RLP_No_0VA2222_-_LEED-NC_2009_Checklist.xls
XLS spreadsheet 153 KB Posted
- Attached to
- Lease Space to the Federal Government in Frederick County, Virginia, or Winchester, Virginia - 0VA2222
- Solicitation number
- 0VA2222
About this file
LEED-NC 2009 Checklist This document is provided based on Amendment 05 to RLP No. 0VA2222.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
One Page
| LEED 2009 for New Construction and Major Renovations | RLP No. 0VA2222 | |||||||||||||
| Project Checklist | Date | |||||||||||||
| 0 | 0 | 0 | Sustainable Sites | Possible Points: | 26 | Materials and Resources, Continued | ||||||||
| Y | ? | N | Y | ? | N | |||||||||
| Y | Prereq 1 | Construction Activity Pollution Prevention | Credit 4 | Recycled Content | 1 to 2 | |||||||||
| Credit 1 | Site Selection | 1 | Credit 5 | Regional Materials | 1 to 2 | |||||||||
| Credit 2 | Development Density and Community Connectivity | 5 | Credit 6 | Rapidly Renewable Materials | 1 | |||||||||
| Credit 3 | Brownfield Redevelopment | 1 | Credit 7 | Certified Wood | 1 | |||||||||
| Credit 4.1 | Alternative Transportation—Public Transportation Access | 6 | ||||||||||||
| Credit 4.2 | Alternative Transportation—Bicycle Storage and Changing Rooms | 1 | 0 | 0 | 0 | Indoor Environmental Quality | Possible Points: | 15 | ||||||
| Credit 4.3 | Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles | 3 | ||||||||||||
| Credit 4.4 | Alternative Transportation—Parking Capacity | 2 | Y | Prereq 1 | Minimum Indoor Air Quality Performance | 0 | ||||||||
| Credit 5.1 | Site Development—Protect or Restore Habitat | 1 | Y | Prereq 2 | Environmental Tobacco Smoke (ETS) Control | 0 | ||||||||
| Credit 5.2 | Site Development—Maximize Open Space | 1 | Credit 1 | Outdoor Air Delivery Monitoring | 1 | |||||||||
| Credit 6.1 | Stormwater Design—Quantity Control | 1 | Credit 2 | Increased Ventilation | 1 | |||||||||
| Credit 6.2 | Stormwater Design—Quality Control | 1 | Credit 3.1 | Construction IAQ Management Plan—During Construction | 1 | |||||||||
| Credit 7.1 | Heat Island Effect—Non-roof | 1 | Credit 3.2 | Construction IAQ Management Plan—Before Occupancy | 1 | |||||||||
| Credit 7.2 | Heat Island Effect—Roof | 1 | Credit 4.1 | Low-Emitting Materials—Adhesives and Sealants | 1 | |||||||||
| Credit 8 | Light Pollution Reduction | 1 | Credit 4.2 | Low-Emitting Materials—Paints and Coatings | 1 | |||||||||
| Credit 4.3 | Low-Emitting Materials—Flooring Systems | 1 | ||||||||||||
| 0 | 0 | 0 | Water Efficiency | Possible Points: | 10 | Credit 4.4 | Low-Emitting Materials—Composite Wood and Agrifiber Products | 1 | ||||||
| Credit 5 | Indoor Chemical and Pollutant Source Control | 1 | ||||||||||||
| Y | Prereq 1 | Water Use Reduction—20% Reduction | Credit 6.1 | Controllability of Systems—Lighting | 1 | |||||||||
| Credit 1 | Water Efficient Landscaping | 2 to 4 | Credit 6.2 | Controllability of Systems—Thermal Comfort | 1 | |||||||||
| Credit 2 | Innovative Wastewater Technologies | 2 | Credit 7.1 | Thermal Comfort—Design | 1 | |||||||||
| Credit 3 | Water Use Reduction | 2 to 4 | Credit 7.2 | Thermal Comfort—Verification | 1 | |||||||||
| Credit 8.1 | Daylight and Views—Daylight | 1 | ||||||||||||
| 0 | 0 | 0 | Energy and Atmosphere | Possible Points: | 35 | Credit 8.2 | Daylight and Views—Views | 1 | ||||||
