PROJECT DESIGN/BUILD

SPECIFICATIONS

FOR

HOMEPORTING FAST RESPONSE

CUTTERS (FRC)

AT

U.S. COAST GUARD BASE SUPPORT UNIT

MIAMI, FLORIDA

PROJECT NO: 07-457957

FEBRUARY 2010

DEPARTMENT OF HOMELAND SECURITY

UNITED STATES COAST GUARD

FACILITIES DESIGN & CONSTRUCTION CENTER

(FDCC)

5505 ROBIN HOOD ROAD

SUITE K

NORFOLK, VIRGINIA 23513-2413

HOMEPORTING FAST RESPONSE CUTTERS (FRC)

Coast Guard Base Support Unit Miami, FL SFRL No. 07-457957

PROJECT TABLE OF CONTENTS

DIVISION 1 GENERAL REQUIREMENTS

TOC TABLE OF CONTENTS

00102 LIST OF DOCUMENTS, EXHIBITS AND ATTACHMENTS

01110 DESIGN-BUILD GENERAL PARAGRAPHS

01158 DESIGN / BUILD CRITERIA

1.1 GENERAL PROJECT REQUIREMENTS AND DESCRIPTION

1.2 ROLES OF RFP SPECIFICATIONS & DRAWINGS

1.3 DESIGN RELATED PERMITS & CERTIFICATIONS

1.4 CIVIL AND SITE WORK

1.5 GEOTECHNICAL

1.6 LANDSCAPING (NOT USED)

1.7 ARCHITECTURAL (NOT USED)

1.8 STRUCTURAL

1.9 DEMOLITION

1.10 FIRE PROTECTION

1.11 PLUMBING (NOT USED)

1.12 HEATING VENTILATION AND AIR CONDITIONING (HVAC) (NOT USED)

1.13 ELECTRICAL

1.14 TELECOMMUNICATIONS

01160 DESIGN DOCUMENTS

01200 DESIGN – BUILD PROGRESS PAYMENTS

01320 DESIGN - BUILD PROGRESS DOCUMENTATION

01330 DESIGN – BUILD SUBMITTAL PROCEDURES

01450 QUALITY CONTROL

01500 TEMPORARY FACILITIES

01575 TEMPORARY ENVIRONMENTAL CONTROLS

01781 OPERATION AND MAINTENANCE DATA

-END OF TABLE OF CONTENTS-

TABLE OF CONTENTS Page 1

SECTION 00102

LIST OF DOCUMENTS, EXHIBITS AND ATTACHMENTS

1.1 SUMMARY

This section lists the Contract Supplemental Drawings, Exhibits and Attachments for the project and supplements Section J “List of Attachments.”

1.2 CONTRACT DRAWINGS

Contract Drawings are provided to the Contractor in electronic format on compact disk. Contract drawings are as follows:

DRAWING NO. SHEET NO. DISCIPLINE DRAWING TITLE

A07745957G001 G001 GENERAL TITLE SHEET

A07745957G002 G002 GENERAL CONSTRUCTION PHASING PLAN

A07745957G201 G201 GENERAL PHOTOGRAPHS

A07745957G202 G202 GENERAL PHOTOGRAPHS

A07745957C001 C001 CIVIL EXISTING BERTHING SITE PLAN

A07745957C002 C002 CIVIL EXISTING UTILITIES PLAN

A07745957C003 C003 CIVIL PROPOSED BERTHING SITE PLAN

A07745957E101 E101 ELECTRICAL PROPOSED MOORING PLAN

A07745957E102 E102 ELECTRICAL EXISTING SHIPS SERVICE

A07745957E103 E103 ELECTRICAL PROPOSED ST SUBSTATION-NORTH

A07745957E104 E104 ELECTRICAL PROPOSED ST SUBSTATION-SOUTH

A07745957E105 E105 ELECTRICAL MISCELLANEOUS DETAILS

A07745957E106 E106 ELECTRICAL MISCELLANEOUS DETAILS

1.3 SUPPLEMENTAL DRAWINGS, EXHIBITS AND ATTACHMENTS

The following supplemental drawings, exhibits and attachments are not part of the contract but are provided to the Contractor for information only.

DRAWING/DOCUMENT

NO.

