About this file
This document is an amendment to Request for Proposal No. 210000000701 issued by the State of Michigan for Camp Grayling Substation Fire Services. The RFP solicits proposals for fire and emergency services to be provided for five months annually (May through September) over an initial three-year contract period. Services include Basic Life Support (BLS) with Automated External Defibrillator (AED) capability, coordination with Advanced Life Support (ALS) medical evacuation providers, and both Airport Rescue and Firefighting (ARFF) and structural firefighting personnel. The contractor must provide all equipment, uniforms, trained certified personnel, and turnout gear. Facilities available to the contractor include exclusive use of one bay and administrative areas within Building 39 at Camp Grayling's main cantonment, plus six double-occupancy rooms and one single-occupancy room in Building 216Q for personnel sleeping quarters. The average call volume is 32 calls annually (9 EMS and 23 fire and rescue calls) based on a two-year average during the May 1 through September 30 period.
Staffing requirements mandate a minimum of one EMT-qualified person on each initial fire and emergency response, with personnel meeting either IFSAC or ProBoard certification standards. Evaluation criteria utilize a point-based system determined by evaluation team consensus rather than a weighted deduction formula. No performance bond is required based on Schedule A, and no mutual aid or automatic aid agreements currently exist. A Service-Disabled Veteran-Owned Business (SDVOB) receives a 10% price preference after technical requirements are met, though this preference does not apply to Prime/Subcontractor relationships. No upfront funding is available for equipment or uniforms, and the contractor must obtain appropriate State of Michigan licensure prior to award. Workers Compensation Insurance may be established upon contract award if not currently in place.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3-ADDENDUM rfp deadline extended by two days.pdf | ||
| 2-Answers to Vendor Questions 210000000701.pdf | ||
| 210000000701 RFP Camp Grayling Substation Fire Services.docx | DOCX document | |
| Training Attachment 1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment to RFP 210000000701 Answers to Vendor Questions
Q. 1 Question date: 01/17/21
RE:
a. Do we understand correctly that you are requesting proposals for these Fire Services for five months only each year (May through September only, each year for an initial three year period)?
ANSWER:
Yes – please refer to the Schedule B pricing page and SCOPE section under Schedule A Statement of Work on the RFP.
Q. 2 Question date: 01/25/21
RE:
a. This question is related to pages 3 and 4 of the RFP – the evaluation process. Regarding the document marked as Camp Grayling Substation Fire Services Request for Proposal No. 210000000701 Page 4 Technical Evaluation Criteria; as to the point system, are these points in all sections “all or nothing,” or is there a weighted deduction formula criterion in reviewing each proposal?
ANSWER:
Points based on evaluation team consensus according to vendor responses.
b. If these points are weighed what is the criteria for assigning points?
ANSWER:
Number of points determined by evaluation team consensus.
Q. 3 Question date: 01/25/21
RE:
a. This question is related to Section C. sections 2 and 4A – the requirement of a licensed ambulance.
With regard to the primary transport being completed by the private ambulance service that provides Advanced Life Support care and transport to the camp as well as the surrounding community; is noncompliance with this section a firm requirement or is this section a weighted point item? To maintain the required staffing would require a minimum of an EMT and EMR or EMT. Section 2 of this same document only requires a single EMT.
ANSWER:
Provide BLS (Basic Life Support with AED) and coordinate with ALS (Advanced Life Support) medical evacuation providers. State law require vehicle to be licensed to MFR or BLS, non-transport, licensure level. Vehicle inspection by state inspector within 15 calendar days from date of application receipt by the Contractor.
Licensed vehicle or ambulance.
Each initial fire and emergency response shall have an EMT qualified person. Page 20, section 1.1, C3.
Q. 4 Question date: 01/25/21
RE:
a. Regarding the document marked as Camp Grayling Substation Fire Services Request for Proposal No.
210000000701 Pages 18 and 24, Section 3.2 letter F. With our commitment to ensuring coverage and with the current situation with COVID-19, our proposal is looking at doing 24 hour shifts as to limiting the contact between our personnel. We are inquiring as to the availability of sleeping quarters for our personnel.
ANSWER:
Yes, Building 216Q, six (6) double occupancy rooms and one (1) single occupancy room across from the fire station with one common restroom.
b. Is there any up-front funding for the purchase of equipment, uniforms, or other items to aid in facilitating this contract?
ANSWER:
No
Q. 5 Question date: 01/25/21
RE:
a. Document & Section: General Conditions, Page# 13. Do you have to have an active business license in the State of Michigan to submit a bid? Or can this be accomplished upon award?
ANSWER:
Question is not consistent with required information on Page 13. A contract cannot be awarded without meeting any required State of Michigan licensure requirements.
b. Document & Section: Michigan Economic Impact, Page# 16. If we currently do not have employees residing in Michigan, but plan to hire 95% of the employees in Michigan to work for this contract is that acceptable?
