This is a Tenant Improvements Cost Summary (TICS) template, Version February 2026, used for estimating and documenting construction costs associated with leasehold space improvements. The template is configured for Lease No. 57-46091-26-FA in Mountain City, Tennessee, though all cost fields currently display zero values, indicating this is a blank or preliminary version awaiting completion.

The TICS template is structured to capture both Tenant Improvement (TI) costs and Shell costs across 33 Masterformat CSI divisions, ranging from General Requirements (Division 1) through Utilities (Division 33). For each division, users input material descriptions, quantities, unit costs, labor hours, labor rates, and totals. The template automatically calculates subtotals for trade costs, general contractor fees, architectural and engineering fees, lessor's project management fees, and other lessor costs. Additional sections accommodate Building Specific Amortized Capital (BSAC) costs, typically for security-related improvements, and fees applied to both TI and BSAC. Shell work is defined per GSA Pricing Desk Guide standards and includes base building components such as structure, enclosure, mechanical/electrical/plumbing systems, finishes, and fire suppression. The INPUT tab requires key data including ABOA square footage, General Contractor Fee percentages or lump sums for both TI and Shell work, A/E fees, Lessor's Project Management Fee percentages, and Other Lessor Costs. All percentage-based fees for TI automatically apply to BSAC costs if applicable, while lump sum basis amounts do not duplicate.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TICS

TENANT IMPROVEMENTS COST SUMMARY (TICS)Version Feb. 2026
For:57-46091-26-FAABOA SF=- 0
TIA PER ABOA SF=$ - 0
Location:Mountain City, TennesseeTOTAL TIA=$ - 0
Common Area Factor:-RSF=- 0
Masterformat CSISystem ElementsTI*SHELL**
Div 1General Requirements$ - 0$ - 0
Div 2Existing Conditions$ - 0$ - 0
Div 3Concrete$ - 0$ - 0
Div 4Masonry$ - 0$ - 0
Div 5Metals$ - 0$ - 0
Div 6Wood, Plastics, Composites$ - 0$ - 0
Div 7Thermal and Moisture Protection$ - 0$ - 0
Div 8Openings$ - 0$ - 0
Div 9Finishes$ - 0$ - 0
Div 10Specialties$ - 0$ - 0
Div 11Equipment$ - 0$ - 0
Div 12Furnishings$ - 0$ - 0
Div 13Special Construction$ - 0$ - 0
Div 14Conveying Equipment$ - 0$ - 0
Div 21Fire Suppression$ - 0$ - 0
Div 22Plumbing$ - 0$ - 0
Div 23Heating, Ventilating, and Air Conditioning (HVAC)$ - 0$ - 0
Div 26.1Electrical$ - 0$ - 0
Div 26.2Lighting$ - 0$ - 0
Div 27Communications$ - 0$ - 0
Div 28.1Electronic Safety$ - 0$ - 0
Div 28.2Electronic Security (TI - Non-BSAC)$ - 0$ - 0
Div 31Earthwork$ - 0$ - 0
Div 32Exterior Improvements$ - 0$ - 0
Div 33Utilities$ - 0$ - 0
SubtotalTrade Costs$ - 0$ - 0
General Contractor Fee$ - 0$ - 0
SubtotalConstruction Costs$ - 0$ - 0
Architectural & Engineering Fees (NIC DID costs) ***$ - 0$ - 0
Other Lessor Costs Established Under the Lease$ - 0$ - 0
SubtotalLessor's Costs:$ - 0$ - 0
Lessor's Project Management FeePercent$ - 0
TotalPrice to Government:GRAND TOTAL$ - 0
Cost per ABOA SF$ - 0$ - 0
Cost per RSF$ - 0$ - 0
Notes:
*Include all subcontractors' costs.
**Shell and core work items within tenant space will include those items for a warm lit shell. Please refer to the SHELL DEFINITIONS tab, and the lease for further information.
***Not subject to Lessor's project management fee.
BSAC SUMMARY
BSACBuilding Specific Amortized Capital Costs$ - 0
BSAC Architectural & Engineering Fees$ - 0
BSAC Lessor's Project Management FeePercent$ - 0
TotalBSAC Costs and FeesTOTAL$ - 0
Cost per ABOA SF$ - 0
Cost per RSF$ - 0