TITLE

3405 BULKHEAD REPAIRS (Sheets 1 – 24, pdf) 1000005998 TOPOGRAPHIC SURVEY BASE ISC – DATED JANUARY 9, 2009 pdf) 32-M1253 Geotechnical report titled “REPORT OF SUBSURFACE SOIL EXPLORATION

& GEOTECHNICAL EVALUATION OF SUBSURFACE CONDITIONS” -

“WATERFRONT REPAIRS” dated April 1999 (pdf)

COMDTINST M6240.5 WATER SUPPLY AND WASTEWATER DISPOSAL MANUAL (CIM_6240_5

.pdf)

FRC REQUIREMENTS SUMMARY (pdf) M0444-D WATERFRONT REPAIRS, (Sheets 1-7,pdf) M9914 SEWER COLLECTION SYSTEM PLAN (pdf) M1193-D PIER SHORE TIES – POTABLE WATER SERVICE AND DETAILS (Sheets 1-

2, pdf) T000 TELEPHONE SHORE TIE OUTLET (pdf) 07-01-84 BASE MIAMI BEACH EXPANSION & REHABILITATION (Civil and Electrical, 35 total Sheets, pdf) M1169 REPAIR FIRE ALARM SYSTEM (Sheets 1-5, dwg) 683315 DIVESTURE OF 4.16 KV POWER SYSTEM (Sheets 1-17, pdf)

1.3.1 Reference Drawings

SECTION 00102 Page 1

SECTION 00102 Page 2

The reference drawings are intended only to show the original construction. Drawings are the property of the Government and shall not be used for any purpose other than that intended by the contract. The Government does not guarantee that these drawings reflect present conditions and the Contractor is responsible for verifying actual conditions. The drawings are provided in electronic format on compact disk.

1.3.2 Boring Logs and Subsurface data

The Government does not guarantee that borings indicate actual conditions, except for the exact locations and the time that they were made. Except for past reports indicated above, boring logs and subsurface data has not been obtained by the Government at the project site.

--End of Section—

SECTION 01110

DESIGN-BUILD GENERAL PARAGRAPHS

PART 1 GENERAL

1.1 SCOPE OF WORK

Design and construct the new and modified existing infrastructure required for Homeporting new Fast Response Cutters (FRC) at US Coast Guard Base Support Unit (BSU) Miami, Miami Beach, Florida.

The scope of work includes, but is not limited to, modifications to existing and provision of new electrical, telecommunications, water, compressed air and sewer shore-tie services and provisions of new bollards and fendering based on the vessel berthing plan shown on the RFP drawings. Do the work according to this specification and as shown on the Government-approved, Contractor-originated drawings.

1.2 CONTRACTING OFFICER'S REPRESENTATIVE/GOVERNMENT CONTRACTED INSPECTOR

The term "COR" is an abbreviation for "Contracting Officer's Representative." The term “GCI” is an abbreviation for “Government Contracted Inspector.”

1.3 NEW UTILITY SERVICES

Make all arrangements with the local utility providers and pay all fees, charges, and costs of any nature associated with establishing and installing new temporary (during construction) and subsequent permanent utility services required to ensure permanent and uninterrupted utility service at project completion. All utilities on BSU Miami are owned and managed by the Government, except electrical lines. The contract documents may provide a conceptual plan for utility layouts. These plans shall be confirmed by the contractor during the bidding stage with the local utility provider to determine the exact materials, equipment placement, and other features that may be required by the specific utility provider. The term utility service includes, but is not limited to, meters, mains, service lines, high voltage feeders, transformers, force mains, lift stations, etc. The contractor is responsible for coordinating the work with the utility provider to insure the utility connection to the site is completed and that there is no delay in the prosecution of the work or completion of the project. Utility services include electricity, water, sewer, and telephone. The local utility providers are as follows:

Company/Govt Office Service Telephone Number

BSU Miami FE** All except HV Electrical (305) 535-4547

Florida Power & Light (FP&L) High voltage (HV) Electrical (305) 377-6157 (POC: Jorge L. Arocha)

* FE = facilities engineering ** for connection of Govt lines

1.3.1 Water

There will be no charge to connect to the Government water lines.

1.3.2 Sewer

There will be no charge to connect to the Government sewer lines.

SECTION 01110 Page 1

1.3.3 Gas

Natural gas is not applicable.

1.3.4 Telephone Service

Temporary telephone service to the contractor’s trailer is available via the local telephone company at the contractor’s expense. There will be no charge to connect to the Government telephone lines for permanent telephone service to the cutter shoreties.

1.3.5 Electrical

There will be no charge to connect to the Government electrical system (load side of FPL equipment).

