This is a Geotechnical Engineering Report prepared by NADIC Engineering Services, Inc. for Orange County, Florida, regarding the Seidel Road at Summerlake Park Boulevard Roundabout Intersection Improvements project. The report documents subsurface soil and groundwater conditions at the proposed roundabout location in Windermere, Florida (Section 34, Township 23 South, Range 27 East), which is being constructed as part of Orange County's initiative to reduce fatal and serious injury crashes. The project involves converting a three-legged stop-controlled intersection into a two-lane roundabout. The geotechnical investigation included four hand auger borings drilled to depths of four to six feet below existing grade and four pavement core samples extracted from existing pavements along Summerlake Park Boulevard and Seidel Road. Field exploration was conducted in October 2024, with boring locations identified using GPS and subsequently backfilled for safety.
The subsurface investigation identified two primary soil strata: Stratum 1 consisting of gray to dark brown fine sand with silt (AASHTO A-3 classification) and Stratum 2 comprising brown to light brown silty sand with occasional limerock fragments (AASHTO A-2-4 classification). Both strata are classified as Select (S) materials suitable for roadway support and embankment fill per FDOT standards. Groundwater was encountered in three of four borings at elevations ranging from +101.5 to +102 feet NAVD-88, with estimated seasonal high groundwater levels identified. Pavement cores revealed an average asphalt thickness of 3.3 inches and soil cement base thickness of 10.5 inches, with pavement conditions rated as fair. The report recommends at least two feet of clearance between the bottom of the proposed pavement base course and estimated seasonal high groundwater levels, removal of any plastic or organic materials encountered, and in-place density testing during fill placement to verify compaction specifications in accordance with FDOT Standard Specifications and Index Numbers 120-001 and 120-002.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prepared for:
VHB
Landmark Center Two
225 E. Robinson St., Suite 300 Orlando, Florida 32801-4326
Prepared by:
Nadic Engineering Services, Inc.
601 N. Hart Blvd
Orlando, Florida 32818 407-521-4771
Consultants in: Civil · Environmental · Geotechnical Engineering Offices in: Orlando · Miami
Geotechnical Engineering Report Seidel Road at Summerlake Park
Boulevard Roundabout Intersection Improvements
Orange County, Florida Orange County Project No.: Y21-906B NADIC Project No.: PR.GEO-RD24015
November 20, 2024
225 E. Robinson Street, Suite 300 Orlando, FL 32801-4326
Attention: Mr. Juan Camacho, P.E.
Director of Traffic Engineering
Re: Geotechnical Engineering Soil Survey Report Seidel Road at Summerlake Park Boulevard Roundabout Intersection Improvements Orange County, Florida Orange County Contract: Y21-906B NADIC Project No. PR.GEO-RD24015
Dear Mr. Camacho:
Nadic Engineering Services, Inc. (NADIC) is pleased to submit this Geotechnical Engineering Soil Survey Report for the Seidel Road at Summerlake Park Boulevard Roundabout Intersection Improvements project. The purpose of this exploration was to evaluate the soil and groundwater conditions along the intersection of Seidel Road and Summerlake Park Boulevard to provide geotechnical recommendations for the proposed Roundabout system. This evaluation was authorized through a Sub-consultant agreement between VHB and NADIC, dated June 28, 2024.
This report is presented to support the development of Roadway Plans for the intersection improvements.
This report has been prepared in accordance based on generally accepted geotechnical engineering practices for specific application to the project study area indicated herein. NADIC appreciates the opportunity to be of service to VHB and Orange County Public Works Department on this project. We look forward to a continued association. Please contact us if you have any questions, or if we may be of further assistance to you as this project proceeds.
Sincerely, NADIC ENGINEERING SERVICES, INC.
Engineering Business No. 8214
Juan Cano Oliver D. Rosen, E.I. Godwin N. Nnadi, Ph.D.,P.E.
Intern Engineer Staff Engineer Principal Engineer FL Registration No. 50637
C:\…\PR.GEO-RD24015 - Summerlake Park @ Seidel Road Roundabout\Project Working File\Report
VHB Page i of ii
NADIC Project No. PR.GEO-RD24015 November 20, 2024
NADIC
Table of Contents
1.0 PROJECT LOCATION AND DESCRIPTION
2.0 PURPOSE AND SCOPE OF SERVICES
3.0 REVIEW OF AVAILABLE DATA
3.1 General
3.2 USGS Topographic Map
3.3 USDA, NRCS Soil Survey
4.0 FIELD EXPLORATION PROGRAM AND METHODS
4.1 Field Exploration Program
4.2 Field Exploration Methods
4.2.1 Hand Auger Borings
4.2.2 Pavement Coring
5.0 SUBSURFACE CONDITIONS
5.1 General
5.2 Roundabout Boring Results
5.3 Groundwater
6.0 LABORATORY TESTING
7.0 EVALUATION AND RECOMMENDATIONS
7.1 General
7.2 Roadway Roundabout Construction
7.3 Pavement Condition Evaluation
7.4 Groundwater Control
8.0 CONSTRUCTION CONSIDERATIONS
8.1 General
8.2 Excavation
9.0 REPORT LIMITATIONS
VHB Page ii of ii
APPENDICES
Appendix A
Figure 1 Vicinity Map Figure 2 USGS Topographic Map
Figure 3 USDA NRCS Soils Map Figure 4 Boring Location Map Table 2 Summary of Laboratory Test Results
Appendix B Sheet 1 Roadway Cross Section of Soil Survey
Sheet 2 Report of Auger Borings
Appendix C Table 3 Pavement Evaluation and Condition Sheet Plates 1 through 4 Pavement Core Photographic Log
VHB Page 1 of 9
1.0 PROJECT LOCATION AND DESCRIPTION
Orange County Traffic Engineering plans to construct a new two-lane roundabout at the intersection of Seidel Road and Summerlake Park Boulevard in Orange County, Florida. The current intersection is a side street stop-controlled three-legged intersection. This project is part of an effort by Orange County to reduce the number of fatal and serious injury crashes within the County.
