1-ART130900 Locals Only Miller Art Center-RFQ-RFP-FINAL.pdf
PDF 3 MB Posted
- Attached to
- ART130900 Larry H. & Gail Miller Arts Center Public Art Project Utah Residents Only - RFQ-RFP
- Solicitation number
- SLCoART130900-RFP
- Issued by
- Salt Lake County, Salt Lake City, Utah
About this file
This is a Request for Qualifications and Request for Proposal (RFQ-RFP) issued by Salt Lake County Arts & Culture for a public art commission at the Larry H. & Gail Miller Arts Center in South Jordan, Utah. The County is soliciting proposals from Utah resident artists or artist-led teams to create a cohesive interior or exterior public artwork that will connect and respond to the Visual Arts Gallery, Classroom Area, and Studio Theater within the new facility. The artwork must address aesthetic compatibility, safety and durability, quality and craftsmanship, and scale appropriateness, while ideally incorporating storytelling through movement, inspiration for creative making, unity of visual and performance art, and celebration of the artistic process. The selection process occurs in two phases: Phase One requires submission of a letter of interest, artist resume, and up to 10 digital images of relevant past work by June 12, 2026, at 1:00 PM; up to three semi-finalists will be selected and invited to a mandatory virtual meeting on July 9, 2026, followed by full proposal submission by August 14, 2026, at 1:00 PM; semi-finalists will present proposals in person on August 28, 2026, in Salt Lake City. An award notice is anticipated by September 2, 2026, with a notice to proceed in mid-September 2026, and artwork installation completion targeted for early 2028. A pre-proposal optional meeting is scheduled for May 26, 2026, at 4:00 PM, and questions must be submitted by June 3, 2026, at 1:00 PM.
Up to $145,000 has been designated for the commissioned artwork, and this all-inclusive budget must cover artist fees, materials, insurance, engineering plans, labor, fabrication, permits, travel, and all costs associated with installation. The opportunity is restricted to Utah residents, defined as individuals maintaining their primary residence in Utah at the time of application and throughout the project duration; the lead artist on team submissions must meet this residency requirement. Semi-finalists will receive a $1,500 honorarium to prepare and present their proposals, which is inclusive of all expenses including travel and hotel costs. Phase One review criteria weight quality of past work at 40 percent, ability to create artwork appropriate for the Miller Arts Center at 30 percent, and comparable project experience at 30 percent; Phase Two criteria weight quality of the proposal design at 40 percent, alignment with project goals at 30 percent, budget realism at 20 percent, and availability to meet timeline at 10 percent. Selected artists must enter into a formal written agreement with Salt Lake County and will be required to provide insurance, stamped engineering reports, fabrication documentation, maintenance instructions, and attend project meetings and opening ceremonies. A valid U.S. Tax Identification Number is required for participation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-RFP 1.12 A-E Combined Attachments (For Art Projects).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL
Phase 1 – Qualifications
Phase 2 – Project Development
SALT LAKE COUNTY
Larry H. & Gail Miller Arts Center Public Art Project
Utah Residents Only
South Jordan, Utah
RFQ-RFP ART130900
BWhitehead Highlight
BWhitehead Highlight
BWhitehead Highlight
BWhitehead Highlight
BWhitehead Highlight
TABLE OF CONTENTS
I. INTRODUCTION
II. PURPOSE
III. BACKGROUND
IV. SCOPE OF WORK
V. SELECTION PROCESS
VI. TASKS TO BE COMPLETED
VII. COSTS/FEES
VIII. SUBMISSION REQUIREMENTS
IX. SUBMISSION OF APPLICATIONS
X. TENTATIVE SCHEDULE FOR THE RFQ PROCESS
XI. REVIEW CRITERIA
XII. WRITTEN AGREEMENT REQUIRED
XIII. NOTICE TO APPLICANTS
XIV. CHECK LIST
EXHIBIT A - APPLICATION FORM
EXHIBIT B - SITE DRAWINGS AND RENDERINGS
ATTACHMENT A - Cover Summary
ATTACHMENT B - Request for Protected Status
ATTACHMENT C - Procurement Preference System .……………………………………………………
ATTACHMENT D - Environmental Procurement …………………………………………………………
ATTACHMENT E - Sample Artist Agreement ………………………………………………………………
SALT LAKE COUNTY
ART130900
REQUEST FOR QUALIFICATIONS/REQUEST FOR PROPOSAL
I.INTRODUCTION
Salt Lake County is requesting Qualifications from artists who are Utah residents who wish to participate in an open competition for an interior or exterior public art project at the Larry H. & Gail Miller Arts Center (Miller Arts Center) in South Jordan, Utah. Up to $145,000 has been designated for the acquisition of artwork through this process.
