This is a Request for Qualifications (RFQ) document issued by Salt Lake County for the selection of general contractors to provide construction services for the Midvale Campus Renovation project located at 799 W Coliseum Way, Midvale, Utah. The project involves the renovation of approximately 250,000 square feet within an existing three-level building to serve as the County's new main government center, consolidating various county functions including public services, departments, the Mayor's office, and County Council operations. The scope includes reconfiguration of office and workspace layouts, construction of a two-level central nucleus with public-facing services, establishment of a centralized public service center on the first level, significant modifications to electrical and data systems, limited structural modifications to post-tensioned concrete, construction of a new secured parking structure accommodating more than 40 vehicles, and improvements to existing parking areas. The RFQ is a two-stage bidding process wherein Stage I involves short-listing 2-5 general contractors based on evaluation criteria, with selected contractors advancing to Stage II for competitive bidding. The last day to submit questions is September 16, 2026, with proposals due by 1:00 PM on September 23, 2026. Evaluation of proposals is anticipated for October 1, 2026, with short-list selection announced October 2, 2026. Stage II bid documents are anticipated to be issued between mid-October and mid-November 2026, with a Notice to Proceed expected in January 2027. The project duration is anticipated to be 12 months from Notice to Proceed, followed by a one-year warranty period after final acceptance.
Proposals must not exceed 15 pages and are evaluated based on responsiveness to the RFQ (10%), experience and references (30%), construction project team qualifications (30%), and overall project approach and management plan (30%). General contractors must be licensed as B100 General Building Contractors in the State of Utah and demonstrate bonding capacity from a surety company. Contractors must have completed at least one project of similar scope and complexity exceeding $30 million within the past five to seven years, with experience in office buildings, complex tenant improvements, systems renovations, parking structures, and contaminated site work. Key personnel requirements include a Project Manager with at least ten years of experience on comparable projects and a Project Superintendent with similar qualifications. Contractors are required to provide comprehensive management plans addressing construction methodology, scheduling, site management and safety programs, coordination protocols, subcontractor management, quality control, and sustainability initiatives. Insurance requirements include General Liability ($5 million), Automobile Liability ($10 million), Workers' Compensation (statutory/$1 million employers liability), Contractors Professional Liability ($5 million), and Environmental/Pollution Liability ($10 million). The project involves complex considerations including an operational data center requiring separation and security, separately procured furniture coordination, environmental remediation compliance for a capped contaminated site, and work within an existing LEED-certified building. All proposals must remain firm for 60 days after opening, and selected contractors must be willing to enter into a written construction agreement incorporating County design and construction standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Salt Lake County
Request for Qualifications
Multi-Step Bidding Process for General Contractors
For
Construction Services
For
Midvale Campus Renovation
Stage I
RFQ# FAC133816
Date of Issue: September 2, 2026
TABLE OF CONTENTS
Title Section I Salt Lake County Proposal Requirements Introduction Register Utah Public Procurement Place (U3P) Scope of Work/Background Schedule Written Agreement Required Contract and Proposal Information
Section II Procurement Process Request for Qualifications (RFQ) Documents Site Visit Last Day to Submit Questions Distribution of Response to Questions Submittal Requirements / Due Date and Times
Proposal Format Proposal Evaluation Criteria Selection Committee Short-Listing Interviews Selection and Announcement Projected Schedule for the Stage II RFQ Process
Section III Proposal Requirements Title/Cover Page Contractual Entity Information
Experience/References Identification of the Construction Project Team
Overall Project Approach/Management Plan
Section IV General Requirements General Notices Insurance Requirements
Exhibit A – Graphic Package – Site plans, floor plans
ATTACHMENT A - Proposal Cover Summary ATTACHMENT B - Request for Protected Status ATTACHMENT C - Environmental Compliance Practices ATTACHMENT D - Instructions to Bidders, Construction Agreement, General Conditions ATTACHMENT E - 3.26 Apprenticeship Utilization Ordinance ATTACHMENT F - 3.27 Const Procurement Min Standards Ordinance
SECTION I
PROPOSAL REQUIREMENTS
A. INTRODUCTION
Salt Lake County (County) is soliciting proposals from qualified general contractors to provide construction services to Salt Lake County for the Midvale Campus Renovation (Project) located at 799 W Coliseum Way, Midvale, UT. This solicitation is the first stage of a Two-Stage Bidding process. Stage I will involve the short-listing of general contractors based on the selection criteria outlined in this Request for Qualifications (RFQ). 2-5 general contractors (Contractors) who are selected to advance pursuant to this RFQ shall be allowed to submit bids for Stage II of the selection process. The Stage II award will subsequently be made to the lowest responsible and responsive bidder.
B. REGISTER AT UTAH PUBLIC PROCUREMENT PLACE
Contractors are encouraged to register through the county’s online solicitation system the Utah Public Procurement Place (U3P) powered by Bonfire at https://purchasing.utah.gov/for-vendors/. If the proposal needs to be modified or clarified, the County will issue a written amendment on U3P.