| Y | Prereq 1 | Fundamental Commissioning of Building Energy Systems | 0 | 0 | 0 | Innovation and Design Process | Possible Points: | 6 | ||||||
| Y | Prereq 2 | Minimum Energy Performance | 0 | |||||||||||
| Y | Prereq 3 | Fundamental Refrigerant Management | Credit 1.1 | Innovation in Design: Specific Title | 1 | |||||||||
| Credit 1 | Optimize Energy Performance | 1 to 19 | Credit 1.2 | Innovation in Design: Specific Title | 1 | |||||||||
| Credit 2 | On-Site Renewable Energy | 1 to 7 | Credit 1.3 | Innovation in Design: Specific Title | 1 | |||||||||
| Credit 3 | Enhanced Commissioning | 2 | Credit 1.4 | Innovation in Design: Specific Title | 1 | |||||||||
| Credit 4 | Enhanced Refrigerant Management | 2 | Credit 1.5 | Innovation in Design: Specific Title | 1 | |||||||||
| Credit 5 | Measurement and Verification | 3 | Credit 2 | LEED Accredited Professional | 1 | |||||||||
| Credit 6 | Green Power | 2 | ||||||||||||
| 0 | 0 | 0 | Regional Priority Credits | Possible Points: | 4 | |||||||||
| 0 | 0 | 0 | Materials and Resources | Possible Points: | 14 | |||||||||
| Credit 1.1 | Regional Priority: Specific Credit | 1 | ||||||||||||
| Y | Prereq 1 | Storage and Collection of Recyclables | 0 | Credit 1.2 | Regional Priority: Specific Credit | 1 | ||||||||
| Credit 1.1 | Building Reuse—Maintain Existing Walls, Floors, and Roof | 1 to 3 | Credit 1.3 | Regional Priority: Specific Credit | 1 | |||||||||
| Credit 1.2 | Building Reuse—Maintain 50% of Interior Non-Structural Elements | 1 | Credit 1.4 | Regional Priority: Specific Credit | 1 | |||||||||
| Credit 2 | Construction Waste Management | 1 to 2 | ||||||||||||
| Credit 3 | Materials Reuse | 1 to 2 | 0 | 0 | 0 | Total | Possible Points: | 110 | ||||||
| Certified 40 to 49 points Silver 50 to 59 points Gold 60 to 79 points Platinum 80 to 110 |
Detailed
| LEED 2009 for New Construction and Major Renovations | RLP No. 0VA2222 | ||||||||
| Project Checklist | Date | ||||||||
| 0 | 0 | 0 | Sustainable Sites | Possible Points: | 26 | ||||
| Y | ? | N | d/C | Notes: | |||||
| Y | C | Prereq 1 | Construction Activity Pollution Prevention | ||||||
| d | Credit 1 | Site Selection | 1 | ||||||
| d | Credit 2 | Development Density and Community Connectivity | 5 | ||||||
| d | Credit 3 | Brownfield Redevelopment | 1 | ||||||
| d | Credit 4.1 | Alternative Transportation—Public Transportation Access | 6 | ||||||
| d | Credit 4.2 | Alternative Transportation—Bicycle Storage and Changing Rooms | 1 | ||||||
| d | Credit 4.3 | Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles | 3 | ||||||
| d | Credit 4.4 | Alternative Transportation—Parking Capacity | 2 | ||||||
| C | Credit 5.1 | Site Development—Protect or Restore Habitat | 1 | ||||||
| d | Credit 5.2 | Site Development—Maximize Open Space | 1 | ||||||
| d | Credit 6.1 | Stormwater Design—Quantity Control | 1 | ||||||
| d | Credit 6.2 | Stormwater Design—Quality Control | 1 | ||||||
| C | Credit 7.1 | Heat Island Effect—Non-roof | 1 | ||||||
| d | Credit 7.2 | Heat Island Effect—Roof | 1 | ||||||
| d | Credit 8 | Light Pollution Reduction | 1 | ||||||
| 0 | 0 | 0 | Water Efficiency | Possible Points: | 10 | ||||
| Y | ? | N | Notes: | ||||||
| Y | d | Prereq 1 | Water Use Reduction—20% Reduction | ||||||
