This is a design and technical services document for the City of Bowling Green's interior renovations project at the Police East Precinct and Wellness Center located at 940 Bryant Way, Bowling Green, Kentucky. The project encompasses approximately 12,000 square feet of interior renovations across two distinct areas: the Wellness Center and the East Precinct. The scope of work includes demolition of existing finishes and two restrooms, construction of new office and restroom facilities with associated plumbing work, installation of new lighting fixtures throughout, interior painting, and new flooring installations. The design plans, prepared by architect Hannah Epley with a project number A05 dated May 2026, include reflected lighting plans, original and proposed floor plans with dimensions, and detailed finish schedules specifying materials and specifications for each space.
The renovation project specifies particular finish materials and construction standards, including 2x4 LED ceiling fixtures, LVT flooring (Northern Grain in Antique Wash), carpet squares (Interface Daybreak in Limestone for Wellness Center and Mohawk Side Stripe for East Precinct), ceramic tile flooring and walls in bathrooms (Daltile Calgary CG43 Armor in 12x24 and 2x2 mosaic formats), rubber base materials, and paint finishes from Sherwin Williams applied in two coats of primer with Cashmere Interior Acrylic Latex in Low Lustre, with Emerald Urethane Trim Enamel for trim in Semi-Gloss. Specific renovations include full restroom renovations with new floor tile, partitions, fixtures, and lighting; installation of a new 3x5 Level 3 ballistic transaction window; new metal doors and frames throughout; removal of old cabinets with purchase and installation of new cabinets; abandonment of existing urinals with installation of three new urinals in the new men's restroom; and general contractor responsibility for ductwork cleaning upon project completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4-Bid 2027-05 Addendum 1.pdf | ||
| 6-Bid 2027-05 Tabulation.pdf | ||
| 5-Bid 2027-05 Addendum 1.pdf | ||
| 7-Bid 2027-05 Tabulation.pdf | ||
| 2-GENERAL SERVICE PROVIDER - GS1.docx | DOCX document | |
| 3-Wellness Center.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF BOWLING GREEN
EAST PRECINCT AND
WELLNESS CENTER HANNAH EPLEY
5/2026
00001
1/16" = 1' - 0"
1/16" = 1' - 0"HANNAH EPLEY
5/2026
00001
HANNAH EPLEY
5/2026
00001
CITY OF BOWLING GREEN
EAST PRECINCT AND
WELLNESS CENTER
ORIGINAL FLOORPLAN W/DIMS
HANNAH EPLEY
00001
1/16" = 1' - 0"
CITY OF BOWLING GREEN
EAST PRECINCT AND
WELLNESS CENTER
PROPOSED FLOORPLAN
HANNAH EPLEY
00001
1/16" = 1' - 0"
CITY OF BOWLING GREEN
EAST PRECINCT AND
WELLNESS CENTER
PROPOSED FLOORPLAN W/DIMS
hehnd31 Architect hehnd31 Architect hehnd31 Architect hehnd31 Architect hehnd31 Architect New Paint, LVT Flooring hehnd31 Architect hehnd31 Architect New Paint, LVT Flooring hehnd31 Architect hehnd31 Architect Remove old cabinets, purchase and install new cabinets hehnd31 Architect Take up VCT, New LVT Flooring hehnd31 Architect hehnd31 Architect hehnd31 Architect hehnd31 Architect hehnd31 Architect New Walls, Paint, LVT Flooring hehnd31 Architect New Multipurpose Room hehnd31 Architect Kitchen/ Breakroom hehnd31 Architect Office hehnd31 Architect hehnd31 Architect Remove closet and bi fold doors hehnd31 Architect New Paint, LVT, LED Lighting hehnd31 Architect Womens hehnd31 Architect Mens hehnd31 Architect hehnd31 Architect hehnd31 Architect Full Renovation of Restrooms, New floor tile, partitions, fixtures, paint, lighting (18"x12" Ceramic Tile with Schluter Corners) (New Solid Surface Vanities with trough style drains). Existing womens restroom shall become mens restroom. Existing urinals shall be abandoned and three (3) new urinals shall be installed in new mens restroom.
