RLP_No_0VA2222_-_LEED-CI_2009_Checklist.xls
XLS spreadsheet 142 KB Posted
- Attached to
- Lease Space to the Federal Government in Frederick County, Virginia, or Winchester, Virginia - 0VA2222
- Solicitation number
- 0VA2222
About this file
RLP No. 0VA2222 - LEED 2009 Commercial Interiors Checklist
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
One Page
| LEED 2009 for Commercial Interiors | RLP No. 0VA2222 | |||||||||||||
| Project Checklist | Date | |||||||||||||
| 0 | 0 | 0 | Sustainable Sites | Possible Points: | 21 | 0 | 0 | 0 | Indoor Environmental Quality | Possible Points: | 17 | |||
| Y | ? | N | Y | ? | N | |||||||||
| Credit 1 | Site Selection | 1 to 5 | Y | Prereq 1 | Minimum IAQ Performance | 0 | ||||||||
| Credit 2 | Development Density and Community Connectivity | 6 | Y | Prereq 2 | Environmental Tobacco Smoke (ETS) Control | 0 | ||||||||
| Credit 3.1 | Alternative Transportation—Public Transportation Access | 6 | Credit 1 | Outdoor Air Delivery Monitoring | 1 | |||||||||
| Credit 3.2 | Alternative Transportation—Bicycle Storage and Changing Rooms | 2 | Credit 2 | Increased Ventilation | 1 | |||||||||
| Credit 3.3 | Alternative Transportation—Parking Availability | 2 | Credit 3.1 | Construction IAQ Management Plan—During Construction | 1 | |||||||||
| Credit 3.2 | Construction IAQ Management Plan—Before Occupancy | 1 | ||||||||||||
| 0 | 0 | 0 | Water Efficiency | Possible Points: | 11 | Credit 4.1 | Low-Emitting Materials—Adhesives and Sealants | 1 | ||||||
| Credit 4.2 | Low-Emitting Materials—Paints and Coatings | 1 | ||||||||||||
| Y | Prereq 1 | Water Use Reduction—20% Reduction | Credit 4.3 | Low-Emitting Materials—Flooring Systems | 1 | |||||||||
| Credit 1 | Water Use Reduction | 6 to 11 | Credit 4.4 | Low-Emitting Materials—Composite Wood and Agrifiber Products | 1 | |||||||||
| Credit 4.5 | Low-Emitting Materials—Systems Furniture and Seating | 1 | ||||||||||||
| 0 | 0 | 0 | Energy and Atmosphere | Possible Points: | 37 | Credit 5 | Indoor Chemical & Pollutant Source Control | 1 | ||||||
| Credit 6.1 | Controllability of Systems—Lighting | 1 | ||||||||||||
| Y | Prereq 1 | Fundamental Commissioning of Building Energy Systems | Credit 6.2 | Controllability of Systems—Thermal Comfort | 1 | |||||||||
| Y | Prereq 2 | Minimum Energy Performance | 0 | Credit 7.1 | Thermal Comfort—Design | 1 | ||||||||
| Y | Prereq 3 | Fundamental Refrigerant Management | Credit 7.2 | Thermal Comfort—Verification | 1 | |||||||||
| Credit 1.1 | Optimize Energy Performance—Lighting Power | 1 to 5 | Credit 8.1 | Daylight and Views—Daylight | 1 to 2 | |||||||||
| Credit 1.2 | Optimize Energy Performance—Lighting Controls | 1 to 3 | Credit 8.2 | Daylight and Views—Views for Seated Spaces | 1 | |||||||||
| Credit 1.3 | Optimize Energy Performance—HVAC | 5 to 10 | ||||||||||||
| Credit 1.4 | Optimize Energy Performance—Equipment and Appliances | 1 to 4 | 0 | 0 | 0 | Innovation and Design Process | Possible Points: | 6 | ||||||
| Credit 2 | Enhanced Commissioning | 5 | ||||||||||||
| Credit 3 | Measurement and Verification | 2 to 5 | Credit 1.1 | Innovation in Design: Specific Title | 1 | |||||||||
| Credit 4 | Green Power | 5 | Credit 1.2 | Innovation in Design: Specific Title | 1 | |||||||||
| Credit 1.3 | Innovation in Design: Specific Title | 1 | ||||||||||||
| 0 | 0 | 0 | Materials and Resources | Possible Points: | 14 | Credit 1.4 | Innovation in Design: Specific Title | 1 | ||||||
| Credit 1.5 | Innovation in Design: Specific Title | 1 | ||||||||||||
| Y | Prereq 1 | Storage and Collection of Recyclables | 0 | Credit 2 | LEED Accredited Professional | 1 | ||||||||
| Credit 1.1 | Tenant Space—Long-Term Commitment | 1 | ||||||||||||
| Credit 1.2 | Building Reuse | 1 to 2 | 0 | 0 | 0 | Regional Priority Credits | Possible Points: | 4 | ||||||
