General Decision Number: FL100267 03/12/2010 FL267

Superseded General Decision Number: FL20080267

State: Florida

Construction Type: Heavy

County: Miami-Dade County in Florida.

HEAVY CONSTRUCTION PROJECTS (Including Sewer and Water Lines)

Modification Number Publication Date 0 03/12/2010

ELEC0349-007 08/31/2009

Rates Fringes

ELECTRICIAN

Electrical contracts including materials that are over $2,000,000.........$ 29.61 8.71 Electrical contracts including materials that are under $2,000,000........$ 27.15 8.44

* ENGI0487-017 01/16/2010

Rates Fringes

OPERATOR: Backhoe...............$ 27.57 8.78 OPERATOR: Crane All Tower Cranes (Must have 2 operators) Mobile, Rail, Climbers, Static- Mount; All Cranes with Boom Length 150 Feet & Over (With or without jib) Friction, Hydro, Electric or Otherwise; Cranes 150 Tons & Over (Must have 2 operators); Cranes with 3 Drums (When 3rd drum is rigged for work); Gantry & Overhead Cranes; Hydro Cranes Over 25 Tons but not more than 50 Tons (Without Oiler/Apprentice);

Hydro/Friction Cranes without Oiler/Apprentices when Approved by Union; & All Type of Flying Cranes;

Boom Truck..................$ 28.30 8.78 Cranes with Boom Length Less than 150 Feet (With or without jib); Hydro Cranes 25 Tons & Under, & Over 50 Tons (With

5/12/2010http://www.wdol.gov/wdol/scafiles/davisbacon/FL267.dvb

Oiler/Apprentice); Boom Truck.......................$ 27.57 8.78 OPERATOR: Drill.................$ 25.05 8.78 OPERATOR: Loader................$ 24.89 8.78 OPERATOR: Oiler.................$ 22.24 8.78

IRON0272-005 10/01/2006

Rates Fringes

IRONWORKER, STRUCTURAL...........$ 26.70 6.43

LABO1652-004 05/01/2009

Rates Fringes

LABORER: Grade Checker...........$ 14.50 4.67

PAIN0365-007 07/01/2008

Rates Fringes

PAINTER: Brush, Roller and Spray............................$ 16.00 6.15

SUFL2009-164 06/24/2009

Rates Fringes

CARPENTER, Including Form Work...$ 17.00 2.51

CEMENT MASON/CONCRETE FINISHER...$ 16.61 5.52

LABORER: Common or General......$ 13.09 1.26

LABORER: Landscape..............$ 7.25 0.00

LABORER: Power Tool Operator (Hand Held Drills/Saws, Jackhammer and Power Saws Only)............................$ 10.63 2.20

OPERATOR: Asphalt Paver.........$ 11.59 0.00

OPERATOR: Backhoe Loader Combo............................$ 16.10 2.44

OPERATOR: Blade/Grader..........$ 16.00 2.84

OPERATOR: Bulldozer.............$ 14.95 0.81

OPERATOR: Excavator.............$ 21.16 1.67

OPERATOR: Mechanic..............$ 14.32 0.00

OPERATOR: Roller................$ 10.95 0.00

OPERATOR: Scraper...............$ 11.00 1.74

OPERATOR: Trackhoe..............$ 20.92 5.50

OPERATOR: Tractor...............$ 10.54 0.00

TRUCK DRIVER: Lowboy Truck......$ 12.73 0.00

TRUCK DRIVER: Off the Road Truck............................$ 12.21 1.97

TRUCK DRIVER: Dump Truck.........$ 9.60 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and

3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Other files

File Type Posted
Amendment0001Miami.pdf PDF
Amendment 0006_5-11-10_.pdf PDF
Amendment0003Miami.pdf PDF
Amendment0005Miami.pdf PDF
Amendment0002Miami.pdf PDF
Amendment0004Miami.pdf PDF
DRAWINGS.pdf PDF
A07457957Spec.pdf PDF
General Requirements.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .