This is a mold remediation procedures document prepared by BSI for a FEMA facility (VSAB 1 FRF) located at 800 N. Loop 288 in Denton, Texas. The document outlines detailed procedures for remediating less than 25 square feet of contiguous mold growth affecting shoes, a leather chair, carpeting, contents and ceiling tile within the FRF room and lobby areas.

The procedures specify requirements for containment barriers, decontamination chambers, negative pressure/air filtration, personal protective equipment, and specific cleaning methodologies. Key requirements include using HEPA vacuums, installing critical barriers with 6-mil fire-retardant polyethylene sheeting, maintaining negative pressure with air filtration devices, and following detailed cleaning protocols for both the FRF room and lobby areas. Clearance criteria require post-remediation assessments including visual inspections and air/surface sampling, with specific spore count thresholds that must be met (less than 1000 spores per cubic meter total, no single genus exceeding 200 spores per cubic meter, and Stachybotrys below 70 spores per cubic meter). The associated contract opportunity indicates site visits are available on January 8th, 2025 and proposals are due January 10th, 2025 by 5:00 PM ET.

View the file

Other files

File Type Posted
BSI Initial Mold Assessment Report.2024-2118.pdf PDF
2.2.1 - RFQ--Update 3.docx DOCX document
wage determination.pdf PDF
1.1.4 - SOW - Mold Remediation - FRF room.doc DOC document
2.2.1 - RFQ.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BSI MOLD REMEDIATION PROCEDURES

BSI Project No. | 2024-2118

For Project:

FEMA - VSAB 1 FRF, 800 N. Loop 288, Denton, Texas 76209

Prepared For:

Native Energy & Technology, Inc., 12793 Cogburn Ave., San Antonio, Texas 78249

BSI Mold Remediation Procedures for BSI Project No. | 2024 - 2118 For Project: FEMA - VSAB 1 FRF, 800 N. Loop 288, Denton, Texas 76209

Prepared For: Native Energy & Technology, Inc., 12793 Cogburn Ave., San Antonio, Texas 78249

Jeffrey M. Hackney, MAC Mold Assessment Consultant

DSHS License Number MAC1098 Expiration Date 2/18/2025

July 17, 20204

TABLE OF CONTENTS

MOLD REMEDIATION PROCEDURES

1. REMEDIATION SUMMARY

2. AREAS OF REMEDIATION

3. METHODS OF REMEDIATION

3.1 CONTAINMENT PREPARATIONS

4. REMEDIATION METHODOLOGY

5. REMEDIATION AREA

6. CLEARANCE PROCEDURES AND CRITERIA

Project: FEMA - VSAB 1 FRF| 800 N. Loop 288| Denton, Texas 76209 Client: Native Energy & Technology, Inc. | 12793 Cogburn Ave. | San Antonio, Texas 78249

P a g e | 1 Jeff Hackney, MAC1098

Exp. 2/18/25

SERVICE AREA(S) – VSAB 1 FRF

APPROXIMATE AMOUNT OF IMPACTED MATERIAL - SHOES AND LEATHER CHAIR, AND LESS THAN 25 SF OF

CONTIGUOUS VISIBLE MOLD GROWTH.

MOLD REMEDIATION PROCEDURES

This mold remediation procedures document complies with Texas Mold Assessors and Remediators Administrative Rules (TMARAR).

1. Remediation Summary

2. Areas of Remediation

The mold remediation and decontamination protocol will specifically address the areas of visible mold on carpeting, contents and ceiling tile within the identified areas of VSAB 1 FRF. The area impacted includes approximately less than 25 sf of contiguous mold growth and state notification is not required.

3. Methods of Remediation

3.1 Containment Preparations

The purpose of containment during remediation activities is to limit release of mold into the air and surroundings. The primary objective of containment should be to prevent occupant and remediator exposure to mold.1

3.1.1 Critical Barriers

3.1.1.1 Remediation Areas

Critical barriers shall be installed to isolate the work area from other areas not included in the remediation. Critical barriers shall consist of a minimum of two layers of six- (6) mil fire-retardant polyethylene sheeting securely attached to the floors and walls of the Remediation Area following isolation of the HVAC units. All fixed objects within the Remediation Area shall be covered with a minimum of one layer of six- (6) mil fire-retardant polyethylene sheeting securely attached in place. All openings between the Remediation Areas and unoccupied areas shall be sealed to prevent access.

