RLP_No_0VA2222_-_LEED-NC_2009_Checklist.pdf
PDF 122 KB Posted
- Attached to
- Lease Space to the Federal Government in Frederick County, Virginia, or Winchester, Virginia - 0VA2222
- Solicitation number
- 0VA2222
About this file
LEED-NC 2009 Checklist Pursuant to Amendment 05 to RLP No. 0VA2222 this document is attached to and included as part of RLP No. 0VA2222.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEED 2009 for New Construction and Major Renovations RLP No. 0VA2222
Project Checklist Date
Possible Points: 26 Y ? N Y ? N
Y Prereq 1 Credit 4 1 to 2
Credit 1 1 Credit 5 1 to 2
Credit 2 5 Credit 6 Rapidly Renewable Materials 1
Credit 3 Brownfield Redevelopment 1 Credit 7 1
Credit 4.1 6
Credit 4.2 1 Possible Points: 15 Credit 4.3 Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles 3
Credit 4.4 2 Y Prereq 1
Credit 5.1 Site Development—Protect or Restore Habitat 1 Y Prereq 2
Credit 5.2 Site Development—Maximize Open Space 1 Credit 1 1
Credit 6.1 Stormwater Design—Quantity Control 1 Credit 2 1
Credit 6.2 Stormwater Design—Quality Control 1 Credit 3.1 1
Credit 7.1 Heat Island Effect—Non-roof 1 Credit 3.2 1
Credit 7.2 1 Credit 4.1 1
Credit 8 Light Pollution Reduction 1 Credit 4.2 1
Credit 4.3 1
Possible Points: 10 Credit 4.4 1
Credit 5 1
Y Prereq 1 Credit 6.1 Controllability of Systems—Lighting 1
Water Efficient Landscaping 2 to 4 1
Construction IAQ Management Plan—Before Occupancy
Materials and Resources, Continued
Water Efficiency
Alternative Transportation—Parking Capacity
Heat Island Effect—Roof
Recycled Content
Regional Materials
Certified Wood
Alternative Transportation—Bicycle Storage and Changing Rooms
Sustainable Sites
Alternative Transportation—Public Transportation Access
Site Selection
Development Density and Community Connectivity
Construction Activity Pollution Prevention
Low-Emitting Materials—Adhesives and Sealants
Low-Emitting Materials—Paints and Coatings
Water Use Reduction—20% Reduction
Low-Emitting Materials—Composite Wood and Agrifiber Products
Low-Emitting Materials—Flooring Systems
Indoor Chemical and Pollutant Source Control
Controllability of Systems—Thermal Comfort
Construction IAQ Management Plan—During Construction
Outdoor Air Delivery Monitoring
Indoor Environmental Quality
Minimum Indoor Air Quality Performance
Environmental Tobacco Smoke (ETS) Control
Increased Ventilation
Credit 1 Water Efficient Landscaping 2 to 4 Credit 6.2 1
Credit 2 Innovative Wastewater Technologies 2 Credit 7.1 1
Credit 3 2 to 4 Credit 7.2 Thermal Comfort—Verification 1
Credit 8.1 1
Possible Points: 35 Credit 8.2 1
Y Prereq 1 Possible Points: 6 Y Prereq 2
Y Prereq 3 Credit 1.1 1
Credit 1 1 to 19 Credit 1.2 1
Credit 2 1 to 7 Credit 1.3 1
Credit 3 2 Credit 1.4 1
Credit 4 2 Credit 1.5 1
Credit 5 3 Credit 2 1
Credit 6 2
Possible Points: 4 Possible Points: 14
Credit 1.1 1
Y Prereq 1 Credit 1.2 1
Credit 1.1 1 to 3 Credit 1.3 1
Credit 1.2 Building Reuse—Maintain 50% of Interior Non-Structural Elements 1 Credit 1.4 1
Credit 2 1 to 2
Credit 3 1 to 2 Possible Points: 110
Regional Priority: Specific Credit
Regional Priority: Specific Credit
Regional Priority: Specific Credit
Regional Priority: Specific Credit
Measurement and Verification
Innovation in Design: Specific Title
Innovation in Design: Specific Title
Innovation in Design: Specific Title
