About this file

This document is Exhibit A (Leasehold Surrender Interest) to Contract CC-GRSM007-27, establishing terms and conditions governing a concessioner's rights to compensation for capital improvements constructed on federal lands.

The exhibit defines key terms including capital improvements (structures, fixtures, or non-removable equipment provided by the concessioner on U.S. lands), construction costs (total eligible direct and indirect costs capitalized per GAAP), and leasehold surrender interest (a right to payment for related capital improvements). Leasehold surrender interest value is calculated as the initial construction cost, adjusted by Consumer Price Index changes from substantial completion to payment date, less depreciation based on the improvement's condition at contract termination or expiration. The concessioner must obtain Director approval before construction, including detailed plans and cost estimates. Upon substantial completion, the concessioner must submit a detailed construction report supported by invoices and, if requested, certified public accountant certification verifying all costs comply with GAAP and are eligible direct or indirect costs. The Director reviews the report to determine final construction cost, which becomes binding unless the concessioner requests binding arbitration within three months. Arbitration involves a three-member panel with members selected by each party and a neutral licensed real estate appraiser, with costs shared equally. The concessioner may encumber, transfer, or waive leasehold surrender interest. Payment is due by contract expiration or termination date; if delayed by extraordinary circumstances, interest accrues at the statutory overdue rate plus continuing Consumer Price Index adjustments. New concessioners must pay the previous concessioner's leasehold surrender interest value. Major rehabilitations and fixture replacements increase leasehold surrender interest by their respective construction costs, while routine repairs and maintenance do not generate leasehold surrender interest unless qualifying as major rehabilitation.

View the file

Other files

File Type Posted
GRSM007-27 AMENDMENT 1 20260916.pdf PDF
05 CC-GRSM007-27 Proposal Instructions amendment 1 20260916.pdf PDF
GRSM007-27 AMENDMENT 1 20260821.pdf PDF
21 CC-GRSM007-27 Appendices Table of Contents.pdf PDF
18 CC-GRSM007-27 Exhibit I Insurance.pdf PDF
09 CC-GRSM007-27 Exhibit B Op Plan.pdf PDF
07 CC-GRSM007-27 CAT I Contract.pdf PDF
05 CC-GRSM007-27 Proposal Instructions.pdf PDF
18 CC-GRSM007-27 Exhibit I Insurance.pdf PDF
03 CC-GRSM007-27 Table of Contents.pdf PDF
17 CC-GRSM007-27 Exhibit H Maintenance Plan.pdf PDF
16 CC-GRSM007-27 Exhibit H Attachement I.pdf PDF
15 CC-GRSM007-27 Exhibit G LSI.pdf PDF
19 CC-GRSM007-27 EXHIBIT J.pdf PDF
14 CC-GRSM007-27 Exhibit F2.pdf PDF
13 CC-GRSM007-27 Exhibit F1.pdf PDF
02 CC-GRSM007-27 Inside Cover.pdf PDF
04 CC-GRSM007-27 Business Opportunity.pdf PDF
21 CC-GRSM007-27 Appendix A Proposal Package.docx DOCX document
22 CC-GRSM007-27 Appendix B Proposal Package Excel Forms.xlsx XLSX spreadsheet
10 CC-GRSM007-27 Exhibit C.pdf PDF
11 CC-GRSM007-27 EXHIBIT D.pdf PDF
06 CC-GRSM007-27 Proposal Package.pdf PDF
01 CC-GRSM007-27 Back and Front Cover.pdf PDF
20 CC-GRSM007-27 Exhibit K IP.pdf PDF
12 CC-GRSM007-27 EXHIBIT E.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CC-GRSM007-27 Exhibit A: LSI Page A-1

V01.29.2024

EXHIBIT A

LEASEHOLD SURRENDER INTEREST

This Exhibit A to this Contract establishes certain terms and conditions of the Contract regarding the nature, scope and applicable conditions of leasehold surrender interest. In event of any inconsistency between this Exhibit A and Exhibit F1 of this Contract this Exhibit A shall prevail.