1 United States Environmental Protection Agency “Mold Remediation in Schools and Commercial Buildings

P a g e | 2

Critical barriers (a minimum of one layer of six- (6) mil fire-retardant polyethylene sheeting) shall cover all openings in the drywall ceilings, HVAC supply and return air vents, windows and doorways of areas and rooms not impacted by the remediation.

3.1.2 Decontamination

Construct a decontamination unit consisting of a minimum of two chambers. The first chamber will be considered the “changing or clean room”. Workers will enter the contained area through the clean room. The second chamber will be considered the “dirty room”. The dirty room will attach directly to the containment and will be separated from the containment and the clean room by double flaps. Workers will exit the containment through the dirty room. Workers shall HEPA vacuum disposable coveralls and remove them prior to entering the clean room. The decontamination chambers will be constructed of two layers of six - (6) mil fire-retardant polyethylene sheeting for walls, ceilings and floors. Contractor may choose to use commercially available portable decontamination chambers. At his discretion, Contractor may choose to construct three-stage wet decontamination chambers, which includes a functioning shower between the dirty room and the clean room. All wastewater should be filtered prior to discharge into the nearest sanitary sewer.

3.1.3 Negative Pressure/Air Filtration Devices

3.1.3.1 Remediation Area(s)

All air filtration devices (AFDs) and Negative Air Machines (NAMs) shall be HEPA filtered with a minimum of three stages of filtration (HEPA filter, primary filter, and secondary filter). The Remediation Contractor shall supply written verification to the MAC that all AFDs and NAMs have been wet wiped and cleaned prior to mobilization to the project and that primary, secondary and HEPA filters are clean prior to start of project. Remediation Contractor shall supply written verification that all seals are functioning properly, and no evidence of leakage occurs. This applies to HEPA vacuums as well.

The Remediation Contractor shall place and maintain the remediation area(s) under negative pressure relative to areas adjacent to the remediation area(s) until final clearance is achieved.

Negative pressure shall be verified by a manometer to the MAC prior to beginning remediation.

After negative pressure has been established, it may be confirmed visually until final clearance has been achieved. Whenever possible, negative air should be exhausted to the outside.

3.1.4 Personal Protective Equipment

Remediation workers will donn personal protective clothing consisting of a minimum of full body disposable coveralls from the time the potential for disturbance of mold is expected. It is the Contractor's responsibility to ensure that his employees are afforded the respiratory protection as required by the OSHA standard for respiratory protection (29 CFR 1910.134, September 1988, as amended August 24, 2006, with an effective date of November 27, 2006) or the respiratory protection requested by the employee. The OSHA Respirator Standard, 29 CFR 1910.134, states all persons wearing respiratory protection must be medically qualified to do so.

P a g e | 3

3.1.5 Notice Signs

Notice signs advising that a mold remediation project is in progress shall be displayed at all entrances to remediation areas. The signs shall have a visible readable area of at least 8” x 10” in size and shall bear the words “NOTICE: Mold remediation in progress” in black on a yellow background. The text shall be legible from a distance of ten (10) feet and shall be written in both English and Spanish.

4. Remediation Methodology

The remediation methodology applicable to this project shall include the following.

5. Remediation Area

Prior to Remediation and Decontamination FRF Room

▪ Setup critical barriers with zipper flaps on the entrances to the FRF.

▪ Place three (3) 1000 CFM air scrubbers in the room. This should provide at least 6

ACH (air changes per hour) in the room.

▪ Establish an area in the Garage that can be used to decontaminate contents.

▪ Remove all items to be decontaminated or discarded, out of the FRF through the

Garage entry door to the Garage decontamination area.

