1._Seidel_Rd_Roundabout_Location_Map.pdf

PDF 8 MB Posted

Attached to
Y26-720-EB Seidel Road at Summerlake Park Boulevard Roundabout Improvements
Solicitation number
Y26-720
Issued by
Orange County, Orlando City, Florida

About this file

This is a location map document supporting a construction bid solicitation issued by Orange County, Florida for the Seidel Road at Summerlake Park Boulevard Roundabout Improvements project (Y26-720-EB). The project involves converting a three-legged stop-controlled intersection into a two-lane roundabout with associated roadway, drainage, sidewalk, and lighting improvements. Orange County is accepting sealed electronic bids through the OpenGov e-Procurement Platform with a submission deadline of 4:00 pm EST on Thursday, March 12, 2026. A non-mandatory pre-bid meeting and site visit is scheduled for February 16, 2026 at 10:30 am, and questions must be submitted by Friday, February 27, 2026 at 5:00 pm EST. The project scope includes westbound two-lane and single-lane eastbound and northbound approaches, storm sewer systems, utility coordination, traffic control design, signage, pavement markings, and pedestrian-level LED lighting compliant with FDOT and South Florida Water Management District standards. Contractors must complete substantial construction within 218 days and final completion within 248 days from Notice to Proceed.

The estimated project cost is $1,512,000, with awards made to the lowest responsive and responsible bidder. Qualified respondents must have completed at least three similar intersection improvement projects within the past ten years, with at least one project including roundabout installation and roadway signing incorporating a minimum of four specified construction elements. A bid bond equal to at least 10 percent of the estimated contract amount, along with performance and payment bonds upon award, are required. The contractor is responsible for all costs associated with site investigation, subsurface condition verification, permit acquisition, and environmental compliance. Liquidated damages are assessed at $200 per day for failure to meet substantial or final completion dates, with 5 percent retainage withheld from progress payments and payable within 20 business days of invoice approval at 95 percent of earned amounts. Service Disabled Veteran businesses may be eligible for a price preference of up to 8 percent depending on bid thresholds. Supporting documentation including a geotechnical engineering report, drainage analysis, lighting design calculations, and 91-sheet construction plans are available to support cost estimations.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Figure 1.1 Location Map

(Photo from Nearmap)

N

File details come from the government source that posted it. Updated .