C. SCOPE OF WORK/BACKGROUND
1. The Midvale Campus building has been acquired by Salt Lake County to serve as the County’s new main government center, replacing the existing government center located at 2100 South.
a. The facility will be renovated to accommodate a broad range of County government functions, including public services, departments and divisions, the Mayor, the County Council, and their supporting staff.
b. The renovated facility is intended to provide a centralized, accessible, and welcoming environment for the public, including a dedicated service center designed to improve access to County services. The project will also create a modern workplace environment that supports the County’s established hybrid work model and the evolving needs of its workforce.
c. Consolidating County functions within the Midvale Campus will promote greater collaboration and coordination among departments and divisions, strengthen connections between employees and leadership, and create a more cohesive environment for delivering services to the public. The renovation will transform the existing facility into a functional, flexible, and efficient government center that supports both current operations and the County’s future needs.
2. The Midvale Campus project involves the renovation of approximately 250,000 square feet within the existing three-level building, along with improvements to site parking and select supporting facilities. The project will transform the existing facility into a secure, flexible, and highly functional County government center while incorporating new public-facing services and shared amenities.
https://purchasing.utah.gov/for-vendors/
The primary project components include:
a. Main Government Center: The majority of the construction work will occur within the main building and will consist of reconfiguring existing spaces to support the new County workplace layout. The building will include offices, open workspaces, conference rooms, focus rooms, training rooms, support spaces, and other administrative functions. Workspaces will be secured and will require badge access or controlled access/escorts.
b. Central Nucleus: A two-level central structure within the building will serve as a focal point for the facility and will include an art gallery, marriage rooms, and flexible open space.
c. Public Service Center: The first level will include a centralized service center designed to provide the public with convenient access to a broad range of County services. The first level will also include a café serving staff and the public, Council Chambers, training rooms, and other public and support functions.
d. Building Systems: Significant modifications to electrical and data systems will be required to support the new workstation and office configurations.
Existing HVAC equipment will generally remain in place, with modifications to distribution and controls to support the revised floor plan. The project will require careful coordination of these systems within an existing building environment.
e. Structural Modifications: Structural work is expected to be limited primarily to the removal of existing staircases and infill of associated floor openings to create additional usable space. The existing floors consist of post-tensioned concrete construction. Any modifications to the structure will require careful planning, coordination, and protection of the existing post-tensioning system.
f. New Secured Parking Structure: A new secured parking structure will be constructed between the main building and the existing greenhouse. The structure will provide parking for more than 40 vehicles and will include an active roof area intended for use by County staff and the public.
g. Existing Parking Structures and Surface Parking: The existing parking structure on the east side of the property will remain in service, with limited improvements included in the project. Additional surface parking will be constructed closer to the main building as part of the project.
h. Auxiliary Building: An existing auxiliary building contains a workout facility, daycare, and health clinic. These uses will remain in place, with only limited improvements anticipated as part of the project.
i. Key Coordination and Project Considerations
i. Data Center: The existing first-floor data center is operational and leased to an outside vendor. The data center is not part of the project. No construction work will occur within the data center or on equipment associated with its operation. The Contractor will be required to maintain appropriate separation, security, access, and coordination around this active facility throughout construction.
ii. FF&E: The County will separately procure a significant furniture package that is not included in the construction contract. The Contractor will be responsible for coordination with the furniture procurement and installation as identified in the construction documents, including coordination of building systems and other work necessary to accommodate the furniture package.
iii. LEED The existing building is LEED certified; however, LEED certification or additional LEED requirements are not part of this project.
j. Environmental and Site Considerations:
i. The project site is located within a reclaimed area and contains an existing environmental cap over contaminated material. Any disturbance of the cap or underlying material will be subject to specific environmental requirements. The construction documents and applicable permits will identify required procedures for disturbance, handling, storage, transportation, disposal, and restoration of the cap and contaminated material.
ii. The majority of anticipated cap disturbance is associated with construction of the new parking structure. The Contractor will be responsible for complying with all applicable environmental requirements and coordinating construction activities to protect the integrity of the cap and maintain compliance with project permits and environmental requirements.
iii. The Contractor should recognize that the project involves substantial renovation within an existing facility, significant building-system modifications, active and secured areas, structural modifications to post-tensioned concrete, coordination with separately procured furniture, and site work involving environmental restrictions.
Successful execution will require careful planning, phasing, coordination, and protection of existing operations throughout construction.
3. Contractor will be responsible for and/or participate in managing the construction, sub-contractors, safety, quality control, site access, closeout, and warranty of the project. They are required to work with the County’s architect and their consultants, and various third-party consultants such as envelope commissioner, systems commissioner, Geotech engineer, environmental engineer, materials inspection, permitting authority, county’s project manager, owner’s representative, etc.
4. The Contractor will need to be familiar with the County Design & Construction Standards & Procedures. This document is found at the following link:
https://slco.org/globalassets/1-site-files/facilities/slcodesignconstrstdproc.pdf
D. SCHEDULE
It is anticipated that the bid documents will be distributed for Stage II bids mid- October to mid-November contingent upon Midvale City’s permitting process.
Notice to Proceed (NTP) for the project is expected in January 2027. The Project is anticipated to be 12 months from NTP. There will be a 1-year warranty period after Final Acceptance.
