This solicitation requests quotes for a firm fixed-price construction contract to install concrete trench drains, condensate drainage systems, and a whole building dehumidification system at the Fish Broodstock Building of the National Center for Cool and Cold Water Aquaculture. The selected vendor will receive a single award contract not to exceed $5 million for a one year period of performance. Interested small businesses are invited to submit technical, past performance, and price proposals by the specified due date for evaluation under the lowest price technically acceptable process. The requirement has been set aside for small businesses with a size standard of $36.5 million in average annual receipts. The soliciting agency is the Agricultural Research Service within the United States Department of Agriculture.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A003 12305B22R0006.pdf | ||
| A003 Questions during bid.docx | DOCX document | |
| A002 RFI 2 5JUL2022.pdf | ||
| A002 Specifications Trench Drain and Dehumidifier Part B Dehumidifier.pdf | ||
| A002 12305B22R0006.pdf | ||
| A001 Questions during bid.docx | DOCX document | |
| A001 Visit Roster.pdf | ||
| A001 12305B22R0006.pdf | ||
| 12.0 SF1442 Clauses.pdf | ||
| 1.0 Trench Drain Spec Booklet Issue for Bid Stamp (1).pdf | ||
| 10.0 WD WV20220037 SAM.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCALE:
SITE LOCATION PLAN
NTS
CS SCALE:
VICINITY PLAN
NTS
CS
Sheet: 1 File: O:\2017\SAGQ17056.04\90-SAGQ17056.04_XREF\Location.pdf Missing or invalid reference
Missing or invalid reference
Xref O:\2017\SAGQ17056.04\90-SAGQ17056.04_XREF\30X42 Title block.dwg
PROJECT COVERSHEET
G001
USDA AGRICULTURAL RESEARCH SERVICE
PROJECT # NEA MOD#25 FY20
PROJECT NATIONAL CENTERS FOR COOL AND COLD WATER AQUACULTURE
11861 LEETOWN RD, KEARNEYSVILLE, WV 25430
ISSUED FOR BID
BROOD STOCK BUILDING TRENCH DRAIN AND DEHUMIDIFICATION UNIT
GENERAL DRAWING LIST
SHEET DRAWING TITLE
1 G001 GENERAL COVER SHEET
STRUCTURAL DRAWING LIST
SHEET DRAWING TITLE
2 SD101
S101
STRUCTURAL DEMOLITION PLAN
S501
STRUCTURAL NEW WORK PLAN
PLUMBING DRAWINGS LIST
SHEET DRAWING TITLE
7 P001 PLUMBING COVER SHEET
8 PD101 PLUMBING DEMOLITION PLAN
9 P101 PLUMBING NEW WORK PLAN
P701 PLUMBING DETAILS, RISERS, AND SCHEDULES
Original drawing size is 30"x42"; Scale entities accordingly if reduced/enlarged.
3040 WILLIAMS DRIVE, SUITE 600
FAIRFAX, VIRGINIA 22031
P: 703-691-2115 www. .com
TM
PROJECT NUMBER: SAG21056.14
MECHANICAL DRAWING LIST
SHEET DRAWING TITLE
11 M001 MECHANICAL NOTES SYMBOLS AND ABBREVIATIONS
12 MD101 MECHANICAL DEMOLITION PLAN
13 M101 MECHANICAL NEW WRK PLAN
14 M601 MECHANICAL SCHEDULES AND DETAILS
15 M801 MECHANICAL CONTROLS NOTES SYMBOLS AND ABBREVIATIONS
16 M802 MECHANCIAL CONTROLS AHU AND VAVs
ELECTRICAL DRAWINGS LIST
SHEET DRAWING TITLE
17 E001 ELECTRICAL NOTES SYMBOLS AND ABBREVIATIONS
18 ED101 ELECTRICAL DEMOLITION PLAN
19 E101 ELECTRICAL POWER PLAN - NEW WORK
20 E501 ELECTRICAL RISER DIAGRAMS AND SCHEDULES
STRUCTURAL DETAILS
S502 STRUCTURAL DETAILS
S503 STRUCTURAL DETAILS
PLUMBING SYMBOLS ABBREVIATIONS
NOTE: ALL SYMBOLS MAY NOT APPEAR ON THE DRAWINGS.
A
A
REDUCED PRESSURE ZONE BACKFLOW PREVENTER (ASSE1013)
BALL VALVE
CHECK VALVE
DOUBLE CHECK VALVE BACKFLOW PREVENTER (ASSE 1015,1048)
SOLENOID VALVE
GATE VALVE
PRESSURE REDUCING VALVE
THERMOSTATIC MIXING VALVE
PLUG VALVE
BACKFLOW PREVENTER (ASSE 1015 &1024)
PUMP
WATER HAMMER ARRESTOR ('A' = PDI SIZE)
PRESSURE GAUGE
THERMOMETER GAUGE
AQUASTAT VALVE
BALANCING VALVE
PIPE VALVES AND ACCESSORIES
VACUUM RELIEF VALVE
STRAINER
REDUCER/INCREASER
CAPPED CONNECTION
PIPE UNION
ELBOW TURNED UP
TEE UP
TEE DOWN
SHUT-OFF VALVE IN RISER
ELBOW TURNED DOWN
PIPE FITTINGS
COLD WATER PIPING
HOT WATER PIPING
HOT WATER RETURN PIPING
GAS PIPING
SANITARY PIPING ABOVE GROUND
VENT PIPING
STORM WATER PIPING ABOVE GROUND
PIPE REPRESENTATION
STORM WATER PIPING BELOW GROUND
SANITARY PIPING BELOW GROUND
G
STORM WATER PIPING FROM GREEN ROOF ABOVE GROUND
STORM WATER PIPING FROM GREEN ROOF BELOW GROUND
GENERAL PLUMBING NOTES
1. ALL PLUMBING WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL PLUMBING CODE (WITH 2020 WEST VIRGINIA
AMENDMENTS).
2. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, FEES AND TAXES.
3. CONTRACTOR SHALL MAKE NO CHANGES WITHOUT THE WRITTEN PERMISSION FROM THE ARCHITECT/ENGINEER.
4. CONTRACTOR ASSUMES RESPONSIBILITY FOR PROPER ARRANGEMENT OF PIPE, FIXTURES, ETC., TO CONNECT APPROVED EQUIPMENT IN A PROPER AND APPROVED MANNER. CONTRACTOR SHALL FOLLOW EQUIPMENT MANUFACTURER'S DETAILED INSTRUCTIONS AND THE CONTRACT DOCUMENTS. NOTIFY THE ARCHITECT/ENGINEER BEFORE PROCEEDING WITH ALL WORK.
NO EQUIPMENT INSTALLATION OR CONNECTIONS SHALL BE MADE IN A MANNER THAT VOIDS THE MANUFACTURER'S
WARRANTY.
5. BEFORE POURING CONCRETE FLOORS, INSTALL ALL REQUIRED SLEEVES.
6. DO NOT CUT STRUCTURAL MEMBERS WITHOUT THE APPROVAL OF THE ARCHITECT/ENGINEER, AND PERFORM CUTTING IN A
MANNER AS DIRECTED BY ARCHITECT AND ENGINEER.
7. PROVIDE SLEEVES FOR ALL FLOOR PENETRATIONS WITH TOP OF SLEEVE 2" ABOVE FINISHED FLOOR.
8. PLUMBING CONTRACTOR TO FURNISH AND INSTALL ALL PLUMBING FIXTURES COMPLETELY AS SPECIFIED ON DRAWINGS.
9. PROVIDE SHUT-OFF VALVES ON ALL EQUIPMENT AND ANGLE STOPS ON HOT AND COLD WATER PIPING TO ALL PLUMBING
FIXTURES.
10. FLOOR TO BE SLOPED 1/8" TO FLOOR DRAINS. TOP OF DRAIN FLUSH WITH FINISHED FLOOR.
11. CONTRACTOR SHALL PROVIDE ACCESS PANELS FOR ALL CONCEALED VALVES AND MECHANICAL EQUIPMENT.
12. MAINTAIN WORK AREA CLEAN AT ALL TIMES DURING CONSTRUCTION. AFTER COMPLETING INSTALLATION OF WORK, CLEAN ALL
FIXTURES OF ALL RUBBISH, PLASTER, DIRT, AND OTHER DEBRIS.
13. TEST ALL SYSTEMS. ALL FIXTURES SHALL OPERATE SATISFACTORILY AS DESIGNED AND INTENDED. REPORT ANY DEFICIENCIES
TO THE ARCHITECT/ENGINEER.
14. ALL SUPPLY PIPING SHALL BE DISINFECTED AND FLUSHED IN FULL ACCORDANCE WITH THE LOCAL AUTHORITIES HAVING
JURISDICTION.
15. ALL PIPING SYSTEMS SHALL BE TESTED AT DESIGN PRESSURES FOR A PERIOD OF TIME AS PRESCRIBED BY THE LOCAL
AUTHORITIES HAVING JURISDICTION.
16. CONTRACTOR SHALL REFER TO STRUCTURAL DRAWINGS, EQUIPMENT, LAYOUT DRAWINGS, AND ALL OTHER RELATED DRAWINGS AS REQUIRED FOR DIMENSIONS, DETAILS, ETC. PLUMBING LAYOUT SHOWN ON THIS DRAWING IS FOR GENERAL ARRANGEMENT ONLY. CONTRACTOR SHALL COORDINATE ALL WORK WITH FIELD CONDITIONS AND ALL OTHER TRADES INVOLVED AS REQUIRED. DO NOT SCALE DIMENSIONS FROM THIS DRAWING. CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN
FIELD AS REQUIRED.
17. CONTRACTOR SHALL REFER TO MANUFACTURER'S INSTALLATION INSTRUCTIONS AND CUT SHEETS AS REQUIRED FOR
INSTALLATION OF EQUIPMENT.
18. CONTRACTOR SHALL FURNISH AND INSTALL ALL PIPING, FITTINGS, VALVES, PARTS AND ACCESSORIES REQUIRED FOR PROPER INSTALLATION AND OPERATION OF PLUMBING SYSTEM. (INCLUDING ALL FITTINGS AND DEVICES REQUIRED BY CODE, SUCH AS CHECK VALVES, VACUUM BREAKERS, SAFETY RELIEF VALVES, VACUUM RELIEF, ETC. ALL FLOOR DRAINS, WHERE REQUIRED BY
CODES AND REGULATIONS, SHALL BE PROVIDED WITH TRAP PRIMER VALVE AND FITTINGS.
19. ALL PIPING SHALL BE HUNG, FIRMLY ANCHORED, AND SUPPORTED IN ACCORDANCE WITH MSS SP-58 MSS SP-69.
20. CONTRACTOR SHALL FURNISH AND INSTALL WATER SHOCK ARRESTORS DOWN STREAM OF SOLENOID AND QUICK CLOSING VALVES. AIR CHAMBERS SHALL NOT BE CONSIDERED AN EQUAL TO WATER ARRESTORS AS SPECIFIED.
21. PLUMBING CONTRACTOR SHALL PROVIDE ACCESS PANELS WHERE REQUIRED FOR ACCESS TO VALVES IN CEILINGS AND
WALLS.