Nadic Engineering Services, Inc. (NADIC) was retained to conduct geotechnical engineering investigation for the proposed Roundabout at the intersection of Seidel Road and Summerlake Park Boulevard. In addition, the project includes pavement coring within the current three-legged intersection. The purpose of the exploration was to explore subsurface conditions and groundwater conditions and use the information obtained to provide recommendations for the proposed Roundabout construction and site preparation requirements.
The project area is located in Section 34, Township 23 South, Range 27 East in Windermere, Florida. The project vicinity map is shown in Figure 1 in Appendix A.
This report presents the findings of our subsurface exploration within the intersection of Seidel Road and Summerlake Park Boulevard. It also includes an evaluation of the soil and ground water encountered, and provides geotechnical recommendations to support the development of engineering design plans and technical specifications as well as construction considerations for the proposed improvements.
2.0 PURPOSE AND SCOPE OF SERVICES
The purpose of this study was to obtain information on the general subsurface conditions including soil and groundwater conditions along the roadway alignment in order to make geotechnical engineering assessments and recommendations to guide the proposed roadway improvements.
Our services for this project are in general accordance with the Florida Department of Transportation (FDOT), “Soils and Foundation Manual.” The following services were provided in order to achieve the preceding objectives.
1. Reviewed readily available published geologic and topographic information. This published information was obtained from the appropriate Quadrangle Maps published by the United States Geological Survey (USGS) and “Soil Survey of Orange County, Florida” published by the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NSCS)
2. Performed site reconnaissance to evaluate existing conditions and drilling accessibility
3. Coordinated clearance with utility locators
VHB Page 2 of 9
4. Provided Maintenance of Traffic (MOT) during the drilling and pavement coring operations
5. Executed a program of subsurface exploration consisting of four (4) auger borings to a maximum depth of six (6) feet below existing grade for the proposed roundabout construction
6. Performed four (4) pavement corings; three (3) along Summerlake Park Boulevard and one (1) along Seidel Road.
7. Measured the existing groundwater table at the individual boring locations and estimated normal wet seasonal high groundwater table depths
8. Visually classified and stratified representative soil samples in the laboratory using the American Association of State Highway and Transportation Officials (AASHTO) classification system. Performed laboratory testing of selected soil samples to evaluate the basic index and engineering properties of the encountered soils
9. Prepared this formal engineering report summarizing the field exploration, laboratory tests, engineering analyses, evaluations and recommendations.
3.0 REVIEW OF AVAILABLE DATA
3.1 General
To obtain general information on soil and ground water conditions along the project alignment, NADIC reviewed data including aerial maps, United States Geological Survey (USGS), Quadrangle Topographic Maps, and the United State Department of Agriculture (USDA), Natural Resources Conservation Services Soil Survey for Orange County, Florida. A summary of this information is presented below in the following report section. A vicinity map of the site location is shown on Figure 1 in Appendix 1.
3.2 USGS Topographic Map
The "Windermere, Florida" United States Geological Survey (USGS) topographic map issued in 2024 was reviewed. The map shows the ground surface elevation in the project vicinity about +100 feet, North American Vertical Datum of 1988 (NAVD-88). The project area is shown on an excerpt of the USGS topographic map presented in Figure 2 in Appendix A.
3.3 USDA, NRCS Soil Survey
The "Soil Survey of Orange County, Florida" published by the United States Department of Agriculture (USDA), National Resources Conservation Services (NRCS) was reviewed.
Reproductions of the NRCS map for this project area can be found on Figure 3 in Appendix A.
Soils found in the project vicinity are listed below on Table 1.
VHB Page 3 of 9
… A-3 and A-2-4 are appropriate for use as embankment fill…
Table 1: USDA/NRCS Soil Survey Summary
*AASHTO: American Association of State Highway and Transportation Officials **SHGWT: Seasonal High Groundwater Table.
The soils classified as A-3 and A-2-4 are appropriate for use as roadway support and embankment fill. Information contained in the NRCS Soil Survey is very general and may be outdated due to recent development in the site vicinity. Therefore, it may not reflect the actual soil and groundwater conditions, particularly where developments may have modified soil conditions or surface and near surface drainage.
4.0 FIELD EXPLORATION PROGRAM AND METHODS
4.1 Field Exploration Program
To evaluate the subsurface conditions within the proposed roundabout construction, field visits were conducted to establish drilling equipment access, layout and mark boring locations, and coordinate underground utility locations and markings. Three (3) auger borings were completed to a depth of six (6) feet and one (1) auger borings was completed to a depth of four (4) below existing grade to examine the subsurface conditions at the proposed improvement areas. In addition, four (4) pavement corings were performed to examine the existing pavement conditions.
Approximate location of the borings and pavement cores were determined in the field by NADIC based on information provided to us by VHB. The boring and pavement coring locations were staked in the field by a representative of NADIC using a hand-held Garmin GPSMAPst Global Positioning System (GPS) unit. Although the locations are given only approximately, the methods used to locate them are, in NADIC’s opinion, sufficient to meet the intent of our study.