EXHIBIT H

LEASE No. 57-47091-26-FA

INITIALS: _______ LESSOR & _______ GOV'T Page &P of &N

INSTRUCTIONS

INSTRUCTIONS
Read and understand 'SHELL' tab.
Input project specific information as appropriate in the light blue fields of the 'INPUT' worksheet, in order to auto-populate the TICS worksheet. This includes ANSI-BOMA Office Area (ABOA) square footage, General Contractor Fee, Lessor's Project Management Fee, and A/E Fees. Note that some of these fees are already established under the lease agreement and must be used when completing this worksheet.
Fill in each line for all Shell and TI items in the corresponding division tabs included in the Tenant Improvement Cost Summary (TICS). Include all subcontractors' soft costs. Example shown below.
Material
DescriptionAccurately describe each item being priced.
QuantityList the quantity e.g., 1, 2, 3, etc.
Unit(Example) LS,EA,GAL,LF, SF, etc.
CostAmount per one unit
TotalTotal cost of all material.
Labor
HoursTime projected to perform the task.
Labor RateCost per hour of labor.
TotalCost of labor.
TOTAL Combines overall materials and labor.

Tenant Improvements (TI)

TIs include the finishes and fixtures that take space from the shell condition to a finished, usable condition.

1. Fill out light blue fields categorized Tenant Improvements (TI), inputting only costs associated with TI.

2. Fill each division tab 1-33 as needed for the construction to be performed under the TI costs as indicated above.

Shell

1. Fill out light blue fields categorized SHELL, inputting only costs associated with shell as defined in the 'SHELL' tab.

2. Fill each division tab 1-33 as needed for the construction to be preformed under the SHELL cost as indicated above.

DIVISION 9 - FINISHESFOR:DATE PREPARED:
Project or Lease #1/1/22
Tentant Improvement (TI) Cost Estimate for Division 9
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
XYZ Paint1.00GAL.$25.00$25.002.50$36.25$90.63
$0.00$0.00
$0.00$0.00
Material Total:$25.00Labor Total:$90.63
TOTAL TI MATERIAL & LABOR:$115.63
Shell Cost Estimate for Division 9
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
ABC Paint10.00GAL.$27.00$270.006.00$36.25$217.50
$0.00$0.00
$0.00$0.00
Material Total:$270.00Labor Total:$217.50
TOTAL SHELL MATERIAL & LABOR:$487.50

Building Specific Amortized Capital (BSAC)

BSAC is used for the build-out of security-related improvements, most commonly listed on a 'Security Requirements' attachment.

1. Because Architectural & Engineering Fees and Lessor's Project Management Fees apply to BSAC as well as Tenant Improvement costs, this form includes opportunities to include BSAC pricing in order to capture a comprehensive fee evalutation. Fees identified as having a percentage basis for TI costs on the INPUT tab will automatically be applied to BSAC costs as well on the TICS tab, if applicable.

2. BSAC elements are traditionally itemized on a Security Unit Price List form. Enter the 'Total Costs' value from that form on the BSAC tab as instructed on the page. If a Security Unit Price List is not available and/or a more detailed examination of BSAC costs is desired, the BSAC tab can also itemize costs.

INITIALS: _______ LESSOR & _______ GOV'T Page &P of &N

SHELL

Per GSA Pricing Desk Guide, 5th Edition.
Table 2-4. Shell Definition for General Use Buildings
Base BuildingOccupant Areas

Base structure and building enclosure components (windows with exterior finishes) are complete.

Broom-clean concrete floor slab, with a flat and level floor.

Base building mechanical, electrical and plumbing systems (e.g., central fire alarm, chiller plant, cooling tower) are complete and functional.

Gypsum wallboard, spackled and prime painted, on exterior perimeter walls and tenant demising walls, without suite entry door.

All common areas, such as lobbies, elevators, fire egress corridors and stairwells, garages, and service areas are complete. (Circulation corridors are provided as part of the base building only on multi- tenanted floors where the corridor is common to more than one tenant. On single tenant floors, only the fire egress corridor necessary to meet code is provided as part of the shell.)

Suspended acoustical ceiling system including grid and lay-in tiles (or other building standard). Lighting luminaires should be installed in the ceiling grid for an open office plan at the rate of one fixture per 80 USF.3 Lighting controls with ambient lighting adjusted per daylight availability, occupancy, vacancy, or other building automation system signals.

Building common restrooms are complete and operational.