22. VALVES AND FITTINGS SHALL BE OF THE SAME SIZE AS THE LINE ON WHICH THEY ARE LOCATED UNLESS OTHERWISE INDICATED
ON DRAWINGS.
23. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY SUPPORTING DEVICES FOR ALL FIXTURES INCLUDED IN
CONTRACT OR HEREIN SPECIFIED UNLESS OTHERWISE NOTED.
24. CONTRACTOR SHALL SLEEVE ALL PIPING CROSSING THROUGH OR UNDERNEATH STRUCTURAL MEMBERS. NOTIFY ARCHITECT AND ENGINEERS PRIOR TO PROCEEDINGS WITH WORK TO ASSURE STRUCTURAL SUPPORT WILL NOT BE AFFECTED.
25. DOMESTIC WATER PIPING SHALL BE SLOPED TO DRAIN POINTS. PROVIDE DRAIN VALVES WITH 3/4" HOSE THREAD AT BASE OR
RISERS.
26. ALL SANITARY DRAINAGE PIPING 3" AND LARGER SHALL BE INSTALLED WITH A MINIMUM SLOPE OF 1/8" FALL PER 1'-0" OF RUN
UNLESS OTHERWISE NOTED.
27. ALL SANITARY DRAINAGE PIPING 2" AND LESS SHALL BE INSTALLED WITH A MINIMUM SLOPE OF 1/4" FALL PER 1'-0" OF RUN
UNLESS OTHERWISE NOTED.
28. ALL STORM DRAINAGE PIPE SHALL BE INSTALLED WITH A MINIMUM SLOPE OF 1/8" FALL PER 1'-0" OF RUN UNLESS OTHERWISE
NOTED.
29. PROVIDE PRODUCTS AND FIXTURES AS SPECIFIED OR EQUIVALENT.
30. ALL FLOOR DRAIN TRAP SEALS SHALL BE MAINTAINED BY AN APPROVED TRAP PRIMER.
31. MAKE FINAL CONNECTIONS AFTER FIXTURES AND EQUIPMENT ARE SET IN PLACE. ALL REQUIRED TRIM, FAUCETS AND MINOR ITEMS NECESSARY FOR A COMPLETE FUNCTIONING INSTALLATION, SUCH AS STRAINERS, TRAPS, TAILPIECES, ESCUTCHEONS, ETC., SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR IN ACCORDANCE WITH EQUIPMENT REQUIREMENTS. ALL
FAUCETS ARE TO BE HEAVILY CHROME-PLATED.
32. CONTRACTOR ASSUMES RESPONSIBILITY FOR PROPER ARRANGEMENT OF PIPE, FIXTURES, ETC., TO CONNECT APPROVED EQUIPMENT IN A PROPER AND APPROVED MANNER. CONTRACTOR SHALL FOLLOW EQUIPMENT MANUFACTURER'S DETAILED INSTRUCTIONS AND THE CONTRACT DOCUMENTS. NOTIFY THE ARCHITECT/ENGINEER BEFORE PROCEEDING WITH ALL WORK.
NO EQUIPMENT INSTALLATION OR CONNECTIONS SHALL BE MADE IN A MANNER THAT VOIDS THE MANUFACTURER'S
WARRANTY.
33. SUBMIT OPERATING AND MAINTENANCE MANUALS AND WARRANTY CERTIFICATES TO OWNER.
34. PROVIDE SUBMITTAL DOCUMENTS OF ALL EQUIPMENT, PIPING, AND MATERIALS BEING INSTALLED AS OUTLINED IN DIVISION 1.
BACK WATER VALVE
GREASE SANITARY ABOVE GROUND
GREASE SANITARY BELOW GROUND
GR
GR
DESIGN CRITERIA
P101 P701
P701
DETAIL NUMBER
DETAIL NUMBER
WHERE THE DETAIL IS DRAWN
WHERE THE DETAIL IS DRAWN
WHERE THE DETAIL REFERENCED
DETAIL ANNOTATIONS
G
ST
S
W
DOMESTIC WATER RISER DESIGNATION
SANITARY WATER RISER DESIGNATION
STORM RISER DESIGNATION
GAS RISER DESIGNATION
REVISION NUMBER
ANNOTATIONS
POINT OF DEMOLITION
POINT OF CONNECTION
AD
FD
GD
ORD
RD
FCO
FS
AREA DRAIN
FLOOR DRAIN
GARAGE DRAIN
OVER FLOW ROOF DRAIN
ROOF DRAIN
FLOOR CLEAN OUT
FLOOR SINK DRAIN
DRAINS
WH
HB
CO HORIZONTAL CLEANOUT
WALL HYDRANT
HOSE BIB
MISCELLANEOUS
F
M
GM GAS METER
WATER METER
WATER FILTER
TP
VACCUM BREAKER
TEMPERATURE AND PRESSURE RELIEF VALVE
TRAP PRIMER
DIRT LEG
TD
TRENCH DRAIN
BREAK PIPE BELOW
X"
X"
PIPE SIZE
PIPE SIZE/NOTE
OSD
OPEN SITE DRAIN
FUNNEL FLOOR DRAIN
ST(G)
GREEN STORM RISER DESIGNATION
V
VENT RISER DESIGNATION
ROOF DRAIN-GREEN ROOF
EMERGENCY ROOF DRAIN
RD(G)
EMERGENCY ROOF DRAIN-GREEN ROOF
EST
EMERGENCY STORM RISER DESIGNATION
EST(G)
EMEREGENCY GREEN STORM RISER DESIGNATION
ORD(G) OVER FLOW ROOF DRAIN-GREEN ROOF
ERD
ERD(G)
GCO GRADE CLEAN OUT
ROOF HYDRANT
GARDEN HYDRANT
RH
GH
TRAP PRIMER TUBE
INDIRECT DRAINAGE PIPE
EMERGENCY STORM WATER PIPING ABOVE GROUND
EMERGENCY STORM WATER PIPING BELOW GROUND
EMERGENCY STORM WATER PIPING FROM GREEN ROOF ABOVE GROUND
EMERGENCY STORM WATER PIPING FROM GREEN ROOF BELOW GROUND
GAS PIPING
ST
ST
ST(G)
ST(G)
EST
EST
EST(G)
EST(G)
ID
TP
2015 INTERNATIONAL BUILDING CODE, WITH 2020 WEST VIRGINIA AMENDMENTS
2015 INTERNATIONAL PLUMBING CODE, WITH 2020 WEST VIRGINIA AMENDMENTS
2015 INTERNATIONAL MECHANICAL CODE, WITH 2020 WEST VIRGINIA AMENDMENTS
EQUIPMENT DESIGNATIONEQPM
NOTE: ALL ABBREVIATIONS MAY NOT APPEAR ON THE DRAWINGS.
AAV AIR ADMITTANCE VALVE
ABV ABOVE
AD AREA DRAIN
ADA AMERICAN DISABILITY ACT
AFF ABOVE FINISHED FLOOR
AP ACCESS PANEL
ARCH ARCHITECTURAL
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
ASPE AMERICAN SOCIETY OF PLUMBING ENGINEERS
ASSE AMERICAN SOCIETY OF SANITARY ENGINEERS
BFP BACK FLOW PREVENTER
BLW BELOW
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
BV BACKWATER VALVE
CA COMPRESSED AIR
CFM CUBIC FEET PER MINUTE
CLG CEILING
CO CLEAN OUT
CONT CONTINUATION
CW COLD WATER
DF DRINKING FOUNTAIN
DFU DRAINAGE FIXTURE UNIT
DIA DIAMETER
DMR DISTRIBUTED METER ROOM
DN DOWN
DWG DRAWING
DWH DOMESTIC WATER HEATER
DW DISHWASHER
E EXISTING
EA EACH
EQUIP EQUIPMENT
ERD EMERGENCY ROOF DRAIN
ERD(G) EMERGENCY ROOF DRAIN-GREEN ROOF
EST EMERGENCY STORM
EST(G) EMERGENCY STORM-FROM GREEN ROOF
ET EXPANSION TANK
ETR EXISTING TO REMAIN
F WATER FILTER
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FL FLOOR
FS FLOW SINK
FT FEET
FM FORCED MAIN
FWR FISH WATER RETURN
FWS FISH WATER SUPPLY
GAL GALLON
GCO GRADE CLEAN OUT
GD GARBAGE DISPOSAL
GH GARDEN HYDRANT
GPM GALLONS PER MINUTE
HB HOSE BIB
HDPE HIGH DENSITY POLYETHYLENE
HP HORSE POWER
HW HOT WATER SUPPLY
HWR HOT WATER RETURN
HPCW HIGH PRESSURE COLD WATER
HWSH HOT WATER STORAGE/HEATER
INV INVERT
IM ICE MAKER
IWH INSTANTANEOUS WATER HEATER
KW KILOWATT
LAV LAVATORY
LPA LOW PRESSURE AIR
MAX MAXIMUM
MBH THOUSAND BTU PER HOUR
MECH MECHANICAL
MFR MANUFACTURER
MGCV MASTER GAS CONTROL VALVE
MIN MINIMUM
MS MOP SINK
MTD MOUNTED
N NEW
NC NORMALLY CLOSED
NFWH NON FREEZE WALL HYDRANT
NG NATURAL GAS
NIC NOT IN CONTRACT
NO. NUMBER
NO NORMALLY OPEN
NT ACID NEUTRALIZATION TANK
O2 OXYGEN
ORD OVERFLOW ROOF DRAIN
ORD(G) OVERFLOW ROOF DRAIN-GREE ROOF
OSD OPEN SITE DRAIN
P PUMP
PD PLANTER DRAIN
PDD POOL DECK DRAIN
PDI PLUMBING AND DRAINAGE INSTITUTE
PH PHASE (ELECTRICAL)
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
RCV RISER CONTROL VALVE
REF REFRIGERATOR
RD ROOF DRAIN
RD(G) ROOF DRAIN-GREEN ROOF
RH ROOF HYDRANT
RPM REVOLUTIONS PER MINUTE
RR RAINWATER REUSE
RW RAIN WATER
RWC RAIN WATER CONDUCTOR
SA SHOCK ABSORBER
SAN SANITARY/WASTE PIPE
SF SQUARE FEET
SFU SUPPLY FIXTURE UNIT
SPW SPRING WATER
SS STAINLESS STEEL
SS SERVICE SINK
ST STORM WATER
ST(G) STORM-FROM GREEN ROOF
STRUC STRUCTURAL
TD TRENCH DRAIN
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER TUBE
TW TEMPERED WATER
TYP TYPICAL
UR URINAL
V VENT PIPE
VTR VENT THRU ROOF
W WATT
WD WASTE DISPOSER
WC WATER CLOSET
WCO WALL CLEANOUT
WH WALL HYDRANT
WM WATER METER
WTR WATER
W/ WITH
W/O WITHOUT
WV WASHER VALVE
Pl ott ed B y:
TE
JA
S.
H.
B
P lot
D ate
: 1 1/1
8/2
1 2 :44
:04 P
M Sa ve d B y:
TE
JA
S.
BA
SA
VA
RA
J Fil e:
O:
\20
\S
AG
6.1 4\2
2-
SA
G2
.14
_P \21
6.1
4_ P0
.dw g Sa ve D ate : 1
1/1 8/2
1 0
2:3 5 P
M
P001
PLUMBING COVERSHEET
Original drawing size is ##"x##"; Scale entities accordingly if reduced/enlarged.
