1-Exhibit 4 - Draper City Standard Impact Fees.pdf

PDF 31 KB Posted

Attached to
GJ27-106 The Point - Master Developer, Stage II Part I, for River District For-Sale Housing
Solicitation number
GJ27-106
Issued by
Utah

About this file

This is a Consolidated Fee Schedule document from Draper City, Utah, established under Resolution 26-29, detailing impact fees and miscellaneous charges applicable to new residential and commercial development projects within the jurisdiction. The schedule encompasses multiple fee categories including fire impact fees, police facilities impact fees, transportation facilities impact fees, water system facilities impact fees, storm water facilities impact fees, parks and recreation impact fees, and hazardous materials fees. These impact fees are assessed and collected upon issuance of building permits and apply to various property types including single-family residential units, multi-family residential developments, commercial spaces, office buildings, and industrial facilities. The fees vary based on specific property classifications, unit counts, square footage measurements, and utility meter sizes. Additionally, the schedule includes miscellaneous fees for services such as prosecutor records requests, discovery production, passport photo services, planning commission items, maps and GIS digital data, annexation processing, and electric vehicle charging station usage.

The fee structure establishes specific dollar amounts for each category and classification, with residential impact fees ranging from $46 to $3,024 depending on development type and facility category, while commercial and industrial fees are typically calculated on a per-1,000-square-foot basis. Notable provisions include a non-standard water impact fee formula calculated at $2,097 per Equivalent Residential Unit (ERU), overhead utility conversion fees charged per linear foot, and electric vehicle charging station fees assessed on a per-kilowatt-hour basis with differentiated rates for usage within and beyond the initial four-hour period. Storm water facilities impact fee collection is temporarily suspended per Resolution 21-11. The document references multiple ordinances and resolutions establishing these fees, and certain fees such as passport processing are regulated by external entities including the United States Department of State. All fees outlined in this schedule are applicable to development activities and services within Draper City's jurisdiction.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM

CONSOLIDATED FEE SCHEDULE

(Resolution 26-29)

DESCRIPTION

DRAPER CITY

FEE

225. Pyroxylin Plastics, Cellulose Nitrate (pyroxylin) Plastics - Solid (> 25 lbs.)

226. Body Shop/Garage (Up to 5000 sq. ft.) (In addition to base fee)

227. Body Shop/Garage (> 5000 sq. ft.) (In addition to base fee)

228. Gas Station XX. Open Flame for Proximal Audience/Approved Indoor Fireworks

229. Per Event

230. Oversight of Installation (per hour)

231. Open Flame for Assembly Occupancy

232. Application of Flammable Finishes, Spray, or Dip (In addition to base fee) XX. More than 9 sq. ft. for Flammable Liquid Spray Application or > 55 Gal. for Dip Tank Operations

233. Fire Stand-by Special Events (concerts, sports events, pyrotechnics, etc.) (per hour/per inspector) (In ad

234. Carnivals & Fairs/Outdoor Assembly Events XX. Blasting Permit

235. Annual Permit

236. Single Event Permit XX. Carbon Dioxide System Over 875 Cubic Feet (100 lb.) (Annual Permit)

237. Beverage Dispensing (In addition to base fee)

238. Single Family Residential (per dwelling unit)

239. Multi Family Residential (per dwelling unit)

240. Commercial (per 1,000 sq ft gross lease area)

241. Office (per 1,000 sq ft)

242. Industrial (per 1,000 sq ft)

243. One – Single-Family, Detached (per unit)

244. One – Single Family, Attached, Duplex or Two Attached Units (per unit)

245. Three (3) or Four (4) Units (per unit)

246. Five (5) to Nine (9) Units (per unit)

247. Ten (10) or More Units (per unit)

248. One – Mobile Home (per unit)

249. Single Family Residential (per dwelling unit)

250. Multi Family Residential (per dwelling unit)

251. Commercial (per 1,000 sq ft gross lease area)

252. Office (per 1,000 sq ft)

253. Industrial (per 1,000 sq ft)

254. Single-family residential (per dwelling unit)

255. Multi-family residential (per dwelling unit)

256. Hotel (per room)

257. Commercial (per 1,000 sf gross area lease)

258. Office, service, light manufacture (per 1,000 sq. ft.)

259. Industrial/Manufacturing (per 1,000 sq. ft.)

260. Institutional (per 1,000 sq. ft.)

1,741.00$

102.00$ 75.00$

130.00$

75.00$ 250.00$

350.00$ Hazardous Materials

75.00$

1,872.00$

200.00$ 200.00$

200.00$

200.00$

Parks & Recreation Impact Fee - New Residential Development (paid when building permit is issued) (Ord 388) (Ord 597) (Res 04-52) (Res 05- 04)(Res 16-58)