There may be a charge to connect to FP&L owned electrical system. Contractor is responsible to include any FP&L costs in his bid.

1.4 PERMITS

Contractor’s responsibility for permits is discussed in Section I contract clause 52.236-7 “Permits and Responsibilities” and in Section 01158 paragraph 1.3 “Design Related Permits”, and paragraph 1.4.1 “Design Requirements Overview.” The Contractor shall comply with all terms and conditions of permits, whether the Contractor or the Government obtains the permit.

1.5 DRAWINGS FURNISHED

One compact disc (CD) of the plans and specifications will be furnished to the Contractor without charge.

1.6 WORK SEQUENCE

The existing facility and waterfront will be in operation during construction.

Work in the waterfront areas shall be sequenced in order to minimize the impact on present BSU Miami vessel mooring capabilities (shore tie services) and to provide new shore tie services to moor both existing vessels and the new FRC vessels, which will be arriving at BSU Miami on a sequenced delivery schedule beginning in January 2011. The following work sequence for completing the waterfront work in phases corresponding to specific sections of the waterfront is based on limiting the extent of construction work on the waterfront at any one time so that vessels can be moored and operations can be conducted in the sections that are not under construction. Work on the waterfront shall begin at the south end (new berths 10/11) and proceed sequentially to the north end (on the west side). Once work in the one phase is successfully completed and the work is accepted by the Government, the Government will take “use and possession” (FAR Clause 52.236-11: Use and Possession Prior to Completion) of that phase and the Contractor shall begin work in the next phase and work shall continue sequentially along the waterfront in that manner until completion. The Coast Guard requires one full work day notice to relocate vessels and operations after one phase is completed before work can begin in the next phase.

The contractor may perform work outside the immediate waterfront areas at any time, if the work has no impact on BSU Miami waterfront operations or on overall BSU Miami base operations. Work that has no impact on the waterfront operations, but does impact on BSU Miami base operations including parking availability, road access, etc (e.g. for the installation of new underground ductbank or other utility lines), shall be done so as to minimize the impact on BSU Miami operations by a combination of sequencing the work to limit the extent of the area affected at any one time, working outside of normal BSU Miami working hours, temporarily restoring work areas for use during normal working hours, etc.

A work plan detailing the areas of construction, periods of construction and measures to minimize

SECTION 01110 Page 2 impact on BSU Miami operations shall be submitted to and approved by the Contracting Officer before excavation for utility lines will be permitted. Access to all buildings shall be maintained at all times during construction. See Section 01500, Temporary Facilities, paragraph 1.2.1 for additional details.

In addition, there may be periods when unforeseen BSU Miami operations will require the contractor to cease work in a specific area for some duration. These events will be addressed if and when they occur.

1.6.1 Sequence of Work. The following phasing plan for sequencing work in the waterfront areas is based on the new vessel berths as shown on the RFP drawings. Work at new berth 12 (old berth SP-

9) is not phase dependent, but shall be done so as to minimize duration of outages to the existing shore tie service or coordinated with vessel operations so that the work is done when the shore tie will not be in use.

Phase IA: Berths 9-11: Work shall be completed by December 17, 2010.

Phase IB: Berths 7 & 8: The existing 400 ampere shore tie outlet at “old berthing location ST-7” shall remain in service until completion of Phase III work unless the COR indicates that it may be removed prior to that time. Work shall be completed by January 10, 2011.

Phase IIA: Berths 5 & 6: Work shall be completed by February 25, 2011.

Phase IIB: Berths 3 & 4: Work shall be completed by April 08, 2011.

Phase III: Berths 1 & 2: Work shall be completed by May 13, 2011.

The contractor shall demolish (remove) existing shore tie services that will not be reused as part of the work under each Phase, unless specified otherwise, or where demolition would impact on shore tie services in other phases. The remaining portion of the 4.16 KV electrical distribution system, step down transformers, and distribution equipment shall not be removed until after the new 13.2 KV transformers and new electrical shore tie services are fully operational, and accepted by the Government and the existing equipment is not required.

1.7 GOVERNMENT-FURNISHED ITEMS

Not applicable.

1.8 RELOCATED EQUIPMENT AND ITEMS

Not applicable,

1.9 UTILITY OUTAGES

Utility outages should be limited; coordinate with FPL for any outages required for connection of the new 13.2 KV transformers to their distribution system. Before interrupting or shutting down any utility, make a request for the interruption to the Contracting Officer at least 2 working days before the anticipated interruption. Identify the utility, reason, proposed time, and duration of the requested power interruption. Do not interrupt utilities until authorized by the Contracting Officer.