This opportunity is open only to artists who are residents of Utah.
For the purposes of this RFQ, a “Utah resident” is defined as an individual who maintains their primary residence in the State of Utah at the time of application and for the duration of the project, if selected. A primary residence is the place where the artist lives on a permanent basis and to which they intend to return. Proof of residency may be required and may include, but is not limited to, a valid Utah driver’s license or state-issued identification, voter registration, lease agreement, property ownership records, or recent utility bills in the artist’s name. Individuals residing in Utah on a temporary basis, including for educational or short-term purposes, without establishing permanent residency are not considered Utah residents under this definition.
Artist-led team applications are welcome. Each team must be led by an individual with a demonstrated history of professional activity as an artist. The lead artist must meet the Utah residency requirements outlined above and must submit the application on behalf of the team, clearly identifying themselves as the team lead. Team members other than the lead artist are not required to be Utah residents. Teams may not substitute members after submission without prior written consent from the Project Selection Committee. An artist may only submit one application, either as an individual artist or as part of a single team.
Following an initial review, up to three semi-finalists will be selected and invited to submit a full proposal for the project. Semi-finalists will be asked to make individual presentations to the Selection Committee, reviewing their project proposal, showcasing past work, and detailing their approach to the project.
To participate, applicants must have a valid U.S. Tax Identification Number (SSN, EIN, ITIN, or other).
II.PURPOSE
The County plans to contract with an artist or artist team to create a unique interior or exterior artwork that will be installed on-site at the new Miller Arts Center. The art piece will be located and focused on the area of the venue that bridges the Visual Art Gallery, Studio Theater, and Classroom spaces. See Exhibit B for more details on the location.
GOALS
It is the intent of Salt Lake County to enter into a contract with an artist or artist team for this public art piece to ensure that project requirements are met, the best value is achieved, the project budget is maintained, the timeline is upheld, and a unified approach is carried out by all members of the project team.
Project Must Address:
• Aesthetic Compatibility: The artwork must complement the building’s architectural design, enhance the overall visual appeal of the site, and integrate into the venue’s environment.
• Safety and Durability: The artwork must adhere to all mandatory safety standards and be built to withstand internal or external environmental conditions. It should be designed for long-term durability and structural stability and require minimal maintenance.
• Quality and Craftsmanship: The artwork should reflect the highest artistic standards, showcase excellence in design and craftsmanship, while pushing creative boundaries.
• Scale Appropriateness: The artwork should be thoughtfully scaled to fit the site, maintaining a harmonious balance with the venue’s size and architectural features, ensuring a well-integrated visual presence.
Project is Encouraged to Address:
• Storytelling Through Movement: Through its sense of movement and progression, the artwork should tell a story and visually guide visitors through the designated location. It should create a narrative experience that unfolds as people move through the space, a form of storytelling unique to the medium of public art.
• A Spark for Creative Making: The artwork should inspire visitors of all ages and should be a catalyst for imagination and creative confidence, celebrating curiosity, experimentation, and the joy of making.
• Uniting Visual and Performance Art: Miller Arts Center is the first county-owned venue to include a visual art gallery and classrooms, formally uniting visual and performing arts in one venue. The art piece should acknowledge and celebrate the coming together of these two art forms. It should reflect the shared energy, expression, and collaboration between disciplines.
• Celebrating the Artistic Process: The artwork should honor the creative process itself — the rehearsal, revision, risk-taking, and discovery that happens behind the scenes. It should embody the spirit of artistic growth and transformation that defines the purpose of this arts center.