▪ HEPA vacuum and damp wipe these items with the cleaning solution in the Garage decontamination area. Nonporous items can easily be decontaminated, however items that are more porous should be assessed prior to decontamination and discarded as applicable.

▪ Additional scrubbers should be placed in any area the same HVAC system supplies.

Lobby

▪ Place one (1) 500 CFM air scrubber in the hall outside the restrooms and one (1) 500 CFM air scrubber in the Lobby. This should provide at least 6 ACH (air changes per hour) in the areas.

FRF Room

▪ The HVAC system that controls the remediation areas shall be isolated prior to beginning remediation. As noted previously, critical barriers shall be placed over supply and return vents.

▪ Containment should be placed under negative pressure. Negative pressure could be exhausted out the Garage doors.

▪ Clean any nonporous surfaces in the remediation areas.

▪ Clean all surfaces exposed during the course of the remediation.

▪ Once the affected materials have been removed (including contents and any water damaged or debris impacted ceiling tile), the Remediation Contractor shall thoroughly HEPA vacuum all surfaces to remove all residual dust and associated debris. Following HEPA vacuuming, Remediation Contractor will conduct detailed cleaning by thoroughly damp wiping exposed building materials, all polyethylene sheeting (walls, floors and critical barriers), and other non-porous materials, P a g e | 4 including decontamination chamber, with a solution of liquid detergent and water, or an EPA registered product. Contractor will replace primary and secondary filters in all AFDs and air scrubbers in preparation for final clearance criteria.

▪ All debris from the remediation area (including the HVAC filters) will be double bagged in clear un-labeled six – (6) mil polyethylene disposal bags or double wrapped in six – (6) mil polyethylene sheeting and disposed of as construction debris.

▪ The contractor should subcontract a licensed HVAC contractor to inspect and address the local HVAC unit that supplies the room. The HVAC contractor should pay specific attention to the evaporator coils, drain pans, the return and supply plenums as well as the ductwork.

▪ All cleaning should be conducted in accordance with the most recent National Air Duct Cleaners Associations (NADCA) Standard ACR (Assessment, Cleaning and Restoration of HVAC Systems).

▪ If ductwork is uncleanable, the Remediation Contractor shall Poly off both ends and discard as necessary.

Lobby

▪ The Remediation Contractor will conduct detailed cleaning by thoroughly damp wiping exposed building materials, all polyethylene sheeting (walls, floors and critical barriers), and other non-porous materials.

6. Clearance Procedures and Criteria

Clearance procedures and criteria for mold remediation in this project shall consist of the following:

▪ Post remediation assessments will be conducted following all remediation activities while the remediation containment(s) are in place.

▪ Visual observations will be conducted to verify that all visible and accessible molds have been remediated.

▪ Air samples, typically spore traps, or surface samples of the remediated areas will be collected following remediation. Air samples and surface samples are collected in general accordance with the guidelines identified in the American Conference of Governmental Industrial Hygienists’ “Bioaerosols: Assessment and Control.” Analytical methodology for identification of fungal spores is by direct microscopic examination utilizing light microscopy, as well as in accordance with the manufacturer’s instructions. Bioaerosol Analytical clearance will be achieved if, after outside totals are subtracted from containment sample totals, the total number of spores per cubic meter is less than 1000 spores per cubic meter with no single genus being greater than 200 spores per cubic meter (Stachybotrys must be below 70 spores per cubic meter). If surface samples are utilized for clearance, clearance will be achieved if analytical results indicate that surface spores are equal to or less than “trace.”

▪ Determination of the underlying cause of the identified mold will be verified by the Client’s Building Trades Specialist (i.e., plumbing contractor, mechanical contractor, roofing contractor or water intrusion specialist). Client shall be responsible for

P a g e | 5 engaging the services of a Building Trades Specialist to investigate and certify that the source or sources of moisture have been properly mitigated.

▪ Upon receipt of written certification that the source or sources of moisture have been properly identified and properly mitigated, BSI will sign the assessor’s portion of the Mold Remediation Certificate

P a g e | 6

Site Plan

Containment Area

Scrubbers and cleaning

File details come from the government source that posted it. Updated .