| d | Credit 1 | Water Efficient Landscaping | 2 to 4 | ||||||
| Reduce by 50% | 2 | ||||||||
| No Potable Water Use or Irrigation | 4 | ||||||||
| d | Credit 2 | Innovative Wastewater Technologies | 2 | ||||||
| d | Credit 3 | Water Use Reduction | 2 to 4 | ||||||
| Reduce by 30% | 2 | ||||||||
| Reduce by 35% | 3 | ||||||||
| Reduce by 40% | 4 | ||||||||
| 0 | 0 | 0 | Energy and Atmosphere | Possible Points: | 35 | ||||
| Y | ? | N | Notes: | ||||||
| Y | C | Prereq 1 | Fundamental Commissioning of Building Energy Systems | ||||||
| Y | d | Prereq 2 | Minimum Energy Performance | ||||||
| Y | d | Prereq 3 | Fundamental Refrigerant Management | ||||||
| d | Credit 1 | Optimize Energy Performance | 1 to 19 | ||||||
| Improve by 12% for New Buildings or 8% for Existing Building Renovations | 1 | ||||||||
| Improve by 14% for New Buildings or 10% for Existing Building Renovations | 2 | ||||||||
| Improve by 16% for New Buildings or 12% for Existing Building Renovations | 3 | ||||||||
| Improve by 18% for New Buildings or 14% for Existing Building Renovations | 4 | ||||||||
| Improve by 20% for New Buildings or 16% for Existing Building Renovations | 5 | ||||||||
| Improve by 22% for New Buildings or 18% for Existing Building Renovations | 6 | ||||||||
| Improve by 24% for New Buildings or 20% for Existing Building Renovations | 7 | ||||||||
| Improve by 26% for New Buildings or 22% for Existing Building Renovations | 8 | ||||||||
| Improve by 28% for New Buildings or 24% for Existing Building Renovations | 9 | ||||||||
| Improve by 30% for New Buildings or 26% for Existing Building Renovations | 10 | ||||||||
| Improve by 32% for New Buildings or 28% for Existing Building Renovations | 11 | ||||||||
| Improve by 34% for New Buildings or 30% for Existing Building Renovations | 12 | ||||||||
| Improve by 36% for New Buildings or 32% for Existing Building Renovations | 13 | ||||||||
| Improve by 38% for New Buildings or 34% for Existing Building Renovations | 14 | ||||||||
| Improve by 40% for New Buildings or 36% for Existing Building Renovations | 15 | ||||||||
| Improve by 42% for New Buildings or 38% for Existing Building Renovations | 16 | ||||||||
| Improve by 44% for New Buildings or 40% for Existing Building Renovations | 17 | ||||||||
| Improve by 46% for New Buildings or 42% for Existing Building Renovations | 18 | ||||||||
| Improve by 48%+ for New Buildings or 44%+ for Existing Building Renovations | 19 | ||||||||
| d | Credit 2 | On-Site Renewable Energy | 1 to 7 | ||||||
| 1% Renewable Energy | 1 | ||||||||
| 3% Renewable Energy | 2 | ||||||||
| 5% Renewable Energy | 3 | ||||||||
| 7% Renewable Energy | 4 | ||||||||
| 9% Renewable Energy | 5 | ||||||||
| 11% Renewable Energy | 6 | ||||||||
| 13% Renewable Energy | 7 | ||||||||
| C | Credit 3 | Enhanced Commissioning | 2 | ||||||
| d | Credit 4 | Enhanced Refrigerant Management | 2 | ||||||
| C | Credit 5 | Measurement and Verification | 3 | ||||||
| C | Credit 6 | Green Power | 2 | ||||||
| 0 | 0 | 0 | Materials and Resources | Possible Points: | 14 | ||||
| Y | ? | N | Notes: | ||||||
| Y | d | Prereq 1 | Storage and Collection of Recyclables | ||||||
| C | Credit 1.1 | Building Reuse—Maintain Existing Walls, Floors, and Roof | 1 to 3 | ||||||