E. WRITTEN AGREEMENT REQUIRED
The selected Contractor must be willing to enter into a written agreement with Salt
Lake County at the conclusion of the Stage II portion of the bidding process and upon notification of the proposed selection. The following documents will be included as part of the contract between the successful Contractor and the County:
Construction Agreement, General Conditions, Bidding Schedule, Salt Lake County Design and Construction Standards, and all documents listed in opening paragraph of the Construction Agreement. Modification of, or refusal to accept, these documents will result in the final bid being rejected. Contractors who are unwilling to accept the terms and conditions presented in this RFQ without deviation should not submit a proposal. County reserves the right to alter the construction agreement or the general terms and conditions, or any other provisions of the Construction Agreement, before and during Stage II. Contractors are on notice that County reserves the right to modify the Construction Agreement and General Conditions in Stage II.
F. CONTRACT AND PROPOSAL INFORMATION
By submitting a proposal to this RFQ, Contractor understands and agrees to the following:
A. RFQ Cancellation: This RFQ may be cancelled at any time prior to the execution of a written agreement if deemed in the best interests of the County. This includes cancellation of the RFQ after an award has been made, but prior to the execution of a written contract. Contractor is not entitled to recover any costs related to the preparation of the proposal due to cancellation of the RFQ or withdrawal of an award prior to the execution of a written agreement.
B. Firm Proposal: All proposals are to remain firm for up to sixty (60) days from the date of opening of the proposals. If the County desires to extend the two-month period, upon County’s request, the Contractor must provide written verification that the proposal is still valid to the County to remain under consideration during Stage II. All prices and quotes (in the Stage II Proposals) are to remain firm for sixty (60) days after the opening date, unless a different period is stated in the County's Stage II request for bids.
Any proposal that does not offer to remain firm for the required periods may be considered non-responsive. The County may ask the General Contractor to substitute a sub-contractor if they don’t meet the minimum standards for key sub-contractors. If the General Contractor submits a new sub-contractor for consideration that meets the minimum standards, the General Contractor will still be held to their bid price for sixty (60) days after the opening date.
C. Costs: Contractor bears all costs and expenses related to this RFQ including, but not limited to, preparation and delivery of the proposal, attending the pre-proposal conference, and attending the interview.
D. Licensing: All applicable federal, state, and local licenses must be acquired before the contract is entered into between County and the selected respondent. Licenses must be maintained throughout the entire contract period. Persons doing business as an Individual, Association, Partnership, Corporation, or otherwise shall be registered with the Utah State Division of
Corporations and Commercial Code. NOTE: Forms and information on registration may be obtained by calling (801) 530-4849 or toll free at 877- 526-3994, or by accessing: www.commerce.utah.gov.
E. License Requirements: The General Contractor is to be licensed B100
General Building Contractor.
F. Changes or Modifications: County will make any changes or modification to the RFQ by written addendum. Contractor submitting a proposal based on any information other than that contained in County’s RFQ and any addenda, do so at their own risk.
G. Receiving Proposals: Contracts and Procurement will administer receipt and opening of all proposals. Proposals will be held, unopened, by Contracts and Procurement in the same condition as received if delivered prior to the date and closing time designated in the RFQ. After the closing time, only the identity of each Contractor will be made public. If only one proposal is received in response to County request, Contracts and Procurement, in coordination with the agency requesting the project, may recommend an award of a contract to the single Contractor if the conditions cited above are met. Alternatively, Contracts and Procurement may re-solicit for the purpose of obtaining additional proposals.
H. Modifying or Withdrawing Proposals: Contractor may modify or withdraw their proposal at any time prior to the closing time. Requests to modify a proposal before the closing time shall be made in writing to the County.
I. Rejection of Proposals: Any proposal containing significant deviations from the specifications of the RFQ shall be considered non-responsive and may be rejected in whole or in part.
J. Protests: Pursuant to Salt Lake County Code of Ordinances § 3.20.150, a protest regarding the RFQ document shall be submitted in writing prior to the RFQ closing date. All other protests shall be submitted in writing within five (5) business days after notification of the award is posted on U3P. A protestor may file only one (1) protest after the RFQ closing date. Protest letters shall specifically and completely state the facts that the protestor believes constitute error in the RFQ document or the award.
K. Free and Competitive Selection: Any agreement or collusion among prospective Contractor to fix a price or limit competition shall render the proposal void, and such conduct is unlawful and subject to criminal sanction. Contractor certifies that no one within its firm or company has either directly or indirectly restrained free and competitive selection, participated in any collusion, or otherwise taken any action unauthorized by County Purchasing Ordinances or applicable law.
L. Reasonable Accommodations: Reasonable accommodations for qualified individuals may be provided upon receipt of a request with 5 working days’ notice. Please contact SLCo-Purchasing@slco.org. TTY users shall call http://www.commerce.utah.gov/
711.
M. Environmentally Responsible Procurement Practices: County has implemented environmentally responsible procurement practices (Attachment C).
SECTION II
PROCUREMENT PROCESS
Midvale Campus Renovation
A. REQUEST FOR QUALIFICATIONS (RFQ) DOCUMENTS
Available at: https://utah.bonfirehub.com/opportunities/250483
B. SITE VISIT
A site visit will not be held during the Stage 1 RFQ process. A mandatory site visit will be held during the Stage 2 bid for the approved Contractors. The contractor will be responsible for covering any associated scope/costs related to existing conditions readily discoverable on and around the site that may affect the project.
Contractors are encouraged to submit their questions in writing before the meeting through the county’s online solicitation system, the Utah Public Procurement Place (U3P) powered by Bonfire. The meeting is for informational purposes only and is not binding. If the RFQ needs to be modified or clarified, the County will issue a written amendment on U3P Bonfire.
B. LAST DAY TO SUBMIT QUESTIONS AND SUBSTITUTION REQUESTS
All questions regarding the RFQ shall be submitted through U3P Bonfire no later than 1:00 PM September 16 2026.
C. DISTRIBUTION OF RESPONSES TO QUESTIONS
Responses to all questions received will be answered in U3P Bonfire and made available to all registered vendors.
D. SUBMITTAL REQUIREMENTS / DUE DATES AND TIMES
Proposals must be uploaded before 1:00 PM September 23, 2026, in Contracts and Procurement online solicitation system, the Utah Public Procurement Place (U3P) powered by Bonfire. No proposals will be accepted after the closing date and time.
E. PROPOSAL FORMAT
All proposals shall be formatted according to the following requirements.
1. Proposal Page Limit: 15 pages or less. Page size shall be 8 ½ x 11 (11 x
14 or 11 X 17 will not be accepted). The page count includes any page that has written or graphic information. Each page should be numbered.
Proposals in nonstandard formats cannot be evaluated without considerable analysis. Failure to follow the prescribed format may result in rejection of the proposal.
2. Page Numbering: the proposal shall contain page numbers.
3. Table of Contents: the proposals shall contain a table of contents with references to page numbers (not included in the page count).
4. Cover Summary for the Program Proposal (Attachment A): Submit the attached cover summary indicating the Contractors willingness and authorization to enter into an agreement with the County in reference to the attached sample. If you wish to alter any of the terms of the attached standard https://utah.bonfirehub.com/opportunities/250483 form agreement and/or the RFQ, the terms must be specifically identified in your proposal with reasonable alternatives presented (not included in the page count).
5. Contractor Request for Protected Information: If requesting protected record status complete Attachment B and upload a redacted program proposal.
• All documents submitted in response to this RFQ will be treated as public records in accordance with GRAMA unless a claim of business confidentiality is submitted. Refer to Section IV General Requirements C.
• Failure to provide a redacted copy, or otherwise comply with the requirements, waives your request for protected record.
F. PROPOSAL EVALUATION CRITERIA
Proposals will be evaluated and ranked by a selection committee. Each member of the committee will be provided with a score sheet to complete the proposal evaluation utilizing a point system listed below. Committee Members individually score the proposals and rank them 1st, 2nd, 3rd, etc. according to their total score.
The following point system is utilized:
Excellent (5): If the proposal offer exceeds expectations, with an excellent probability of success in achieving all requirements of the RFQ and is very innovative; a score of “5” is given.
Good (4): If the proposal offers a very good probability of success, achieves all requirements of the RFQ in a reasonable fashion; a score of “4” is given.
Acceptable (3): If the proposal offers a reasonable probability of success, but some of the requirements may not be met; a score of “3” is given.
Poor (1 or 2): If the proposal falls short of expectations and has a low probability of success; a score of “1 or 2” is given.
Unacceptable (0): If the approach completely fails the requirements; a score of “0” is given.
A select number of Contractors may, if it is in the best interest of the County, be invited for an interview. The County reserves the right to request a best and final offer process. A notification will then be presented to the Mayor or Designee for those Contractors selected to advance to the Stage II.
Debriefing meetings with the selection committee members will not be allowed, however, a Contractor may discuss the RFQ process with the chair/facilitator of the committee at any time. A Contractor may request any public documents from the process, including the winning proposal and committee score sheets after a Stage II award has been finalized.
Evaluation criteria with assigned weighting criteria are as follows:
10% Responsiveness to the Request for Qualifications. (1) Completeness and conformity of the proposal to RFQ requirements; (2) The Contractor’s demonstrated ability to perform the required services; (3) The Contractor’s indication of its understanding of the purpose and scope of the proposed services as evidenced by the quality of the proposal submitted. Additional criteria from Section III of this RFQ is incorporated.
30% Experience/References. The Contractor’s background and related experience in constructing similar projects of comparable size and scope within the last five (5) to seven (7) years including the Contractor’s experience with each of the following: office buildings, complex tenant improvements, systems renovations, parking structures, and work with contaminated sites. Provide updated reference contact information. The County may contact some or all your clients listed in the references.
Additional criteria from Section III of this RFQ are incorporated.
30% Project Construction Team. This area of evaluation will consider the individual qualifications and work experience of the proposed individual project team members. This category includes the technical qualifications and work experience of the key personnel assigned to the project and experience of the team and sub-contractors working on previous projects of similar type, size, complexity, and scope to achieve the project objectives.
Also under consideration will be the Contractor’s proven capability to work effectively with the County based upon references provided and other resources such as the County’s experiences with Contractor and Contractor’s experience with other governmental agencies. Additional criteria from Section III of this RFQ is incorporated.
30% Project Approach / Management Plan / Schedule. The management plan submitted with the response form will be evaluated to measure the Contractor’s understanding of the project scope, construction phasing, schedule, budget, changes to the work, sub-contractor management, volatile markets, tariffs, and other key project issues. The overall approach the Contractor takes for each task of the project; the shown methodology and philosophy and how it will be applied to this project. The proposed timeline for the main tasks of this project will be given careful evaluation.
Additional criteria from Section III of this RFQ is incorporated.
G. SELECTION COMMITTEE
The Selection Committee will evaluate and score each proposal and Contractor.