3040 WILLIAMS DRIVE, SUITE 600
FAIRFAX, VIRGINIA 22031
P: 703-691-2115 www. .com
TM
PROJECT NUMBER: SAG21056.14
24232221201918171615141312111098765432
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 71 7270
7473 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96
98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118
132 133 134 135 136 137 138 139 140 141121 122 123 124 125 126 127 128 129 130 131
1 2 3
(E)1-1/2" FWS
(E)1-1/2" LPA
1. CONTRACTOR SHALL PROVIDE TEMPORARY BARRIERS AND DUST
PROTECTION OF ADJACENT SPACE AT ALL TIMES WHILE CONSTRUCTION
IS ONGOING. PROVIDE ADDITIONAL TARPS OR COVERS ON ADJACENT
IN-USE TANKS TO MITIGATE CONTAMINATION.
2. WORK WITHIN THE MAIN TANK ROOM SHALL BE FROM AUGUST THROUGH
DECEMBER OR AS DIRECTED BY THE CONTRACTING OFFICER.
3. EXISTING AQUACULTURAL SYSTEM PIPING, SHALL BE ADJUSTED AT THE
INDIVIDUAL TANKS IMPACTED BY SCOPE OF WORK. ALL OTHER MAINS,
PUMPS, AND SYSTEMS SHALL REMAIN OPERATIONAL THROUGHOUT THE
CONSTRUCTION PROCESS. COORDINATE WITH USER AND CONTRACTING
OFFICER FOR ANY TEMPORARY SHUTDOWN OR DRAIN DOWN OF SPECIFIC
PIPING SYSTEMS.
4. CONTRACTOR SHALL COORDINATE THE REMOVAL AND STORAGE OF
"FAMILY/POLY TANKS" #1-141 (REFER TO PLANS) ALONG WITH
ASSOCIATED STEEL SUPPORT STRUCTURES. TANKS SHALL BE STORED AT
A LOCATION AS DESIGNATED BY THE CONTRACTING OFFICER.
5. SUPPLY AND DRAINAGE PIPING SERVING TANKS #1-141 SHALL BE
REMOVED TO ALLOW FLOOR/TRENCH WORK WITHIN THE FACILITY. REFER
TO STRUCTURAL DRAWINGS FOR EXTENT OF FLOOR/TRENCH WORK.
6. UPON COMPLETION OF THE FLOOR/TRENCH UPGRADES, TANKS #1-141
ALONG WITH EXISTING SUPPORT STRUCTURES SHALL BE REINSTALLED
AND RECONNECTED.
7. BRANCH DRAINAGE PIPING SERVING EACH TANK SHALL BE ADJUSTED TO
BE RAISED 4" ABOVE FLOOR. BRANCH PIPING SHALL BE SUPPORTED
FROM STEEL STANDS WITH STAINLESS STEEL STRAPS AND PLASTIC
BLOCKS.
8. NEW 6" HORIZONTAL PVC MAINS SHALL BE INSTALLED WITH RAISED
PLASTIC BLOCKS SPACED AT 4FT TO KEEP MAINS ABOVE FLOOR.
MAINTAINING PIPING AT MINIMUM 4" ABOVE FINISHED FLOOR AND
SLOPING TOWARDS TIE IN CONNECTION POINTS AT TRENCH/SLAB.
9. MAINS SHALL RECONNECT TO EXISTING PIPING AT THE TRENCH OR
EXISTING CAPPED CONNECTION ABOVE SLAB.
1. LABEL AND MOVE EXISTING TANKS (#1-141), STEEL SUPPORT
STRUCTURES, BRANCH DRAIN AND SUPPLY PIPING TO DESIGNATED
LOCATION. ENSURE ALL COMPONENTS ARE COVERED WHILE IN
STORAGE.
2. PROVIDE DUST PROTECTION WITH BARRIER EXTENDING FROM SLAB TO
STRUCTURE ABOVE.
3. COVER ALL GRATES/TRENCHES PREVENTING DUST/DEBRIS FROM
ENTERING TRENCHES.
4. REMOVE EXISTING 1-1/2" PVC SUPPLY BRANCH LINES AND CAP PIPING UP
HIGH AT SHUTOFF VALVE.
5. REMOVE DRAINAGE PIPING, RETAINING BRANCH LINES SERVING
INDIVIDUAL TANKS (TO BE REINSTALLED). HORIZONTAL MAINS TYING TO
TRENCH PIPING SHALL BE REMOVED, CAPPING EXISTING PIPING AT
TRENCH/SLAB PENETRATIONS.
Pl ott ed B y:
TE
JA
S.
H.
B
P lot
D ate
: 1 1/1
8/2
1 2 :44
:07 P
M Sa ve d B y:
DA
RS
HA
N.
YR
F ile
: O :\2
1\S
AG
6.1
4\2 2-
SA
G2
.14 _P
\21
6.1 4_
PD
1.d wg
S av e D ate
: 1 1/1
7/2
1 1 1:5
5 A M
Original drawing size is ##"x##"; Scale entities accordingly if reduced/enlarged.
3040 WILLIAMS DRIVE, SUITE 600
FAIRFAX, VIRGINIA 22031
P: 703-691-2115 www. .com
TM
PROJECT NUMBER: SAG21056.14
NORTH
SCALE:
FLOOR PLAN - PLUMBING - DEMOLITION
1/4" = 1'-0"
PD101
GENERAL NOTES
KEY NOTES
PD101FLOOR PLAN - PLUMBING -
DEMOLITION
1 2 3
24232221201918171615141312111098765432
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 71 7270
7473 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96
98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118
132 133 134 135 136 137 138 139 140 141121 122 123 124 125 126 127 128 129 130 131
4 5
4 5
4 5
HB
(E)1-1/2" FWS
(E)1-1/2" LPA
(N)3/4" CW
(E)3/4" CW
HB
1. CONTRACTOR SHALL PROVIDE TEMPORARY BARRIERS AND DUST
PROTECTION OF ADJACENT SPACE AT ALL TIMES WHILE CONSTRUCTION
IS ONGOING. PROVIDE ADDITIONAL TARPS OR COVERS ON ADJACENT
IN-USE TANKS TO MITIGATE CONTAMINATION.
2. WORK WITHIN THE MAIN TANK ROOM SHALL BE FROM AUGUST THROUGH
DECEMBER OR AS DIRECTED BY THE CONTRACTING OFFICER.
3. EXISTING AQUACULTURAL SYSTEM PIPING, SHALL BE ADJUSTED AT THE
INDIVIDUAL TANKS IMPACTED BY SCOPE OF WORK. ALL OTHER MAINS,
PUMPS, AND SYSTEMS SHALL REMAIN OPERATIONAL THROUGHOUT THE
CONSTRUCTION PROCESS. COORDINATE WITH USER AND CONTRACTING
OFFICER FOR ANY TEMPORARY SHUTDOWN OR DRAIN DOWN OF SPECIFIC
PIPING SYSTEMS.
4. CONTRACTOR SHALL COORDINATE THE REMOVAL AND STORAGE OF
"FAMILY/POLY TANKS" #1-141 (REFER TO PLANS) ALONG WITH
ASSOCIATED STEEL SUPPORT STRUCTURES. TANKS SHALL BE STORED AT
A LOCATION AS DESIGNATED BY THE CONTRACTING OFFICER.
5. SUPPLY AND DRAINAGE PIPING SERVING TANKS #1-141 SHALL BE
REMOVED TO ALLOW FLOOR/TRENCH WORK WITHIN THE FACILITY. REFER
TO STRUCTURAL DRAWINGS FOR EXTENT OF FLOOR/TRENCH WORK.
6. UPON COMPLETION OF THE FLOOR/TRENCH UPGRADES, TANKS #1-141
ALONG WITH EXISTING SUPPORT STRUCTURES SHALL BE REINSTALLED
AND RECONNECTED.
7. BRANCH DRAINAGE PIPING SERVING EACH TANK SHALL BE ADJUSTED TO
BE RAISED 4" ABOVE FLOOR. BRANCH PIPING SHALL BE SUPPORTED
FROM STEEL STANDS WITH STAINLESS STEEL STRAPS AND PLASTIC
BLOCKS.
8. NEW 6" HORIZONTAL PVC MAINS SHALL BE INSTALLED WITH RAISED
PLASTIC BLOCKS SPACED AT 4FT TO KEEP MAINS ABOVE FLOOR.
MAINTAINING PIPING AT MINIMUM 4" ABOVE FINISHED FLOOR AND
SLOPING TOWARDS TIE IN CONNECTION POINTS AT TRENCH/SLAB.
9. MAINS SHALL RECONNECT TO EXISTING PIPING AT THE TRENCH OR
EXISTING CAPPED CONNECTION ABOVE SLAB.
1. RETURN EXISTING TANKS (#1-141), ASSOCIATED STEEL SUPPORT
STRUCTURES, AND REINSTALL AT ORIGINAL LOCATION. INSTALL NEW
DRAINAGE MAINS AS INDICATED AND REINSTALL ADJUSTED BRANCH
DRAINAGE COMPONENTS TYING BACK TO NEW MAIN. PROVIDE
SUPPORTS FOR ALL SUSPENDED PIPING.
2. REINSTALL AND RECONNECT PVC SUPPLY PIPING SERVING TANKS. FLUSH
PIPING PRIOR TO TURNING OVER TO OWNER.
3. UPON COMPLETION OF CONSTRUCTION WORK, CLEAN AREA OF WORK
REMOVING ALL DEBRIS AND DUST. REMOVE DUST BARRIER AND ANY
PROTECTIVE COVERINGS FROM TRENCHES/GRATES.
4. RECONNECT 1-1/2" PVC SUPPLY PIPING TO EXISTING CAPPED
CONNECTIONS.
5. RECONNECT NEW 6" DRAINAGE PIPING TO EXISTING CAPPED
CONNECTIONS.
6. PROVIDE NEW 2" AIR ADMITTANCE VALVE (AAV) AT UPSTREAM END OF THE
6" DRAINAGE MAIN. AAV TO BE INSTALLED MIN. 12" AFF.
7. CONNECT NEW 3/4" CW TO EXISTING. RUN PIPING TO NEW PROPOSED
HOSE BIB.
P101FLOOR PLAN - PLUMBING - NEW WORK
3040 WILLIAMS DRIVE, SUITE 600
FAIRFAX, VIRGINIA 22031
P: 703-691-2115 www. .com
TM
PROJECT NUMBER: SAG21056.14
NORTH
GENERAL NOTES
KEY NOTES
SCALE:
FLOOR PLAN - PLUMBING - NEW WORK
1/4" = 1'-0"
P101
PLASTIC TANK
CUT 3" PIPE TO MATCH TANK HEIGHT
STEEL SUPPORT
NEW 6" HORIZONTAL MAIN
PLASTIC PIPE SUPPORT
ADJUST 1 1/2" TANK OUTLET
PIPING TO ALLOW
RAISING PIPING ABOVE FLOOR
NOTES:
1. BRANCH PIPING TO BE REUSED AND ADJUSTED TO ELEVATED POSITION. USE PLASTIC BLOCKS AND
STAINLESS STEEL STRAPS TO SECURE BRANCH PIPING.