SEC. 1. DEFINITIONS

(a) “Arbitration” means binding arbitration conducted by an arbitration panel. All arbitration proceedings conducted under the authority of this Exhibit A will utilize the following procedures unless otherwise agreed by the Concessioner and the Director. One member of the arbitration panel will be selected by the Concessioner, one member will be selected by the Director, and the third (neutral) member will be selected by the two party-appointed members. The neutral arbiter must be a licensed real estate appraiser. The expenses of the neutral arbiter and other associated common costs of the arbitration will be borne equally by the Concessioner and the Director. The arbitration panel will adopt procedures that treat each party equally, give each party the opportunity to be heard, and give each party a fair opportunity to present its case.

Determinations must be made by a majority of the members of the panel and will be binding on the Concessioner and the Director.

(b) A “capital improvement” is a structure, fixture, or non-removable equipment provided by the Concessioner pursuant to the terms of this Contract and located on lands of the United States within the area. A capital improvement does not include any interest in land. Additionally, a capital improvement does not include any interest in personal property of any kind including, but not limited to, vehicles, boats, barges, trailers, or other objects, regardless of size, unless an item of personal property becomes a fixture as defined in this Exhibit A.

(c) “Construction cost” of a capital improvement means the total of the incurred eligible direct and indirect costs necessary for constructing or installing the capital improvement that are capitalized by the concessioner in accordance with Generally Accepted Accounting Principles (GAAP).

(d) “Consumer Price Index” means the national “Consumer Price Index--All Urban Consumers” published by the Department of Labor. If this index ceases to be published, the Director will designate another regularly published cost-of-living index approximating the national Consumer Price Index.

(e) “Depreciation” means the loss of value in a capital improvement as evidenced by the condition and prospective serviceability of the capital improvement in comparison with a new unit of like kind.

(f) “Eligible direct costs” means the sum of all incurred capitalized costs (in amounts no higher than those prevailing in the locality of the project), that are necessary both for the construction of a capital improvement and are typically elements of a construction contract. Eligible direct costs may include, without limitation, the costs of (if capitalized in accordance with GAAP and in amounts no higher than those prevailing in the locality of the project): building permits; materials, products and equipment used in construction; labor used in construction; security during construction; contractor's shack and temporary fencing; material storage facilities; power line installation and utility costs during construction; performance bonds; and contractor's (and subcontractor's) profit and overhead (including job supervision, worker's compensation insurance and fire, liability, and unemployment insurance).

(g) “Eligible indirect costs” means, except as provided in the last sentence of this definition, the sum of all other incurred capitalized costs (in amounts no higher than those prevailing in the locality of the project) necessary for the construction of a capital improvement. Eligible indirect costs may include, without limitation, the costs of (if capitalized in accordance with GAAP and in amounts no higher than those prevailing in the locality of the project): architectural and engineering fees for plans, plan checks; surveys to

CC-GRSM007-27 Exhibit A: LSI Page A-2 establish building lines and grades; environmental studies; if the project is financed, the points, fees or service charges and interest on construction loans; all risk insurance expenses and ad valorem taxes during construction. The actual capitalized administrative expenses (in amounts no higher than those prevailing in the locality of the project) of the Concessioner for direct, on-site construction inspection are eligible indirect costs. Other administrative expenses of the Concessioner are not eligible indirect costs.

(h) “Fixtures and non-removable equipment” are manufactured items of personal property of independent form and utility necessary for the basic functioning of a structure that are affixed to and considered to be part of the structure such that title is with the Director as real property once installed. Fixtures and non-removable equipment do not include building materials (e.g., wallboard, flooring, concrete, cinder blocks, steel beams, studs, window frames, windows, rafters, roofing, framing, siding, lumber, insulation, wallpaper, paint, etc.). Because of their special circumstances, floating docks (but not other types of floating property) that may be constructed by the Concessioner pursuant to the terms of this Contract are considered to be non-removable equipment for leasehold surrender interest purposes only. Except as otherwise indicated in Exhibit A, the term “fixture” includes the term “non-removable equipment.”