Soil Unit Depth (in)
Soil Description AASHTO* USDA
SHGWT (ft)**
Pomello (34)
0 – 40
40-55
55-80
Fine sand
Coarse sand, sand, fine sand
Coarse sand, sand, fine sand
A-3
A-3. A-2-4
A-3
2.0 – 3.5
Smyrna (44)
0-17 17-27 27-80
Fine sand
Sand, fine sand, loamy fine sand
Sand, fine sand
A-3, A-2-4
A-3, A-2-4
A-3
0 – 1.0
Tavares- Millhopper
(47)
0-6
6-80
Fine sand
Sand, fine sand
A-3
A-3
3.5 – 6.0
VHB Page 4 of 9
Upon completion of groundwater level measurement, the borings were backfilled for safety. The pavement coring locations were also backfilled with ready-made asphalt and compacted with a metal tapper.
The approximate boring and pavement coring locations are presented on Figure 4 in Appendix A. The Roadway Cross Section of Soil Survey is presented on Sheet 1 in Appendix B. The results of the exploration program in the form of soil and pavement profiles are shown in Sheet 2 in Appendix B.
4.2 Field Exploration Methods
4.2.1 Hand Auger Borings
Three (3) hand auger borings were completed to a depth of six (6) feet and one (1) to a depth of four (4) below the existing grade by manually twisting and advancing a bucket auger into the ground in four (4) to six (6) inch increments. These borings were performed in general accordance with the American Society of Testing and Materials (ASTM) Test Designation D- 1452. As each soil type was revealed, representative samples were placed in air-tight bags and returned to our laboratory for further visual examination and classification by a geotechnical engineer. For safety, these boreholes were backfilled after groundwater level measurement.
4.2.2 Pavement Coring
The pavement cores were performed by NADIC at four (4) designated locations as provided by VHB. At each location, the pavement was cored with a six-inch diameter core barrel. The core was removed and measured for pavement thickness and base thickness. After performing the pavement corings, the coring holes were backfilled using native materials and ready-mix asphalt compacted to the top. Pavement conditions encountered within project limits were categorized according to the classification system outlined in the Florida Department of Transportation (FDOT) Flexible Pavement Condition Survey Handbook. Pavement core photographs are shown on Plates 1 through 4 in Appendix C.
5.0 SUBSURFACE CONDITIONS
5.1 General
The soils encountered were classified using the AASHTO Soil Classification System and were described using the ASTM soil descriptions such as sand with silt (A-3, A-2-4, etc.) and were described using the ASTM soil descriptions such as sand with silt. Soil classification and stratification are based on visual examination of the recovered soil samples, interpretation of field boring logs by geotechnical engineer and laboratory testing of selected soil samples.
The stratification lines represent approximate boundaries between soil types of significantly different engineering properties; however, the actual transition between layers may be gradual.
VHB Page 5 of 9
These stratification lines should be used with caution; actual earthwork quantities measured during construction should be expected to vary from quantities calculated based on the information from this report. The soil profiles indicate subsurface conditions encountered only at the specific boring locations at the time of the field exploration. Subsurface conditions, including groundwater conditions may differ from the conditions we encountered at the boring locations at other locations within the project site. In addition, subsurface conditions at the boring locations can change over time.
5.2 Roundabout Boring Results
Based on the soil boring and laboratory test results, the soils encountered along the project alignment have been grouped into two strata. Each stratum exhibits a range of engineering properties related to application for roadway construction as outlined by FDOT Standard Plan Indices 120-001 and 120-002. Included with the soil profiles on Sheet 2 in Appendix B are the groundwater levels measured at the time the borings were performed and the estimated seasonal high groundwater levels.
The soil strata encountered, soil descriptions, AASHTO classifications and FDOT Standard Plans 120-002 Embankment Soil Utilization designations are summarized below:
Stratum No. Soil Description AASHTO
Index 120-001 Classification
1 Gray to dark brown fine SAND with silt, occasionally limerock fragments A-3 Select (S)
2 Brown to light brown silty SAND, occasionally limerock fragments
A-2-4 Select (S)
The above subsurface conditions are only general descriptions. For details refer to the boring profiles in Sheet 2 in Appendix B.
5.3 Groundwater
Groundwater was encountered in all the borings except in boring AB-3 and AB-4. Groundwater was encountered at elevations ranging from +101.5 to +102 feet NAVD-88, at the time of our field investigation (October 2024). Groundwater conditions will vary with environmental variations, seasonal conditions such as the frequency and magnitude of rainfall patterns, as well as man-made influences, such as swales, drainage ponds, underdrains, and areas of covered soil (roadways, sidewalks, etc.).
For the purposes of this report, estimated seasonal high groundwater levels are defined as groundwater levels that are anticipated at the end of the wet season of a “normal rainfall year” under current site conditions. “Normal rainfall year’ is defined as a year in which rainfall quantity and distribution were at or near historical rainfall averages. The estimated seasonal high groundwater levels presented next to the boring profiles (Sheet 2 in Appendix B) are based on
VHB Page 6 of 9 the soil stratigraphy, measured groundwater levels, USDA/SCS information, review of roadway plans, and past experience with similar soil conditions.
In general, the estimated seasonal high groundwater level is not intended to define a limit or ensure future seasonal fluctuations in groundwater levels will not exceed the estimated levels.
Post-development groundwater levels could exceed the seasonal high groundwater level estimates as a result of a series of rainfall events, changed conditions at the site which alter surface water drainage characteristics, or variations in the duration, intensity, or total volume of rainfall.
6.0 LABORATORY TESTING
Representative soil samples were retrieved from the borings and returned to NADIC's laboratory for further visual classification, stratification and selective soil testing. The boring samples were classified and stratified in general accordance with the American Association of State Highway and Transportation (AASHTO) Soil Classification System.
