1-Cost Proposal Worksheet RFP27-40 FINAL.docx

DOCX document 62 KB Posted

Attached to
On-Call Power Line Contractor Services
Solicitation number
RFP27-40
Issued by
Los Alamos County, New Mexico

About this file

This is a Cost Proposal Worksheet for RFP27-40 issued by the Incorporated County of Los Alamos, New Mexico, Department of Public Utilities, for On-Call Power Line Contractor Services. The County is soliciting proposals from qualified firms to provide predominately make-ready pole changes for a fiber installation project related to the County's electric distribution system, with all work to be performed on a Task Order basis. The contract term is up to seven years, and proposers must provide fully loaded hourly wage rates for all labor classifications, including supervisory, electrical distribution and transmission, laborers, operators, and truck drivers groups. The worksheet requires itemized costs for equipment hourly and daily rates, including bucket trucks, digger derrick trucks, wire pulling rigs, directional drilling, and various other specialized equipment necessary for power line work.

Pricing must be submitted in U.S. dollars and must comply with New Mexico Department of Workforce Solutions prevailing wage requirements, including all applicable benefits, fringe benefits, labor burden, contractor overhead, and profit. Offerors may propose additional optional services and must include price escalation mechanisms for future years if applicable, which may be based on specified dollar amounts, percentages, capped not-to-exceed amounts, or indexed formulas such as Producer Price Index or Consumer Price Index. Material and specialty equipment rental costs are to be billed at vendor invoice cost with applicable administrative processing fees, while subcontractor costs are to be billed at the subcontractor's cost to the prime contractor plus administrative processing fees. Cost-plus-a-percentage-of-cost contracts are prohibited under County Code. Mobilization costs are billed as one-way mileage charges from the contractor's home office to the job site on a per task order basis. The County reserves the right to award for any term length up to seven years and to accept or reject any proposed price escalation mechanism.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offeror Company Name:

Solicitation No.:

Solicitation Title:

Name and Title of the Person Completing this Form

INSTRUCTIONS:

1. Using this form, propose costs for all services, defined clearly in individual line items. If more space is needed, Offerors may add rows to clearly describe all costs or may provide more information separately.

2. All costs proposed must be in the currency of the United States of America. County intends to award for a term of up to seven (7) years, if Offerors don’t provide cost for up to seven (7) years, County may award an Agreement for the years proposed.

3. Describe costs for any additional and optional services Offeror may propose that are not already clearly described.

4. In accordance with County Code, the use of a cost-plus-a-percentage-of-cost contract is prohibited.

5. Provide costs for all services (including additional, optional, and future services) for all years of an agreement. County will consider, but is under no obligation to accept proposed future year unit prices or price escalations, which may include but are not limited to price escalations based on:

a. a specified dollar amount;

b. a specified percentage;

c. a capped not-to-exceed dollar amount or percentage (e.g., annual increases will never exceed the lesser of $1,000.00 or 3%, per year over the prior year’s fee amounts);

d. or some other formula (e.g., a specific Producer Price Index or Consumer Price Index).

6. If proposing a price escalation mechanism for future years of an agreement where a specified dollar amount or specified percentage has not been proposed (e.g., if using a CPI), Offerors should also clearly describe the process and timing for Offeror to notify County of any such increase and the process by which County would approve such an increase in future years. County, at its sole discretion, reserves the right to accept any given proposed fees and price escalation mechanism and process for any agreement term length.

COST PROPOSAL WORKSHEET

Incorporated County of Los Alamos Procurement Division 101 Camino Entrada, Building 3 Los Alamos, NM 87544

Material Costs & Specialty Equipment Rental:

Contractor supplied material (where County supplied material is not provided) and specialty rental equipment (excluding small tools and equipment listed below) to be paid at invoice cost from the vendor/supplier with applicable proposed hourly rates for administrative/invoice processing costs.

Subcontractors:

To be paid at the subcontractor’s cost to Prime Contractor based upon an itemized quote for labor, material, and equipment costs with applicable proposed hourly rates for administrative processing costs.

Administrative/Invoice Fee Hourly Rates
Year 1
Year 2
Year 3
Year 4
Year 5
Year 6
Year 7

Material Administrative Processing Cost - Hourly

Subcontractor Administration Processing Cost - Hourly

Insurance and Bond Fees: Where applicable to an individual Task Order, Insurance (such as Builder’s Risk Policies for example), Performance and Payment Bond Fees are to be billed at cost.

Fully Loaded Hourly Wage Rates. Rates entered below shall include:

1) Hourly labor costs for prevailing wages to meet wage decision requirements of the New Mexico Department of Workforce Solutions.

2) All benefits, fringe, and labor burden including benefits required by collective bargaining agreements applicable to the labor class.

3) Contractor’s overhead and profit.

Proposal Items
Fully Loaded Hourly Wage Rate
Labor Classification
UNIT
Year 1
Year 2
Year 3
Year 4
Year 5
Year 6
Year 7

Supervisory Group

Project Manager
HR
Superintendent
HR
Foreman
HR
List other Classifications as necessary
HR

Electrical Distribution and Transmission Classifications

Lineman/Lineworker
HR
Journeyman Lineworker
HR
Apprentice Lineworker
HR
Groundman
HR
Equipment Operator
HR
List other Classifications as necessary
HR

Laborers

Group I - Unskilled
HR
Group II - Semi-skilled
HR
Group III - Skilled
HR
Group IV - Specialty
HR
List other Classifications as necessary
HR

Operators

Group I
HR
Group II
HR
Group III
HR
Group IV
HR
Group V
HR
Group VI
HR
Group VII
HR
Group VIII
HR
Group IX
HR
Group X
HR
List other Classifications as necessary
HR

Truck Drivers

Group I-IX
HR

Miscellaneous

List other Classifications as necessary
HR
List Other Service Type Offeror wishes to Propose on. (OTHER 1)
HR
List Other Service Type Offeror wishes to Propose on. (OTHER 2)
HR
List Other Service Type Offeror wishes to Propose on. (OTHER 3)
HR
Equipment Hourly/Daily Rates
Equipment Rates
Bucket Truck Less than 50 feet
HR
Bucket Truck Greater than 50 feet
HR
Back Yard Unit
HR
Digger Derrick Truck
HR
Skid Loader
HR
Backhoe
HR
Mini Excavator
HR
Multi-Reel Trailer
DAY
Single-Reel Trailer
DAY
HydroVac Unit
HR
Wire Pulling Rig - Overhead
HR
Wire Pulling Rig - URD
HR
Directional Drilling 4 Inch - including duct
LF
Directional Drilling 6 Inch - including duct
LF
Service Truck
DAY
Pole Trailer
DAY
Pressure Digger
HR
Dump Truck
HR
Dump Trailer
DAY

List Other Equipment Type Offeror wishes to Propose on. (OTHER 1)

List Other Equipment Type Offeror wishes to Propose on. (OTHER 2)

List Other Equipment Type Offeror wishes to Propose on. (OTHER 3)

Other Costs and Charges.

Description
Cost per Mile

Mobilization:

Travel, transportation and storage costs to mobilize/demobilize crews, tools, supplies, equipment, etc. To be paid as a one-way mileage charge from Contractor’s home office to the job site, on a per task order basis.