| Reuse 55% | 1 | ||||||||
| Reuse 75% | 2 | ||||||||
| Reuse 95% | 3 | ||||||||
| C | Credit 1.2 | Building Reuse—Maintain 50% of Interior Non-Structural Elements | 1 | ||||||
| C | Credit 2 | Construction Waste Management | 1 to 2 | ||||||
| 50% Recycled or Salvaged | 1 | ||||||||
| 75% Recycled or Salvaged | 2 | ||||||||
| C | Credit 3 | Materials Reuse | 1 to 2 | ||||||
| Reuse 5% | 1 | ||||||||
| Reuse 10% | 2 | ||||||||
| C | Credit 4 | Recycled Content | 1 to 2 | ||||||
| 10% of Content | 1 | ||||||||
| 20% of Content | 2 | ||||||||
| C | Credit 5 | Regional Materials | 1 to 2 | ||||||
| 10% of Materials | 1 | ||||||||
| 20% of Materials | 2 | ||||||||
| C | Credit 6 | Rapidly Renewable Materials | 1 | ||||||
| C | Credit 7 | Certified Wood | 1 | ||||||
| 0 | 0 | 0 | Indoor Environmental Quality | Possible Points: | 15 | ||||
| Y | ? | N | Notes: | ||||||
| Y | d | Prereq 1 | Minimum Indoor Air Quality Performance | ||||||
| Y | d | Prereq 2 | Environmental Tobacco Smoke (ETS) Control | ||||||
| d | Credit 1 | Outdoor Air Delivery Monitoring | 1 | ||||||
| d | Credit 2 | Increased Ventilation | 1 | ||||||
| C | Credit 3.1 | Construction IAQ Management Plan—During Construction | 1 | ||||||
| C | Credit 3.2 | Construction IAQ Management Plan—Before Occupancy | 1 | ||||||
| C | Credit 4.1 | Low-Emitting Materials—Adhesives and Sealants | 1 | ||||||
| C | Credit 4.2 | Low-Emitting Materials—Paints and Coatings | 1 | ||||||
| C | Credit 4.3 | Low-Emitting Materials—Flooring Systems | 1 | ||||||
| C | Credit 4.4 | Low-Emitting Materials—Composite Wood and Agrifiber Products | 1 | ||||||
| d | Credit 5 | Indoor Chemical and Pollutant Source Control | 1 | ||||||
| d | Credit 6.1 | Controllability of Systems—Lighting | 1 | ||||||
| d | Credit 6.2 | Controllability of Systems—Thermal Comfort | 1 | ||||||
| d | Credit 7.1 | Thermal Comfort—Design | 1 | ||||||
| d | Credit 7.2 | Thermal Comfort—Verification | 1 | ||||||
| d | Credit 8.1 | Daylight and Views—Daylight | 1 | ||||||
| d | Credit 8.2 | Daylight and Views—Views | 1 | ||||||
| 0 | 0 | 0 | Innovation and Design Process | Possible Points: | 6 | ||||
| Y | ? | N | Notes: | ||||||
| d/C | Credit 1.1 | Innovation in Design: Specific Title | 1 | ||||||
| d/C | Credit 1.2 | Innovation in Design: Specific Title | 1 | ||||||
| d/C | Credit 1.3 | Innovation in Design: Specific Title | 1 | ||||||
| d/C | Credit 1.4 | Innovation in Design: Specific Title | 1 | ||||||
| d/C | Credit 1.5 | Innovation in Design: Specific Title | 1 | ||||||
| d/C | Credit 2 | LEED Accredited Professional | 1 | ||||||
| 0 | 0 | 0 | Regional Priority Credits | Possible Points: | 4 | ||||
| Y | ? | N | Notes: | ||||||
| d/C | Credit 1.1 | Regional Priority: Specific Credit | 1 | ||||||
| d/C | Credit 1.2 | Regional Priority: Specific Credit | 1 | ||||||
| d/C | Credit 1.3 | Regional Priority: Specific Credit | 1 | ||||||
| d/C | Credit 1.4 | Regional Priority: Specific Credit | 1 | ||||||
| 0 | 0 | 0 | Total | Possible Points: | 110 | ||||
| Certified 40 to 49 points Silver 50 to 59 points Gold 60 to 79 points Platinum 80 to 110 |
&L&"Trebuchet MS,Regular"&8LEED 2009 for New Construction and Major Renovations Project Checklist
File details come from the government source that posted it. Updated .