(i) “Leasehold surrender interest” solely means a right to payment in accordance with this Contract for related capital improvements that the Concessioner makes or provides within the area on lands owned by the United States pursuant to the terms and conditions of this Contract. The existence of a leasehold surrender interest does not give the Concessioner, or any other person, any right to conduct business in a park area, to utilize the related capital improvements, or to prevent the Director or another person from utilizing the related capital improvements. The existence of a leasehold surrender interest does not include any interest in the land on which the related capital improvements are located.

(j) “Leasehold surrender interest value” means the amount of compensation the Concessioner is entitled to be paid for a leasehold surrender interest in capital improvements in accordance with this Contract. The leasehold surrender interest value in existing capital improvements under the terms of this Contract is an amount equal to:

(1) The initial construction cost of the related capital improvement;

(2) Adjusted by (increased or decreased) the same percentage increase or decrease as the percentage increase or decrease in the Consumer Price Index from the date the Director approves the substantial completion of the construction of the related capital improvement to the date of payment of the leasehold surrender interest value;

(3) Less depreciation of the related capital improvement on the basis of its condition as of the date of termination or expiration of this Contract, or, if applicable, the date on which the Concessioner ceases to utilize a related capital improvement (e.g., where the related capital improvement is taken out of service by the Director pursuant to the terms of this Contract).

(k) “Major rehabilitation” means a planned rehabilitation of an existing structure that the Director determines:

(1) The construction cost of which exceeds thirty percent of the pre-rehabilitation value of the structure;

and

(2) Improves visitor health, safety, and enjoyment or the health and safety of concessioner employees and will either enhance the property's overall value, prolong its useful life, or adapt it to new uses.

(l) “Pre-rehabilitation value” of an existing structure means the replacement cost of the structure less depreciation.

(m) “Real property improvements” means improvements other than land itself, including, but not limited to, capital improvements.

CC-GRSM007-27 Exhibit A: LSI Page A-3

(n) “Related capital improvement” or “related fixture” means a capital improvement in which the Concessioner has a leasehold surrender interest.

(o) “Replacement cost” means the estimated cost to reconstruct, at current prices, an existing structure with utility equivalent to the existing structure, using modern materials and current standards, design and layout.

(p) “Structure” means a building, dock, or similar edifice affixed to the land so as to be part of the real estate. A structure may include both constructed infrastructure (e.g., water, power and sewer lines) and constructed site improvements (e.g., paved roads, retaining walls, sidewalks, paved driveways, paved parking areas) that are permanently affixed to the land so as to be part of the real estate and that are in direct support of the use of a building, dock, or similar edifice. Landscaping that is integral to the construction of a structure is considered as part of a structure. Interior furnishings that are not fixtures are not part of a structure.

(q) “Substantial completion of a capital improvement” means the condition of a capital improvement construction project when the project is substantially complete and ready for use and/or occupancy.

SEC. 2. OBTAINING A LEASEHOLD SURRENDER INTEREST

The Concessioner will obtain leasehold surrender interest in capital improvements constructed in accordance with the terms and conditions of this Contract, including, without limitation, the terms and conditions of this Exhibit A to the Contract.

SEC. 3. AUTHORIZING THE CONSTRUCTION OF A CAPITAL IMPROVEMENT

The Director may only authorize or require the Concessioner to construct capital improvements on area lands in accordance with the terms and conditions of this Contract and for the conduct by the Concessioner of visitor services, including, without limitation, the construction of capital improvements necessary for the conduct of visitor services.

SEC. 4. REQUIREMENTS FOR BEGINNING TO CONSTRUCT A CAPITAL IMPROVEMENT

Before beginning to construct any capital improvement, the Concessioner must obtain written approval from the Director in accordance with the terms of this Contract, including the terms and conditions of this Exhibit A and Exhibit F1. The request for approval must include appropriate plans and specifications for the capital improvement and any other information that the Director may specify. The request must also include an estimate of the total construction cost of the capital improvement. The estimate of the total construction cost must specify all elements of the cost in such detail as is necessary to permit the Director to determine that they are elements of construction cost as defined in this Exhibit. (The approval requirements of this and other sections of this Contract also apply to any change orders to a capital improvement project and to any additions to a structure or replacement of fixtures as described in this Contract.)