Committee members may include individuals from Mayor’s Office, Facilities Management, Architectural Consultants, and others deemed appropriate by Salt Lake County.
H. SHORT-LISTING
The Selection Committee will select 2-5 of the highest scoring Contractors who will be short-listed and allowed the opportunity to proceed to Stage II proposals.
During Stage II, only the short-listed Contractors will be invited to bid on the project described in this document. The final Contractor selection will be based upon criteria provided in the Stage II documents. Individual Contractors or alliances between two or more Contractors are allowed in this process. However, the County will contract with only one legal entity. Contractors must be licensed by the
State of Utah and comply with and require all of its subcontractors to comply with the license laws as required by the State of Utah.
I. INTERVIEWS
If, at the discretion of the County, interviews are held, the Contractor’s ability to communicate its understanding of the project, along with its ability to communicate with the various entities involved in the project will be evaluated. Contractors will be further evaluated upon their methods, qualifications, team, schedule and any other matter deemed material by any member of the selection committee.
As a minimum, the following Contractor’s Individuals will be required to be present at the interview:
1. A Principal of the firm or an official who can bind the firm contractually
2. The Project Manager(s)
3. The Project Superintendent(s)
J. SELECTION AND ANNOUNCEMENT
At the conclusion of the selection committee’s Stage I RFQ deliberations, the committee will decide on top selected Contractors to advance to Stage II of the procurement process. The successful Contractors will be notified. Non-selected Contractors will be notified in writing at the conclusion of the procurement process.
K. PROJECTED SCHEDULE FOR THE RFQ PROCESS
The County reserves the right to modify this schedule at their discretion.
September 2, 2026 Stage I RFQ Advertised September 16, 2026 Last day to submit questions September 23, 2026 Stage I Proposals Due October 1, 2026 Evaluation of proposals October 2, 2026 Short-list Selection announced October 26, 2026 Anticipated date for Stage II Bid issuance November 18, 2026 Anticipated Stage II Bid Date January 2027 Contract Fully Executed January 2027 Anticipated NTP 12 months Project Duration
L. ACCEPTANCE OF EVALUATION METHODOLOGY
By submitting a response to this RFQ, each Contractor accepts the Salt Lake County evaluation process for selection of services as outlined in this document, and in doing so, acknowledges and accepts the determination of which proposal is “most advantageous to the county” will entail subjective judgements not measurable by quantifiable data by members of the Selection Committee during this review process.
SECTION III
PROPOSAL REQUIREMENTS
A. TITLE / COVER PAGE
A title / cover page will be required at the front of all copies of the submittal. This page must be signed by an authorized individual for the company.
1. Title of the Project:
2. Contractor’s Name:
3. Statement of willingness to enter into an agreement with the County
4. Name and Title of Authorized Signature
5. Authorized Signature
B. CONTRACTOR INFORMATION
1. Contractor’s Legal Name.
2. Name and Title of Contractor’s Principal who would sign the contract, and other contact persons.
3. Contractor’s address, telephone number, and email address.
4. Contractor entity type (e.g., corporation, LLC, JV, etc).
5. A statement that the Contractor is licensed and authorized to do business in the State of Utah and registered with the dept of commerce at https://commerce.utah.gov/corporations/online-registration-instructions/.
6. Contractor’s years in business under current name and license.
7. A statement that the Contractor maintains a permanent office in the State of
Utah.
8. List licensed categories of work that Contractor will self-perform.
A statement of the Contractor’s bonding capacity from Contractor’s surety company. (Bonds or proof of insurance do not need to be included with your proposal for Stage 1. A Bid Bond will be required during Stage II.)
C. PAST PROJECT DISPUTES
1. In the past five years, has Contractor completed all construction projects without the owner making a claim to or otherwise involving the surety to assist in completing or assuming responsibility for the project? If no, please identify all construction projects where the surety was involved. For each project, identify the project, the owner, and the surety and explain the circumstances that lead to the surety’s involvement, and the final outcome or current status of the project. Please add pages if required.
2. In the past five years, has Contractor been assessed or paid liquidated damages on any project? If yes, please identify all construction projects in the last five years in which you have been assessed for any amount of liquidated damages. For each project identified, state the name of the owner, the number of days delay, and the total liquidated damages. Please add pages if required.
D. EXPERIENCE/REFERENCES
The Contractor shall have completed at least one (1) project of similar scope and complexity within the last five (5) years to seven (7) years preceding the RFQ date.
The projects shall be more than $30,000,000. Provide a list of additional similar projects completed in the last five (5) years to seven (7) years which are similar in scope, size, and complexity. At a minimum, information for each project shall include:
1. Project Title
2. Original and final contract amount
3. A brief description of the project
4. Name of owner or contact person(s)
5. Telephone or E-mail address for each contact person
6. Names of Project Manager and Superintendent with list of responsibilities for the project
7. Names of subcontractors on the project, i.e., pool construction, excavation, concrete, landscape, irrigation, electrical, plumbing, etc.
8. Indicate which of your proposed team members participated in each project
E. IDENTIFICATION OF THE CONSTRUCTION PROJECT TEAM
Identify the Construction Project Team. Provide an Organizational Chart that identifies the primary role and time commitments for the key individuals assigned to the project, for the following:
1. Principal-in-Charge who will oversee the project
2. Project Manager(s)
a. The Contractor’s project manager shall have at least ten (10) year’s experience as project manager on projects of similar scope and complexity as this project and shall, within ten (10) years preceding the bid date, have been project manager on at least one facility that includes requirements comparable to this project.