Please Note: Multiple public art projects are planned for this venue. One exterior and one interior artwork have already been selected through the Salt Lake County procurement process. This local-only proposal opportunity is a separate project and will be reviewed by a Selection Committee specifically created for this project. They will review all submissions and select an artist or artist team for this project.
III.BACKGROUND
The Larry H. & Gail Miller Arts Center is the newest Salt Lake County Arts & Culture venue and will serve as a regional cultural center for visual and performing arts in the heart of Downtown Daybreak in South Jordan. The Miller Arts Center broke ground in March 2026, and the grand opening is anticipated for mid-2028.
Plans for the approximately 89,000-square-foot facility include an 800-seat proscenium theater, flexible performance and rehearsal spaces, and in a first for a Salt Lake County venue, Miller Arts Center includes a visual art gallery and arts classrooms. The center is expected to become an arts destination, presenting artists from the community, the region, and across the country and will host performances, exhibitions, educational programming, and community events designed to serve audiences of all ages.
The Miller Arts Center, designed by Method Studio, is a dynamic, sculptural building that embodies the energy and expression of the arts. The architectural form features folded planes and creases, creating an interplay of light and shadow that will transform the building into a glowing lantern at night. This design symbolizes the theatrical curtain, representing the threshold between reality and imagination, while embodying the magic of performance and the arts.
Salt Lake County’s Art in Public Places program will incorporate four site-specific artworks, such as murals and sculptures, to further enhance the center. Art in Public Places supports local artists and strengthens our community identity by integrating art into county spaces across the valley. The program’s collections feature a wide range of media, including paintings, photography, mixed media, and sculptures.
As part of Salt Lake County’s commitment to sustainability, the facility will be built to meet USGBC LEED Gold certification standards, which will be confirmed upon completion of construction.
The Miller Arts Center is made possible through both Salt Lake County funding and a transformative $25 million investment from the Larry H. & Gail Miller Family Foundation.
The investment reflects the Miller Family’s deep commitment to enriching the community through the arts and demonstrates Salt Lake County’s dedication to expanding access to cultural experiences across the valley.
This regional cultural center addresses the long-documented demand for live performing arts and visual arts spaces in the southwest region as identified in Arts & Culture’s 2008 and 2020 Cultural Master Plans.
Salt Lake County Arts & Culture is dedicated to supporting the county’s vibrant arts community through a variety of programs, including the Zoo, Arts & Parks (ZAP) grant program. Through its spaces, places, services, and programs, the division fosters community engagement and provides opportunities for shared cultural experiences.
For a visual representation, please refer to the site map below, which includes the development activation surrounding the Miller Arts Center.
Rendering of the Daybreak Development Site Map, subject to change
IV.SCOPE OF WORK
The Design Team – including the architects, theater planners, and representatives from Salt Lake County Arts & Culture, County Facilities, and Art in Public Places have determined that this commission should be one cohesive public artwork.
The artwork will be located within the interior and/or exterior public areas of the facility, specifically connecting and responding to:
o The Visual Arts Gallery – the primary exhibition space for rotating visual art exhibitions.
o The Classroom Area – the dedicated arts education space primarily serving youth and community classes.
o The Studio Theater – the performance space designed for rehearsals, small productions, and community performances.
While the artwork may extend across multiple sites within these designated areas, the intent is to commission one unified and conceptually cohesive work rather than multiple independent pieces.
Final placement location(s) within the designated areas will be determined in collaboration with the selected artist after the contract is executed. Salt Lake County will enter into a single agreement with one Utah-based artist or one artist-led team. If applying as a team, the lead artist must be a current Utah resident. This opportunity is open only to artists who reside in Utah.
The estimated installation and completion date for this project is Summer 2028.
V.SELECTION PROCESS
The Selection Committee, composed of community members, representatives from Salt Lake County Arts & Culture, architects, and arts professionals, will review all submissions and make the final recommendation to the Salt Lake County Mayor.
The process is structured in two phases, designed to ensure a thorough and fair evaluation of each artist's qualifications and creative vision.
Phase One: Initial Qualification Submission
Utah based artists are invited to submit a Letter of Interest and Qualifications, which should include:
• A brief written statement describing their approach to the project.
• Up to 10 images of relevant past work that demonstrate experience with similar projects.