Building cores on each floor with assignable space contain the following: tappable domestic water riser, service sanitary drain, sanitary vent, ready for extension to tenant- demised areas.

Electrical power distribution panels and circuit breakers available in an electrical closet, with capacity at 120/208 volt, 3- phase, 4-wire providing 4 watts per USF excluding lighting and HVAC.

Designated connection point to the central fire alarm system for extension to tenant- demised areas.

Distribution backboard within a wire closet for connection to tenant’s telephone lines. Vertical conduit (empty sleeve) through building core, available for tenant wiring and cabling.

Central heating, ventilation, and air conditioning (HVAC) systems are installed and operational, including, as appropriate, main and branch lines, variable air volume boxes, dampers, flex ducts and diffusers, for open office layout. Conditioned air through medium pressure ductwork at a rate of .75 cfm per square foot of usable area is provided.

Sprinkler mains and distribution piping in a protection layout (open plan) with heads turned down, concealed with an escutcheon or trim plate, are installed.

INITIALS: _______ LESSOR & _______ GOV'T Page &P of &N

INPUT

INFORMATION NEEDED TO COMPLETE TICS TABLEFALSE
FALSE
LEASE GS-XXP-LXXXXXXX or Project57-46091-26-FAFALSE
FALSE
Location: City, StateMountain City, TennesseeFALSE
FALSE
ABOA SF =General contractor fee, A/E Fee and Lessor's Project Management Fee fields are structured to allow you to choose percentage or a lump sum.
TENANT IMPROVEMENT ALLOWANCE PER ABOA SF =
RSF=
DATE:
BasisAmount
Tenant Improvement General Contractor FeeEnter percent values as decimals. Ex: 0.06 for 6.00%
Shell General Contractor Fee
Tenant Improvement A/E Fees (per Lease)
Shell A/E FeesFor A/E fees established as a cost per ABOA sf, convert rate to lump sum.
Lessor's TI Project Management Fee (per Lease)percent
StevenTFreund: Request for Lease Proposals requires a percentage basis for TI and BSAC project management fee.percent
TIShelllump sum
Other Lessor Costs Established Under the Lease

If BSAC is applicable, 'Amount' values entered above for TI fees that have a 'percent' basis will automatically be applied to BSAC on the TICS tab. 'Lump Sum' basis amounts will NOT be applied twice; 'lump sum' basis amounts entered above should consider the full scope of both TI and BSAC and will only be displayed once on the TICS tab.

INITIALS: _______ LESSOR & _______ GOV'T Page &P of &N

BSAC

BUILDING SPECIFIC AMORTIZED CAPITAL (BSAC)FOR:DATE PREPARED:
57-46091-26-FA
Building Specific Amortized Capital (BSAC) Cost Estimate (Most commonly itemized on a Security Unit Price List.)
Select Method of BSAC Inclusion:N/A← Click if entering BSAC values
If entering BSAC values, select method from cell F4 dropdown list.
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL BSAC MATERIAL AND LABOR:$ - 0
Division 1 - General RequirementsFOR:DATE PREPARED:
57-46091-26-FA
Tentant Improvement (TI) Cost Estimate for Division 1 (examples: superintendence, mob/demob, dust control, waste & dumpsters, temporary barriers & barricades)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 1 (examples: superintendence, mob/demob, dust control, waste & dumpsters, temporary barriers & barricades)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

INITIALS: _______ LESSOR & _______ GOV'T Page &P of &N

Division 2 - Existing ConditionsFOR:DATE PREPARED:
57-46091-26-FA
Tentant Improvement (TI) Cost Estimate for Division 2 (examples: site work, demolition)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 2 (examples: demolition, survey, geotech, HAZMAT)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

INITIALS: _______ LESSOR & _______ GOV'T Page &P of &N

Division 3 - ConcreteFOR:DATE PREPARED:
57-46091-26-FA
Tentant Improvement (TI) Cost Estimate for Division 3
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 3 (examples: foundations, columns, flatwork, beams)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

INITIALS: _______ LESSOR & _______ GOV'T Page &P of &N

Division 4 - MasonryFOR:DATE PREPARED:
57-46091-26-FA
Tentant Improvement (TI) Cost Estimate for Division 4
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 4 (examples: brick, block)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