Innovation in Design: Specific Title
Innovation in Design: Specific Title
Materials Reuse
Storage and Collection of Recyclables
Materials and Resources
Fundamental Commissioning of Building Energy Systems
Total Construction Waste Management
Enhanced Commissioning
On-Site Renewable Energy
Enhanced Refrigerant Management
Building Reuse—Maintain Existing Walls, Floors, and Roof
Optimize Energy Performance
Energy and Atmosphere
Thermal Comfort—Design
Controllability of Systems—Thermal Comfort
Green Power
Water Use Reduction
Minimum Energy Performance
Fundamental Refrigerant Management
Daylight and Views—Views
LEED Accredited Professional
Daylight and Views—Daylight
Certified 40 to 49 points Silver 50 to 59 points Gold 60 to 79 points Platinum 80 to 110
Regional Priority Credits
Innovation and Design Process
0 0 0 Possible Points: 26
Y ? N d/C Notes:
Y C Prereq 1 d Credit 1 1 d Credit 2 5 d Credit 3 Brownfield Redevelopment 1 d Credit 4.1 6 d Credit 4.2 1 d Credit 4.3 Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles 3 d Credit 4.4 2
C Credit 5.1 Site Development—Protect or Restore Habitat 1 d Credit 5.2 Site Development—Maximize Open Space 1 d Credit 6.1 Stormwater Design—Quantity Control 1 d Credit 6.2 Stormwater Design—Quality Control 1
C Credit 7.1 Heat Island Effect—Non-roof 1 d Credit 7.2 1 d Credit 8 Light Pollution Reduction 1
0 0 0 Possible Points: 10
Y ? N Notes:
Y d Prereq 1 d Credit 1 Water Efficient Landscaping 2 to 4
Reduce by 50% 2
No Potable Water Use or Irrigation 4 d Credit 2 Innovative Wastewater Technologies 2 d Credit 3 2 to 4
Reduce by 30% 2
Reduce by 35% 3
Reduce by 40% 4
Sustainable Sites
Water Efficiency
Alternative Transportation—Parking Capacity
Heat Island Effect—Roof
Water Use Reduction—20% Reduction
Water Use Reduction
Construction Activity Pollution Prevention
Site Selection
Development Density and Community Connectivity
Alternative Transportation—Public Transportation Access
Alternative Transportation—Bicycle Storage and Changing Rooms
LEED 2009 for New Construction and Major Renovations Project Checklist
0 0 0 Possible Points: 35
Y ? N Notes:
Y C Prereq 1
Y d Prereq 2
Y d Prereq 3 d Credit 1 1 to 19
Improve by 12% for New Buildings or 8% for Existing Building Renovations 1
Improve by 14% for New Buildings or 10% for Existing Building Renovations 2
Improve by 16% for New Buildings or 12% for Existing Building Renovations 3
Improve by 18% for New Buildings or 14% for Existing Building Renovations 4
Improve by 20% for New Buildings or 16% for Existing Building Renovations 5
Improve by 22% for New Buildings or 18% for Existing Building Renovations 6
Improve by 24% for New Buildings or 20% for Existing Building Renovations 7
Improve by 26% for New Buildings or 22% for Existing Building Renovations 8
Improve by 28% for New Buildings or 24% for Existing Building Renovations 9
Improve by 30% for New Buildings or 26% for Existing Building Renovations 10
Improve by 32% for New Buildings or 28% for Existing Building Renovations 11
Improve by 34% for New Buildings or 30% for Existing Building Renovations 12
Improve by 36% for New Buildings or 32% for Existing Building Renovations 13
Improve by 38% for New Buildings or 34% for Existing Building Renovations 14
Improve by 40% for New Buildings or 36% for Existing Building Renovations 15