1.10 UNDERGROUND UTILITIES

The underground utility locations shown on the drawings are not exact. “Miss Utility” locator services are not available at Base Support Unit Miami. Use a private utility locator service, at contractor expense, to locate underground utilities. Notify the GCI and the Facilities Engineer’s representative at least 48 hours before excavating. Mark the excavation route and intersecting utilities. The GCI or the

SECTION 01110 Page 3 locator service sub-contractor will review the contractor's layout and notify the contractor if any known utilities have been left unmarked. Should excavation cross an existing utility line, use hand tools to excavate for a distance of 5 feet on each side of the intersection location shown on the drawings.

Once exposed, protect underground utilities from damage.

a. Make utility cut-over and interruptions after the normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in contract clause H.3 "Work Outside Regular Work Hours.

b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, and fire alarm shall be considered utility cut-overs. All outages shall be restored prior to the start of normal working hours on the next work day as defined in contract clause H.3 "Work Outside Regular Work Hours." This time limit includes time for deactivation and reactivation.

d. Operation of BSU Utilities: The Contractor shall not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, and electrical services. The Government will operate the control devices as required for the normal conduct of the work.

The Contractor shall notify the Contracting Officer giving reasonable advance notice when such operation is required.

1.11 CONTRACTOR USE OF PREMISES/SECURITY

The Contractor will be working on a Coast Guard operational military installation. Become familiar with and obey station fire, traffic, and security regulations. Personnel shall not stray from the immediate area of work or direct avenues of ingress and egress unless authorized in advance by the Contracting Officer's Technical Representative. The contractor shall submit a list of all personnel who will be working on site for security reasons. The list shall include the following minimum items: Name of employee, current address, social security number, date of birth and gender. The list shall be submitted to the COTR, a minimum of two weeks prior to starting work. The Contractor may submit a revised list at any time during the project. Only personnel on the approved listing will be allowed on the site.

For vehicle access, the following is required:

1. Vehicles must have current proof of insurance and registration

2. Drivers must have valid drivers license

3. All passengers and personnel must have a valid driver’s license or other State-issued identification that includes photograph, name and address

All personnel shall carry proper identification (ID) when on site. Proper ID is defined as either the individual's driver's license, or a company issued ID. The identification must be laminated, and show a facial picture of the individual. Individuals without proper ID will be escorted off the Coast Guard premises.

BSU Miami is on Terminal Island off the MacArthur Causeway, which links the cities of Miami and Miami Beach. Access to the island is provided by a two lane road and the overall site has very limited parking for other than Coast Guard personnel during normal working hours; contractor parking shall be limited to the immediate work area and areas assigned for contractor trailers; other arrangements may need to be made by the contractor for contractor personnel access to the site. BSU Miami normal working hours for Coast Guard personnel are 0700 to 1600, Monday through Friday. Work outside of normal working hours shall be coordinated with and approved by the COR.

SECTION 01110 Page 4

1.12 WEATHER

Delays caused by unusually severe weather (FAR Clause 52.249-10). Unusually severe weather will be considered unforeseeable and unusually severe if it is more severe than the statistical 3-year average for the appropriate weather parameters established by the National Weather Service. See Section 01320 “Anticipated Weather Delays” for additional requirements.

1.13 STORM PROTECTION

Should warnings of winds of gale force or stronger be issued, the Contractor shall take every practicable precaution to minimize danger to person, the work, and to adjacent property. Precautions shall include, but not be limited to, closing all openings, removing all loose materials, tools and equipment from exposed locations, and removing or securing scaffolding and other temporary work.

1.14 MANUFACTURER'S INSTRUCTIONS

Particular items and products specified in the sections are to be provided and/or installed according to the manufacturer's printed instructions. For bidding and contract performance purposes, the contractor is deemed to be aware of the requirements of these instructions.

1.15 RECEIPT OF MATERIALS

Shipments of equipment, materials, and supplies shall be addressed to the contractor - not the Government. The contractor must be on hand to accept shipments; the Government will not accept shipments.

