This is a design and technical services document for the City of Bowling Green's interior renovations project at the Police East Precinct and Wellness Center located at 940 Bryant Way, Bowling Green, Kentucky. The project encompasses approximately 12,000 square feet of interior renovations across two distinct areas: the Wellness Center and the East Precinct. The scope of work includes demolition of existing finishes and two restrooms, construction of new office and restroom facilities with associated plumbing work, installation of new lighting fixtures throughout, interior painting, and new flooring installations. The design plans, prepared by architect Hannah Epley with a project number A05 dated May 2026, include reflected lighting plans, original and proposed floor plans with dimensions, and detailed finish schedules specifying materials and specifications for each space.

The renovation project specifies particular finish materials and construction standards, including 2x4 LED ceiling fixtures, LVT flooring (Northern Grain in Antique Wash), carpet squares (Interface Daybreak in Limestone for Wellness Center and Mohawk Side Stripe for East Precinct), ceramic tile flooring and walls in bathrooms (Daltile Calgary CG43 Armor in 12x24 and 2x2 mosaic formats), rubber base materials, and paint finishes from Sherwin Williams applied in two coats of primer with Cashmere Interior Acrylic Latex in Low Lustre, with Emerald Urethane Trim Enamel for trim in Semi-Gloss. Specific renovations include full restroom renovations with new floor tile, partitions, fixtures, and lighting; installation of a new 3x5 Level 3 ballistic transaction window; new metal doors and frames throughout; removal of old cabinets with purchase and installation of new cabinets; abandonment of existing urinals with installation of three new urinals in the new men's restroom; and general contractor responsibility for ductwork cleaning upon project completion.

View the file

Other files

File Type Posted
4-Bid 2027-05 Addendum 1.pdf PDF
6-Bid 2027-05 Tabulation.pdf PDF
5-Bid 2027-05 Addendum 1.pdf PDF
7-Bid 2027-05 Tabulation.pdf PDF
2-GENERAL SERVICE PROVIDER - GS1.docx DOCX document
3-Wellness Center.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF BOWLING GREEN

EAST PRECINCT AND

WELLNESS CENTER HANNAH EPLEY

5/2026

00001

1/16" = 1' - 0"

1/16" = 1' - 0"HANNAH EPLEY

5/2026

00001

HANNAH EPLEY

5/2026

00001

CITY OF BOWLING GREEN

EAST PRECINCT AND

WELLNESS CENTER

ORIGINAL FLOORPLAN W/DIMS

HANNAH EPLEY

00001

1/16" = 1' - 0"

CITY OF BOWLING GREEN

EAST PRECINCT AND

WELLNESS CENTER

PROPOSED FLOORPLAN

HANNAH EPLEY

00001

1/16" = 1' - 0"

CITY OF BOWLING GREEN

EAST PRECINCT AND

WELLNESS CENTER

PROPOSED FLOORPLAN W/DIMS

hehnd31 Architect hehnd31 Architect hehnd31 Architect hehnd31 Architect hehnd31 Architect New Paint, LVT Flooring hehnd31 Architect hehnd31 Architect New Paint, LVT Flooring hehnd31 Architect hehnd31 Architect Remove old cabinets, purchase and install new cabinets hehnd31 Architect Take up VCT, New LVT Flooring hehnd31 Architect hehnd31 Architect hehnd31 Architect hehnd31 Architect hehnd31 Architect New Walls, Paint, LVT Flooring hehnd31 Architect New Multipurpose Room hehnd31 Architect Kitchen/ Breakroom hehnd31 Architect Office hehnd31 Architect hehnd31 Architect Remove closet and bi fold doors hehnd31 Architect New Paint, LVT, LED Lighting hehnd31 Architect Womens hehnd31 Architect Mens hehnd31 Architect hehnd31 Architect hehnd31 Architect Full Renovation of Restrooms, New floor tile, partitions, fixtures, paint, lighting (18"x12" Ceramic Tile with Schluter Corners) (New Solid Surface Vanities with trough style drains). Existing womens restroom shall become mens restroom. Existing urinals shall be abandoned and three (3) new urinals shall be installed in new mens restroom.