• A detailed biography, including relevant artistic and professional experience.
If submitting as a team, each artist should prepare an individual application, which must be submitted as a complete package. The Selection Committee will review the materials and select up to three semi-finalists to move forward in the process.
Phase Two: Full Proposal Submission
Semi-finalists will be required to participate in at least two meetings before submitting their full proposals. Semi-finalists must attend a mandatory virtual meeting on July 9, 2026, from 3:00 – 5:00 PM via WebEx. This will be an opportunity for artists to meet the architects, project managers, and other key stakeholders and ask detailed questions about the project. This meeting will provide critical information and clarify any project details, ensuring that artists have a full understanding of the site and the project’s vision.
Following this meeting, Semi-finalists will be invited to submit their site-specific full proposal for the project. This proposal must be submitted via email on or before 1:00 PM on August 14, 2026, to Bibi Whitehead (bwhitehead@saltlakecounty.gov). Late proposals will not be accepted.
The full proposal must include:
• A detailed project concept and vision.
• A proposed budget for the project.
• A timeline outlining the completion of the artwork.
mailto:bwhitehead@saltlakecounty.gov
Each semi-finalist will then be required to present their proposal in person to the Selection Committee on Friday, August 28, 2026, in Salt Lake City. Each semi-finalist will have up to one hour to present their proposal.
Semi-finalists will receive a $1,500 honorarium to prepare and present their proposals. This honorarium is inclusive of any expenses incurred for the creation of their proposal, including travel expenses, hotel, shipping, etc.
VI. TASKS TO BE COMPLETED
Once selected, the finalist will enter into a formal contract for the public art project and will be expected to collaborate with the design team and fulfill the following responsibilities:
• Final Timeline Submission: Submit a finalized timeline detailing key milestones for fabrication, transportation, and installation of the art piece.
• Provide Insurance: Meet the insurance requirements outlined in Attachment E (sample agreement).
• Prepare Artwork: Fabricate the artwork according to the approved design and timeline.
• Document Fabrication and Installation: Document the entire fabrication and installation process, providing updates to the Art in Public Places Manager and project team.
• Provide Stamped Engineering Reports: Supply necessary engineering reports ensuring structural integrity and safety of the artwork, with Utah-certified engineering stamps.
• Attend Ongoing Project Meetings: Participate in regular project meetings, either virtually or in person, providing status updates and addressing any design, fabrication, or installation issues.
• Artwork Transportation: Coordinate and oversee transportation of the completed artwork to the site.
• Install Artwork: Supervise the artwork's installation, ensuring proper placement and alignment with the project’s vision.
• Provide Maintenance Instructions: Deliver comprehensive maintenance guidelines, including materials and methods used in the artwork’s creation.
• Attend Opening or Ceremonial Events: Attend venue Grand Opening and at any opening, unveiling, or exhibition ceremonies related to the artwork.
• Press and Social Media Engagement: Participate in media interviews in consultation with the Arts & Culture Communications Manager. Engage in social media activities, such as creating videos or participating in promotional content.
• Additional Tasks: Be prepared to complete any additional tasks as requested by the project team to ensure the successful execution of the public art project.
VII.COSTS/FEES
Up to $145,000 has been dedicated to the artist(s) for this commissioned public art project. The all-inclusive budget is intended to cover all the costs associated with the project, including but not limited to, artist fee(s), artwork materials, insurance, stamped engineering plans, tax requirements, research, community engagement, contract, labor, fabrication, platforms, insurance (including Utah Workers Compensation), lighting, permits, travel and accommodation, and all related costs required for the installation of the artwork(s). Please note that due to recent changes in federal import/export policies, production material prices could change during the scope of this project.
Upon selection of artist(s), a contract between the artist(s) and Salt Lake County will be required.
Salt Lake County reserves the right to select none of the applications submitted.
VIII.SUBMISSION REQUIREMENTS
Submit your proposals to the Utah Public Procurement Place (U3P) or emailed to Bibi Whitehead (bwhitehead@saltlakecounty.gov) by the time and date indicated in section IX - Submission of Applications.