hehnd31 Architect hehnd31 Architect Provide and install new metal door and frame hehnd31 Architect LVT, Paint, Lights hehnd31 Architect LVT, Paint, Lights hehnd31 Architect Paint, LVT hehnd31 Architect hehnd31 Architect hehnd31 Architect hehnd31 Single Door hehnd31 Architect Remove VCT Flooring, Install Sealed Concrete, New Lights, Paint. Keep ammo storage with new metal doors.
hehnd31 Architect hehnd31 Architect hehnd31 Architect New 3'x5' Level 3 Ballistic Transaction Window hehnd31 Architect hehnd31 Architect hehnd31 Architect Remove Wall hehnd31 Architect hehnd31 Architect hehnd31 Architect Remove Door hehnd31 Architect New Paint, LVT hehnd31 Architect New Paint, LVT hehnd31 Architect hehnd31 Architect New Paint, Carpet Squares, Lights hehnd31 Architect New Paint, Carpet Squares, Lights hehnd31 Architect New Paint, Carpet, Lights hehnd31 Architect New Paint, Carpet, Lights hehnd31 Architect hehnd31 Architect Remove All Existing Chair Rail Along Corridor hehnd31 Architect New Paint, Carpet, Lighting hehnd31 Architect General Notes:
-All existing metal doors and frames shall remain. All residential style doors and frames shall be removed and replaced with 3'-0"x7'-0" solid metal doors and frames.
-Existing slats on walls shall be removed, drywall repaired, and painted.
-Existing drinking fountain shall be replaced with new, Elkay fountain with bottle filler.
-All new lighting shall be 2'x4' LED fixtures to fit in existing drop ceiling locations.
-General Contractor shall have all ductwork cleaned after completion of renovation.
hehnd31 Architect Existing Shooting Range. (No work to be completed here) t;
No. Description Date
HAE Project Number:
A 0 5
BOWLING GREEN, KY
DESIGN AND TECHNICAL SERVICES
Date: D E s I G N
S T U D 10
Drawn By: Scale:
REFLECTED LIGHTING PLAN
HANNAH EPLEY
5/2026
00001
CITY OF BOWLING GREEN
EAST PRECINCT AND
WELLNESS CENTER
Ceiling Tiles
2x2 Ceiling fixtures
Legend
Wellness Center - Finish Legend
Surface Finish Code Material Manufacturer Description
Wall Base RB1 Rubber Base Roppe Rubber Base- 178 Pewter
Wall PT1 Paint Sherwin Williams SW9165- Gossamer Veil
Wall PT2 Paint Sherwin Williams SW6187- Rosemary
Wall PT3 Paint Sherwin Williams SW6244- Naval
Trim PT4 Paint Sherwin Williams SW7030- Anew Gray
Wall ACF1 Soundproof Panel Acoufelt Barcode 1, 2- MU75 Mushroom
Wall ACF2 Soundproof Panel Acoufelt Ribbed A- WQ03 Wine Barrel
Floor C1 Carpet Interface Daybreak- Limestone 108624
Floor T1 LVT Interface Northern Grain- Antique Wash C01101
Wellness Center - Finish Schedule
Number Name Base Finish Trim Finish Floor Finish North East South West
1 Waiting Area RB1 PT4 CP1 PT1 PT1 PT1 PT1
2 Hallway RB1 PT4 CP1 PT1 PT1 PT1 PT1
3 Office RB1 PT4 CP1 PT3 ACF2 PT3 PT3
4 Meeting 1 RB1 PT4 CP1 PT3 ACF2 PT3 PT3
5 Meeting 2 RB1 PT4 CP1 PT3 PT3 PT3 ACF2
6 Multi-Purpose RB1 PT4 T1 PT1 PT1 PT1 PT1
Notes
All Wall Paint- 2 coats of primer, Cashmere Interior Acrylic Latex, Low Lustre
All Trim Paint- Emerald Urethane Trim Enamel, Semi-Gloss
HAE
D E S I G N S T U D I O
No. Description Date
B O W L I N G G R E E N , K Y D E S I G N A N D T E C H N I C A L S E R V I C E S E A S T P R E C I N C T A N D
W E L L N E S S C E N T E R