SEC. 5. REQUIREMENTS AFTER SUBSTANTIAL COMPLETION OF A CAPITAL IMPROVEMENT

Upon substantial completion of the construction of a capital improvement in which the Concessioner is to obtain a leasehold surrender interest, the Concessioner must provide the Director a detailed construction report in accordance with the terms and conditions of this Contract, including without limitation Exhibit A and Exhibit F1. The construction report must be supported by actual invoices of the capital improvement's construction cost together with, if requested by the Director, a written certification from a certified public accountant. The construction report must document, and any requested certification by the certified public accountant must certify, that all components of the construction cost were incurred and capitalized by the Concessioner in accordance with GAAP, and that all components are eligible direct or indirect construction costs as defined in this Exhibit. Invoices for additional construction costs of elements of the project that were

CC-GRSM007-27 Exhibit A: LSI Page A-4 not completed as of the date of substantial completion may subsequently be submitted to the Director for inclusion in the project's construction cost.

SEC. 6. DETERMINING CONSTRUCTION COST FOR PURPOSES OF LEASEHOLD SURRENDER INTEREST

VALUE

After receiving the detailed construction report (and certification, if requested), from the Concessioner, the Director will review the report, certification and other information as appropriate to determine that the reported construction cost is consistent with the construction cost approved by the Director in advance of the construction and that all costs included in the construction cost are eligible direct or indirect costs as defined in this Exhibit A. The construction cost determined by the Director will be the final determination of construction cost for purposes of the leasehold surrender interest value in the related capital improvement unless the Concessioner requests arbitration of the construction cost under Section 7 of this Exhibit A. The Director may at any time review a construction cost determination (subject to arbitration under Section 7 of this Exhibit A) if the Director has reason to believe that it was based on false, misleading or incomplete information.

SEC. 7. ARBITRATING THE CONSTRUCTION COST OF A CAPITAL IMPROVEMENT

If the Concessioner requests arbitration of the construction cost of a capital improvement determined by the Director, the request must be made in writing to the Director within 3 months of the date of the Director's determination of construction cost under Section 6 of this Exhibit A. The arbitration procedures are described in Section 1 of this Exhibit A. The decision of the arbitration panel as to the construction cost of the capital improvement will be binding on the concessioner and the Director.

SEC. 8. ACTIONS THE CONCESSIONER MAY OR MUST TAKE REGARDING LEASEHOLD SURRENDER

INTEREST

The Concessioner:

(a) May encumber a leasehold surrender interest in accordance with the terms of this Contract;

(b) Where applicable, must transfer its leasehold surrender interest in connection with any assignment, termination or expiration of this Contract; and

(c) May waive or relinquish a leasehold surrender interest.

SEC. 9. EXTINGUISHMENT OF A LEASEHOLD SURRENDER INTEREST

(a) A leasehold surrender interest may not be extinguished by the expiration or termination of this Contract and a leasehold surrender interest may not be taken for public use except on payment of just compensation.

Payment of leasehold surrender interest value pursuant to the terms of this Contract will constitute the payment of just compensation for leasehold surrender interest within the meaning of this Contract and for all other purposes.

(b) The Director at any time during the term of this Contract or after its termination or expiration may in his discretion pay the Concessioner the then applicable Leasehold Surrender Interest Value in all or portions of the related capital improvements in which the Concessioner holds a Leasehold Surrender Interest under the terms of this Contract. Upon receipt of such payment by the Concessioner, the applicable Leasehold Surrender Interest shall be extinguished or reduced, as applicable, for all purposes of this Contract and Applicable Laws. In the event of a dispute between the Director and the Concessioner as to the appropriate amount of such payment under the terms of this Contract, the dispute shall be resolved through binding arbitration as defined above.

CC-GRSM007-27 Exhibit A: LSI Page A-5

SEC. 10. LEASEHOLD SURRENDER INTEREST UNDER A NEW CONCESSION CONTRACT

If the Concessioner under this Contract is awarded a new concession contract by the Director, and the new concession contract continues a leasehold surrender interest in related capital improvements, then the Concessioner's leasehold surrender interest value (established as of the date of expiration or termination of this Contract) in the related capital improvements will be continued as the initial value of the Concessioner's leasehold surrender interest under the terms of the new concession contract.