Improve by 42% for New Buildings or 38% for Existing Building Renovations 16
Improve by 44% for New Buildings or 40% for Existing Building Renovations 17
Improve by 46% for New Buildings or 42% for Existing Building Renovations 18
Improve by 48%+ for New Buildings or 44%+ for Existing Building Renovations 19 d Credit 2 1 to 7
1% Renewable Energy 1
3% Renewable Energy 2
5% Renewable Energy 3
7% Renewable Energy 4
9% Renewable Energy 5
11% Renewable Energy 6
13% Renewable Energy 7
C Credit 3 2 d Credit 4 2
C Credit 5 3
C Credit 6 2
Fundamental Refrigerant Management
Fundamental Commissioning of Building Energy Systems
Optimize Energy Performance
On-Site Renewable Energy
Energy and Atmosphere
Enhanced Commissioning
Enhanced Refrigerant Management
Measurement and Verification
Green Power
Minimum Energy Performance
0 0 0 Possible Points: 14
Y ? N Notes:
Y d Prereq 1
C Credit 1.1 1 to 3
Reuse 55% 1
Reuse 75% 2
Reuse 95% 3
C Credit 1.2 Building Reuse—Maintain 50% of Interior Non-Structural Elements 1
C Credit 2 1 to 2
50% Recycled or Salvaged 1
75% Recycled or Salvaged 2
C Credit 3 1 to 2
Reuse 5% 1
Reuse 10% 2
C Credit 4 1 to 2
10% of Content 1
20% of Content 2
C Credit 5 1 to 2
10% of Materials 1
20% of Materials 2
C Credit 6 Rapidly Renewable Materials 1
C Credit 7 1
Materials and Resources
Storage and Collection of Recyclables
Building Reuse—Maintain Existing Walls, Floors, and Roof
Construction Waste Management
Materials Reuse
Recycled Content
Regional Materials
Certified Wood
0 0 0 Possible Points: 15
Y ? N Notes:
Y d Prereq 1
Y d Prereq 2 d Credit 1 1 d Credit 2 1
C Credit 3.1 1
C Credit 3.2 1
C Credit 4.1 1
C Credit 4.2 1
C Credit 4.3 1
C Credit 4.4 1 d Credit 5 1 d Credit 6.1 Controllability of Systems—Lighting 1 d Credit 6.2 1 d Credit 7.1 1 d Credit 7.2 Thermal Comfort—Verification 1 d Credit 8.1 1 d Credit 8.2 1
0 0 0 Possible Points: 6
Y ? N Notes:
d/C Credit 1.1 1 d/C Credit 1.2 1 d/C Credit 1.3 1 d/C Credit 1.4 1 d/C Credit 1.5 1 d/C Credit 2 1
0 0 0 Possible Points: 4
Y ? N Notes:
d/C Credit 1.1 1 d/C Credit 1.2 1 d/C Credit 1.3 1 d/C Credit 1.4 1
0 0 0 Possible Points: 110 Certified 40 to 49 points Silver 50 to 59 points Gold 60 to 79 points Platinum 80 to 110
Indoor Environmental Quality
Innovation in Design: Specific Title
Innovation in Design: Specific Title
Innovation in Design: Specific Title
Minimum Indoor Air Quality Performance
Environmental Tobacco Smoke (ETS) Control
Outdoor Air Delivery Monitoring
Increased Ventilation
Construction IAQ Management Plan—During Construction
Construction IAQ Management Plan—Before Occupancy
Low-Emitting Materials—Adhesives and Sealants
Low-Emitting Materials—Paints and Coatings
Low-Emitting Materials—Flooring Systems
Low-Emitting Materials—Composite Wood and Agrifiber Products
LEED Accredited Professional
Regional Priority: Specific Credit
Regional Priority: Specific Credit
Regional Priority: Specific Credit
Regional Priority: Specific Credit
Innovation and Design Process
Total
Indoor Chemical and Pollutant Source Control
Controllability of Systems—Thermal Comfort
Thermal Comfort—Design
Daylight and Views—Daylight
Daylight and Views—Views
Regional Priority Credits
Innovation in Design: Specific Title
Innovation in Design: Specific Title
File details come from the government source that posted it. Updated .