3. Project Superintendent(s)
a. The Contractor’s superintendent shall have at least ten (10) year’s experience as superintendent on projects of similar scope and complexity as this project and shall, within ten (10) years preceding the bid date, have been superintendent on at least one facility that includes requirements comparable to this project.
4. Scheduler(s)
5. Estimator(s)
6. Quality Control(s)
7. Other staff directly related to the project
8. Identify where this team has worked together on previous projects.
By listing the individuals in the proposal, the firm is making a commitment that they are the personnel who will be assigned to the project. The County must approve of any changes to the personnel indicated. The County reserves the right to request a substitution.
F. OVERALL PROJECT APPROACH / MANAGEMENT PLAN
Approach / Management Plan:
As a condition of the Proposal, the Contractor shall submit a comprehensive Statement of Approach and Management Plan specific to this Project. The Statement shall clearly define the Contractor’s overall project approach and management methodology and, at a minimum, address the following elements:
1. Overall Construction Management
Description of the Contractor’s methodology for managing and delivering the Project to meet scope, schedule, budget, and quality objectives.
2. Project Scheduling A detailed approach to scheduling, including:
o Pre-construction activities o Development and maintenance of the construction schedule o Transition, commissioning, and occupancy planning
The identified construction period is extremely critical to the success of the construction project. In your approach, provide evidence and detail about the plan to ensure the timeline is met, how you will maintain efficiency, tracking of schedule, dealing with weather, timely decision, timely notifications, lead time of equipment, sub-contractor issues, volatile markets, etc. Describe what makes your company stand out from the competition in terms of meeting and/or exceeding schedule expectations.
Describe your goals, purposes and desire in taking on this project.
3. Site Management/Safety Program Procedures for site access, logistics, contaminated site, safety, and security.
Describe your firm’s safety program and how you will implement it on our project. Provide your firm’s EMR. If there is more than one firm for your team provide an EMR for each firm on your team. Demonstrate knowledge and experience in complying with OSHA and NFPA requirements for safety during construction. Describe methods to be used to ensure an OSHA certified team member will maintain a presence at the work site whenever work is being done. Describe methods to be used to ensure all workers have received the required minimum 10-hour OSHA training.
4. Coordination and Communication Approach to coordination with the Owner, Architect, and the Owner’s consultants, including communication protocols.
5. Project Staffing Proposed organizational structure, key personnel, roles, and responsibilities.
6. Subcontractor Management Methods for procurement, coordination, and oversight of subcontractors.
Indicate your plan to qualify and select subcontractors. Discuss how you’ll coordinate the individual trade components for the major subcontractors
(Mechanical, Electrical, Plumbing, Civil, Landscape, etc.). Provide your plan to manage how subcontractors will communicate between various trades. How you manage these tasks and how subcontractors communicate between various trades will be critical to the evaluation of the management plan.
7. Project Controls Systems for project reporting, progress meetings, documentation, and record-keeping.
8. Cost Management Approach to budgeting, estimating, and ongoing cost control.
9. Market Conditions and Procurement Strategies to address market conditions, including cost escalation, material availability, and procurement risks.
10. Change Management Procedures for identifying, evaluating, and processing changes to the Work.
11. Quality Control/Quality Assurance Describe your firm’s approach to maintaining quality. Identify practices and tools used. Identify individuals within your team who are responsible for maintaining quality. Provide examples where your approach was effective.
12. Warranty and Closeout
Procedures for project closeout and administration of warranty requirements.
13. Sustainability Requirements The County has an interest in measures used by its consultants to ensure sustainable operations with minimal adverse impact on the environment.
Please state whether your firm has a formal sustainability program or policy and, if so, please attach a copy to your proposal (not included in the page count).
Show how you implement these efforts, their purpose, use and benefit to your philosophy and the project as a whole. Describe how these methods differentiate your company from the rest of the field.
SECTION IV
GENERAL REQUIREMENTS
A. County’s Right to Select The County reserves the right to advance 2- 5 Contractors to Stage II of the procurement process to the Contractors, who in the judgment of the Selection Committee present the proposals that best accomplishes the County’s desired results. Selection will be made on the basis of combined score of the evaluation factors identified in Section II, Procurement Process.
If for any reason, the County is unsuccessful in negotiating a final contract with the selected Contractor, the County may elect to negotiate with another of the Contractors or withdraw the solicitation and re-advertise at a future time.
B. Eligibility Requirements
The Contractor must comply, at all times during the solicitation and contracting period, with all applicable Federal, State, County and City anti-discrimination laws, ordinances, rules and regulations. Any violations of this provision shall be considered a violation of a material provision of the solicitation process or contract and shall be grounds for disqualification, cancellations, termination or suspension.