First Phase APPLICATION – Exhibit A
1. Two-Page Letter of Interest. This letter should explain why you are interested in the project, how your work is appropriate for the project, your relevant experience, and your approach to the site. If submitting as a team, the letter should include a description of how the team works together and clearly explains any collaborative work experiences.
2. Two-Page Artist Resume. For team applications please include resumes for all team members (not to exceed 2 pages per resume).
3. Digital Images of Relevant Past Work. Please submit up to 10 digital images of your past work that best illustrate your qualifications. Each image must be saved in JPEG format and cannot be larger than 1MB. A slide identification sheet must accompany documentation or use the application form provided (see Exhibit A). If the digital image files are too large to email, please include a Dropbox link (or similar file sharing program) with the images. Images must be in the order listed on the slide identification sheet in Exhibit A.
https://utah.bonfirehub.com/portal/?tab=openOpportunities
Second Phase
Semi-Finalists will be invited to submit up to three design concepts during this phase.
Each concept must include the following materials to support a comprehensive review by the Selection Committee:
1. Written Proposal Narrative Provide a detailed written description of each proposed concept. The narrative should include:
o A brief statement outlining the key themes and inspiration behind your design.
o An explanation of how your concept integrates with the site and complements the surrounding environment.
o A clear plan for adhering to the project’s timeline and any specific considerations regarding fabrication, installation, and project milestones.
The narrative must be submitted in a format of 8 ½” x 11”, with a minimum of 500 words. Please ensure your proposal is thorough and well-articulated, offering the Selection Committee a clear understanding of the concept and its relevance to the project.
2. Budget and Timeline o Detailed Budget: A comprehensive budget that outlines all projected costs related to the design, fabrication, transportation, installation, and any other expenses related to the execution of the public art project.
o Project Timeline: A clear and detailed timeline for the completion of the artwork, including milestones for each phase of the project (fabrication, transportation, installation, etc.), ensuring alignment with the overall project schedule.
3. Visual Illustration Provide a visual representation of the proposed design. The illustration should clearly demonstrate how the artwork will look in its intended location and how it interacts with the space. This visual representation should allow the Selection Committee to easily grasp the scale, materials, and integration of the proposed artwork within the site.
Once submitted, the finalists will be required to present their concepts in person in Salt Lake City. Please ensure all materials are submitted in a clear and organized manner.
Failure to meet submission requirements may result in disqualification from further consideration. This is a critical stage in the selection process, and we encourage finalists to present their most thoughtful, innovative, and well-prepared proposals.
IX.SUBMISSION OF APPLICATIONS
Phase 1 Proposals must be submitted to U3P or emailed to and received by Bibi Whitehead (bwhitehead@saltlakecounty.gov) before 1:00 PM on June 12th, 2026.
No proposals will be accepted after the closing date and time.
Submit your proposals in Contracts and Procurement online solicitation system, the Utah Public Procurement Place (U3P) powered by Bonfire, or email to Bibi Whitehead (bwhitehead@saltlakecounty.gov) by the time and date indicated above. No proposals will be accepted after the closing date and time.
X.TENTATIVE SCHEDULE FOR THE RFQ PROCESs
Activity Posting Date
Date May 4, 2026
Pre-proposal Optional Meeting (via WebEx) Tuesday, May 26, 2026, at 4 pm
MT
Questions Due Date June 3, 2026, by 1:00 PM MT Phase I - Qualifications Proposal Due: June 12, 2026 Committee Meeting to Review Qualifications June 26, 2026, 1 – 3:30 PM Notification of Preliminary Review Decisions June 30, 2026 Finalist Mandatory Meeting (via WebEx) July 9, 2026, 3 – 5:00 PM Phase 2 – Proposals Due August 14, 2026, at 1:00 PM Finalists’ Interview with Selection Committee: Friday, August 28, 2026 Award Notice September 2, 2026 Anticipated Notice to Proceed Mid-September 2026 Anticipated Install Completion Early 2028
Salt Lake County reserves the right to modify this schedule at its discretion.