INITIALS: _______ LESSOR & _______ GOV'T Page &P of &N

Division 5 - MetalsFOR:DATE PREPARED:
57-46091-26-FA
Tentant Improvement (TI) Cost Estimate for Division 5 (examples: structural, grates, decking, joists, stairs, railings, custom fabrications)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 5 (examples: structural, grates, decking, joists, stairs, railings, custom fabrications)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

INITIALS: _______ LESSOR & _______ GOV'T Page &P of &N

DIVISION 6 - WOOD, PLASTICS, COMPOSITESFOR:DATE PREPARED:
57-46091-26-FA
Tentant Improvement (TI) Cost Estimate for Division 6 (examples: wood framing, rough carpentry, sheathing, millwork, decking, paneling, stairs & railings)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 6 (examples: wood framing, rough carpentry, sheathing, millwork, decking, paneling, stairs & railings)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

INITIALS: _______ LESSOR & _______ GOV'T Page &P of &N

DIVISION 7 - THERMAL & MOISTURE PROTECTIONFOR:DATE PREPARED:
57-46091-26-FA
Tentant Improvement (TI) Cost Estimate for Division 7 (examples: roof Penetration/Patching, firestopping, joint sealants, caulking, dampproofing, insulation, weather barriers)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 7 (examples: roof Penetration/Patching, firestopping, joint sealants, caulking, dampproofing, insulation, weather barriers)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

INITIALS: _______ LESSOR & _______ GOV'T Page &P of &N

DIVISION 8 - OPENINGSFOR:DATE PREPARED:
57-46091-26-FA
Tentant Improvement (TI) Cost Estimate for Division 8 (examples: doors, frames, hardware, louvers, windows, glazing, curtainwall)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 8 (examples: doors, frames, hardware, louvers, windows, glazing, curtainwall)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

INITIALS: _______ LESSOR & _______ GOV'T Page &P of &N

DIVISION 9 - FINISHESFOR:DATE PREPARED:
57-46091-26-FA
Tentant Improvement (TI) Cost Estimate for Division 9 (examples: painting, carpeting, flooring & base, wall protection, walls)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 9 (examples: painting, carpeting, flooring & base, wall protection, walls)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

INITIALS: _______ LESSOR & _______ GOV'T Page &P of &N

DIVISION 10 - SPECIALTIESFOR:DATE PREPARED:
57-46091-26-FA
Tentant Improvement (TI) Cost Estimate for Division 10 (examples: displays, signage, directory boards, movable partitions, wall and door protection, lockers, flagpoles, storage assemblies)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 10 (examples: displays, signage, directory boards, movable partitions, wall and door protection, lockers, flagpoles, storage assemblies)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

INITIALS: _______ LESSOR & _______ GOV'T Page &P of &N

DIVISION 11 - EQUIPMENTFOR:DATE PREPARED:
57-46091-26-FA
Tentant Improvement (TI) Cost Estimate for Division 11 (examples: AV, lab, recreational, food, banking, medical, retail, parking, loading dock, and other equipment)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 11 (examples: AV, lab, recreational, food, banking, medical, retail, parking, loading dock, and other equipment)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

INITIALS: _______ LESSOR & _______ GOV'T Page &P of &N

DIVISION 12 - FURNISHINGSFOR:DATE PREPARED:
57-46091-26-FA
Tentant Improvement (TI) Cost Estimate for Division 12 (examples: decorations, systems and office funiture, casework, countertops)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 12 (examples: decorations, systems and office funiture, casework, countertops)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

INITIALS: _______ LESSOR & _______ GOV'T Page &P of &N

DIVISION 13 - SPECIAL CONSTRUCTIONFOR:DATE PREPARED:
57-46091-26-FA
Tentant Improvement (TI) Cost Estimate for Division 13 (examples: pre-engineered & prefab structures)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 13 (examples: pre-engineered & prefab structures)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

INITIALS: _______ LESSOR & _______ GOV'T Page &P of &N

DIVISION 14 - CONVEYING EQUIPMENTFOR:DATE PREPARED:
57-46091-26-FA
Tentant Improvement (TI) Cost Estimate for Division 14
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 14
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

INITIALS: _______ LESSOR & _______ GOV'T Page &P of &N

DIVISION 21 - FIRE SUPPRESSIONFOR:DATE PREPARED:
57-46091-26-FA
Tentant Improvement (TI) Cost Estimate for Division 21
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 21
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

INITIALS: _______ LESSOR & _______ GOV'T Page &P of &N

DIVISION 22 - PLUMBINGFOR:DATE PREPARED:
57-46091-26-FA
Tentant Improvement (TI) Cost Estimate for Division 22
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 22
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