2. BRANCH LINES SHALL TIE TO NEW 6” MAIN WITH NEW TEE FITTINGS. ADJUST BRANCH PIPING TO SUITE
NEW SLOPED MAIN ELEVATION.
3. MAIN SHALL BE RAISED AT MINIMUM 4” ABOVE FINISHED FLOOR USING PLASTIC BLOCKS AND
STAINLESS STEEL STRAPS WRAPPED AROUND STEEL SUPPORT STRUCTURE. SLOPE 6” MAIN AT 1/8” PER
FOOT SLOPE TO TRENCH/FLOOR CONNECTION.
FINISHED FLOOR
22"
UNISTRUT/KINDORF
SUPPORT RAIL
STEEL
BRACKET
HANGER
ROD
JAMB NUT
SUPPORT NUT
HEAVY DUTY
CLEVIS HANGER
PIPE INSULATION
HIGH DENSITY PIPE
INSULATION AT HANGER
POINTS. REFER SPEC'S
GALVANIZED STEEL
SADDLE (INSULATION
SHIELD)
SCALE:
PIPE SUPPORT DETAIL
NOT TO SCALE
P701
NOTES:
GALVANIZED STEEL SADDLE SHALL BE
TAPED TO THE PIPE INSULATION ON
BOTH ENDS WITH VINYL TAPE
MATCHING THE COLOR OF THE
INSULATION JACKET THAT IS
OVERLAPPED AT LEAST ONE WRAP.
SCALE:
TANK PIPING DETAIL
NOT TO SCALE
P701
FIRST FLOOR
ROOF
(E)3/4" (N)3/4"
(E)3/4"
SCALE:
PARTIAL WATER RISER DIAGRAM
NOT TO SCALE
P701
Pl ott ed B y:
TE
JA
S.
H.
B
P lot
D ate
: 1 1/1
8/2
1 2 :44
:11 P
M Sa ve d B y:
DA
RS
HA
N.
YR
F ile
: O :\2
1\S
AG
6.1
4\2 2-
SA
G2
.14 _P
\21
6.1 4_
P7
.dw g
Sa ve
D ate
: 1 1/1
7/2
1 1 1:5
5 A M
P701
PLUMBING DETAILS, RISERS, AND
SCHEDULES
Original drawing size is ##"x##"; Scale entities accordingly if reduced/enlarged.
3040 WILLIAMS DRIVE, SUITE 600
FAIRFAX, VIRGINIA 22031
P: 703-691-2115 www. .com
1.1. ALL CONSTRUCTION ACTIVITIES SHALL BE CLOSELY COORDINATED WITH THE
CO/COR AND NCCCWA LOCATION MANAGEMENT TO MINIMIZE THE DISRUPTION OF
THE ONGOING RESEARCH AT THE FACILITY. CONSTRUCTION CAN ONLY TAKE
PLACE BETWEEN EARLY MARCH AND END OF NOVEMBER. SPECIAL NOTE SHALL
BE GIVEN TO COORDINATING ACTIVITIES AND PROTECTIONS BECAUSE THIS IS
AN OPERATIONAL RESEARCH FACILITY WITH ONGOING ACTIVITIES AND LIVE
FISH IN TANKS THAT MUST BE PROTECTED.
1.2. THE INTENT OF THE CONTRACT DOCUMENTS IS TO PROVIDE FINISHED WORK,
TESTED AND READY FOR OPERATION. ALL MATERIALS AND EQUIPMENT SHALL
BE NEW EXCEPT FOR EQUIPMENT NOTED TO BE REUSED.
1.3. WORK INDICATED ON THESE DRAWINGS IS DIAGRAMMATIC AND SHOULD NOT
BE SCALED TO ESTABLISH LOCATION OF WORK. THE DRAWINGS ARE INTENDED
TO CONVEY THE SCOPE OF WORK AND INDICATE GENERAL ARRANGEMENTS OF
ENGINEERED SYSTEMS. THE CONTRACTOR SHALL VERIFY ALL EXISTING
CONDITIONS IN THE FIELD AND MAKE ADJUSTMENTS AS NECESSARY TO
COMPLETE THE WORK. SEE NOTES ON M101 AND M601 WITH RESPECT TO
COORDINATING THE DUCTWORK WITH THE MANY LIGHTING AND PIPING
HANGERS.
1.4. FURNISH ALL LABOR, MATERIALS, TOOLS, EQUIPMENT AND SERVICES FOR ALL
WORK, IN ACCORDANCE WITH PROVISIONS OF THE CONTRACT DOCUMENTS.
ALTHOUGH SUCH WORK IS NOT SPECIFICALLY INDICATED, FURNISH AND
INSTALL ALL SUPPLEMENTARY OR MISCELLANEOUS ITEMS, APPURTENANCES
AND DEVICES INCIDENTAL TO OR NECESSARY FOR A SOUND, SECURE AND
COMPLETE INSTALLATION, AT NO ADDITIONAL COST TO THE OWNER.
1.5. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE
WITH MANUFACTURERS' RECOMMENDATIONS, CONTRACT DOCUMENTS, AND
APPLICABLE CODES AND REGULATIONS.
1.6. IN ADHERENCE WITH THE INTENT OF THESE CONTRACT DOCUMENTS, PROVIDE
FINISHED WORK, TESTED AND READY FOR OPERATION. WHEREVER THE WORD
"PROVIDE" IS USED, IT SHALL MEAN "FURNISHED, INSTALL, BALANCE, ADJUST
AND TEST, COMPLETE AND READY FOR USE".
1.7. CONTRACTOR IS RESPONSIBLE FOR COMPLETE COORDINATION BETWEEN ALL
SUB-CONTRACTORS, SUPPLIERS, AUTHORITIES HAVING JURISDICTION,
BUILDING PERSONNEL, CODE ENFORCEMENT OFFICIALS, ENGINEER AND
BUILDING OWNER.
1.8. COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURERS'
CERTIFIED DRAWINGS. COORDINATE AND PROVIDE ALL DUCT AND PIPING
TRANSITIONS REQUIRED FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED
EQUIPMENT. FIELD VERIFY AND COORDINATE ALL DUCT AND PIPING
DIMENSIONS BEFORE FABRICATION.
1.9. ALL PIPES SHALL BE INSTALLED IN A NEAT AND ORDERLY APPEARANCE AND
FREE FROM CONTACT WITH STRUCTURE OR INSTALLED ITEMS. RUN PIPING
PARALLEL TO WALLS AND FLOORS OF BUILDING UNLESS OTHERWISE
INDICATED.
1.10. LOCATIONS AND SIZES OF ALL FLOOR, WALL, AND ROOF OPENINGS SHALL BE
COORDINATED WITH ALL OTHER TRADES INVOLVED.
1.11. ALL OPENINGS IN FIRE WALLS DUE TO DUCTWORK, PIPING, CONDUIT, ETC.,
SHALL BE FIRE STOPPED. PRODUCT USED MUST MEET TEST METHODS BY ASTM
E814 OR NFPA 251 FOR FIRE RATING. PROVIDE UL LABELED FIRE DAMPERS AT
ALL DUCT PENETRATIONS INTO FIRE RATED STRUCTURES.
1.12. REFER TO SPECIFICATIONS FOR WARRANTY REQUIREMENTS.
1.13. THE CONTRACTOR SHALL NOT CORE DRILL CONCRETE SLAB WITHOUT THE
KNOWLEDGE AND WRITTEN CONSENT OF THE ENGINEER AND THE BUILDING
OWNER. CORE DRILLING SHALL BE SCHEDULED WITH THE BUILDING OWNER.
1.14. ALL EQUIPMENT (INCLUDING PIPING) SHALL BE SECURELY SUPPORTED FROM
THE BUILDING STRUCTURE IN AN APPROVED MANNER. EQUIPMENT SHALL NOT
GENERATE NOISE GREATER THAN CATALOG RATINGS. ALL EQUIPMENT AND
APPURTENANCES SHALL NOT TRANSMIT NOISE OR VIBRATION TO THE
OCCUPIABLE SPACES.
1.15. PROVIDE FIRE SAFING, AS APPROVED BY THE AUTHORITY HAVING
JURISDICTION, AROUND ALL PIPING PENETRATIONS THROUGH BUILDING
CONSTRUCTION TO MAINTAIN FIRE, SMOKE, AND SOUND RATINGS. ALL FIRE
SAFING MATERIALS SHALL BE UL LISTED.
1.16. THE CONTRACTOR SHALL FURNISH AND INSTALL ACCESS PANELS WHERE
REQUIRED FOR ACCESS TO EQUIPMENT, VALVES, DAMPERS, CONTROLS, ETC.
1.17. MECHANICAL CONTRACTOR SHALL PROVIDE ALL MOTOR STARTERS,
DISCONNECTS, ETC., AS REQUIRED BY THE MECHANICAL EQUIPMENT; THE
ELECTRICAL CONTRACTOR SHALL INSTALL AND PROVIDE FINAL CONNECTIONS.
WHERE THE MECHANICAL SYSTEMS COME WITH INTEGRAL STARTERS,
DISCONNECTS, ETC., THE ELECTRICAL CONTRACTOR SHALL PROVIDE FINAL
CONNECTIONS.
1.18. ALL EQUIPMENT MUST BE INSTALLED SUCH THAT FACTORY REQUIRED
CLEARANCES FOR SERVICEABILITY ARE MAINTAINED. NOTIFY THE ENGINEER
IMMEDIATELY SHOULD ANY EQUIPMENT HAVE ACCESS LIMITED BECAUSE OF
FIELD CONDITIONS, EQUIPMENT ORIENTATION, ETC. DO NOT INSTALL THIS
EQUIPMENT UNTIL THE SITUATION HAS BEEN RESOLVED.
1.19. THE CONTROLS CONTRACTOR SHALL PROVIDE ALL NECESSARY COMPONENTS
FOR A COMPLETE AND FUNCTIONAL SYSTEM, INCLUDING BUT NOT LIMITED TO,
WIRING, TRANSFORMERS, HARDWARE, PARTS AND ACCESSORIES INCLUDING
ALL SAFETY DEVICES REQUIRED IN ACCORDANCE WITH ALL CODE
REQUIREMENTS. THE CONTROLS CONTRACTOR SHALL PROVIDE POWER TO ALL
CONTROL DEVICES AND EQUIPMENT FROM THE NEAREST ELECTRICAL PANEL
DESIGNATED FOR CONTROLS. THE CONTRACTOR SHALL VERIFY ALL VOLTAGE
AND POWER REQUIREMENTS. DEVICES PROVIDED BY UNIT MANUFACTURERS
SHALL BE INSTALLED AND WIRED BY THE CONTROLS CONTRACTOR UNLESS
INDICATED OTHERWISE.
1.20. MAINTAIN A MINIMUM 6'8" CLEARANCE TO THE UNDERSIDE PIPES, CONDUITS,
SUSPENDED EQUIPMENT, ETC., THROUGHOUT ACCESS ROUTES IN
MECHANICAL ROOMS.