XI.REVIEW CRITERIA
Phase 1 - Review criteria are considered around the following:
% CRITERIA
40 QUALITY: Quality and strength of past work as demonstrated in the submitted application materials
30 GOALS: Ability to create artwork appropriate in concepts for the Miller Arts Center
30 EXPERIENCE: Experience with projects of a comparable scope
100% TOTAL
Phase 2 – Review criteria is considered around the following:
% CRITERIA
40 QUALITY: Quality and strength of designed proposal(s) 30 GOALS: Designed proposal(s) meets project goals outlined in the Purpose Section 20 Budget: The budget should reflect a realistic and comprehensive cost for the completed project, covering all phases from design to installation. It should ensure that the artist is fairly compensated for their work, including a reasonable profit margin, while remaining within the project's overall financial scope
10 TIME COMMITMENT: Availability to complete design work on time
100% TOTAL
XII.WRITTEN AGREEMENT REQUIRED
The selected Artist must be willing to enter into a written agreement with Salt Lake County (Attachment E). A binding agreement between the County and any offeror will be dependent upon the negotiation, preparation, and execution of a formal contract.
Proposers are advised that the County is not bound by the terms of the RFQ until a written agreement is fully executed and any activity taken on by the Proposer prior to full execution of a written agreement is done at the Proposer’s sole risk.
XIII.NOTICE TO APPLICANTS
By submitting a proposal to this RFQ, Proposer understands and agrees to the following:
A. Government Records Access and Management Act (GRAMA):
County is a governmental entity subject to the Utah Government Records Access and Management Act (“GRAMA”), Utah Code Ann. §§ 63G-2-101 to -901. As a result, County is required to disclose certain information and materials to the public, upon request. Generally, any document submitted to County is considered a “public record” under GRAMA. Any person who provides to County a record that the person believes merits protection under subsection 63G-2- 305(1) or (2) must submit with their proposal all of the following: (1) a written claim of business confidentiality, (2) a concise statement of reasons supporting the claim of business confidentiality, and (3) a separate copy of the proposal with the information requested to be protected redacted. Failure to comply with any of the three requirements for a claim of business confidentiality waives the request for protected record. Generally, GRAMA only protects against the disclosure of trade secrets or commercial information that could reasonably be expected to result in unfair competitive injury. For your convenience, County has provided a Business Confidentiality Request Form which is attached to this RFQ as Attachment C. All documents submitted in response to this RFQ will be treated as public records in accordance with GRAMA unless a claim of business confidentiality has been properly made and approved by County.
All proposed costs/pricing/fees submitted to the county are public records.
An entire proposal cannot be identified as “PROTECTED,” “CONFIDENTIAL,” or “PROPRIETARY” and may be considered non-responsive if marked as such.
B. Copyrighted Material Waiver: In the event that the proposal contains copyrighted or trademarked materials, by submitting its proposal the Proposer grants the County the right to use, reproduce, and publish the copyrighted or trademark materials in any manner the County deems necessary for conducting County business and for allowing public access to the responses under GRAMA or otherwise, including but not limited to photocopying, County Intranet/Internet postings, broadcast faxing, and direct mailing.
If the proposal contains materials whose copyright or trademark is held by a third party, it is the Proposer’s sole responsibility to obtain permission from that third party for the County to reproduce and publish the information.
By submitting its proposal, the Proposer certifies that it owns or it has obtained all necessary approvals for the reproduction or distribution of the contents of the proposal and agrees to indemnify, protect, save and hold the County, its representatives and employees harmless from any and all claims arising from all intellectual property claims related or connected to the proposal and agrees to pay all legal fees incurred by the County in the defense of any such action.
C. Restrictions On Communications: From the issue date of this solicitation until a Proposer is selected and the selection is announced, Proposers are prohibited from communications regarding this procurement with agency staff, evaluation committee members, or other associated individuals EXCEPT the Buyer overseeing this procurement. Failure to comply with this requirement may result in disqualification.
D. RFQ Cancellation: This RFQ may be cancelled at any time prior to the execution of a written agreement if deemed in the best interests of County. This includes cancellation of the RFQ after an award has been made, but prior to the execution of a written contract. Proposer is not entitled to recover any costs related to the preparation of the proposal due to cancellation of the RFQ or withdrawal of an award prior to the execution of a written agreement.