INITIALS: _______ LESSOR & _______ GOV'T Page &P of &N

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)FOR:DATE PREPARED:
57-46091-26-FA
Tentant Improvement (TI) Cost Estimate for Division 23
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 23
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

INITIALS: _______ LESSOR & _______ GOV'T Page &P of &N

26.1

DIVISION 26.1 - ELECTRICALFOR:DATE PREPARED:
57-46091-26-FA
Tentant Improvement (TI) Cost Estimate for Division 26.1 (examples: conduit, wire, supports, boxes, fittings, terminations, outlets, cover plates, receptacles, power devices, panels & breakers, electrical equipment)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 26.1 (examples: conduit, wire, supports, boxes, fittings, terminations, outlets, cover plates, receptacles, power devices, panels & breakers, electrical equipment)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

INITIALS: _______ LESSOR & _______ GOV'T Page &P of &N

26.2

DIVISION 26.2 - LIGHTINGFOR:DATE PREPARED:
57-46091-26-FA
Tentant Improvement (TI) Cost Estimate for Division 26.2 (examples: lighting fixtures, wall switches, motion switches)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 26.2 (examples: lighting fixtures, wall switches, motion switches)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

INITIALS: _______ LESSOR & _______ GOV'T Page &P of &N

DIVISION 27 - COMMUNICATIONSFOR:DATE PREPARED:
57-46091-26-FA
Tentant Improvement (TI) Cost Estimate for Division 27 (examples: Low Voltage cabling (CAT6, POE, Coax, HDMI, speaker), overhead speakers/intercom, sound-masking/white noise devices, jacks, punchdown, cover plates, cable trays/j-hooks, server racks (conduit & boxes see Div 26.1))
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 27
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

INITIALS: _______ LESSOR & _______ GOV'T Page &P of &N

28.1

DIVISION 28.1 - ELECTRONIC SAFETYFOR:DATE PREPARED:
57-46091-26-FA
Tentant Improvement (TI) Cost Estimate for Division 28.1 (examples: Fire Alarm Only: wire, devices, smokes, heats, CO2, exit signs, addressing & testing)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 28.1
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

INITIALS: _______ LESSOR & _______ GOV'T Page &P of &N

28.2

DIVISION 28.2 - ELECTRONIC SECURITYFOR:DATE PREPARED:
57-46091-26-FA
Tentant Improvement (TI) Cost Estimate for Division 28.2 (examples: duress, IDS, motion, video surveillance systems, CCTV, security scanning, glass break, alarm devices) SHOULD NOT include items required/itemized as BSAC on a Security Unit Price List, provided separately, or the BSAC tab on this form. SHOULD include items labeled TI on a Security Unit Price List.
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 28.2 SHOULD NOT include items required/itemized as BSAC on a Security Unit Price List, provided separately if necessary. SHOULD include items labeled SHELL on a Security Unit Price List.
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

INITIALS: _______ LESSOR & _______ GOV'T Page &P of &N

DIVISION 31 - EARTHWORKFOR:DATE PREPARED:
57-46091-26-FA
Tentant Improvement (TI) Cost Estimate for Division 31
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 31
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

cornerstone

INITIALS: _______ LESSOR & _______ GOV'T Page &P of &N

DIVISION 32 - EXTERIOR IMPROVEMENTSFOR:DATE PREPARED:
57-46091-26-FA
Tentant Improvement (TI) Cost Estimate for Division 32
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 32 (examples: site, civil, pavements, landscaping, walks, pedestals, fences, gates, permanent vehicle barriers, foundations, earthwork)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

INITIALS: _______ LESSOR & _______ GOV'T Page &P of &N

DIVISION 33 - UTILITIESFOR:DATE PREPARED:
57-46091-26-FA
Tentant Improvement (TI) Cost Estimate for Division 33
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 33
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

INITIALS: _______ LESSOR & _______ GOV'T Page &P of &N image1.jpg image2.emf image3.emf image4.emf image5.emf image6.emf image7.emf image8.emf image9.emf image10.emf image11.emf image12.emf image13.emf image14.emf image15.emf image16.emf image17.emf image18.emf image19.emf image20.emf image21.emf image22.emf image23.emf image24.emf image25.emf image26.emf image27.emf

File details come from the government source that posted it. Updated .