1.21. PERFORM ALL WORK IN ACCORDANCE WITH LOCAL AND STATE CODES.
1.22. CONTRACTOR SHALL COMPLY WITH ALL OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION (OSHA) AND ENVIRONMENTAL PROTECTION AGENCY (EPA)
REQUIREMENTS.
1.23. CLEAN UP ALL WASTE AND DEBRIS AT THE END OF EACH WORKING DAY AND AS
REQUIRED TO KEEP ALL BUILDING AREAS CLEAN, CLEAR AND UNOBSTRUCTED.
AT THE COMPLETION OF THE PROJECT, THE CONTRACTOR SHALL REMOVE ALL
TOOLS, APPLIANCES, SURPLUS MATERIAL AND SCRAP FROM THE JOB SITE.
1.24. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE NATIONAL
ELECTRIC CODE.
1.25. THE CONTRACTOR SHALL PROVIDE PROTECTION FOR ALL PARTS OF THE
BUILDING, ITS CONTENTS, AND OCCUPANTS WHEREVER WORK UNDER THIS
CONTRACT IS PERFORMED.
1.26. DEMOLITION SHALL INCLUDE REMOVAL OF EXISTING BUILDING CONSTRUCTION
TO EXTENT REQUIRED TO PERFORM NEW CONSTRUCTION ACTIVITIES
INDICATED IN CONTRACT DOCUMENTS.
1.27. THE DEMOLITION PROCEDURES SHALL PROVIDE FOR SAFE CONDUCT OF THE
WORK, PROTECTION OF PERSONNEL, CAREFUL REMOVAL AND DISPOSITION OF
MATERIALS SPECIFIED TO BE SALVAGED, PROTECTION OF PROPERTY TO
REMAIN UNDISTURBED, COORDINATION WITH OTHER DEMOLITION IN
PROGRESS, AND TIMELY DISCONNECTION OF UTILITY SERVICES. COORDINATE
ALL UTILITY OUTAGES AND AFFECTED AREAS WITH OWNER PROVIDING A
MINIMUM OF 14 DAY NOTICE.
1.28. EXISTING WORK TO REMAIN SHALL BE PROTECTED FROM DAMAGE. WORK
DAMAGED BY THE CONTRACTOR SHALL BE REPLACED TO MATCH EXISTING
WORK OR AS REQUIRED TO ACCOMMODATE NEW WORK INSTALLED UNDER
THIS CONTRACT. SPECIAL NOTE SHALL BE GIVEN TO THE OPEN TANKS AND
EGG HATCHING CYLINDERS AND OTHER RESEARCH EQUIPMENT IN THE AREAS
OF WORK. THE CONTRACTOR SHALL COORDINATE THE APPROPRIATE
PROTECTIONS REQUIRED WITH THE BUILDING RESEARCH PERSONNEL TO
ENSURE THAT ONGOING RESEARCH, WATER QUALITY, AND LIVE FISH ARE
PROTECTED FROM HARM WHILE DEMOLITION AND NEW WORK IS PERFORMED.
ESPECIALLY WHEN IT COMES TO CONTROL OF DUST AND DEBRIS ENTERING
TANKS AND THE OPEN WATER SYSTEMS IN THE BUILDING.
1.29. EXISTING WORK SHALL BE CUT, DRILLED, ALTERED, REMOVED OR
TEMPORARILY REMOVED AND REPLACED FOR PERFORMANCE OF WORK UNDER
THE CONTRACT. WORK REPLACED SHALL MATCH SIMILAR.
1.30. EXISTING WORK, STRUCTURAL MEMBERS OF CONCRETE, OR STRUCTURAL
STEEL SHALL NOT BE CUT OR ALTERED EXCEPT AS SHOWN, WITHOUT
AUTHORIZATION OF THE OWNER. WORK REMAINING IN PLACE, DAMAGED OR
DEFACED DURING THIS CONTRACT, SHALL BE RESTORED TO THE CONDITION
AT TIME OF AWARD OF CONTRACT. CUT, ALTER, REMOVE OR TEMPORARILY
REMOVED AND REPLACE EXISTING WORK FOR INSTALLATION OF MECHANICAL,
PLUMBING AND ELECTRICAL WORK AND OTHER CONSTRUCTION.
1.31. EXISTING CONDITIONS (I.E., PRESENCE AND LOCATION OF DUCTWORK,
EQUIPMENT, PIPING AND MATERIALS, AS WELL AS EXISTING DUCT, PIPE AND
EQUIPMENT SIZES) ARE BASED ON INFORMATION OBTAINED FROM AVAILABLE
RECORD DRAWINGS AND FIELD SURVEYS AND ARE NOT WARRANTED TO BE
COMPLETE. CONTRACTOR SHALL FIELD VERIFY EXACT SIZES, LOCATIONS, AND
DATA PRIOR TO STARTING ALL WORK. MAJOR DISCREPANCIES DISCOVERED
DURING THE DEMOLITION PHASE OR DEVIATIONS FROM NEW WORK SHALL BE
IMMEDIATELY BROUGHT TO THE ATTENTION TO THE ENGINEER & OWNER.
1.32. PRIOR TO THE COMMENCEMENT OF DEMOLITION, THE CONTRACTOR SHALL
COORDINATE AND VERIFY WITH THE USDA FACILITY PERSONNEL THE PLAN FOR
PROTECTING EXISTING OPENINGS AND RESEARCH TO CONTAIN
CONSTRUCTION DUST AND DEBRIS. CONTRACTOR SHALL VERIFY ALL EXISTING
SYSTEMS REQUIRED TO BE REMOVED, DEMOLISHED, RELOCATED OR SHIFTED.
1.33. ALL DISCONNECTION POINTS SHOWN ARE APPROXIMATE OR SUGGESTED
LOCATIONS. CONTRACTOR SHALL VERIFY LOGICAL POINTS OF DISCONNECTION
AT THE PROJECT SITE.
1.34. ALL DEMOLITION WORK SHALL COMPLY WITH NFPA 241. (STANDARD FOR
SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION)
1.35. EXISTING MECHANICAL EQUIPMENT, PIPING AND MATERIALS AFFECTED BY
DEMOLITION THAT ARE REQUIRED TO REMAIN IN SERVICE SHALL BE
PROTECTED.
1.36. IF COMPLETE REMOVAL IS NOTED ON THE DEMOLITION DRAWINGS, THEN
COMPLETE REMOVAL MEANS REMOVAL OF PIPING, AND EQUIPMENT INCLUDES
(BUT IS NOT LIMITED TO) PIPE HANGERS, VALVES, INSULATION, CONTROL
WIRING, DIFFUSERS, DAMPERS, EQUIPMENT BASE SUPPORT, ALL OTHER
RELATED APPURTENANCES, ETC.
1.37. WHERE PIPING, AND EQUIPMENT ARE INDICATED TO BE REMOVED, REMOVE
EXISTING CONCRETE INSERTS AND STRUCTURAL ATTACHMENTS, AND PATCH
CONCRETE SURFACE TO MATCH ADJACENT.
1.38. EXISTING MECHANICAL AND ELECTRICAL EQUIPMENT, PIPING, AND MATERIALS
AFFECTED BY DEMOLITION OR NEW WORK INSTALLATION AND REQUIRED TO
REMAIN IN SERVICE SHALL BE REINSTALLED OR SUPPORTED AS REQUIRED IN
ACCORDANCE WITH NEW WORK SPECIFICATION. ALL WORK SHALL BE
COMPLETED AT NO ADDITIONAL COST.
ABBREVIATIONSSYMBOLSGENERAL NOTES
NEW WORK KEY NOTE
DEMOLITION KEY NOTE
REVISION NUMBER
POINT OF DISCONNECTION
POINT OF CONNECTION
APPLICABLE CONSTRUCTION CODES
INTERNATIONAL MECHANICAL CODE, WITH AMENDMENTS 2015
INTERNATIONAL ENERGY CONSERVATION CODE, WITH AMENDMENTS 2009
INTERNATIONAL PLUMBING CODE, WITH AMENDMENTS 2015
INTERNATIONAL FUEL GAS CODE, WITH AMENDMENTS
INTERNATIONAL BUILDING CODE, WITH AMENDMENTS
NOTES:
1. CODES AND STANDARDS LISTED ARE MINIMUM STANDARDS. WHERE CONTRACT DOCUMENTS CALL FOR A HIGHER STANDARD, CONTRACT DOCUMENTS WILL TAKE PRECEDENCE OVER ALL REFERENCED CODES AND STANDARDS. IF CONTRACT DOCUMENTS CONFLICT WITH CODES OR STANDARDS, CONTRACTOR SHALL INFORM
ENGINEER, IN WRITING, PRIOR TO QUOTE.