Laboratory classification tests consisted of sieve analysis, organic and moisture content. The results of these tests are presented on the Summary of Laboratory Test Results, Table 2 in Appendix A. Results of all roadway laboratory tests are summarized on the Roadway Soil Survey Sheet (Sheet 1 in Appendix B). The types of tests performed with their associated test designations are presented below.
Test Type FDOT ASTM
Grain Size Analysis FM 1-T 088 D-422
Moisture Content FM 1-T 265 D-2216
Organic Content FM 1-T 267 D-2974
7.0 EVALUATION AND RECOMMENDATIONS
7.1 General
The evaluation and recommendations contained in this report are based in part on the data obtained from a limited number of soil samples and groundwater measurements obtained from widely spaced borings. The exploration methods used indicate subsurface conditions at specific boring locations only, at the time they were performed and to the depths penetrated. Borings cannot be relied upon to accurately reflect the variations that usually exist between boring locations and these variations may not become evident until construction. If variations from the conditions described in this report become evident during the course of construction, or project characteristics described in this report change, NADIC should be retained to re-evaluate the conclusions and recommendations contained in this report in light of such changes.
VHB Page 7 of 9
7.2 Roadway Roundabout Construction
The results of our geotechnical exploration indicate that the subsurface soils encountered along roadway alignment are generally suitable for support of the proposed roadway improvement after proper subgrade preparation. Non select soils, muck, clays or debris, if encountered within the limits, should be removed and replaced with selected soils in accordance with FDOT Standard Plan Index Nos. 120-001 and 120-002. Site preparation and roadway construction can proceed in accordance with the latest version of the FDOT “Standard Specifications for Road and Bridge Construction” and the FDOT "Roadway and Traffic Design Standards," including Index 120- 001.
The soils encountered in our borings classified as fine sand with silt to silty fine sand (A-3 and A-2-4) (Strata Nos. 1 and 2) should be treated as Select (S) materials in accordance with Index No. 120-001. However, the A-2-4 may retain excess moisture and may be difficult to compact.
Therefore, the contractor should be prepared to adjust moisture content of the unstable subgrade as necessary to achieve stability and compaction requirements. If plastic and/or organic material is encountered along the project alignment during construction, at locations that were not indicated in this report or where soil borings were not performed, these materials should be removed in accordance with Index Nos. 120-001 and 120-002 unless shown “to remain” in the plans.
All fill soils placed for the roadway improvement should be selected in accordance with Index No. 120-001. In-place density tests should be performed on the fill soils to verify the specified degree of compaction. The minimum test frequency should be in accordance with the FDOT Materials, Sampling, Testing and Reporting Guide.
7.3 Pavement Condition Evaluation
Four (4) pavement cores were performed to determine the thickness of the existing pavement within the influence of the access road improvements. The pavement condition was generally fair within the project limits. The results of NADIC pavement coring are summarized below. The pavement condition was generally fair within the project limits.
The data and information for the pavement core samples recorded in the field during coring are presented on the Pavement Evaluation and Condition Data Sheet on Table 3 in Appendix C.
Locations of the pavement cores can be found in Figure 4 in Appendix A. The general conditions of the existing pavements are shown on Plates 1 through 4 in Appendix C.
Type of Material (By Layer)
Average Layer Thickness (inches)
Layer Thickness Range (inches)
Type S-I 3.3 2.6 – 4.3
Soil Cement Base 10.5 10.3 – 10.8
Average Pavement Thickness 3.3 2.6 – 4.3
VHB Page 8 of 9
7.4 Groundwater Control
Groundwater table fluctuates seasonally depending upon intensity and duration of rainfall and presence and proximity of ant artificial drainage facilities within the project area. Depending upon groundwater levels at the time of construction, some form of dewatering may be required to achieve the required compaction. Based on the encountered groundwater, the existing groundwater is controlled by a drainage system consisting of swales and cross drains.
One of the most critical influences on pavement performance in Central Florida is the relationship between pavement subgrade and the seasonal high groundwater level. Many roadways have been destroyed as a result of deterioration of the base and the base/surface course bond. It is our opinion that at least two feet of clearance be provided between the bottom of the proposed pavement base course and the estimated seasonal high groundwater levels along the roadway alignment.
8.0 CONSTRUCTION CONSIDERATIONS
8.1 General
Roadway Roundabout construction should be performed in accordance with the appropriate sections of the FDOT current edition of the Standard Specifications for Road and Bridge Construction. The proposed improvement should be cleared, and all debris completely removed, including vegetation and construction debris from the ground surface. Site preparation and roadway construction should be in accordance with Section 110 of the latest version of the FDOT Standard Specifications for Road and Bridge Construction and FDOT Standard Specifications and Index Nos. 120-002 and 120-001.
If needed, backfill should generally consist of select materials (A-3) and (A-2-4) compacted in accordance with Section 110 of the latest version of the FDOT Standard Specification for Road and Bridge Construction and FDOT Standard Specifications and Index Nos. 120-002 and 120- 001 unless otherwise shown on the plans.
In-place density tests should be performed on the fill soils to verify the specified degree of compaction. The minimum test frequency should be in accordance with the FDOT Materials, Sampling, Testing and Reporting Guide.
8.2 Excavation
Excavation, if necessary, should be performed in accordance with Section 125 and 455-1.2 of the current FDOT Standard Specifications for Road and Bridge Construction.