| Credit 2 | Construction Waste Management | 1 to 2 | ||||||||||||
| Credit 3.1 | Materials Reuse | 1 to 2 | Credit 1.1 | Regional Priority: Specific Credit | 1 | |||||||||
| Credit 3.2 | Materials Reuse—Furniture and Furnishings | 1 | Credit 1.2 | Regional Priority: Specific Credit | 1 | |||||||||
| Credit 4 | Recycled Content | 1 to 2 | Credit 1.3 | Regional Priority: Specific Credit | 1 | |||||||||
| Credit 5 | Regional Materials | 1 to 2 | Credit 1.4 | Regional Priority: Specific Credit | 1 | |||||||||
| Credit 6 | Rapidly Renewable Materials | 1 | ||||||||||||
| Credit 7 | Certified Wood | 1 | 0 | 0 | 0 | Total | Possible Points: | 110 | ||||||
| Certified 40 to 49 points Silver 50 to 59 points Gold 60 to 79 points Platinum 80 to 110 |
Detailed
| LEED 2009 for Commercial Interiors | RLP No. 0VA2222 | ||||||||
| Project Checklist | Date | ||||||||
| 0 | 0 | 0 | Sustainable Sites | Possible Points: | 21 | ||||
| Y | ? | N | Notes: | ||||||
| d | Credit 1 | Site Selection | 1 to 5 | ||||||
| Option 1: Select a LEED Certified Building | 5 | ||||||||
| OR | |||||||||
| Path 1: Brownfield Redevelopment | 1 | ||||||||
| Path 2: Stormwater Design—Quantity Control | 1 | ||||||||
| Path 3: Stormwater Design—Quality Control | 1 | ||||||||
| Path 4: Heat Island Effect—Nonroof | 1 | ||||||||
| Path 5: Heat-Island Effect—Roof | 1 | ||||||||
| Path 6: Light Pollution Reduction | 1 | ||||||||
| Path 7: Water Efficient Landscaping—Reduce by 50% | 2 | ||||||||
| Path 8: Water Efficient Landscaping—No Potable Water Use or Irrigation | 2 | ||||||||
| Path 9: Innovative Wastewater Technologies | 2 | ||||||||
| Path 10: Water Use Reduction—30% Reduction | 1 | ||||||||
| Path 11: On-site Renewable Energy | 2 | ||||||||
| Path 12: Other Quantifiable Environmental Performance | 1 | ||||||||
| d | Credit 2 | Development Density and Community Connectivity | 6 | ||||||
| d | Credit 3.1 | Alternative Transportation—Public Transportation Access | 6 | ||||||
| d | Credit 3.2 | Alternative Transportation—Bicycle Storage and Changing Rooms | 2 | ||||||
| d | Credit 3.3 | Alternative Transportation—Parking Availability | 2 | ||||||
| 0 | 0 | 0 | Water Efficiency | Possible Points: | 11 | ||||
| Y | ? | N | Notes: | ||||||
| Y | d | Prereq 1 | Water Use Reduction—20% Reduction | ||||||
| d | Credit 1 | Water Use Reduction | 6 to 11 | ||||||
| 0 | 0 | 0 | Energy and Atmosphere | Possible Points: | 37 | ||||
| Y | ? | N | Notes: | ||||||
| Y | C | Prereq 1 | Fundamental Commissioning of Building Energy Systems | ||||||
| Y | d | Prereq 2 | Minimum Energy Performance | ||||||
| Y | d | Prereq 3 | Fundamental Refrigerant Management | ||||||
| d | Credit 1.1 | Optimize Energy Performance—Lighting Power | 1 to 5 | ||||||
| 15% Reduction | 1 | ||||||||
| 20% Reduction | 2 | ||||||||
| 25% Reduction | 3 | ||||||||
| 30% Reduction | 4 | ||||||||
| 35% Reduction | 5 | ||||||||
| d | Credit 1.2 | Optimize Energy Performance—Lighting Controls | 1 to 3 | ||||||
| Daylight Controls for Daylit Areas | 1 | ||||||||
| Daylight Controls for 50% of the Lighting Load | 1 | ||||||||
| Occupancy Sensors for 75% of the Connected Lighting Load | 1 | ||||||||
| d | Credit 1.3 | Optimize Energy Performance—HVAC | 5 to 10 | ||||||
| Equipment Efficiency | 5 | ||||||||
| Zoning Controls | 5 | ||||||||
| OR | |||||||||
| Reduce Design Energy Cost and 15% Improvement | 5 | ||||||||
| Reduce Design Energy Cost and 30% Improvement | 10 | ||||||||
| d | Credit 1.4 | Optimize Energy Performance—Equipment and Appliances | 1 to 4 | ||||||
| 70% ENERGY STAR | 1 | ||||||||
| 77% ENERGY STAR | 2 | ||||||||
| 84% ENERGY STAR | 3 | ||||||||
| 90% ENERGY STAR | 4 | ||||||||
| C | Credit 2 | Enhanced Commissioning | 5 | ||||||
| d | Credit 3 | Measurement and Verification | 2 to 5 | ||||||
| Install Sub-Metering Equipment | 2 | ||||||||