EQPM-## EQUIPMENT DESIGNATION TAG
MXXX
DETAIL NUMBER
WHERE THE DETAIL IS DRAWN
WHERE THE DETAIL REFERENCED
M4.00
NUMBER INDICATES SECTION
SHEET NUMBER WHERE
SECTION IS DRAWN
T THERMOSTAT
S SWITCH
AFF ABOVE FINISHED FLOOR
AI ANALOG INPUT
AO ANALOG OUTPUT
AHU AIR HANDLING UNIT
BDD BACKDRAFT DAMPER
BHP BRAKE HORSE POWER
BLDG BUILDING
BLW BELOW
BS BIRD SCREEN
BTUH BRITISH THERMAL UNIT
PER HOUR
CB COMMUNICATION BUS
CD CONDENSATE DRAIN
CFM CUBIC FEET PER
MINUTE
CLG CEILING
CO CLEAN OUT
(D) DEMOLISH
DB DRY BULB
DDC DIRECT DIGITAL
CONTROL
DI DIGITAL INPUT
DIA DIAMETER
DN DOWN
DO DIGITAL OUTPUT
DOAS DEDICATED OUTSIDE
AIR SYSTEM
DPS DIFFERENTIAL
PRESSURE SENSOR
DWG DRAWING
EA EACH
EAT ENTERING AIR
TEMPERATURE
EF EXHAUST FAN
EQUIP EQUIPMENT
EMD END OF MAIN DRAIN
EXT EXPANSION TANK
ETR EXISTING TO REMAIN
(E) EXISTING TO REMAIN
F FAHRENHEIT
FL FLOOR
FPM FEET PER MINUTE
FT FEET
HC HEATING COIL
HEPA HIGH EFFICIENCY
PARTICULATE AIR
HP HORSE POWER
HR HOUR
HWS/R HOT WATER
SUPPLY/RETURN
IN INCH
KW KILOWATT
LAN LOCAL AREA NETWORK
LAT LEAVING AIR
TEMPERATURE
LBS POUNDS
LPC LOW PRESSURE
CONDENSATE
LPS LOW PRESSURE STEAM
MAX MAXIMUM
MBH 1000 BTUH
MECH MECHANICAL
MIN MINIMUM
MOCP MAXIMUM OVER
CURRENT PROTECTION
MTD MOUNTED
MFG MANUFACTURER
(N) NEW WORK
NC NOISE CRITERIA
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM NOMINAL
OA OUTSIDE AIR
OAT OUTSIDE AIR
TEMPERATURE
P PRESSURE
PD PRESSURE DROP
PSI POUNDS PER SQUARE
INCH
RPM REVOLUTION PER
MINUTE
S SWITCH
SG STEAM GENERATOR
SRV SAFETY RELIEF VALVE
TS TEMPERATURE
SENSOR
TYP TYPICAL
UH UNIT HEATER
UNO UNLESS NOTED
OTHERWISE
VFD VARIABLE
FREQUENCY DRIVE
W WATT
WB WET BULB
WC WATER COLUMN
W/ WITH
W/O WITHOUT
H HUMIDISTAT
NEW DUCT (1ST DIMENSION INDICATES
TOP SHOWN, INSIDE CLEAR DIMENSIONS)
2" DOUBLE WALL DUCTWORK
EXISTING DUCTWORK OR
EQUIPMENT TO REMAIN
DUCTWORK OR EQUIPMENT
TO BE REMOVED
12X10
DUCT WORK WITH TRANSITION
MANUAL VOLUME DAMPER
VD
EXHAUST DUCT
TO RISE UP
EXHAUST AIR DEVICE
MOTORIZED DAMPER
FIRE DAMPER
VERTICALLY MOUNTED
SUPPLY AIR DUCT
TO RISE UP
SUPPLY AIR DUCT
TO DROP DOWN
RETURN AIR DUCT
TO RISE UP
RETURN AIR DUCT
TO DROP DOWN
SUPPLY AIR DEVICE
RETURN OR
EXHAUST AIR DEVICE
DUCTWORK WITH
DUCT BRANCH
DUCTWORK WITH ROUND
DUCT TAKE-OFF
OPEN END DUCT
WITH CAP
FLEXIBLE ROUND DUCT
M
FD
VD
VD
FIRE DAMPER
HORIZONTALLY MOUNTED
EXHAUST DUCT
TO DROP DOWN
EXHAUST DUCT
TO RISE UP
EXHAUST AIR DEVICE
MOTORIZED DAMPER
FIRE DAMPER
VERTICALLY MOUNTED
SUPPLY AIR DUCT
TO RISE UP
SUPPLY AIR DUCT
TO DROP DOWN
RETURN AIR DUCT
TO RISE UP
RETURN AIR DUCT
TO DROP DOWN
SUPPLY AIR DEVICE
RETURN OR
EXHAUST AIR DEVICE
DUCTWORK WITH
DUCT BRANCH
DUCTWORK WITH ROUND
DUCT TAKE-OFF
OPEN END DUCT
WITH CAP
FLEXIBLE ROUND DUCT
M
FD
VD
VD
FIRE DAMPER
HORIZONTALLY MOUNTED
EXHAUST DUCT
TO DROP DOWN
COMBINATION FIRE/SMOKE DAMPER
VERTICALLY MOUNTED
FSD
SMOKE DAMPER
SD
DUCT MOUNTED SMOKE DETECTOR
U UNDER CUT DOOR
BDD BACK DRAFT DAMPER
SD
Pl ott ed B y:
TE
JA
S.
H.
B
P lot
D ate
: 1 1/1
8/2
1 2 :43
:36 P
M Sa ve d B y:
TE
JA
S.
BA
SA
VA
RA
J Fil e:
O:
\20
\S
AG
6.1 4\2
3-
SA
G2
.14
_M \21
6.1
4_ M0
.dw g Sa ve D ate : 1
1/1 8/2
1 0
2:4 3 P
M
M001
MECHANICAL NOTES
SYMBOLS AND
ABBREVIATIONS
Original drawing size is 30"x42"; Scale entities accordingly if reduced/enlarged.
3040 WILLIAMS DRIVE, SUITE 600
FAIRFAX, VIRGINIA 22031
P: 703-691-2115 www. .com
(D) EF-1
(D) UH-1
(D) UH-1
(D) UH-1
(D) EF-2
(E) MOTORIZED
LOUVER
(E) MOTORIZED
LOUVER
3 3
(D) WINDOW AC UNIT
(D) EF-1
(E) EF-3
(E) UH-2
ADD ALTERNATE #1
ADD ALTERNATE #1
Pl ott ed B y:
TE
JA
S.
H.
B
P lot
D ate
: 1 1/1
8/2
1 2 :43
:39 P
M Sa ve d B y:
TE
JA
S.
BA
SA
VA
RA
J Fil e:
O:
\20
\S
AG
6.1 4\2
3-
SA
G2
.14
_M \21
6.1
4_
MD
1.d wg S av e D ate : 1
1/1 8/2
1 0
2:4 2 P
M
MD101
MECHANICAL
DEMOLITION PLAN
SCALE:
MECHANICAL DEMOLITION PLAN
1/4" = 1'-0"
MD101
GENERAL NOTES
KEY NOTES
A. EXISTING WORK SHOWN IS BASED ON AVAILABLE DOCUMENTATION
AND FIELD SURVEY. CONTRACTOR TO FIELD VERIFY EXISTING
CONDITIONS AND COORDINATE WITH ENGINEER PRIOR TO
PROCEEDING WITH WORK.
B. ALL EXISTING EQUIPMENT NOT SHOWN TO BE REMOVED OR
ABANDONED SHALL REMAIN AS-IS.
C. THE DEMOLITION PLAN IS NOT INCLUSIVE OF ALL EXISTING DEVICES
WITHIN THE PROJECT AREA. IT IS INTENDED TO PROVIDE THE
CONTRACTOR WITH A GENERAL KNOWLEDGE OF THE IMPACTED
SYSTEMS WITHIN THE PROJECT AREA. THERE ARE MANY PIPING
SYSTEMS AND CONDUITS NOT SHOWN ON THIS PLAN AND
DISCREPANCIES OR CONDITIONS NOT SHOWN ON THIS PLAN SHALL BE
COORDINATED.
D. CONTRACTOR TO FIELD COORDINATE ALL REMOVAL/ STORAGE/
DISPOSAL OF EXISTING EQUIPMENT WITH THE FACILITY.
E. ALL WORK SHALL BE IN ACCORDANCE WITH ALL APPLICABLE CODES,
SAFETY REGULATIONS AND OWNER'S REQUIREMENTS.
F. WHERE EQUIPMENT AND ASSOCIATED APPURTENANCES ARE
INDICATED TO BE REMOVED, REMOVE EXISTING STRUCTURAL
ATTACHMENTS, AND PATCH CONCRETE SURFACE TO MATCH
ADJACENT.
G. CONTRACTOR SHALL SCHEDULE ALL WORK IN ACCORDANCE WITH
OWNER'S REQUIREMENTS.
H. EXISTING MECHANICAL EQUIPMENT, PIPING, DUCTWORK, AND
MATERIALS AFFECTED BY DEMOLITION SHALL BE VERIFIED FOR
PROPER OPERATION AFTER THE DEMOLITION WORK IS COMPLETED AT
NO ADDITIONAL COST TO OWNER.
1. EXISTING ELECTRIC UNIT HEATERS, UH-1, ASSOCIATED WIRING,
CONTROLS, DISCONNECTS SHALL BE ABANDONED IN PLACE. WIRING
ASSOCIATED WITH UNIT HEATERS UH-1 SHALL BE PULLED BACK AND
BREAKERS LABELED AS SPARE, REFER TO ELECTRICAL DRAWINGS FOR
MORE DETAILS.
2. EXISTING EXHAUST FANS, EF-1 (X2) AND EF-2, ASSOCIATED WIRING,
CONTROLS, DISCONNECTS SHALL BE ABANDONED IN PLACE. WIRING
ASSOCIATED WITH ROOF EXHAUST FANS SHALL BE PULLED BACK AND
BREAKERS LABELED AS SPARE, REFER TO ELECTRICAL DRAWINGS FOR
MORE DETAILS.
3. EXISTING 50"X50" MOTORIZED LOUVERS ARE TO BE RE-PURPOSED FOR
AHU-1 ECONOMIZER OPERATION. THE CONTRACTOR IS FIRST TO
VERIFY THAT THE DAMPERS AND ACTUATORS ARE STILL IN GOOD
WORKING CONDITION, IF NOT IN GOOD WORKING CONDITION THEN
THOSE PARTS OR ASSEMBLIES SHALL BE REPLACED IN KIND. THE
CONTRACTOR SHALL THEN PROVIDE THE CONTROLS NECESSARY TO
ENSURE THAT AHU-1 OPERATES THE DAMPERS FOR ECONOMIZER
CONTROL. SEE M801 FOR AHU-1 ECONOMIZER CONTROL SEQUENCE.
4. REMOVE THE EXISTING WINDOW AC UNIT AND INSULATE AND PATCH
THE HOLE TO MATCH THE EXISTING WALL MATERIALS AND PAINT
COLORS ON THE INTERIOR AND EXTERIOR SIDES FROM EDGE TO
EDGE.
5. EXISTING CEILING EXHAUST BATHROOM FAN SHALL REMAIN IN PLACE
AS-IS, SEE M101 FOR NEW WORK ASSOCIATED WITH THE FAN. THE FAN
SHALL BE OPENED AND CLEANED FOR REUSE.
6. THE EXISTING WALL MOUNTED UNIT HEATER IN THE OFFICE SPACE
SHALL REMAIN IN PLACE AS-IS.
7. THE ROOF EXHAUST FANS ARE ADD ALTERNATE #1. THE OWNER HAS
THE OPTION TO ADD THE REMOVAL OF THE EXHAUST FANS INTO THE
SCOPE IF DESIRED, RATHER THAN SIMPLY ABANDONING IN PLACE. IF
ADD ALTERNATE #1 IS INCLUDED IN THE SCOPE OF WORK,
CONTRACTOR IS RESPONSIBLE FOR REMOVAL OF BOTH EF-1 FANS
AND ALL APPURTENANCES, AND CAPPING, SEALING, AND INSULATING
THE ROOF PENETRATIONS.
Original drawing size is 30"x42"; Scale entities accordingly if reduced/enlarged.
3040 WILLIAMS DRIVE, SUITE 600
FAIRFAX, VIRGINIA 22031
P: 703-691-2115 www. .com
TM
NORTH
AHU-1 1
62x34 RA
98x14 SA
BELOW
24"Ø SA
RG-1
VAV-1
VAV-1
VAV-3
VAV-2
16"Ø
12" Ø
16"Ø
16"Ø
24x18
24"Ø
14"Ø 18"Ø10"Ø 14"Ø 10"Ø
SD-1
TYP OF 10
24x18
14"Ø 18"Ø10"Ø 14"Ø 10"Ø
SD-1
TYP OF 10
24"Ø
SD
SD
CD-1
SG-1
10" Ø
12X8
10"Ø
T
T
T
(E) EF-3
4"Ø
12X8
18X8 RA
TRANSFER
DUCT
RG-2
VD
14X14
6" Ø
12" Ø
12" Ø
CD-2
6" Ø
VD 100%
OPEN
6"Ø
CD-3
14"Ø
VD
VD
ABD-1
T
M601
(E) UH-2
TRANSITION
TO 34x24 SA
98x14 RA
ABOVE
TRANSITION
76X14 TO 62X34
EXISTING
TRANSFER
GRILLE
TWO 45
DEG
BENDS
RD-1
H
Pl ott ed B y:
TE
JA
S.
H.
B
P lot
D ate
: 1 1/1
8/2
1 2 :43
:41 P
M Sa ve d B y:
TE
JA
S.