All excavation and below grade construction activities should be in accordance with the Occupational Safety and Health Administration (OSHA). The side slopes of all excavation greater than four (4) feet deep should be sloped at a maximum of one point five (1.5) horizontal to one (1) vertical (1.5H: 1V) as required by OSHA. Steeper slopes can be established by a
VHB Page 9 of 9
“competent person” (as defined by OSHA) and supported with a system designed by a registered Professional Engineer.
For temporary excavation support system, we recommend the following:
Saturated unit weight 120 pcf Angle of soil friction 30 degrees Cohesion 0 Surcharge load 250 psf
9.0 REPORT LIMITATIONS
Our professional services have been performed, our findings obtained and our recommendations prepared in accordance with generally accepted geotechnical engineering principles and practices. We are not responsible for the conclusions, opinions or recommendations made by others based on the data presented herein.
The scope of the exploration was intended to evaluate soil and groundwater conditions within the influence of roadway improvement. The analyses and recommendations submitted in this report are based upon the data obtained from the soil borings performed at the locations indicated and does not reflect any variations which may occur among these borings. If any variations become evident during the course of this project, a re-evaluation of the recommendations contained in this report will be necessary after we have had an opportunity to observe the characteristics of the conditions encountered. The applicability of the report should be reviewed in the event of significant changes occurring in the design, nature or location of the proposed roadway improvements.
The scope of services of this project, included herein, did not include any environmental assessment for the presence or absence of hazardous or toxic materials in the soil, surface water and groundwater, air on the site, below and around the site. Any statements in this report or on the boring logs regarding odors, colors, unusual or suspicious items and conditions are strictly for the information of the client.
APPENDIX A
Figure 1 Vicinity Map
Figure 2 USGS Topographic Map
Figure 3 USDA/NRCS Soil Map
Figure 3 Boring Location Map
Table 2 Summary of Laboratory Test Results
PROJECT NAME:
FIGURE 1
CONTRACT No.COUNTY
ORANGE
VICINITY MAP
GODWIN N. NNADI, Ph.D., P.E.
FL REGISTRATION NO. 50637
NADIC ENGINEERING SERVICES, INC.
601 N. HART BOULEVARD
ORLANDO, FL 32818
PH (407) 521-4771 FAX (407) 521-4772
CERTIFICATE OF AUTHORIZATION NO. 8214
NADIC PROJECT NO.: PR.GEO-RD24015
ORANGE COUNTY,
FLORIDA
DATESNAMES
CHECKED BY:
MODIFIED BY:
CHECKED BY:
APPROVED BY:
11-05-2024JC
GNN
N/AN/A
N/AN/A
DATES BY DESCRIPTION
REVISIONS
DRAWN BY:
APPROX. PROJECT
LOCATION
QUADRANGLE: WINDERMERE, FL (2024)
SECTION: 34
TOWNSHIP: 23 SOUTH
RANGE: 27 EAST
REFERENCE: Google Earth Aerial Maps (2024)
Seidel Rd
Y21-906B
NOT TO SCALE
Summerlake Park Blvd
11-05-2024
SEIDEL ROAD AT SUMMERLAKE PARK
BOULEVARD ROUNDABOUT DESIGN
INTERSECTION IMPROVEMENTS
CONTRACT No.COUNTY
ORANGE
GODWIN N. NNADI, Ph.D., P.E.
FL REGISTRATION NO. 50637
NADIC ENGINEERING SERVICES, INC.
601 N. HART BOULEVARD
ORLANDO, FL 32818
PH (407) 521-4771 FAX (407) 521-4772
CERTIFICATE OF AUTHORIZATION NO. 8214
ORANGE COUNTY,
FLORIDA
DATESNAMES
CHECKED BY:
MODIFIED BY:
CHECKED BY:
APPROVED BY:
N/AN/A
N/AN/A
DATES BY DESCRIPTION
REVISIONS
DRAWN BY:
FIGURE 2
TOPOGRAPHIC MAP
QUADRANGLE: WINDERMERE, FL (2024)
SECTION: 34
TOWNSHIP: 23 SOUTH
RANGE: 27 EAST
REFERENCE: United States Geological Survey (USGS)
Y21-906B
NOT TO SCALE
APPROX. PROJECT
LOCATION
Seidel Rd
Summerlake Park Blvd
JC
GNN
NADIC PROJECT NO.: PR.GEO-RD24015
11-05-2024
11-05-2024
SEIDEL ROAD AT SUMMERLAKE PARK
CONTRACT No.COUNTY
ORANGE
GODWIN N. NNADI, Ph.D., P.E.
FL REGISTRATION NO. 50637
NADIC ENGINEERING SERVICES, INC.
601 N. HART BOULEVARD
ORLANDO, FL 32818
PH (407) 521-4771 FAX (407) 521-4772
CERTIFICATE OF AUTHORIZATION NO. 8214
ORANGE COUNTY,
FLORIDA
DATESNAMES
CHECKED BY:
MODIFIED BY:
CHECKED BY:
APPROVED BY:
N/AN/A
N/AN/A
DATES BY DESCRIPTION
REVISIONS
DRAWN BY:
FIGURE 3
SOIL SURVEY MAP
LEGEND
34:Pomello 44: Smyrna 47: Tavares-Millhopper
QUADRANGLE: WINDERMERE, FL (2024)
SECTION: 34
TOWNSHIP: 23 SOUTH
RANGE: 27 EAST
REFERENCE: United States Geological Survey (USGS)
Y21-906B
NOT TO SCALE
APPROX. PROJECT
LOCATION
Seidel Rd
Summerlake Park Blvd
JC
GNN
NADIC PROJECT NO.: PR.GEO-RD24015
11-05-2024
11-05-2024
SEIDEL ROAD AT SUMMERLAKE PARK
B-1
PC-1
B-2
PC-2
B-3
PC-3
B-4
PC-4
PROJECT NAME: FIGURE NO.