| Tenant Pays for Energy | 3 | ||||||||
| OR | |||||||||
| Metering, Measurement and Payment Accountability | 5 | ||||||||
| d | Credit 4 | Green Power | 5 | ||||||
| 0 | 0 | 0 | Materials and Resources | Possible Points: | 14 | ||||
| Y | ? | N | Notes: | ||||||
| Y | d | Prereq 1 | Storage and Collection of Recyclables | ||||||
| d | Credit 1.1 | Tenant Space—Long-Term Commitment | 1 | ||||||
| d | Credit 1.2 | Building Reuse | 1 to 2 | ||||||
| 40% Reuse | 1 | ||||||||
| 60% Reuse | 2 | ||||||||
| C | Credit 2 | Construction Waste Management | 1 to 2 | ||||||
| Divert 50% from Disposal | 1 | ||||||||
| Divert 75% from Disposal | 2 | ||||||||
| C | Credit 3.1 | Materials Reuse | 1 to 2 | ||||||
| 5% Reuse | 1 | ||||||||
| 10% Reuse | 2 | ||||||||
| C | Credit 3.2 | Materials Reuse—Furniture and Furnishings | 1 | ||||||
| C | Credit 4 | Recycled Content | 1 to 2 | ||||||
| 10% of Content | 1 | ||||||||
| 20% of Content | 2 | ||||||||
| C | Credit 5 | Regional Materials | 1 to 2 | ||||||
| 20% of Materials Manufactured | 1 | ||||||||
| 20% of Materials Manufactured and 10% Extracted | 2 | ||||||||
| C | Credit 6 | Rapidly Renewable Materials | 1 | ||||||
| C | Credit 7 | Certified Wood | 1 | ||||||
| 0 | 0 | 0 | Indoor Environmental Quality | Possible Points: | 17 | ||||
| Y | ? | N | Notes: | ||||||
| Y | d | Prereq 1 | Minimum IAQ Performance | ||||||
| Y | d | Prereq 2 | Environmental Tobacco Smoke (ETS) Control | ||||||
| d | Credit 1 | Outdoor Air Delivery Monitoring | 1 | ||||||
| d | Credit 2 | Increased Ventilation | 1 | ||||||
| C | Credit 3.1 | Construction IAQ Management Plan—During Construction | 1 | ||||||
| C | Credit 3.2 | Construction IAQ Management Plan—Before Occupancy | 1 | ||||||
| C | Credit 4.1 | Low-Emitting Materials—Adhesives and Sealants | 1 | ||||||
| C | Credit 4.2 | Low-Emitting Materials—Paints and Coatings | 1 | ||||||
| C | Credit 4.3 | Low-Emitting Materials—Flooring Systems | 1 | ||||||
| C | Credit 4.4 | Low-Emitting Materials—Composite Wood and Agrifiber Products | 1 | ||||||
| C | Credit 4.5 | Low-Emitting Materials—Systems Furniture and Seating | 1 | ||||||
| d | Credit 5 | Indoor Chemical & Pollutant Source Control | 1 | ||||||
| d | Credit 6.1 | Controllability of Systems—Lighting | 1 | ||||||
| d | Credit 6.2 | Controllability of Systems—Thermal Comfort | 1 | ||||||
| d | Credit 7.1 | Thermal Comfort—Design | 1 | ||||||
| d | Credit 7.2 | Thermal Comfort—Verification | 1 | ||||||
| d | Credit 8.1 | Daylight and Views—Daylight | 1 to 2 | ||||||
| 75% of Spaces | 1 | ||||||||
| 90% of Spaces | 2 | ||||||||
| d | Credit 8.2 | Daylight and Views—Views for Seated Spaces | 1 | ||||||
| 0 | 0 | 0 | Innovation and Design Process | Possible Points: | 6 | ||||
| Y | ? | N | Notes: | ||||||
| d/C | Credit 1.1 | Innovation in Design: Specific Title | 1 | ||||||
| d/C | Credit 1.2 | Innovation in Design: Specific Title | 1 | ||||||
| d/C | Credit 1.3 | Innovation in Design: Specific Title | 1 | ||||||
| d/C | Credit 1.4 | Innovation in Design: Specific Title | 1 | ||||||
| d/C | Credit 1.5 | Innovation in Design: Specific Title | 1 | ||||||
| d | Credit 2 | LEED Accredited Professional | 1 | ||||||
| 0 | 0 | 0 | Regional Priority Credits | Possible Points: | 4 | ||||
| Y | ? | N | Notes: | ||||||
| d/C | Credit 1.1 | Regional Priority: Specific Credit | 1 | ||||||
| d/C | Credit 1.2 | Regional Priority: Specific Credit | 1 | ||||||
| d/C | Credit 1.3 | Regional Priority: Specific Credit | 1 | ||||||
| d/C | Credit 1.4 | Regional Priority: Specific Credit | 1 | ||||||
| 0 | 0 | 0 | Total | Possible Points: | 110 | ||||
| Certified 40 to 49 points Silver 50 to 59 points Gold 60 to 79 points Platinum 80 to 110 |
&L&"Trebuchet MS,Regular"&8LEED 2009 for Commercial Interiors Project Checklist
File details come from the government source that posted it. Updated .