C. Government Records Access and Management Act (GRAMA)
County is a governmental entity subject to the Utah Government Records Access and Management Act (“GRAMA”), Utah Code Ann. §§ 63G-2-101 to -901. As a result, County is required to disclose certain information and materials to the public, upon request. Generally, any document submitted to County is considered a “public record” under GRAMA. Any person who provides to County a record that the person believes merits protection under subsection 63G-2-305(1) or (2) must submit with their proposal all of the following: (1) a written claim of business confidentiality, (2) a concise statement of reasons supporting the claim of business confidentiality, and (3) a separate copy of the proposal with the information requested to be protected redacted. Failure to comply with any of the three requirements for a claim of business confidentiality waives the request for protected record. Generally, GRAMA only protects against the disclosure of trade secrets or commercial information that could reasonably be expected to result in unfair competitive injury. For your convenience, County has provided a Business Confidentiality Request Form which is attached to this RFQ as Attachment B. All documents submitted in response to this RFQ will be treated as public records in accordance with GRAMA, unless a claim of business confidentiality has been properly made and approved by County.
All proposed costs/pricing/fees submitted to the county are public records.
An entire proposal cannot be identified as “PROTECTED,” “CONFIDENTIAL,” or “PROPRIETARY” and may be considered non-responsive if marked as such.
D. NOTICE TO RETIREES OF UTAH RETIREMENT SYSTEM (“URS”)
County is a URS “participating employer.” Entering into an agreement with County may affect a URS retiree’s retirement benefits including, but not limited to, cancellation of the retiree’s “retirement allowance” due to “reemployment” with a
“participating employer” pursuant to Utah Code Ann. § 49-11-504 to -505. In addition, Contractor is required to immediately notify County if a retiree of URS is the Contractor; or an owner, operator, or principal of the Contractor. Contractor shall refer the URS retiree to the URS Retirement Department at 801-366-7770 or 800-695-4877 for all questions about post-retirement employment regulations.
E. Employee Status Verification System Contractor shall register and participate in the Status Verification System before entering into a contract with County as required by Utah Code Ann. § 63G-12-
302. The Status Verification System is an electronic system operated by the federal government, through which an authorized official of a state agency or a political subdivision of the state may inquire by exercise of authority delegated pursuant to 8 U.S.C. § 1373 to verify the citizenship or immigration status of an individual within the jurisdiction of the agency or political subdivision. Contractor is individually responsible for verifying the employment status of only new employees who work under Contractor’s supervision or direction and not those who work for another Contractor or subcontractor, except each Contractor or subcontractor who works under or for another Contractor shall certify to the main Contractor by affidavit that the Contractor or subcontractor has verified, through the Status Verification System, the employment status of each new employee of the respective Contractor or subcontractor. The Contractor shall comply in all respects with the provisions of Utah Code Ann. § 63G-12-302. Contractor’s failure to so comply may result in the immediate termination of its contract with County.
F. Ethical Standards
Contractor represents that it has not: (a) provided an illegal gift to any County officer or employee, or former County officer or employee, or to any relative or business entity of a County officer or employee, or relative or business entity of a former County officer or employee; (b) retained any person to solicit or secure this contract upon an agreement or understanding for a commission, percentage, brokerage or contingent fee, other than bona fide employees of bona fide commercial agencies established for the purpose of securing business; (c) breached any of the ethical standards set forth in State statute or Salt Lake County Code of Ordinances § 2.07; or (d) knowingly influenced, and hereby promises that it will not knowingly influence, any County officer or employee or former County officer or employee to breach any of the ethical standards set forth in State statute or Salt Lake County ordinances.
G. Campaign Contributions
The Salt Lake County campaign finance disclosure ordinance limits campaign contributions by Contractor to County candidates. Salt Lake County Code of Ordinances § 2.72A. Contractor acknowledges and understands those limitations on campaign contributions mean that any person, business, corporation or other entity that enters into a contract or is engaged in a contract with County is prohibited from making campaign contributions in excess of $100 to County candidates during the term of the contract and during a single election cycle as defined in the ordinance. Contractor further acknowledges that violation of those provisions governing campaign contributions may result in criminal sanctions as well as termination of this Agreement.
H. Insurance Insurance will be required in the types and amounts as provided in the general conditions. County reserves the right to modify the amounts and types of insurance required in Stage II.
1. The County reserves the right to purchase its own builder’s risk policy
2. The anticipated amounts of required insurance are listed below.
a. General Liability - $5 million (any combination of primary and excess)
b. Automobile Liability - $10 million (any combination of primary and excess)
c. Workers’ Compensation – Statutory / $1 million – Employers Liability
d. Contractors Professional Liability - $5 million
e. Environmental / Pollution Liability - $10 million.
Attachment A - Request for Proposals Cover Summary t
Legal Name
Doing Business As (if applicable)
Address
City State Zip Code
Contact Person after contract award Telephone Number
E-mail Contact
I certify that to the best of my knowledge the information contained in this proposal is accurate and complete and that I have the legal authority to commit this organization to a contractual agreement. I realize the final funding for any service is based upon funding levels and the approval of the Mayor for Salt Lake County.
Proposer Authorized Representative Type or Print Name
Date
Position or Title
Signature required when submitting hard copy.
Electronic signature acceptable if an electronic proposal is allowed.
X
Proposer
Please include one or two e-mail address for notification of an interview.
Name, telephone number, E-mail address
Attachment B
REQUEST FOR PROTECTED RECORD
(Business Confidentiality Claim)
I request that the attached/enclosed information (record) provided to Salt Lake County, or any of its agencies (divisions or programs), be considered confidential and given protected status as defined in Utah’s Government Records Access and Management Act (“GRAMA”).