SEC. 11. PAYMENT FOR LEASEHOLD SURRENDER INTEREST IF THE CONCESSIONER IS NOT

AWARDED A NEW CONCESSION CONTRACT

(a) If the Concessioner is not awarded a new concession contract after expiration or termination of this Contract, or the Concessioner, prior to such termination or expiration, ceases to utilize under the terms of this Contract capital improvements in which the Concessioner has a leasehold surrender interest, the Concessioner will be entitled to be paid its leasehold surrender interest value in the related capital improvements. The leasehold surrender interest will not be transferred until payment of the leasehold surrender interest value. The date for payment of the leasehold surrender interest value, except in special circumstances beyond the Director's control, will be the date of expiration or termination of this Contract or the date the Concessioner ceases to utilize related capital improvements under the terms of this Contract.

Depreciation of the related capital improvements will be established as of the date of expiration or termination of this Contract, or, if applicable, the date the Concessioner ceases to utilize the capital improvements under the terms this Contract.

(b) In the event that extraordinary circumstances beyond the control of the Director prevent the Director from making the leasehold surrender interest value payment as of the date of expiration or termination of this Contract, or, as of the date the Concessioner ceases to utilize related capital improvements under the terms of this Contract, the payment when made will include interest on the amount that was due on the date of expiration or termination of this Contract or cessation of use for the period after the payment was due until payment is made (in addition to the inclusion of a continuing Consumer Price Index adjustment until the date payment is made). The rate of interest will be the applicable rate of interest established by law for overdue obligations of the United States. The payment for a leasehold surrender interest value will be made within one year after the expiration or termination of this Contract or the cessation of use of related capital improvements under the terms of this Contract.

SEC. 12. PROCESS FOR DETERMINING LEASEHOLD SURRENDER INTEREST VALUE

In the event that the Concessioner and the Director cannot reach agreement as to a leasehold surrender interest value where required by the terms of this Contract, the Director will make a final determination of leasehold surrender interest value unless binding arbitration as to the value is requested by the Concessioner.

The arbitration procedures are described in Section 1. A prior decision as to the construction cost of capital improvements made by the Director or by an arbitration panel in accordance with this Exhibit A is final and not subject to further arbitration.

SEC. 13. PAYMENT OF LEASEHOLD SURRENDER INTEREST BY A NEW CONCESSIONER

A new concession contract awarded to a new concessioner will require the new concessioner to pay the Concessioner its leasehold surrender interest value in existing capital improvements as determined under Section 12.

SEC. 14. OBTAINING ADDITIONAL LEASEHOLD SURRENDER INTEREST BY UNDERTAKING A MAJOR REHABILITATION OR ADDING TO A STRUCTURE IN WHICH THE CONCESSIONER HAS A LEASEHOLD

SURRENDER INTEREST

CC-GRSM007-27 Exhibit A: LSI Page A-6

If the Concessioner, with the written approval of the Director, undertakes a major rehabilitation or adds a new structure (e.g., a new wing to an existing building or an extension of an existing sidewalk) to an existing structure in which the Concessioner has a leasehold surrender interest, the Concessioner will increase its leasehold surrender interest in the related structure, effective as of the date of substantial completion of the major rehabilitation or new structure, by the construction cost of the major rehabilitation or new structure.

The Consumer Price Index adjustment for leasehold surrender interest value purposes will apply to the construction cost as of the date of substantial completion of the major rehabilitation or new structure.

Approvals for major rehabilitations and additions to structures are subject to the same requirements and conditions applicable to new construction as described in this Contract.

SEC. 15. OBTAINING ADDITIONAL LEASEHOLD SURRENDER INTEREST BY REPLACING A FIXTURE IN

WHICH THE CONCESSIONER HAS A LEASEHOLD SURRENDER INTEREST

If the Concessioner replaces an existing fixture in which the Concessioner has a leasehold surrender interest with a new fixture, the Concessioner will increase its leasehold surrender interest by the amount of the construction cost of the replacement fixture less the construction cost of the replaced fixture.