Drawn by:
Checked by:
Designed by:
Checked by:
Approved by:
DESCRIPTIONDATE BY DESCRIPTION DATE
REVISIONS
BY
SHEET TITLE:
COUNTY
NADIC Project No.: PR.GEO-RD24015
NAMES
GNN
GNN
N/A N/A
DATES
N/A N/A
JC 11-05-2024
GODWIN N. NNADI, Ph.D., P.E.
FL REGISTRATION NO. 50637
NADIC ENGINEERING SERVICES, INC.
601 N. HART BOULEVARD
ORLANDO, FL 32818
PH (407) 521-4771 FAX (407) 521-4772
CERTIFICATE OF AUTHORIZATION NO. 8214
ORANGE
CONTRACT NO.
ORANGE COUNTY, FLORIDA BORING LOCATION MAP
11-05-2024
Y21-906B 4
NOT TO SCALE
QUADRANGLE: WINDERMERE, FL (2024)
SECTION: 34
TOWNSHIP: 23 SOUTH
RANGE: 27 EAST
REFERENCE: Google Earth Aerial Maps (2024)
Boring Location Pavement core
SEIDEL ROAD AT SUMMERLAKE PARK BOULEVARD
ROUNDABOUT INTERSECTION IMPROVEMENTS
Summerlake Park Blvd
APPROX. PROJECT
LOCATION
Seidel Rd
Seidel Road at Summerlake Park Boulevard Roundabout Design Intersection Improvements NADIC Project No. PR.GEO-RD24015 November 15, 2024
NADIC
*AASHTO: American Association of State Highway Transportation Officials
TABLE 2
SUMMARY OF LABORATORY TEST RESULTS
Boring No.
Approximate Station & Offset
Sample Depth
(ft)
Stratum No.
Moisture Content (%)
Organic Content
Sieve Analysis (Cumulative Percent Passing) Atterberg Limits
(%) AASHTO*
Classification #4 #10 #20 #40 #60 #100 #200 Liquid Limit
Plasticity Index
AB-1 31+40 & 26’ RT 4 – 6 1 23 - 100 100 100 94 61 27 12 - - A-3
AB-2 34+23 & 22’ LT 0 – 2 1 12 1 100 100 100 95 62 26 7 - - A-3
AB-3 35+84 & 27’ RT 2 – 4 2 37 - 94 90 88 75 39 15 5 - - A-2-4
AB-4 13+10 & 41’ RT 4 – 6 2 21 - 100 100 100 95 60 24 6 - - A-2-4
APPENDIX B
Sheet 1 Roadway Cross Section of Soil Survey
Sheet 2 Report of Auger Borings
GRAY TO DARK BROWN FINE SAND WITH SILT,
OCCASIONALLY WITH LIMEROCK FRAGMENTS
ORGANIC
CONTENT
MOISTURE
CONTENT
SIEVE ANALYSIS RESULTS
% PASSING
ATTERBERG
LIMITS (%)
STRATUM
NO.
No. OF
TESTS
ORGANIC
No. OF
TESTS
No. OF
TESTS
MOISTURE
CONTENT
PASSING
PASSING
PASSING
PASSING
PASSING No. OF
TESTS
LIQUID
LIMIT
PLASTICITY
INDEX
AASHTO
GROUP
DESCRIPTION
10 MESH 40 MESH 60 MESH 100 MESH 200 MESH
1 1 12-37 90 - 100 75 - 95 39 - 62 15 - 26 5 - 7 - -pH RESISTIVITY CHLORIDES
PPM
SULFATE
PPM
CONCRETE STEELOHM-CM
No. OF
TESTS
CORROSION TEST
RESULTS
SUBSTRUCTURE
ENVIRONMENTAL
CLASSIFICATION
GODWIN N. NNADI, P.E. #50637
601 N. Hart Boulevard
ORLANDO, FLORIDA 32818
Geotechnical Environmental
Consulting Engineering
Civil
NADIC
ENGINEER OF RECORD:
SEAL:
SHEET NO.
PROJECT NO.
PROJECT NAME:
SHEET TITLE:
CONTRACT NO.COUNTY
Y21-906BORANGE
ROADWAY SOIL SURVEY
ORANGE COUNTY,
FLORIDA
REVISION
BYDATE DESCRIPTION
23 61100 94 27 121
A-3
A-2-4
NADIC Project No. PR.GEO-RD24015
NADIC ENGINEERING SERVICES, INC
REPORT OF TESTS
ROADWAY CROSS SECTION OF SOIL SURVEY
PROJECT No.: PR.GEO-RD24015
PROJECT DESCRIPTION: SEIDEL ROAD @ SUMMERLAKE PARK
BOULEVARD ROUNDABOUT INTERSECTION
IMPROVEMENTS
SUBMITTED BY: NADIC
QUADRANGLE: WINDERMERE,
FLORIDA
SECTION: 34
TOWNSHIP: 23 SOUTH
RANGE: 27 EAST
DATE REPORTED: NOVEMBER, 2024
3 (FULL)
NOTES:
STRATA BOUNDARIES ARE APPROXIMATE AND REPRESENT SOIL STRATA AT EACH
TEST HOLE LOCATION ONLY. ANY STRATUM CONNECTING LINES SHOWN ARE FOR
ESTIMATING EARTHWORK ONLY AND DO NOT INDICATE ACTUAL STRATUM LIMITS.