ANSWER:
Indicate the above in your response.
c. Document & Section: Workers Comp Insurance, Page# 37. If we currently do not have a Workers Comp Policy, can we submit our current proof of insurance and set up our workers comp policy in Michigan upon award?
ANSWER:
Yes
d. Document & Section: Performance Guarantee, Page# 36. Will this contract require a performance bond? Currently says, may require.
ANSWER:
“The State may require a performance bond (as specified in Schedule A – Statement of Work) if, in the opinion of the State, it will ensure performance of the Contract.” Schedule A does not state a performance bond is required.
e. Document & Section: Proposal Evaluation, Page# 4. What weighted percentage or value will be used in the evaluation based on utilization of a Service Disabled Veteran business? Does a subcontracted SDVB use count, in a Prime / Sub relationship?
ANSWER:
Service-Disabled Veteran-Owned Business (SDVOB). This is authorized through Public Act 431 – Michigan Compiled Law 261(8).
• Qualified SDVOBs must meet solicitation requirements
• A 10% price preference is applied after technical requirements are met
Proof of: Required Documentation
1. Veteran status DD 214, Certificate of Release or Discharge from Active Duty, a standard military discharge document. NOTE: Must be an honorable or general discharge.
2. Service-Connected Disability Documented in one of two ways: • On the DD 214 • If not on the DD 214, typically documented on a Veterans Affairs (VA) Rating Decision letter1 or equivalent document
3. 51% or more of the business ownership Appropriate legal documents setting forth the ownership of the business entity
SDVOB does not apply to a Prime / Sub relationship.
f. Document & Section: Schedule A Statement of Work, Page# 18-21. What was the previous service model used? How many stations, engines, personnel, volunteers etc.
ANSWER:
Previous service not applicable to this RFP.
g. Document & Section: Schedule A Statement of Work, Page# 18-21. Does the contractor provide turnouts, PPE, uniforms?
ANSWER:
Yes, Contractor shall provide all services, equipment and trained certified personnel. Page 19, section 1.1.
h. Document & Section: Schedule A Statement of Work, Page# 18-21. Are there facilities on site we can use? If so, how many stations?
ANSWER:
Yes, Camp Grayling, main cantonment, within building #39 for staging of personnel and equipment. The contractor will have exclusive use of a bay and administrative areas, and shared use of common areas, including showers and bathrooms. The building will or may be shared with military personnel.
i. Document & Section: Schedule A Statement of Work, Page# 18-21. What is the current schedule?
48/96, 24/72? Etc.
ANSWER:
Must meet staffing requirements as stated in Schedule A – Statement of Work, 3.1., and 4.1.A.
j. Document & Section: Schedule A Statement of Work, Page# 18-21. What mutual aid or automatic aid agreements are in place? What are the resources available from these agreements?
ANSWER:
No mutual aid agreements. Grayling Fire Department has jurisdiction within the township and may be requested through Crawford County Central Dispatch.
k. Document & Section: Schedule A Statement of Work, Page# 18-21. What is the Emergency communication process?
ANSWER:
Primary, Crawford County Central Dispatch. Page 21, section 1.3, B.
l. Document & Section: Schedule A Statement of Work, Page# 18-21. Who dispatches and how is 9-1-1 integrated?
ANSWER:
Primary, Crawford County Central Dispatch. Page 21, section 1.3, B.
m. Document & Section: Schedule A Statement of Work, Page# 18-21. How many calls are run in a year?
Can we have a breakdown of the types of calls?
ANSWER:
2 year average, May 01-Sept 30, 9 EMS and 23 Fire and Rescue related calls
n. Document & Section: Schedule A Statement of Work, Page# 18-21. Are equivalent (National, IFSAC or Pro Board) certificates, qualification, and training accepted?
ANSWER:
Yes, IFSAC and ProBoard IAW DoDI 6055.06.
o. Document & Section: Schedule A Statement of Work, Page# 18-21. What level of investigations is required or expected?
ANSWER:
Assist with the investigation, SOM Fire Inspector or AHJ will have primary responsibility.
p. Document & Section: Schedule A Statement of Work, Page# 18-21. Are the ARFF and Structure engine personnel cross staffed?
ANSWER:
Yes, Contractor will provide ARFF/Structural firefighting personnel.
q. Document & Section: Schedule A Statement of Work, Page# 18-21. Are the ARFF and Structure engine personnel cross staffed?
ANSWER:
Yes, Contractor will provide ARFF/Structural firefighting personnel.
r. Document & Section: N/A, Page# N/A. Does this contract augment a current staff? If so, how many additional personnel are available for response?
ANSWER:
No