Amendment 0006_5-11-10_.pdf
PDF 21 KB Posted
- Attached to
- Homeporting Fast Response Cutter (FRC), U. S. Coast Guard Base Support Unit (BSU) Miami, Miami Beach, FL
- Solicitation number
- 07457957
About this file
Amendment 0006
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment0001Miami.pdf | ||
| Amendment0003Miami.pdf | ||
| Amendment0005Miami.pdf | ||
| Amendment0002Miami.pdf | ||
| Amendment0004Miami.pdf | ||
| DRAWINGS.pdf | ||
| A07457957Spec.pdf | ||
| WAGE DECISION | — | |
| General Requirements.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4 REQUISITION/PURCHASE REQ NO. PROJECT NO. (If applicable) 0006 5/12/2010 N/A
6. ISSUED BY Code 7. ADMINISTERED BY (If other than item 6.) Code N/A
Contracting Division
USCG, Facilities Design & Construction Center
(Atlantic) 5505 Robin Hood Road, Suite K
Norfolk, VA 23513-2431
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
Project No. 07-457957
9B. DATED (SEE ITEM 11)
3/1/2010
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers _____ is extended __X__ is not extended .
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
DESIGN AND CONSTRUCT NEW AND MODIFIED EXISTING INFRASTRUCTURE REQUIRED FOR
HOMPORTING NEW FAST RESPONSE CUTTERS (FRC) AT U. S. COAST GUARD BASE SUPPORT
UNIT (BSU) MIAMI, MIAMI BEACH, FL
PROPOSALS DUE: MAY 18, 2010 2:00 PM
Continued on Page 2
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
FAR (49 CFR) 53.243
Project No. 07-457957 Amendment 0006
AMEND PROJECT NO. 07-457957AS FOLLOWS:
1. Specification 01110, 1.6.1: Replace existing paragraph with the following:
1.6.1 Sequence of Work. The following phasing plan for sequencing work in the waterfront areas is based on the new vessel berths as shown on the RFP drawings. Work at new berth 12 (old berth SP-9) is not phase dependent and may be done at any time during the construction at the discretion of the contractor.
Phase 1A: Berths 7 & 8: The existing 400 ampere shore tie outlet at “old berthing location ST-7” shall remain in service until completion of Phase III work unless the COR indicates that it may be removed prior to that time. Work shall be completed by February 17, 2011.
Phase 1B: Berths 5 & 6: Work shall be completed by March 10, 2011.
Phase 2A: Berths 3 & 4: Work shall be completed by April 25, 2011.
Phase 2B: Berths 1 & 2: Work shall be completed by June 08, 2011.
Phase 3: Berths 9-11: Work shall be completed by July 13, 2011.
The contractor shall demolish (remove) existing shore tie services that will not be reused as part of the work under each Phase, unless specified otherwise, or where demolition would impact on shore tie services in other phases. The remaining portion of the 4.16 KV electrical distribution system, step down transformers, and distribution equipment shall not be removed until after the new 13.2 KV transformers and new electrical shore tie services are fully operational, and accepted by the Government and the existing equipment is not required.”
2. Due to a change in the funding source this project will now be an American Recovery and
Reinvestment Act (ARRA) funded project. The contractor shall include cost for the required reporting requirements.
3. Replace existing Wage Decision with attached Wage Decision FL100267 dated 3/12/2010 with 0 modifications.