hehnd31 Architect hehnd31 Architect Provide and install new metal door and frame hehnd31 Architect LVT, Paint, Lights hehnd31 Architect LVT, Paint, Lights hehnd31 Architect Paint, LVT hehnd31 Architect hehnd31 Architect hehnd31 Architect hehnd31 Single Door hehnd31 Architect Remove VCT Flooring, Install Sealed Concrete, New Lights, Paint. Keep ammo storage with new metal doors.

hehnd31 Architect hehnd31 Architect hehnd31 Architect New 3'x5' Level 3 Ballistic Transaction Window hehnd31 Architect hehnd31 Architect hehnd31 Architect Remove Wall hehnd31 Architect hehnd31 Architect hehnd31 Architect Remove Door hehnd31 Architect New Paint, LVT hehnd31 Architect New Paint, LVT hehnd31 Architect hehnd31 Architect New Paint, Carpet Squares, Lights hehnd31 Architect New Paint, Carpet Squares, Lights hehnd31 Architect New Paint, Carpet, Lights hehnd31 Architect New Paint, Carpet, Lights hehnd31 Architect hehnd31 Architect Remove All Existing Chair Rail Along Corridor hehnd31 Architect New Paint, Carpet, Lighting hehnd31 Architect General Notes:

-All existing metal doors and frames shall remain. All residential style doors and frames shall be removed and replaced with 3'-0"x7'-0" solid metal doors and frames.

-Existing slats on walls shall be removed, drywall repaired, and painted.

-Existing drinking fountain shall be replaced with new, Elkay fountain with bottle filler.

-All new lighting shall be 2'x4' LED fixtures to fit in existing drop ceiling locations.

-General Contractor shall have all ductwork cleaned after completion of renovation.

hehnd31 Architect Existing Shooting Range. (No work to be completed here) t;

No. Description Date

HAE Project Number:

A 0 5

BOWLING GREEN, KY

DESIGN AND TECHNICAL SERVICES

Date: D E s I G N

S T U D 10

Drawn By: Scale:

REFLECTED LIGHTING PLAN

HANNAH EPLEY

5/2026

00001

CITY OF BOWLING GREEN

EAST PRECINCT AND

WELLNESS CENTER

Ceiling Tiles

2x2 Ceiling fixtures

Legend

Wellness Center - Finish Legend

Surface Finish Code Material Manufacturer Description

Wall Base RB1 Rubber Base Roppe Rubber Base- 178 Pewter

Wall PT1 Paint Sherwin Williams SW9165- Gossamer Veil

Wall PT2 Paint Sherwin Williams SW6187- Rosemary

Wall PT3 Paint Sherwin Williams SW6244- Naval

Trim PT4 Paint Sherwin Williams SW7030- Anew Gray

Wall ACF1 Soundproof Panel Acoufelt Barcode 1, 2- MU75 Mushroom

Wall ACF2 Soundproof Panel Acoufelt Ribbed A- WQ03 Wine Barrel

Floor C1 Carpet Interface Daybreak- Limestone 108624

Floor T1 LVT Interface Northern Grain- Antique Wash C01101

Wellness Center - Finish Schedule

Number Name Base Finish Trim Finish Floor Finish North East South West

1 Waiting Area RB1 PT4 CP1 PT1 PT1 PT1 PT1

2 Hallway RB1 PT4 CP1 PT1 PT1 PT1 PT1

3 Office RB1 PT4 CP1 PT3 ACF2 PT3 PT3

4 Meeting 1 RB1 PT4 CP1 PT3 ACF2 PT3 PT3

5 Meeting 2 RB1 PT4 CP1 PT3 PT3 PT3 ACF2

6 Multi-Purpose RB1 PT4 T1 PT1 PT1 PT1 PT1

Notes

All Wall Paint- 2 coats of primer, Cashmere Interior Acrylic Latex, Low Lustre

All Trim Paint- Emerald Urethane Trim Enamel, Semi-Gloss

HAE

D E S I G N S T U D I O

No. Description Date

B O W L I N G G R E E N , K Y D E S I G N A N D T E C H N I C A L S E R V I C E S E A S T P R E C I N C T A N D

W E L L N E S S C E N T E R

C I T Y O F B O W L I N G G R E E N Project Number:

Drawn By:

Date:

H A N N A H E P L E Y

5 / 2 0 2 6

0 0 0 1

F I N I S H L E G E N D & S C H E D U L E

A 0 6 Scale: C U S T O M

W E L L N E S S C E N T E R https://www.sherwin-williams.com/homeowners/products/cashmere-interior-acrylic-latex https://www.sherwin-williams.com/homeowners/products/cashmere-interior-acrylic-latex https://www.sherwin-williams.com/homeowners/products/emerald-urethane-trim-enamel

East Precinct - Finish Legend

Surface Finish Code Material Manufacturer Description

Wall Base RB2 Rubber Base Flexco B2-058 Blue Shadow

Wall PT5 Paint Sherwin Williams SW6255- Morning Fog

Wall PT6 Paint Sherwin Williams SW6256- Serious Gray

Trim PT7 Paint Sherwin Williams SW6257- Gibraltar

Wall ACF3 Soundproof Panel Acoufelt Fineline- Color TBD

Floor C2 Carpet Mohawk Side Stripe GT419- 965 Westpoint

Floor T2 LVT Flexco 675 Bramble

Floor T3 Tile Daltile Calgary- CG43 Armor

12x24 Matte Finish Grout- TBD

Wall T4 TIle Daltile Calgary- CG43 Armor

2x2 Mosaic Matte Finish Grout- TBD

East Precinct - Finish Schedule

Number Name Base Finish Floor Finish Trim Finish North East South West

7 Range Rooms RB2 T2 PT7 PT5 PT5 PT5 PT5

Entry/Hallway s

RB2 T2 PT7 PT6 PT6 PT6 PT6

9 Classroom RB2 T2 PT7 PT6 PT6 PT6 PT6

10 Multi-Purpose RB2 T2 PT7 PT6 PT6 PT6 PT6

11 Office RB2 T2 PT7 PT5 PT5 PT5 PT5

12 Kitchen RB2 T2 PT7 PT5 PT5 PT5 PT5

13 Serg. Offices RB2 C2 PT7 PT5 PT5 PT5 PT5

14 Breifing Room RB2 T2 PT7 PT6 PT6 PT6 PT6

15 Cubicals RB2 C2 PT7 PT5 PT5 PT5 PT5

Interview Rooms

RB2 C2 PT7 ACF3 ACF3 ACF3 ACF3

16 Mens T3 Cove Base T3 PT5 PT5, T4 PT5, T4 PT5, T4 PT5, T4

17 Womens T3 Cove Base T3 PT5 PT5, T4 PT5, T4 PT5, T4 PT5, T4

Notes

All Wall Paint- 2 coats of primer, Cashmere Interior Acrylic Latex, Low Lustre

All Trim Paint- Emerald Urethane Trim Enamel, Semi-Gloss Bathroom Tiles- Keep the same layout as current just upgrade the tile

HAE

D E S I G N S T U D I O

No. Description Date

B O W L I N G G R E E N , K Y D E S I G N A N D T E C H N I C A L S E R V I C E S E A S T P R E C I N C T A N D

W E L L N E S S C E N T E R

C I T Y O F B O W L I N G G R E E N Project Number:

Drawn By:

Date:

H A N N A H E P L E Y

5 / 2 0 2 6

0 0 0 1

F I N I S H L E G E N D & S C H E D U L E

A 0 7 Scale: C U S T O M

E A S T P R E C I N C T https://www.sherwin-williams.com/homeowners/products/cashmere-interior-acrylic-latex https://www.sherwin-williams.com/homeowners/products/cashmere-interior-acrylic-latex https://www.sherwin-williams.com/homeowners/products/emerald-urethane-trim-enamel

1622e096-cfa6-4356-9a66-5ab65dcc324e.pdf
All Wall Paint- 2 coats of primer, Cashmere Interior Acrylic Latex, Low Lustre
All Trim Paint- Emerald Urethane Trim Enamel, Semi-Gloss
All Wall Paint- 2 coats of primer, Cashmere Interior Acrylic Latex, Low Lustre
All Trim Paint- Emerald Urethane Trim Enamel, Semi-Gloss
4c432a8e-80f3-4778-987c-32219b18c1e3.pdf
All Wall Paint- 2 coats of primer, Cashmere Interior Acrylic Latex, Low Lustre
All Trim Paint- Emerald Urethane Trim Enamel, Semi-Gloss
All Wall Paint- 2 coats of primer, Cashmere Interior Acrylic Latex, Low Lustre
All Trim Paint- Emerald Urethane Trim Enamel, Semi-Gloss