C I T Y O F B O W L I N G G R E E N Project Number:
Drawn By:
Date:
H A N N A H E P L E Y
5 / 2 0 2 6
0 0 0 1
F I N I S H L E G E N D & S C H E D U L E
A 0 6 Scale: C U S T O M
W E L L N E S S C E N T E R https://www.sherwin-williams.com/homeowners/products/cashmere-interior-acrylic-latex https://www.sherwin-williams.com/homeowners/products/cashmere-interior-acrylic-latex https://www.sherwin-williams.com/homeowners/products/emerald-urethane-trim-enamel
East Precinct - Finish Legend
Surface Finish Code Material Manufacturer Description
Wall Base RB2 Rubber Base Flexco B2-058 Blue Shadow
Wall PT5 Paint Sherwin Williams SW6255- Morning Fog
Wall PT6 Paint Sherwin Williams SW6256- Serious Gray
Trim PT7 Paint Sherwin Williams SW6257- Gibraltar
Wall ACF3 Soundproof Panel Acoufelt Fineline- Color TBD
Floor C2 Carpet Mohawk Side Stripe GT419- 965 Westpoint
Floor T2 LVT Flexco 675 Bramble
Floor T3 Tile Daltile Calgary- CG43 Armor
12x24 Matte Finish Grout- TBD
Wall T4 TIle Daltile Calgary- CG43 Armor
2x2 Mosaic Matte Finish Grout- TBD
East Precinct - Finish Schedule
Number Name Base Finish Floor Finish Trim Finish North East South West
7 Range Rooms RB2 T2 PT7 PT5 PT5 PT5 PT5
Entry/Hallway s
RB2 T2 PT7 PT6 PT6 PT6 PT6
9 Classroom RB2 T2 PT7 PT6 PT6 PT6 PT6
10 Multi-Purpose RB2 T2 PT7 PT6 PT6 PT6 PT6
11 Office RB2 T2 PT7 PT5 PT5 PT5 PT5
12 Kitchen RB2 T2 PT7 PT5 PT5 PT5 PT5
13 Serg. Offices RB2 C2 PT7 PT5 PT5 PT5 PT5
14 Breifing Room RB2 T2 PT7 PT6 PT6 PT6 PT6
15 Cubicals RB2 C2 PT7 PT5 PT5 PT5 PT5
Interview Rooms
RB2 C2 PT7 ACF3 ACF3 ACF3 ACF3
16 Mens T3 Cove Base T3 PT5 PT5, T4 PT5, T4 PT5, T4 PT5, T4
17 Womens T3 Cove Base T3 PT5 PT5, T4 PT5, T4 PT5, T4 PT5, T4
Notes
All Wall Paint- 2 coats of primer, Cashmere Interior Acrylic Latex, Low Lustre
All Trim Paint- Emerald Urethane Trim Enamel, Semi-Gloss Bathroom Tiles- Keep the same layout as current just upgrade the tile
HAE
D E S I G N S T U D I O
No. Description Date
B O W L I N G G R E E N , K Y D E S I G N A N D T E C H N I C A L S E R V I C E S E A S T P R E C I N C T A N D
W E L L N E S S C E N T E R
C I T Y O F B O W L I N G G R E E N Project Number:
Drawn By:
Date:
H A N N A H E P L E Y
5 / 2 0 2 6
0 0 0 1
F I N I S H L E G E N D & S C H E D U L E
A 0 7 Scale: C U S T O M
E A S T P R E C I N C T https://www.sherwin-williams.com/homeowners/products/cashmere-interior-acrylic-latex https://www.sherwin-williams.com/homeowners/products/cashmere-interior-acrylic-latex https://www.sherwin-williams.com/homeowners/products/emerald-urethane-trim-enamel
| 1622e096-cfa6-4356-9a66-5ab65dcc324e.pdf |
| All Wall Paint- 2 coats of primer, Cashmere Interior Acrylic Latex, Low Lustre |
| All Trim Paint- Emerald Urethane Trim Enamel, Semi-Gloss |
| All Wall Paint- 2 coats of primer, Cashmere Interior Acrylic Latex, Low Lustre |
| All Trim Paint- Emerald Urethane Trim Enamel, Semi-Gloss |
| 4c432a8e-80f3-4778-987c-32219b18c1e3.pdf |
| All Wall Paint- 2 coats of primer, Cashmere Interior Acrylic Latex, Low Lustre |
| All Trim Paint- Emerald Urethane Trim Enamel, Semi-Gloss |
| All Wall Paint- 2 coats of primer, Cashmere Interior Acrylic Latex, Low Lustre |
| All Trim Paint- Emerald Urethane Trim Enamel, Semi-Gloss |