2,801.00$ 2,513.00$

5.00$

4,162.00$ 3,024.00$

IMPACT FEES

Fire Impact Fee - New Residential and Commercial Development (paid when building permit is issued) (Ord 388) (Ord 597) (Res 04-52) (Res 05- 04)(Res 16-58)

150.00$

71.00$ 75.00$ 97.00$ 47.00$

46.00$ 21.00$

1,152.00$ 893.00$

1,020.00$ 3,040.00$ 1,189.00$

Transportation Facilities Impact Fee - New Residential and Commercial Development (paid when building permit is issued) (Ord 442) (Res 05-

04) (Ord 1482)

605.00$ 1,852.00$

Police Facilities Impact Fee - New Residential and Commercial Development (paid when building permit issued) (Ord 442) (Ord 597) (Res 04-52) (Res 05-04) (Res 16-58)

Hazardous Materials

400.00$

200.00$ 75.00$

Patricia Bacalao Rectangle

ITEM

CONSOLIDATED FEE SCHEDULE

(Resolution 26-29)

DESCRIPTION

DRAPER CITY

FEE

XX. Residential

261. Single-family detached (per unit)

262. All other housing types (per unit) XX. Non-residential

263. Water Meter Size:

264. 0.75 inches

265. 1.00 inches

266. 1.50 inches

267. 2.00 inches

268. 3.00 inches

269. 4.00 inches

270. 6.00 inches

271. 8.00 inches

272. Formula for Non-standard Water Impact Fees: ERC Count * $2,097.00 = Impact Fee

273.

274.

275.

276. Deposit against actual costs

277.

278.

279. Maximum Fee

280.

281.

282.

283. Discovery provided to indigent defendants and their appointed attorney

284. Discovery produced by electronic means

285. Discovery produced by other than electronic means, up to 35 pages

286. Discovery produced by other than electronic means, over 35 pages

287. Audio, video or photographs provided by other than electronic means (per CD)

XX. Planning Commission items

288. Development Standards drawing, per sheet (11" x 17")

289. Title 9 of the Draper City Code (Res 00-23)

290. Title 17 of the Draper City Code XX. Maps / GIS Digital Data

XX.

291. Existing Map

292. 11" X 17" Digital map download (see website) (Draper City does not provide printed copies)

293. Printed Copy (Size A - 24W" x 24L" to 36W" X 36L")

294. Digital Copy (Size A)

295. Custom Map

296. Printed Copy (Size A - 24W" X 24L" to 35W" X 35L")

297. Printed Copy (Size B - 36W" X 36L" to 36W" x 48L")

5.00$ $5.00 plus $.015 per page

15.00$

1.00$ 35.00$ 10.00$

No Charge No Charge

20.00$

35.00$ 20.00$

75.00$ 95.00$

80.00$

See https://travel.state.gov/ 10.00$

Passport Fees (Res. 16-05) (Res. 18-19) *** Passport processing fees are regulated by the United States Department of State ***

Fees as set by the United States Department of State Passport Photo

167,733.00$

1,729.00$ 1,729.00$

0.25$

1,000.00$ Annexation

1.00$ 2.00$

Electric Vehicle Charging Station (Res 20-31) Charging Station Fee - Level 2 Charger (per kilowatt hour, up to four (4) hours) (per hour rate)

Total Fee Per ERU

6,982.00$ 11,175.00$ 24,468.00$ 41,933.00$ 87,368.00$

2,097.00$ 1,606.00$

2,097.00$

Interactive maps are available on the Draper City website.

3,501.00$

Water System Facilities Impact Fee - New Residential and Commercial Development (paid when building permit is issued) (Res 18-19)

Storm Water Facilities Impact Fee - New Residential and Commercial Development (Paid when building permits are issued) (Res. 18-19) (Res.

21-11) *** Collection Temporarily Suspended *** (Ord 1480)

Charging Station Fee - Level 2 Charger (per kilowatt hour, after first four (4) hours) (per hour rate)

Non-Standard Storm Water Impact Fee Subsurface Drainage Systems Inspection Fee (per lineal ft.)

MISCELLANEOUS

Overhead Utility (Ord 340) Fee in Lieu of converting existing overhead utility facilities to unground facilities (per lineal ft.)

Prosecutor Fees (Res 10-26)

Records (Res 05-20) (Res 14-57)

Patricia Bacalao Rectangle

File details come from the government source that posted it. Updated .