BA
SA
VA
RA
J Fil e:
O:
\20
\S
AG
6.1 4\2
3-
SA
G2
.14
_M \21
6.1
4_ M1
.dw g Sa ve D ate : 1
1/1 8/2
1 0
2:4 2 P
M
M101
MECHANICAL NEW WORK
PLAN
SCALE:
MECHANICAL NEW WORK PLAN
1/4" = 1'-0"
M101
GENERAL NOTES
KEY NOTES
1. AHU-1 IS LOCATED ON GRADE OUTSIDE THE BROODSTOCK BUILDING.
SEE M601 FOR AHU-1 SCHEDULE AND INSTALLATION DETAILS.
2. AIR HANDLING UNIT PROVIDED WITH FACTORY SUPPLY AND RETURN
SMOKE DETECTORS. SMOKE DETECTORS SHALL BE HARD WIRED TO
SHUT DOWN AHU-1 UPON DETECTION OF SMOKE. SEE ELECTRICAL
DRAWINGS FOR DETAILS ON TYING INTO EXISTING FIRE ALARM
SYSTEM.
3. LOCATE NEW DIFFUSER IN EXISTING CEILING GRID ADJACENT TO THE
2X4 LIGHT FIXTURE.
4. PROVIDE NEW WALL MOUNTED THERMOSTAT SENSOR. COORDINATE
LOCATION OF THERMOSTAT WITH RESPECT TO OTHER WALL MOUNTED
COMPONENTS. MOUNT THERMOSTAT AT A MINIMUM OF 4'-6" A.F.F.
(TYPICAL).
5. PROVIDE NEW IN-DUCT MOUNTED HUMIDISTAT. LOCATE BEHIND THE
RETURN GRILLE FOR EASY ACCESS TO SENSOR WHEN GRILLE IS
REMOVED. SEE CONTROL DRAWING M802 FOR HUMIDISTAT
SEQUENCING.
6. PROVIDE 2" DOUBLE WALL DUCTWORK WITH EPOXY PAINTED EXTERIOR
FOR ALL OUTDOOR DUCTS. PAINT COLOR TO MATCH AHU-1. ALL
RETURN DUCTWORK FROM THE TANK ROOM TO AHU-1 SHALL BE
LINED WITH INTERIOR SOUND LINING. SOUND LINING SHALL BE
CLOSED CELL FOAM TYPE AND MECHANICALLY FASTENED.
7. PROVIDE DUCT SUPPORTS TO MEET SMACNA REQUIREMENTS.
SUPPORTS SHOWN ON PLANS ARE REPRESENTATIONAL, CONTRACTOR
TO CALCULATE REQUIRED NUMBER OF SUPPORTS.
8. EXISTING BATHROOM EXHAUST FAN TO REMAIN IN PLACE.
CONTRACTOR TO ADD 4" EXHAUST DUCT FROM THE EXISTING FAN TO
THE EXTERIOR OF THE BUILDING AND ADD A WALL CAP WITH
BACKDRAFT DAMPER BUILT IN. FAN CONTROL BY LIGHT SWITCH SHALL
REMAIN.
9. WALL SUPPLY AND RETURN GRILLES ARE LOCATED AT AN ELEVATION
ABOVE THE CEILING OF THE EGG HATCH ROOM. BASED ON FIELD
MEASUREMENTS, THE STORAGE ROOM GRILLES SHOULD HAVE ROOM
TO GO BELOW THE CONDUIT TRANSITING THE WALL OF THE STORAGE
ROOM, BUT IF THE CONTRACTOR DETERMINES THE CONDUIT MUST BE
MOVED, THEN THE CONTRACTOR IS RESPONSIBLE FOR RELOCATION
OF THE CONDUIT. SUPPLY DIFFUSER SHALL NOT BE LOCATED SO
CLOSE TO THE CEILING OF THE STORAGE ROOM THAT THE STEEL
CEILING BEAMS OBSTRUCT THE AIR FLOW FROM THE SUPPLY GRILLE
TO THE OTHER SIDE OF THE STORAGE ROOM.
10. ABOVE THE VESTIBULE CEILING IS AN ACCESS PLATFORM, WITH
RAILING, WHERE TWO EXISTING TRANSFORMERS ARE LOCATED. VAV-2
SHALL BE LOCATED AT AN ELEVATION SUCH THAT IT IS
APPROXIMATELY CHEST HIGH AND THE CONTROL BOX AND ELECTRIC
HEATER ARE ACCESSIBLE FROM THE EXISTING PLATFORM FOR EASY
FUTURE MAINTENANCE.
11. THIS DIFFUSER IS THREE WAY AS NOTED ON THE PLANS, AND LOCATED
IN THE EXISTING OPEN CEILING HOLE. ONCE DIFFUSER IS IN PLACE
PATCH HOLE AROUND DIFFUSER TO MATCH EXISTING CEILING.
12.PROVIDE NEW TURN DOWN SLAB TO SUPPORT NEW ON GRADE AHU-1.
SLAB SHALL EXTEND AROUND THE UNIT TO PROVIDE A MINIMUM 4'
CLEARANCE ON ALL SIDES, AND EXTEND ON THE SIDES AS REQUIRED
TO SUPPORT RETURN DUCTWORK. THE FACILITY IS SURROUNDED
WITH A CHAIN LINK FENCE, SO THERE IS NO REQUIREMENT TO
PROVIDE EXTRA SECURITY OR SCREENING PROTECTIONS AROUND
AHU-1. SEE AHU-1 STRUCTURAL SUPPORT DETAIL AND SECTION VIEW
ON M-601.
13. APPROXIMATELY FOUR FEET SOUTH OF COLUMN LINE 2 SEEMS TO BE
THE BEST LOCATION TO PENETRATE THE SUPPLY DUCT INTO THE SIDE
OF THE BUILDING HIGH ON THE WALL. THIS AREA APPEARS TO
PROVIDE A 36" WIDE CLEAR PATH, BETWEEN LIGHT HANGERS, FROM
EAST TO WEST FOR THE MAIN DUCT RUN. REFER TO AHU-1 SECTION,
DETAIL 5 ON M601. FOR ADDITIONAL DIMENSIONS AND NOTES.
14.BALL DIFFUSERS SHALL INITIALLY BE ANGLED DOWN AT A 20 DEGREE
ANGLE. AND THE HORIZONTAL ADJUSTMENT SHALL MATCH THE
DIRECTIONAL ARROWS ON M101.
15.PROVIDE 1-1/2" CONDENSATE PVC DRAIN LINE FROM AHU-1 TO GRADE.
3" MIN P-TRAP, TERMINATE OVER THE EDGE OF THE NEW PAD INTO THE
GRASS AWAY FROM THE BUILDING FOUNDATION.
16. SEE VENTILATION CONTROL SEQUENCE, M802, FOR BUILDING
BALANCING CFM VALUES.
17. ALL EXPOSED/VISIBLE RECTANGULAR AND ROUND DUCT SHALL BE
DOUBLE WALL.
A. SUPPORT DUCTS CLOSE TO WALL PENETRATIONS.
B. ALL OUTDOOR SUPPLY & RETURN DUCTS SHALL BE DOUBLE-WALL
CONSTRUCTION.
C. AT DOUBLE-WALL DUCT FLANGED JOINTS, INSULATE JOINTS THAT ARE
EXPOSED OUTSIDE WITH 1- INCH THICK CELLULAR FOAM FLEXIBLE
INSULATION.PROTECT INSULATION WITH POLYGUARD (OR APPROVED
EQUAL) "PEEL-AND-STICK" ALUMINUM INSULATION SHALL BE
THOROUGHLY APPLIED TO COVER ENTIRE JOINT, AND JACKETING
APPLIED TO THOROUGHLY COVER THE INSULATION.
D. SUPPORT LARGE SUPPLY AND RETURN MAINS OUTDOOR FROM FLOOR
WITH UNI-STRUTS OR STEEL ANGLES.
E. CONTRACTOR TO COORDINATE ALL SUPPLY AND RETURN AIR
DUCTWORK WITH STRUCTURAL BEAMS AND NECESSARY TRANSITIONS,
BENDS, AND RISES SHALL BE PROVIDED. COORDINATE DUCTWORK
WITH SPRINKLER HEADS, SPRINKLER PIPING, LIGHTING FIXTURES, AND
PLUMBING PIPES.
F. THERMOSTATS AND HUMIDISTAT'S SHALL BE MOUNTED AT THE
LOCATION SHOWN OR TO THE NEAREST ADJACENT WALL. ADDITIONAL
CONTROL WIRING MAY BE REQUIRED
G. ALL MECHANICAL EQUIPMENT SHALL BE INSTALLED PER
MANUFACTURER'S RECOMMENDATIONS AND IN ACCORDANCE WITH
CODE REQUIREMENTS. PROVIDE MANUFACTURER RECOMMENDED
SERVICE CLEARANCES AND ACCESS PANEL TO ALL HVAC. HVAC
EQUIPMENT SHALL BE SHIFTED AS NECESSARY TO MAINTAIN
REQUIRED ACCESS CLEARANCES FROM THE CONSTRUCTION OF NEW
PARTITIONS, LIGHT FIXTURES, AND CABLE TRAYS.
Original drawing size is 30"x42"; Scale entities accordingly if reduced/enlarged.
3040 WILLIAMS DRIVE, SUITE 600
FAIRFAX, VIRGINIA 22031
P: 703-691-2115 www. .com
TM
NORTH
REFER NOTE#1
MINIMUM 36"
CLEARANCE ON
CONTROL SIDE
MEDIUM PRESSURE SUPPLY DUCT,
REFER TO FLOOR PLAN FOR SIZE
PROVIDE A MIN. STRAIGHT RUN OF
DUCT EQUAL TO 3x OR 4x INLET DIA(D).
SAME SIZE AS BOX INLET PER
TERMINAL BOX REQUIREMENTS.
TERMINAL BOX
REFER NOTE#2
ELECTRIC REHEAT SECTION
DUCTWORK TRANSITION AS
REQUIRED
LOW PRESSURE DISCHARGE
DUCTWORK.
CONTROL BOX
ELECTRICAL
CONNECTION BOX
NOTES:
1. CONTRACTOR TO COORDINATE WITH ALL DISCIPLINES TO ENSURE MINIMUM CLEARANCES, AS REQUIRED BY LOCAL CODES AND RECOMMENDED BY THE MANUFACTURER, ARE MAINTAINED PRIOR TO INSTALLATION. WHERE MINIMUM CLEARANCES CANNOT BE ACCOMMODATED DUE TO SPACE CONSTRAINTS, THE TERMINAL UNIT CONTROL BOX MAY BE SWITCHED TO THE OPPOSITE
SIDE WITH OWNER AND ENGINEERING APPROVAL.
2. SUPPORT HANGER RODS AND BRACKETS SHALL BE PER BUILDING STRUCTURE CAPABILITIES, BOX TYPE, AND FIELD
COORDINATED WITH EXISTING SUPPORTS.