SUBSURFACE VARIATIONS BETWEEN BORINGS SHOULD BE ANTICIPATED AS
INDICATED IN FDOT SECTION 2-4. FOR FURTHER DETAILS SEE FDOT STANDARD
SPECIFICATIONS SECTION 120-3.
(1)
SOIL PARAMETER NOT TESTED DENOTED AS "-" ABOVE.(2)
(3) INDICATES WATER TABLE WHERE ENCOUNTERED AT THE TIME OF SURVEY.
INDICATES GROUNDWATER LEVEL NOT ENCOUNTERED AT THE TIME OF SURVEY.
INDICATES ESTIMATED SEASONAL HIGH WATER LEVEL.
(4) REMOVAL OF PLASTIC AND HIGH PLASTIC MATERIAL OCCURING WITHIN THE
ROADWAY SHALL BE ACCOMPLISHED IN ACCORDANCE WITH FDOT STANDARD
INDEX No. 120-002 UNLESS OTHERWISE STATED IN THE PLANS. THE MATERIAL
UTILIZED IN EMBANKMENT CONSTRUCTION SHALL BE IN ACCORDANCE WITH FDOT
STANDARD INDEX No. 120-001.
(5) STRATA 1 AND 2 SHALL BE TREATED AS SELECT (S) MATERIALS PER FDOT STANDARD
INDEX No. 120-001.
GNE
BROWN TO LIGHT BROWN SILTY SAND,
OCCASIONALLY LIMEROCK FRAGMENTS
N A
D
IC
S H
EE
T
N O
. 1
TH
E O
FF
IC
IA
L
RE
C
O
RD
O F
TH
IS
S H
EE
T
IS
T
H E
EL
EC
TR
O
N
IC
F
IL
E D
IG
IT
AL
LY
S
IG
N
ED
A N
D S
EA
LE
D U
N D
ER
R
U
LE
1G
-2
3.
4, F
.A .C
1 (FULL)
En gi ne er in g
- O rla nd o\
R oa dw ay
(R D
)\2
4\
PR
.G
EO
-R D
- S um m er la ke P ar k
S ei de l R oa d R ou nd ab ou t\P ro je ct
W or ki ng
F ile
\A ut oc ad
Seidel Road @ Summerlake Park Boulevard Roundabout Design Intersection Improvements
Boring No.:
Approx. Station:
Approx. Offset:
Approx. Latitude:
Approx. Longitude:
Approx. Elevation:
Date Drilled:
EL
EV
A
TI
O N
IN
F
EE
T
(N A
V D
-8 8)
AB -1
31+39
25.6 RT
28°26'45.71"N 81°36'6.74"W
106.3 10/28/2024
AB - 2
34+23
22.4 LT
28°26'47.18"N 81°36'3.98"W
104.8 10/28/2024
EL
EV
A
TI
O N
IN
F
EE
T
(N A
V D
-8 8)
Boring Terminated @ Elevation 100.4' Auger Boring
10/28/2024
AB - 3
35+83
27.4 RT
28°26'47.48"N 81°36'2.13"W
104.6 10/28/2024
AB - 4
13+10
41.1 RT
28°26'45.85"N 81°36'3.22"W
104.1 10/28/2024
Boring Terminated @ Elevation 98.8' Auger Boring
110/28/2024
Boring Terminated @ Elevation 98.1' Auger Boring
GNE
PROJECT NAME: SHEET NO.
Drawn by:
Checked by:
Designed by:
Checked by:
Approved by:
NAMES
GNN
GNN
N/A N/A
DATES
N/A N/A
DESCRIPTIONDATE BY DESCRIPTION DATE
REVISIONS
BY
SHEET TITLE:
NADIC Project No. PR.GEO-RD24015
REPORT OF AUGER BORINGSORANGE COUNTY,
FLORIDA
PROJECT NO.COUNTY
ORANGE
N A
D
IC
S H
EE
T
N O
. 2
TH
E O
FF
IC
IA
L
RE
C
O
RD
O F
TH
IS
S H
EE
T
IS
T
H E
EL
EC
TR
O
N
IC
F
IL
E D
IG
IT
AL
LY
S
IG
N
ED
A N
D S
EA
LE
D U
N D
ER
R
U
LE
1G
-2
3.
4, F
.A .C
JC ENGINEER OF RECORD:
NADIC ENGINEERING SERVICES, INC.
