(1)_Asbestos-Free_Materials.pdf

PDF 178 KB Posted

Attached to
Culinary Arts Modernization Project
Solicitation number
WSH2511A
Issued by
Los Angeles County, San Francisco City, California

About this file

This document is a Certification of Asbestos-Free Material form for the William S. Hart Union High School District, designed to ensure that no asbestos or asbestos-containing products are used in a construction project. The form requires the Prime Contractor to certify that no materials containing asbestos (including chrysotile, crocidolite, amosite, anthopyhllite, tremolite, and actinolite) will be incorporated into the construction or used in any tools, devices, clothing, or equipment.

The document outlines strict requirements for asbestos management, including that any material containing more than 0.1% asbestos will be considered asbestos-containing. If asbestos is discovered, the Prime Contractor must immediately remove and replace the contaminated work at no additional cost to the owner. Any disputes regarding asbestos content will be settled by electron microscopy, with testing costs borne by the Prime Contractor. The asbestos removal must be conducted by an EPA-accredited contractor under the supervision of a qualified asbestos abatement consultant, with final approval from the Architect.

View the file

Other files

File Type Posted
Culinary_Arts_Modernization_Project.pdf PDF
Culinary_Arts_Modernization_Project.pdf PDF
(10)_PWC100_DIR_INFO_(1).pdf PDF
2-Certification_of_Safety_Program_(1).pdf PDF
(6)_Safety_Program_A_(1).pdf PDF
1-Substitution_Request_(1).pdf PDF
2-Certification_of_Safety_Program_(1).pdf PDF
1-Substitution_Request_(1).pdf PDF
13283_Culinary_Arts_Specifications_9-26-25.pdf PDF
(2)_Perfomance_Bond_(1).pdf PDF
(3)_Payment_Bond_Blank_(1).pdf PDF
(4)_Drug_and_Tobacco_(1).pdf PDF
(5)_Company_Guarantee_to_Owner_(1).pdf PDF
(6)_Safety_Program_A_(1).pdf PDF
1-Substitution_Request_(1).pdf PDF
13283_Culinary_Arts_Specifications_9-26-25.pdf PDF
(2)_Perfomance_Bond_(1).pdf PDF
(5)_Company_Guarantee_to_Owner_(1).pdf PDF
13283_Culinary_Arts_Specifications_9-26-25.pdf PDF
13283_Cullinary_Arts_Drawings_9-26-25.pdf PDF
DOJ_Rev._5.08.25_Certification_of_Employee_Background_Check.pdf PDF
(11)_Workers_Compensation_Exemption_Declaration_Construction_(1).pdf PDF
(5)_Company_Guarantee_to_Owner_(1).pdf PDF
13283_Cullinary_Arts_Drawings_9-26-25.pdf PDF
2-Certification_of_Safety_Program_(1).pdf PDF
(11)_Workers_Compensation_Exemption_Declaration_Construction_(1).pdf PDF
13283_Cullinary_Arts_Drawings_9-26-25.pdf PDF
DOJ_Rev._5.08.25_Certification_of_Employee_Background_Check.pdf PDF
5-Conditional_Waiver_and_Release_(Upon_Final_Payment).pdf PDF
Agree__Hart__Front_End_GC__General_Provisions_Rev_6.26.23JF_(Rev_6.21.24_Added_Blue_Beam_Illustration_Method_&_Insurance).pdf PDF
CM-MP_Construction_Services_Agreement_2019_informal_and_formal_bids_CUPCCAA.pdf PDF
4-Unconditional_Waiver_and_Release_(Upon_Progress_Payment).pdf PDF
5-Conditional_Waiver_and_Release_(Upon_Final_Payment).pdf PDF
(1)_Asbestos-Free_Materials.pdf PDF
Agree__Hart__Front_End_GC__General_Provisions_OCIP_Rev_6.26.23JF_(Rev_6.21.24_Added_Blue_Beam_Illustration_Method).pdf PDF
CM-MP_Construction_Services_Agreement_2019_informal_and_formal_bids_CUPCCAA.pdf PDF
(7)_Lead_Containing_176349_(1).pdf PDF
3-Conditional_Waiver_and_Release_(upon_Progress_Payment).pdf PDF
4-Unconditional_Waiver_and_Release_(Upon_Progress_Payment).pdf PDF
6-Unconditional_Waiver_and_Release_(Upon_Final_Payment).pdf PDF
Agree__Hart__Front_End_CM-MP__General_Provisions_OCIP_Rev_6.26.23JF_(Rev_6.21.24_Added_Blue_Beam_Illustration_Method).pdf PDF
Agree__Hart__Front_End_GC__General_Provisions_OCIP_Rev_6.26.23JF_(Rev_6.21.24_Added_Blue_Beam_Illustration_Method).pdf PDF
Blank_IRS_W-9_(2024).pdf PDF
GC_Construction_Services_Agreement_2019.pdf PDF
3-Conditional_Waiver_and_Release_(upon_Progress_Payment).pdf PDF
5-Conditional_Waiver_and_Release_(Upon_Final_Payment).pdf PDF
6-Unconditional_Waiver_and_Release_(Upon_Final_Payment).pdf PDF
GC_Construction_Services_Agreement_2019.pdf PDF
(1)_Asbestos-Free_Materials.pdf PDF
GC_Construction_Services_Agreement_2019.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project __________________________ Required Contract Forms William S. Hart Union High School District Bid Package ____________________

CERTIFICATION OF ASBESTOS-FREE MATERIAL

PROJECT: ___________________________________________________________________

Bid Package: ___________________________

WE HEREBY CERTIFY THAT NO ASBESTOS OR ASBESTOS-CONTAINING PRODUCTS SHALL

BE INCORPORATED OR USED IN THIS CONSTRUCTION OR IN ANY TOOLS, DEVICES, CLOTHING

OR EQUIPMENT USED TO EFFECT THIS CONSTRUCTION.

Asbestos and/or asbestos-containing products as defined as all items containing but not limited to chrysotile, crocidolite, amosite, anthopyhllite, tremolite and actinolite.

Any or all material containing greater than one-tenth of one percent (<.1%) asbestos shall be defined as asbestos-containing material.

Any disputes involving the question of whether or not material installed with asbestos-containing equipment is settled by electron microscopy; the cost of any such tests shall be paid by the

Prime Contractor.

All work or materials installed by the Prime Contractor which is found to contain asbestos, or work or material installed with asbestos-containing equipment, will be immediately rejected and this work shall be removed and replaced by the Prime Contractor at no additional cost to the Owner.

Decontamination and removal of work found to contain asbestos or work installed with asbestos-containing equipment shall be done only under supervision of a qualified consultant, knowledgeable in the field of asbestos abatement and accredited by the Environmental Protection Agency (EPA).

The ASBESTOS REMOVAL CONTRACTOR shall be an EPA accredited contractor qualified in the removal of asbestos and shall be approved by the Asbestos Consultant who shall have sole discretion and final determination in this matter.

The asbestos consultant shall be chosen and approved by the Architect who shall have sole discretion and final determination in this matter.

The work will not be accepted until asbestos contamination is reduced to levels deemed acceptable by the Asbestos Consultant.

Company Name of Contractor (exactly as it appears on Contractor’s License)

Print or Type Name of Authorized Signer

Signature of Prime Contractor Dated

PROJECT:
Company Name of Contractor exactly as it appears on Contractors License:
Print or Type Name of Authorized Signer:
Text1:
Bid Package:

File details come from the government source that posted it. Updated .