E. Firm Pricing: All prices, quotes, or proposals are to remain firm for 120 days after the closing date, unless a different period is stated in County’s RFQ. Any proposal that does not offer to remain firm for the required period may be considered to be non-responsive.
F. Costs: Proposers bear all costs and expenses related to this RFQ including, but not limited to, preparation and delivery of the proposal, attending the pre-proposal conference, and attending the interview.
G. Licensing: All applicable federal, state, and local licenses must be acquired before the contract is entered into between County and the selected Proposer.
Licenses must be maintained throughout the entire contract period. Persons doing business as an Individual, Association, Partnership, Corporation, or otherwise must be registered with the Utah State Division of Corporations and Commercial Code. NOTE: Forms and information on registration may be obtained by calling (801) 530-4849 or toll free at 877-526-3994, or by accessing:
www.commerce.utah.gov.
H. Changes or Modifications: Any changes or modification to the RFQ will be made by written addendum. Proposer submitting a proposal based on any information other than that contained in County’s RFQ and any addenda, do so at their own risk.
I. Receiving Proposals: Contracts and Procurement will administer receipt and opening of all proposals. Proposals will be held, unopened, by Contracts and Procurement in the same condition as received if delivered prior to the date and closing time designated in the RFQ. After closing time, only the identity of each Proposer will be made public. If only one proposal is received in response to County request, Contracts and Procurement, in coordination with the agency requesting the project, may recommend entering into a contract to the single Proposer if the conditions cited above are met. Alternatively, Contracts and Procurement may re-solicit for the purpose of obtaining additional proposals.
J. Modifying or Withdrawing Proposals: Proposer may modify or withdraw their proposals at any time prior to the closing time. Requests to modify a proposal before closing time must be made in writing to the County.
K. Rejection of Proposals: Any proposal containing significant deviations from the specifications of the RFQ will be considered non-responsive and may be rejected in whole or in part.
L. Protests: Pursuant to Salt Lake County Code of Ordinances § 3.20.150, a protest in regard to the RFQ document must be submitted in writing prior to the RFQ closing date. All other protests must be submitted in writing within five (5) business days after notification of the award is posted on U3P. A protestor may file only one (1) protest after the RFQ closing date. Protest letters must specifically and completely state the facts that the protestor believes constitute errors in the RFQ document or the award.
M. Free and Competitive Selection: Any agreement or collusion among prospective
Proposers to fix a price or limit competition will render the proposal void, and such conduct is unlawful and subject to criminal sanction. By submitting a proposal, the Proposer hereby certifies that no one in its firm or company has either directly or indirectly restrained free and competitive selection, participated in any collusion, or otherwise taken any action unauthorized by County http://www.commerce.utah.gov/
Purchasing Ordinances or applicable law.
N. Ethical Standards: Proposer represents that it has not: (a) provided an illegal gift to any County officer or employee, or former County officer or employee, or to any relative or business entity of a County officer or employee, or relative or business entity of a former County officer or employee; (b) retained any person to solicit or secure this contract upon an agreement or understanding for a commission, percentage, brokerage or contingent fee, other than bona fide employees of bona fide commercial agencies established for the purpose of securing business; (c) breached any of the ethical standards set forth in State statute or Salt Lake County Code of Ordinances § 2.07; or (d) knowingly influenced, and hereby promises that it will not knowingly influence, any County officer or employee or former County officer or employee to breach any of the ethical standards set forth in State statute or Salt Lake County ordinances.
O. Campaign Contributions: The Salt Lake County campaign finance disclosure ordinance limits campaign contributions by Proposers to County candidates. Salt Lake County Code of Ordinances § 2.72A. Proposer acknowledges and understands those limitations on campaign contributions mean that any person, business, corporation or other entity that enters into a contract or is engaged in a contract with County is prohibited from making campaign contributions in excess of $100 to County candidates during the term of the contract and during a single election cycle as defined in the ordinance. Proposer further acknowledges that violation of those provisions governing campaign contributions may result in criminal sanctions as well as termination of this Agreement.
P. Reasonable Accommodations: Reasonable accommodations for qualified individuals to attend meetings may be provided upon receipt of a request with two (2) working days’ notice. Please contact Contracts and Procurement at
385.468.0306. TTY users may call 711.
Q. Environmentally Responsible Procurement Practices: County has implemented environmentally responsible procurement practices. Please refer to Attachment D.
