This is an asbestos abatement specification document prepared for the Piute County School District regarding demolition and removal services at Circleville Elementary School located at 300 South Center Street, Circleville, Utah 84723. The specification was prepared by Michael Kelly (Utah DAQ Card ASB-0844, Inspector, Management Planner, Project Designer) from Health & Safety Services and is dated March 3, 2026. The project scope involves the removal and disposal of asbestos-containing materials (ACM) from the school building prior to scheduled demolition activities. The owner's project schedule indicates a start date of January 2027 with an estimated completion timeframe of 30 days. The specification covers two primary asbestos-containing materials: approximately 870 square feet of sheet vinyl flooring containing 15% chrysotile and 3% chrysotile in underlying mastic from the walk-in refrigerator/freezer, pantry/storage, and gym restrooms (classified as friable material); and approximately 15 square feet of floor tile and mastic from the water heater closet containing 3% chrysotile in tile and 5% chrysotile in mastic (classified as non-friable material). All disposal must comply with Utah Division of Air Quality Rules R307-801, dated 8/1/2000.
Qualified bidding contractors must be AHERA certified with the Utah Division of Air Quality and capable of performing work under negative air pressure in accordance with OSHA, EPA, and State of Utah DAQ regulations. Proposals must include a full cost breakdown for labor, materials, insurance, and disposal permits, verification of Utah DAQ Company licensing, and agreement to hold bid pricing until June 1, 2027. The invitation to bid was issued on March 16, 2026, and this Circleville Elementary specification is one of two related scopes of work (the other being Oscarson Elementary School). All asbestos-containing materials identified in the specification are designated for abatement by the contractor, with the contractor bearing responsibility for accurately determining the actual amount of ACM present despite the approximate quantities and areas provided in the scope of work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIRCLEVILLE ELEMENTARY SCHOOL
300 SOUTH CENTER STREET
CIRCLEVILLE, UTAH 84723
ASBESTOS ABATEMENT FOR DEMOLITION
REMOVAL AND DISPOSAL SPECIFICATION
Dated: March 3, 2026
Prepared for:
Piute County School District
500 North Main Street Junction, Utah 84740
Prepared by:
Michael Kelly (Utah DAQ Card ASB-0844, Inspector, Management Planner, Project Designer)
Health & Safety Services
P.O. Box 4741 Salt Lake City, Utah 84110
(Utah DAQ Company Card ASBC-133)
Piute County School District Demolition Specification Circleville Elementary School
Part 1 - General Information
1.1 Scope of Work – Circleville Elementary School Asbestos Abatement for Demolition Removal and Disposal Specification.
1.1.1 Owner’s schedule is as follows:
Start Date: January 2027 Completion Date: It is estimated that abatement can be completed within 30 days
1.1.2 This specification covers the abatement of asbestos from building structures and components listed. It is the intent of the Contract Documents to show the work necessary to complete the project.
1.1.3 All dimensions, quantities or areas provided in the Scope of Work are approximate and are only included to assist Contractor in determining the amount of asbestos-containing material (ACM) designated for removal. Contractor is responsible for accurately determining the amount of ACM included in the Scope of Work.
ASBESTOS-CONTAINING MATERIALS TO BE ABATED
1. Sheet Vinyl Flooring
A) Abatement contractor shall remove sheet vinyl flooring and underlying mastic from the walk-in refrigerator/freezer, pantry/storage, and gym restrooms (2) which is below ceramic tile. There is approximately 870 sq. ft. of flooring that contains 15% chrysotile and 3% chrysotile in the underlying mastic. This material is included in Table 1. This material is friable and shall be disposed of as an asbestos-containing material.
2. Floor Tile and Mastic
B) Abatement contractor shall remove floor tile and underlying mastic from the water heater closet.
There is approximately 15 sq. ft. of flooring that contains 3% chrysotile and 5% chrysotile in the underlying mastic. This material is included in Table 1. This material is non-friable and shall be disposed of as an asbestos-containing material.
3. Disposal
C) Abatement contractor shall dispose of sheet vinyl flooring and associated mastic and floor tile and associated mastic as asbestos-containing materials per Utah Division of Air Quality R307-801-15 contained in the Utah Division of Air Quality Rules R307-801, dated 8/1/2000.
