP 750-25-26-006 Library Stairs Renovation.doc | DOC document | |
| 13-ADDENDUM NO 1 to RFP 750-25-26-006.pdf | ||
| 2-Exhibit E - VetHUB Subcontracting Plan.docx | DOCX document | |
| 12-IFC DRAWING SET - Muntz Library Stair Renovation.pdf | ||
| 14-Pre-Submittal Conference Sign-In Sheet - Muntz Library Stairs.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev. 2/26
HUB Subcontracting Plan (HSP)
QUICK CHECKLIST
While this HSP Quick Checklist is being provided to merely assist you in readily identifying the sections of the HSP form that you will need to complete, it is very important that you adhere to the instructions in the HSP form and instructions provided by the contracting agency.
If you will be awarding all of the subcontracting work you have to offer under the contract to only Texas certified HUB vendors, complete:
Section 1 - Respondent and Requisition Information
Section 2 a. - Yes, I will be subcontracting portions of the contract.
Section 2 b. - List all the portions of work you will subcontract, and indicate the percentage of the contract you expect to award to Texas certified HUB vendors.
Section 2 c. - Yes Section 4 - Affirmation
GFE Method A (Attachment A) - Complete an Attachment A for each of the subcontracting opportunities you listed in Section 2 b.
If you will be subcontracting any portion of the contract to Texas certified HUB vendors and Non-HUB vendors, and the aggregate percentage of all the subcontracting work you will be awarding to the Texas certified HUB vendors meets or exceeds the HUB Goal the contracting agency identified in the “Agency Special Instructions/Additional Requirements”, complete:
Section 1 - Respondent and Requisition Information
Section 2 a. - Yes, I will be subcontracting portions of the contract.
Section 2 b. - List all the portions of work you will subcontract, and indicate the percentage of the contract you expect to award to Texas certified HUB vendors and Non-HUB vendors.
Section 2 c. - No
Section 2 d. - Yes Section 4 - Affirmation
GFE Method A (Attachment A) - Complete an Attachment A for each of the subcontracting opportunities you listed in Section 2 b.
If you will be subcontracting any portion of the contract to Texas certified HUB vendors and Non-HUB vendors or only to Non-HUB vendors, and the aggregate percentage of all the subcontracting work you will be awarding to the Texas certified HUB vendors does not meet or exceed the HUB Goal the contracting agency identified in the “Agency Special Instructions/Additional Requirements”, complete:
Section 1 - Respondent and Requisition Information
Section 2 a. - Yes, I will be subcontracting portions of the contract.
Section 2 b. - List all the portions of work you will subcontract, and indicate the percentage of the contract you expect to award to Texas certified HUB vendors and Non-HUB vendors.
Section 2 c. - No
Section 2 d. - No
Section 4 - Affirmation
GFE Method B (Attachment B) - Complete an Attachment B for each of the subcontracting opportunities you listed in Section 2 b.
If you will not be subcontracting any portion of the contract and will be fulfilling the entire contract with your own resources (i.e., employees, supplies, materials and/or equipment), complete:
Section 1 - Respondent and Requisition Information
Section 2 a. - No, I will not be subcontracting any portion of the contract, and I will be fulfilling the entire contract with my own resources.
Section 3 - Self Performing Justification
Section 4 - Affirmation
| group1-1-1: Off |
| group1-1-2: Off |
| group1-1-3: Off |
| group1-1-4: Off |
| group1-1-5: Off |
| group1-1-6: Off |
| group2-1-1: Off |
| group2-1-2: Off |
| group2-1-3: Off |
| group2-1-4: Off |
| group2-1-5: Off |
| group2-1-6: Off |
| group2-1-7: Off |
| group3-1-1: Off |
| group3-1-2: Off |
| group3-1-3: Off |
| group3-1-4: Off |
| group3-1-5: Off |
| group3-1-6: Off |
| group3-1-7: Off |
| group4-1-1: Off |
| group4-1-2: Off |
| group4-1-3: Off |
| group4-1-4: Off |