1-Bid Schedule Jordan River Bank Stabilization.docx

DOCX document 23 KB Posted

Attached to
2026 Saratoga Springs Well #9 RFPQ
Solicitation number
2026-015
Issued by
Salt Lake County, Utah

About this file

This is a Bid Schedule document for the Jordan River Bank Stabilization project issued by the City of Salt Lake City, Utah. The project involves bioengineered and hardened bank stabilization methods along the Jordan River south of Shields Lane at approximately 10000 South. The scope of work encompasses mobilization and demobilization, traffic control, construction surveying and staking, materials and compaction testing, clearing and grubbing, site grading, removal of existing asphalt trail, installation of slope backfill material, installation of City-provided rip rap, asphalt trail repair, and revegetation with native riparian and upland seed mix. The Base Bid Schedule A includes twelve line items with estimated quantities: 700 square feet of asphalt trail removal, 94 tons of slope backfill material, 116 tons of 24-inch D50 rip rap, 14 tons of 3-inch asphalt for trail repair, and 40 tons of 8-inch untreated base course for asphalt trail repair. The work must be substantially complete 45 days from the notice to proceed, which is anticipated for April 30, 2026. All bids must be submitted electronically through Bonfire, the State of Utah's procurement website. No pre-bid conference will be held.

The pricing structure requires bidders to provide unit prices and total estimated prices for each line item, with all labor, supplies, tools, equipment, parts, rentals, fuels, utilities, subcontractors, suppliers, and overhead and profit included in the bid line items. The Base Bid Total represents the complete pricing submission for the project. Bidders must register as vendors on the Bonfire platform at https://utah.bonfirehub.com/, with registration, email notifications, and electronic responses being free services under the State of Utah contract with Bonfire. Technical support for the Bonfire system is available at support.bonfire@eunasolutions.com. Bidders are solely responsible for submitting their bids before the scheduled closing date and time listed on the Bonfire platform.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART 2 PRICE SCHEDULES

2.1 BASE BID

A. Location: The Base Bid covers work at the following sites:

Base Bid Schedule A:

The Work to be performed for this schedule is located on the bank of the Jordan River, south of Shields Lane (approximately 10000 South), and generally includes the installation of bioengineered and hardened bank stabilization methods, but it is not limited to; mobilization and demobilization, traffic control, construction surveying and staking, materials and compaction testing, clearing and grubbing, site grading, removal of existing asphalt trail, installation of slope backfill material, installation of City provided rip rap, asphalt trail repair, and revegetating repaired bank with native riparian and upland seed mix; all labor, supplies, tools, equipment, parts, rentals, fuels, utilities, subcontractors, suppliers, and all other costs including overhead and profit are to be included in bid line items.

B. Base Bid: The sum of the following Schedule A constitutes the base bid.

Schedule A: 2026 Jordan River Bank Stabilization

Item No.

Item

Unit

Estimated Quantity
Unit Price
Total Estimated Price
A-1
Mobilization, Temp Facilities, De-Mobilization
LUMP
1
$
$
A-2
Site Preparation, Traffic Control, LDP & SWPPP
LUMP
1
$
$
A-3
Construction Surveying & Staking
LUMP
1
$
$
A-4
Materials and Compaction Testing
LUMP
1
$
$
A-5
Clearing and Grubbing
LUMP
1
$
$
A-6
Site Grading
LUMP
1
$
$
A-7
Remove Existing Asphalt Trail
SF
700
$
$
A-8
Slope Back Fill Material
TON
94
$
$
A-9
24” D50 Rip Rap
TON
116
$
$
A-10
3-in Asphalt for 10-ft Wide Asphalt Trail Repair
TON
14
$
$
A-11
8-in Untreated Base Course for Asphalt Trail Repair
TON
40
$
$
A-12
Native Riparian and Upland Seed Mix
LUMP
1
$
$

BASE BID TOTAL = $

File details come from the government source that posted it. Updated .