SEC. 16. OBTAINING A LEASEHOLD SURRENDER INTEREST IN EXISTING REAL PROPERTY

IMPROVEMENTS IN WHICH NO LEASEHOLD SURRENDER INTEREST EXISTS

(a) If the main body of this Contract requires the Concessioner to replace fixtures in real property improvements in which there is no leasehold surrender interest (e.g., fixtures attached to an existing government facility assigned by the Director to the Concessioner), a leasehold surrender interest will be obtained by the Concessioner in such replacement fixtures subject to the approval and determination of construction cost and other conditions contained in Contract.

(b) If the main body of this Contract requires the Concessioner to undertake a major rehabilitation of a structure in which there is no leasehold surrender interest (e.g., a government-constructed facility assigned to the Concessioner), upon substantial completion of the major rehabilitation, the Concessioner will obtain a leasehold surrender interest in the structure. The initial construction cost of this leasehold surrender interest will be the construction cost of the major rehabilitation. Depreciation for purposes of leasehold surrender interest value will apply only to the rehabilitated components of the related structure.

SEC. 17. NO LEASEHOLD SURRENDER INTEREST RESULTS FROM REPAIR AND MAINTENANCE OF

REAL PROPERTY IMPROVEMENTS

The Concessioner will not obtain initial or increased leasehold surrender interest as a result of repair and maintenance of real property improvements unless a repair and maintenance project is a major rehabilitation.

EXHIBIT A
LEASEHOLD SURRENDER INTEREST
SEC. 1. DEFINITIONS
SEC. 2. OBTAINING A LEASEHOLD SURRENDER INTEREST
SEC. 3. AUTHORIZING THE CONSTRUCTION OF A CAPITAL IMPROVEMENT
SEC. 4. REQUIREMENTS FOR BEGINNING TO CONSTRUCT A CAPITAL IMPROVEMENT
SEC. 5. REQUIREMENTS AFTER SUBSTANTIAL COMPLETION OF A CAPITAL IMPROVEMENT
SEC. 6. DETERMINING CONSTRUCTION COST FOR PURPOSES OF LEASEHOLD SURRENDER INTEREST VALUE
SEC. 7. ARBITRATING THE CONSTRUCTION COST OF A CAPITAL IMPROVEMENT
SEC. 8. ACTIONS THE CONCESSIONER MAY OR MUST TAKE REGARDING LEASEHOLD SURRENDER INTEREST
SEC. 9. EXTINGUISHMENT OF A LEASEHOLD SURRENDER INTEREST
SEC. 10. LEASEHOLD SURRENDER INTEREST UNDER A NEW CONCESSION CONTRACT
SEC. 11. PAYMENT FOR LEASEHOLD SURRENDER INTEREST IF THE CONCESSIONER IS NOT AWARDED A NEW CONCESSION CONTRACT
SEC. 12. PROCESS FOR DETERMINING LEASEHOLD SURRENDER INTEREST VALUE
SEC. 13. PAYMENT OF LEASEHOLD SURRENDER INTEREST BY A NEW CONCESSIONER
SEC. 14. OBTAINING ADDITIONAL LEASEHOLD SURRENDER INTEREST BY UNDERTAKING A MAJOR REHABILITATION OR ADDING TO A STRUCTURE IN WHICH THE CONCESSIONER HAS A LEASEHOLD SURRENDER INTEREST
SEC. 15. OBTAINING ADDITIONAL LEASEHOLD SURRENDER INTEREST BY REPLACING A FIXTURE IN WHICH THE CONCESSIONER HAS A LEASEHOLD SURRENDER INTEREST
SEC. 16. OBTAINING A LEASEHOLD SURRENDER INTEREST IN EXISTING REAL PROPERTY IMPROVEMENTS IN WHICH NO LEASEHOLD SURRENDER INTEREST EXISTS
SEC. 17. NO LEASEHOLD SURRENDER INTEREST RESULTS FROM REPAIR AND MAINTENANCE OF REAL PROPERTY IMPROVEMENTS

File details come from the government source that posted it. Updated .