601 N. HART BOULEVARD
ORLANDO FL, 32818
GODWIN N. NNADI, P.E. NO. 50637
GNE
Approximate Boring Location
LEGEND
Groundwater not encountered
NOT TO SCALE
11-07-2024 11-07-2024
Y21-906B
Estimated seasonal high groundwater level
Groundwater level encountered on date shown10/28/2024
(A-3) A.A.S.H.T.O.: Soil classification group symbol as determined by visual examination
GNE
1 Brown to gray fine SAND with silt, occasionally with trace organic and roots, (A-3)
2 Brown to dark brown silty SAND, occasionally trace roots and limerock fragments, (A-2-4)
Groundwater not encountered
AB-1
AB-1
AB-2 AB-3
AB-4
Seidel Road @ Summerlake Park Boulevard Roundabout Design Intersection ImprovementsEn gi ne er in g
- O rla nd o\ R oa dw ay (R
D )\2
4\
PR
.G
EO
-R
D
- S um m er la ke
P ar k
S ei de l R oa d
R ou nd ab ou t\P ro je ct W or ki ng F ile \A ut oc ad
Boring Terminated @ Elevation 100.6' (terminated at
4FT due to encountered utilities) Auger Boring
GNE
Summerlake Park Blvd
Seidel Rd
Approximate Coring LocationC-1
C-1 C-4
C-3
C-2
2.9" Asphalt 10.3" Base
C - 1 31+83
6.96' RT
28°26'46.02"N 81°36'6.34"W
+105.5 10/28/2024
GNE
Coring Terminated @
Elevation 104.4' 2.6" Asphalt 10.3" Base
GNE
Coring Terminated @
Elevation 102.3'
3.3" Asphalt 10.5" Base
GNE
Coring Terminated @
Elevation 101.8'
4.3" Asphalt 10.8" Base
GNE
Coring Terminated @
Elevation 102.4'
C - 2 37+01
12.44' LT
28°26'48.43"N 81°36'1.23"W
+103.4 10/28/2024
C - 3 11+96.27
27.80' RT
28°26'44.67"N 81°36'3.18"W
+102.9 10/28/2024
C - 4 13+06
30.15' LT
28°26'45.66"N 81°36'3.99"W
+103.6 10/28/2024
AutoCAD SHX Text
NADIC
AutoCAD SHX Text
ENGINEERING
APPENDIX C
Table 3 Pavement Evaluation and Condition Data Sheet
Plates 1 to 4 Pavement Core Photographic Log
Seidel Road at Summerlake Park Boulevard Roundabout Design Intersection Improvements NADIC Project No.: PR.GEO-RD24015 Page No.: | 1
NADIC
Table 3
PAVEMENT EVALUATION AND CONDITION DATA SHEET
Orange County Project No.: Y21-906B Cored By: Nadic Date: 10/28/2024 Page No.: 1 of 1
County: Orange Location: Seidel Road at Summerlake Park Boulevard From: Seidel Road To: Summerlake Park Blvd
Intersection Name:
Seidel Road at Summerlake Park Boulevard Approx. Begin Station: 31+00 Approx. End Station: 38+00 Approx. Length: 700 ft
Core No.: Approx.
Station
Approx.
Offset Lane Wheel
Path
Pavement Layer (in) Base Crack Pavt Cond
Rut Depth (in)
Cross Slope
Comments Type S-1
Type
S-II
Core Length
(in) Type Thickness
(in) Depth
(in) Type Class Extent
C-1 31+82 7’ RT R1 X 2.9 - 2.9 SC 10.3 - - - - F - 1.6 Summer Lake Bvld.
Alignment
C-2 37+01 12’ LT L1 X 2.6 - 2.6 SC 10.3 - - - - F - 1.7 Summer Lake Bvld.
Alignment
C-3 11+96 28’ RT R1 X 3.3 - 3.3 SC 10.5 - - - - F - 0.8 Seidel Rd. Alignment
C-4 13+06 30’ LT L1 X 4.3 - 4.3 SC 10.8 - - - - F - 0.9 Seidel Rd. Alignment
Remarks:
R1 = Northbound/Eastbound Lane L1 = Southbound/Westbound Lane
SC = Soil Cement
SB = Single Branch
L = Light
F = Fair
SEIDEL ROAD AT SUMMERLAKE PARK BOULEVARD ROUNDABOUT
Core No.: C-1 Asphalt Thickness: 2.9 inches Approx. Location: Summerlake Park Blvd Eastbound Lane Base Type: Soil Cement Approx. Station: 31+39 Base Thickness: 10.3” inches Approx. Offset: 25.6’ RT
NADIC Plate 1
Core No.: C-2 Asphalt Thickness: 2.6 inches Approx. Location: Summerlake Park Blvd Westbound Lane Base Type: Soil Cement Approx. Station: 34+23 Base Thickness: 10.3” inches Approx. Offset: 22.4’ LT
NADIC Plate 2
Core No.: C-3 Asphalt Thickness: 3.3 inches Approx. Location: Seidel Rd Northbound Lane Base Type: Soil Cement Approx. Station: 35+83 Base Thickness: 10.5” inches Approx. Offset: 27.4’ RT
NADIC Plate 3
Core No.: C-4 Asphalt Thickness: 4.3 inches Approx. Location: Seidel Rd Southbound Lane Base Type: Soil Cement Approx. Station: 13+10 Base Thickness: 10.8” inches Approx. Offset: 41.1’ LT
NADIC Plate 4
| 1.0 PROJECT LOCATION AND DESCRIPTION |
| 2.0 PURPOSE AND SCOPE OF SERVICES |
| 3.0 REVIEW OF AVAILABLE DATA |
| 3.1 General |
| 3.2 USGS Topographic Map |
| 3.3 USDA, NRCS Soil Survey |
| 4.0 FIELD EXPLORATION PROGRAM AND METHODS |
| 4.1 Field Exploration Program |
| 4.2 Field Exploration Methods |
| 4.2.1 Hand Auger Borings |
| 4.2.2 Pavement Coring |
| 5.0 SUBSURFACE CONDITIONS |
| 5.1 General |
| 5.2 Roundabout Boring Results |
| 5.3 Groundwater |
| 6.0 LABORATORY TESTING |
| 7.0 EVALUATION AND RECOMMENDATIONS |
| 7.1 General |
| 7.2 Roadway Roundabout Construction |
| 7.3 Pavement Condition Evaluation |
| 7.4 Groundwater Control |
| 8.0 CONSTRUCTION CONSIDERATIONS |
| 8.1 General |
| 8.2 Excavation |
| 9.0 REPORT LIMITATIONS |
| APPENDIX A TO C_Roadway.pdf |
| Sheet 2.pdf |
| Sheets and Views |
| Model |
| Pave core plates_Seidel.pdf |
| SEIDEL ROAD AT SUMMERLAKE PARK BOULEVARD ROUNDABOUT INTERSECTION IMPROVEMENTS |