Name and Address of business and representative making this confidentiality claim:
Description of the information (record) which is to be covered by this confidentiality claim and which you believe qualifies for protected status:
The following reasons support this claim of business confidentiality and protected status under Utah Code § 63G-2-305 (please check all of the following that apply):
(___) 1.
(___) 2.
The record provided is a trade secret as defined in Utah Code § 13-24-2 (See Utah Code §§ 63G-2-305(1) and 63G-2-309).
The record is commercial or non-individual financial information and: (a) disclosure of the information could reasonably be expected to result in unfair competitive injury to the person submitting the information or would impair the ability of Salt Lake County, or its agencies, to obtain necessary information in the future; and (b) the interest of the provider in prohibiting access to the information is greater than the interest of the public in obtaining access. (See Utah Code §§ 63G-2-305(2) and 63G-2-309).
REQUIRED: A concise written statement supporting a business confidentiality claim, as required by Utah Code § 63G-2-309(1). Attach additional sheets if necessary.
NOTE: Claimant shall be notified if a record claimed to be protected is classified public or if the determination is made that the record should be disclosed because the interests favoring access outweigh the interests favoring restriction of access. Records claimed to be protected under this business confidentiality claim may not be disclosed until the period in which to bring an appeal expires or the end of the appeals process, including judicial appeal, unless the claimant, after notice, has waived the claim by not appealing within thirty (30) calendar days. See Utah Code § 63G-2-309(2). The procedure to appeal a GRAMA classification within thirty (30) calendar days is described in Utah Code §§ 63G-2-400.5 through 406 and Countywide Policy 2010, which can be found on the County’s website www.saltlakecounty.gov
Signature of Claimant Representative: _________________________________ Date: ____________________
Claimant Representative Name and Title: ________________________________________________________ https://slco.org/globalassets/1-site-files/policies/countywide/2040.pdf?v=03282022114310737 https://www.saltlakecounty.gov
Attachment C - Environmental Compliance Practices
Vendor Compliance Statement and Non-Debarment Certification
1. Salt Lake County has implemented environmentally responsible procurement practices. The County requires all persons, businesses, corporations and other entities doing business or entering into a contract with the County to comply with all federal, state and local environmental laws, rules and regulations. Compliance with environmental laws, rules and regulations is a relevant factor in evaluating the integrity and responsibility of a business. The county, in its sole discretion, may not solicit proposals from, award contracts to, procure, or otherwise enter into business arrangements with any person, business, corporation or other organization that is noncompliant. If a vendor is suspended, proposed for debarment, debarred, ineligible or excluded from contracting with another government entity due to environmental non-compliance, the County in its sole discretion, may deem the vendor non-responsible and decline to award a contract.
2. Based on the foregoing, the vendor certifies, to the best of its knowledge, that neither the vendor nor any owner, officer or agent of the vendor:
2.1 is presently debarred, suspended, proposed for debarment, declared ineligible, or excluded from the award of a contract or purchase by any federal, state or local agency based on a finding, determination, notice of violation or order of environmental non-compliance;
2.2 is presently indicted or charged by a government entity in a criminal, civil or administrative proceeding with the commission of any offense, violation, or failure to comply with any federal, state, or local environmental law, rule or regulation, indicating a lack of business integrity or business honesty affecting its responsibility as a county vendor;
2.3 has, within the last three (3) years, been convicted, or had a civil judgment or administrative order rendered against it for any offense or violation, including but not limited to environmental noncompliance, indicating a lack of business integrity or business honesty affecting its responsibility as a county vendor;
2.4 has, within the last three (3) years, had a contract/purchase terminated due to an act or omission, including but not limited to environmental non-compliance, demonstrating a lack of business integrity or business honesty affecting its responsibility as a county vendor.
3. Vendor shall require any sub-vendor to disclose in writing, whether at the time of the award of the subcontract, the sub-vendor complies with the certification requirements in subparagraphs 2.1, 2.2, 2.3 and 2.4 above.
4. Vendor shall immediately notify the county in writing if, at any time before the award, the vendor learns that its certification was erroneous when submitted or has since become erroneous because of changed circumstances.
5. If it is later determined that vendor knowingly rendered an erroneous certification under this provision, in addition to other available remedies, the county in its sole discretion, may terminate the contract/purchase for default.
Revised Sept 2019
V. 4-30-2025
TABLE OF CONTENTS
SECTIONS 1-4
SECTION 1 – INSTRUCTIONS TO BIDDERS
1.0 General Information
2.0 Deadline for Bid Submission
3.0 Questions
4.0 Site Visit
5.0 Time for Completion
6.0 Prior Approval of Brands
7.0 Preparation of Bid and Forms Required
8.0 Rules Governing Bid
9.0 License Requirements
10.0 Documents Which Become Part of the Contract
11.0 Environmental Compliance Practices
12.0 County Standards
SECTION 2 – DOCUMENTS
1.0 Offer and Cover Summary
2.0 Unit Price Schedule (If applicable, due within 24 hr. of request)
3.0 Schedule of Values
4.0 Bid Bond
5.0 Sub-contractors list (due within 24 hours of request)
6.0 Performance Bond (Required upon award)
7.0 Payment Bond (Required upon award)
Exhibit A – Contractor Responsibility Form (If applicable)
SECTION 3 – CONSTRUCTION AGREEMENT
1.0 Scope Of Services
2.0 Time Of Completion
3.0 Liquidated Damages
4.0 Consideration
5.0 Acceptance and Final Payment