SCALE:
SUPPLY TERMINAL BOX WITH ELECTRIC REHEAT COIL
NOT TO SCALE
TYP M601
NOTES:
STRUCTURE
CEILING
1. SUPPORT FLEXIBLE DUCT AT 2'-0" OC MAX, CLAMPS AND HANGERS NOT SHOWN.
2. PROVIDE SHEET METAL TRANSITION AS REQUIRED BETWEEN FLEXIBLE DUCT AND DIFFUSER COLLAR IF
DIFFUSER DOES NOT HAVE ROUND DUCT CONNECTION.
3. DIFFUSER SHOWN, REGISTER OR GRILLE SIMILAR.
4. ROUND BRANCH DUCT SHOWN, RECTANGULAR BRACH DUCT SIMILAR WITH APPROPRIATE
CONNECTIONS/TRANSITIONS.
5. LIMIT FLEX TO 5'-0" MAX LENGTH, 1 - 90° TURN ALLOWED.
CEILING
INSULATED
FLEXIBLE
DUCT
VOLUME DAMPER
CONICAL OR 45
DEGREE TAP
SUPPLY
DUCT
SS BAND
SUPPORT FROM CEILING
MAXIMUM 5'-0"
FLEX DUCT ELBOW
FLEXIBLE DUCT ELBOW
SUPPORT
DIFFUSER
SCALE:
SQUARE CEILING DIFFUSER (WITH FLEXIBLE ELBOW)
NOT TO SCALE
TYP M601
NOTES:
1. FOLLOW MANUFACTURER'S INSTALLATION INSTRUCTIONS.
2. PROVIDE EXTENSION RODS TO ACCOMMODATE INSULATION, PULL TO EDGE OF DUCT AS REQUIRED AND
SEAL TO EFFECT VAPOR BARRIER.
3. INSTALL LOCKING QUADRANT AND HANDLE ON BOTTOM OF DUCT FOR EASY SERVICE SHOWN ON TOP FOR
EASE OF ILLUSTRATION ONLY.
4. PROVIDE DAMPER OPENING POSITION 0-90 DEGREES.
SINGLE BLADE
DAMPER
SEE NOTE 2, 3
45° TAP
4" MINIMUM
LENGTH
SCALE:
VOLUME DAMPER
NOT TO SCALE
TYP M601
MAXIMUM ALLOWABLE HANGER
LOAD
STRAPS LBS RODS LBS
2-1"x22 GA 520 2-1/4" Ø 540
2-1"x20 GA 640 2-3/8" Ø 1360
2-1"x18 GA 840 2-1/2" Ø 2500
2-1"x16 GA 1400 2-5/8" Ø 4000
MAXIMUM ALLOWABLE
TRAPEZE ANGLE LOAD
L 2"X2"X1/4" 2-1/2"x2-1/2"x1/4"
36" 1200 LBS 1940 LBS
48" 1160 LBS 1900 LBS
60" 1060 LBS 1800 LBS
72" 900 LBS 1640 LBS
84" 660 LBS 1400 LBS
96" 320 LBS 1060 LBS
ANGLE
(TABLE 2)
2"x2"x3/16" ANGLE (WHERE LENGTH OF ANGLE
EXCEEDS 6 FEET USE INTERMEDIATE SUPPORT)
USE THIS METHOD WHENEVER DUCTS
CAN BE GROUPED TOGETHER
ROD (TABLE 1)
SHEET METAL
SCREWS
NOTES:
1. TABULATED DATA FROM SMACNA ALLOWS FOR DUCT REINFORCING AND INSULATION, BUT NO EXTERNAL LOADS.
2. PROVIDE HIGH DENSITY INSERT AT TRAPEZE FOR INSULATED DUCTS.
3. SEE STRUCTURAL DRAWINGS FOR DETAILS FOR SECURING RODS TO STRUCTURE.
4. DUCTS SHALL BE SUPPORTED AT NOT LESS THAN 10 FT. OFF CENTER.
5. DUCTS SHALL BE SUPPORTED AT NOT LESS THAN 8 FT. OFF CENTER.
SEE PROJECT DRAWINGS
FOR NUMBER & SIZE
TURN STRAP
SECURE STRAP HANGER
TO STRUCTURE
1"x18 GAGE STRAP HANGERS UP THRU 30"Ø 1"x1/8" ABOVE 30"Ø AT 10' OFF CENTER
1"x16GA
STRAPS
DUCT-SEE PROJECT
PLAN FOR SIZE
SINGLE RECTANGULAR DUCT
USE THIS METHOD WHENEVER DUCTSCAN BE GROUPED TOGETHER
BOLT THRU AT
REINFORCING
ANGLE BOLT
1"x18GA
STRAPS
TURN STRAP
MULTIPLE DUCT RUNS ON TRAPEZE HANGERS ROUND DUCT
SEE NOTE 5
SEE PROJECT DRAWINGS FOR
NUMBER & SIZE
SHEET METAL SCREWS
SHEET METAL SCREWS
1"x1/8" STRAPS
1-1/4"x1/8" RING
SECURE STRAPS TO
BEAM WITH LAG SCREWS
2"x2"x3/16" ANGLE (WHERE LENGTH OF
ANGLE EXCEEDS 6 FEET USE
INTERMEDIATE SUPPORT)
SEE NOTE 4
DUCT-SEE PROJECT
PLANS FOR SIZE
1/2" ALL THREAD
ROD
5/8" ALL THREAD ROD
LOW PRESSURE DUCTWORK (UP THRU 2" WG)
MEDIUM AND HIGH PRESSURE DUCTWORK (2" WG TO 10" WG)
(TABLE 1)
(TABLE 2)
SCALE:
TYPICAL DUCT HANGERS & SUPPORTS
NOT TO SCALE
TYP M601
SCALE:
DUCT AT WALL PENETRATION DETAIL
NOT TO SCALE
TYP M601
OUTSIDE AIR HOOD WITH ECONOMIZER
POWER SUPPLY
KNOCKOUT
NEW CONCRETE PAD FOR AHU-1, SEE DETAIL 9. THE
GRADE IS SLOPED TOWARD THE BROODSTOCK BUILDING
ON THE EAST SIDE, SO THE EASTERN MOST PART OF THE
CONCRETE PAD MAY REQUIRE EXCAVATION INTO THE SIDE
OF THE HILL. USDA CURRENTLY WORKING TO ELIMINATE
GROUND HOG IN THIS AREA. COORDINATE WITH THE USDA
PRIOR TO CONSTRUCTION TO VERIFY IF THIS STILL
APPLIES.
48" MINIMUM
CLEARANCE
OUTDOOR GRADE LEVEL
DUCT SUPPORT,
SEE DETAIL 5
AHU STRUCTURAL
SUPPORT, SEE
DETAIL 4
FLUSH MOUNTED
SIDEWALL
RETURN GRILLE
INDOOR GRADE LEVEL
62x34 RA 2" DOUBLE WALL DUCTWORK WITH EPOXY PAINTED
EXTERIOR
30x24 SA 2" DOUBLE WALL DUCTWORK WITH EPOXY PAINTED
EXTERIOR
EXTERIOR WALL, USE
STANDARD DUCT WALL
SUPPORT DETAIL, FIG. 4-8
SMACNA DUCT CONSTRUCTION
STANDARDS 2ND EDITION
SD
AHU-1
SCALE:
AHU-1 UNIT SECTION
NOT TO SCALE
TYP M601
SCALE:
EXTERIOR HORIZONTAL DUCT SUPPORT
NOT TO SCALE
TYP M601
DUCT SIZE AS NOTED ON PLANS
PREFABRICATED DOUBLE WALL
RECTANGULAR DUCT
FASTEN DUCT TO ANGLE IRON WITH
CADMIUM OR STAINLESS STEEL
METAL SCREWS MINIMUM 3" PER
SIDE, MAXIMUM 18" ON CENTER.
CONCRETE PAD. DUCT
SUPPORTS THAT DO NOT LAND
ON THE SURROUNDING PAD
MAY BE SUPPORTED BY
SONOTUBE TYPE CONCRETE
FOOTINGS OR USE A
NON-PENETRATING TYPE
SUPPORT DESIGNED TO REST
ON GRADE.
SQUARE CLOSURE PLATE
ON TOP, WELDED TO
ANGLE IRON FRAME.
ANCHOR BASE
PLATE
MIN. 18" CLEAR
ANGLE IRON 2"x2"x3/16" UP TO
36" LONG DUCT DIMENSIONS
OVER 36", 2-1/2"x 2-1/2"x3/16"
FLEX CONNECTORS AT ALL UNIT CONNECTIONS
NOTES:
1. THE STEEL STRUCTURAL SUPPORT AND SLAB FOR AHU-1 SHALL BE A DELEGATED DESIGN, SEE 23 74 13
SECTION 2.11. REFER TO AHU-1 SCHEDULE FOR WEIGHT AND DIMENSIONS OF BASIS OF DESIGN UNIT.
SCALE:
STEEL DUNNAGE SUPPORTING DETAIL
NOT TO SCALE
TYP M-601
PIPE SUPPORT
CONCRETE
PAD
AHU-1
NEW BEAMS
AHU BASE RAIL
INTERMEDIATE
SUPPORTS AS REQUIRED
BY UNIT MANUFACTURER
GRADE
18" MIN TO
BOTTOM OF AHU
~13'
~4'
NOTES:
1. THE DIMENSIONS PROVIDED ARE APPROXIMATE, AND SHALL BE FIELD VERIFIED FOR BEST FIT BEFORE CONSTRUCTION. REFER ALSO TO NOTE 13 ON M101. THE INTENT HERE IS TO PROVIDE THE INSTALLER WITH THE
FLEXIBILITY TO ADJUST THE LOCATION OF PENETRATIONS AND DUCTWORK ROUTING ABOVE THE LIGHTING AND PIPING TO AVOID AS MANY HANGER INTERFERENCES AS POSSIBLE. IF FINAL ROUTING OR EQUIPMENT LOCATIONS DEVIATE FROM THAT SHOWN ON M101 IT SHALL BE IDENTIFIED TO THE OWNER AND ENGINEER FOR APPROVAL, THROUGH RFI APPROVAL BEFORE EQUIPMENT LOCATIONS AND DUCTWORK IS FINALIZED.
AHU CONDENSATE TO
SPLASH OUT IN GRASS
AWAY FROM BUILDING
FOUNDATION
SD
SCALE:
CONCRETE EQUIPMENT PAD DETAIL
NOT TO SCALE
TYP M601
8"
GRADE
2" MOISTENED SAND
4" GRAVEL 1'-6" MIN
8"
COMPACTED
EARTH
#4 @ 1'-0" EACH WAY
2- #4 CONT.
NOTES:
1. CONTRACTOR SHALL OBTAIN EXACT SIZES, LOCATIONS, HEIGHTS, AND ANY SPECIAL
DETAILSFROM THE EQUIPMENT MANUFACTURER BEFORE PADS ARE POURED. PADS SHALL BE
CONSTRUCTED TO CONFORM TO THE MANUFACTURERS STANDARD FOR THE EQUIPMENT.
2. 3500 PSI CONCRETE SHALL BE USED FOR THE PAD.
2-1/2" CENTERLINE
PACK WITH FIBROUS
MATERIAL ALL AROUND
DUCT
EXISTING INSULATED
PANEL WALL
DUCT
PACK WITH FIBROUS
MATERIAL ALL AROUND
DUCT
MAX. PREFERRED
W…