R. Notice to Retirees of Utah Retirement Systems (“URS”)
County is a URS “participating employer.” Entering into an agreement with County may affect a URS retiree’s retirement benefits including, but not limited to, cancellation of the retiree’s “retirement allowance” due to “reemployment” with a “participating employer” pursuant to Utah Code Ann. § 49-11-504 to -505. In addition, Proposer is required to notify County immediately if a retiree of URS is the Proposer; or an owner, operator, or principal of the Proposer. Proposer may refer the URS retiree to the URS Retirement Department at 801-366-7770 or 800-695-4877 for all questions about post-retirement employment regulations.
S. Employee Status Verification System Proposer shall register and participate in the Status Verification System before entering into a contract with County as required by Utah Code Ann. § 63G-12-
302. The Status Verification System is an electronic system operated by the federal government, through which an authorized official of a state agency or a political subdivision of the state may inquire by exercise of authority delegated pursuant to 8 U.S.C. § 1373 to verify the citizenship or immigration status of an individual within the jurisdiction of the agency or political subdivision. Proposer is individually responsible for verifying the employment status of only new employees who work under Proposer’s supervision or direction and not those who work for another Proposer or subcontractor, except each Proposer or subcontractor who works under or for another Proposer shall certify to the main Proposer by affidavit that the Proposer or subcontractor has verified, through the Status Verification System, the employment status of each new employee of the respective Proposer or subcontractor. The Proposer shall comply in all respects with the provisions of Utah Code Ann. § 63G-12-302. Proposer’s failure to comply with this requirement may result in the immediate termination of its contract with County.
XIV.CHECK LIST
Application Form – Exhibit A
Application Letter – 2 page maximum
Digital images (correctly labeled) with identification sheet (or included on Application Form) (one set) Resume (2 pages maximum) per team member
Exhibit A Requests For Applications/ Miller Arts Center Public Art
Please complete this application form and attach to submission materials.
Name (for collaborative projects, please fill out one form for each artist involved)
Mailing Address
City State Zip Code
Daytime Phone Evening Phone E-mail address
I am willing to enter into an agreement with Salt Lake County per the attached terms and conditions: ____________________________________________________________
Signature
Please complete IMAGE LISTING below, corresponding to slides submitted:
No.# TITLE Date Completed Dimensions Medium Current Location
Exhibit B
Site Drawings and Renderings
Renderings of the Larry H. & Gail Miller Arts Center
Design renderings are subject to change. Images provided by Method Studio.
Layout of the Miller Arts Center.
The highlighted Red Area is the location for this public art project.
Main Lobby, entrance to the gallery and classroom area is on the left.
The lobby of the Studio Theater, in between the gallery and the classroom space
Outside view, gallery on the left, classroom space on the right, lobby for studio theater in the middle.
| REQUEST FOR PROPOSAL |
| SALT LAKE COUNTY |
| Larry H. & Gail Miller Arts Center Public Art Project |
| Utah Residents Only |
| I. INTRODUCTION |
| II. PURPOSE |
| Project Must Address: |
| III. BACKGROUND |
| IV. SCOPE OF WORK |
| V. SELECTION PROCESS |
| Phase One: Initial Qualification Submission |
| Phase Two: Full Proposal Submission |
| VI. TASKS TO BE COMPLETED |
| VII. COSTS/FEES |
| VIII. SUBMISSION REQUIREMENTS |
| Submit your proposals to the Utah Public Procurement Place (U3P) or emailed to Bibi Whitehead (bwhitehead@saltlakecounty.gov) by the time and date indicated in section IX - Submission of Applications. |
| First Phase |
| Second Phase |
| IX. SUBMISSION OF APPLICATIONS |
| X. TENTATIVE SCHEDULE FOR THE RFQ PROCESs |
| XI. REVIEW CRITERIA |
| CRITERIA |
| CRITERIA |
| XII. WRITTEN AGREEMENT REQUIRED |
| XIII. NOTICE TO APPLICANTS |
| XIV. CHECK LIST |
File details come from the government source that posted it. Updated .