Table 1 Asbestos-Containing Materials to be Abated in
Circleville Elementary School Material ACM Location Amount Sheet Vinyl Floor & Mastic
Sheet Vinyl = 15% Chrysotile Mastic = 3% Chrysotile
Waln-in refrigerator/freezer Pantry/storage Gym restrooms (2) under ceramic tile
~870 sq. ft.
Floor Tile & Mastic
Floor Tile = 3% Chrysotile Mastic = 5% Chrysotile
Water heater closet ~15 sq. ft.
<1% ASBESTOS CONTAINING MATERIALS TO BE ABATED
4. Wallboard System
D) Abatement contractor shall remove all finished wallboard systems walls and ceilings throughout.
The wallboard systems have been composite point counted and are <1% chrysotile. There is ~31,465 sq. ft. of wallboard to be abated. This material is included in Table 2.
5. Disposal
E) Wallboard systems have been point counted and shown to contain <1% asbestos. This material shall be contained in clear plastic bags to mitigate dust, and disposed of as construction debris.
Wallboard Systems debris may go to Garfield County Landfill – (435) 676-1101 please contact Garfield County Landfill for payment information and hours of operations.
Table 2
<1% Asbestos Materials to be Abated in Circleville Elementary School
Material Asbestos Content Location Amount Wallboard Systems
<1% Chrysotile by composite point count
Throughout ~31,465 sq. ft.
GENERAL
1. Utilities
a. Water sources will be made available by General Contractor/Piute County School District.
b. Electricity will be made available by General Contractor/Piute County School District and/or the abatement contractor if necessary.
c. Restroom facilities shall be provided by General Contractor/Piute County School District.
2. Dumpster placement: Dumpster placement will be directed by the General Contractor/Piute County School District.
3. All dimensions, quantities or areas provided in the Scope of Work are approximate, and are only included to assist Contractor in determining the amount of ACM designated for removal.
Contractor is responsible for accurately determining the amount of ACM included in the Scope of Work.
4. All poly sheeting used by the Contractor in the construction of containments or barriers shall be of the fire-retardant type.
5. Contractor shall hold his bid for this project until June 1, 2027.
6. Contractor shall perform the prescribed abatement procedures within approved containments or mini-containments that meet OSHA, EPA, and State of Utah DAQ regulations. All work shall be performed within pre-approved containment configurations, critical barriers, and under negative air pressure.
7. The work specified herein shall be the removal and disposal of asbestos-containing materials by competent persons trained, AHERA certified with the Utah Division of Air Quality, knowledgeable and qualified in the techniques of abatement, handling and disposal of asbestos-containing and asbestos-contaminated materials and the subsequent cleaning of contaminated areas, which comply with all applicable Federal, State and Local regulations and are capable of and willing to perform the work of this Contract.
8. Removal and disposal of the asbestos-containing materials identified shall be performed in a manner which prohibits the release of asbestos fibers into the surrounding environment. This shall be accomplished by constructing negative pressure enclosures and following the removal techniques indicated in the contract specifications provided by Health & Safety Services consultants.
9. The Contractor shall supply all labor, materials, services, insurance, permits and equipment necessary to carry out the work in accordance with all applicable Federal, State and Local regulations and these specifications.
10. Abatement projects involving greater than 260 linear feet of pipe insulation or 160 square feet of sprayed, troweled or otherwise applied material or covering or composing building structures or components, send written notification in accordance with 40 CFR Part 61.146 of Sub Part M, to the appropriate State or Federal air pollution control agency responsible for the enforcement of the National Emission Standard for Asbestos at least ten (10) days prior to the commencement of any on site project activity. If the abatement project is less-than NESHAP size, then the appropriate notification shall be sent to the Utah State Division of Air Quality as per State of Utah regulations.
11. Abatement contractor shall post in the Clean Room area of the worker decontamination enclosure a list containing the names, addresses, and telephone numbers of the Contractor, The Building Owner, the Asbestos Project Officer, the General Superintendent, the Air Sampling Professionals, the testing laboratory and any other personnel who may be required to assist during abatement activities (e.g. Safety Officer, Building Maintenance Supervisor, Energy Conservation Officer).
12. A copy of the inspection report shall be on site at all times for the duration of the abatement.
13. Contractor shall conform to the Owner’s projected scheduling requirements. Contractor agrees to a schedule at the Owner’s convenience. Contractors’ bid shall reflect this consideration.
Owner’s schedule is as follows:
Start Date: January 2027 Completion Date: It is estimated that abatement can be completed within 30 days