1.16 DELIVERY, STORAGE, AND HANDLING OF MATERIALS

Deliver, store, and handle products and materials according to the manufacturer's printed instructions and as follows:

a. Deliver products and materials in manufacturer's original unopened packages or containers bearing manufacturer's labels.

b. Store products subject to damage from the elements in weathertight enclosures; maintain temperature and humidity within the ranges stated in the manufacturer's printed instructions.

c. Store fabricated products off the ground on platforms, blocking, or skids. Cover or protect products that may discolor or deteriorate due to exposure to the elements. Provide ventilation to avoid condensation.

d. Store loose granulated material on solid surfaces such as paving, plywood, or sheet material to prevent mixing with foreign matter. Provide drainage to prevent sheet material to prevent mixing with foreign matter. Provide drainage to prevent flow or ponding of rainwater. Prevent mixing of materials.

1.17 MINOR DEMOLITION, CUTTING, AND PATCHING:

a. Provide Contracting Officer 24 hour notice before commencing demolition.

b. Cut surfaces such as masonry, plaster, tile, and metal in straight lines at natural points of division.

SECTION 01110 Page 5

c. Materials for patching, filling-in, repairing, and extending work shall be new, and shall be similar in appearance and equal in quality to the materials used in the adjoining construction or the removed materials when they were new.

d. Protect existing construction, surfaces, and equipment from damage. Damaged existing construction, surfaces, or equipment shall be restored or replaced to match existing conditions or new adjoining work.

e. Dust: Erect and maintain temporary dust tight partitions or barriers to prevent the spread of dust, fumes, and noise to other parts of the building. Seal off return air grilles in the areas enclosed by dust barriers. Vent areas enclosed by dust barriers to the outside and provide filters on these vents. Before removing the dust barrier, completely clean the area enclosed by the barrier and both sides of the barrier itself. Cover existing equipment to protect it from dust.

f. Disassemble, disconnect, cut, remove, and alter existing construction and equipment without damaging other construction or equipment that is to remain or be reused. Cut and remove to the limits shown on the drawings, or, if not shown, to the minimum extent necessary for the proper installation of new work. Piping shall be removed and capped so as to be concealed in the finished work.

g. Cut, move, and remove existing construction as necessary to do the work; replace and restore when work is completed.

h. Completely remove applied finish flooring such as ceramic floor and base, and resilient tile flooring and base, including mastic, to structural floor.

i. Patching: Patch to provide a neatly finished installation and to restore surfaces and items to the condition they were in before the work started. Where removals leave holes and damaged surfaces that will be exposed in the finished work, patch and repair these holes and damaged surfaces to match adjacent finished surfaces and to provide surfaces that are suitable for the provision of the new work. Install materials according to standard trade practice. Provide a smooth, even line of transition where patched work adjoins existing construction or new work.

Patches or repairs shall match existing conditions or new adjoining work and shall provide a uniform finish and texture over the entire surface. When existing finish cannot be matched, refinish the entire surface to the nearest intersection.

j. Transitions: Make smooth and even transitions where new work abuts or aligns with existing construction. Where finished surfaces are cut such that a smooth transition with new work is not possible, terminate the existing surface along a straight line at a natural point of division and submit written recommendations to the COR on how to proceed.

k. Adjustments: Where removal of partitions results in adjacent spaces becoming one, rework floors, walls, and ceilings to a smooth plane without breaks, steps, and bulkheads.

1.18 CONTRACTING OFFICER’S AUTHORITY:

In no event shall any understanding or agreement between the contractor and any Government employee, other than the Contracting Officer, on any contract, modification, change order, letter or verbal direction to the Contractor be effective or binding upon the Government. All such actions must be formalized by a proper contractual document executed by an appointed Contracting Officer. The contractor is hereby put on notice that in the event a Government employee, other than the Contracting Officer, directs a change in the work to be performed, or increases the scope of the work to be performed, it is the contractor's responsibility to make inquiry to the Contracting Officer before making

SECTION 01110 Page 6

SECTION 01110 Page 7 the deviation. Payments will not be made without being authorized by an appointed Contracting Officer with the legal authority to bind the Government.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

End of Section

SECTION 01158

DESIGN/BUILD CRITERIA

1.1 GENERAL PROJECT REQUIREMENTS AND DESCRIPTION

1.1.1 REFERENCES, CODES AND STANDARDS

The codes, standards and publications are referenced in the text by the basic designation only. The latest editions, at the time of bid proposal, shall be used.

New construction and modification to existing construction shall comply with requirements of:

American Society of Civil Engineers- Minimum Design Loads for Buildings and Structures (ASCE-7) American Concrete Institute- Building Code Requirements for Structural Concrete (ACI 318) American Institute of Steel Construction- Steel Construction Manual Pre-cast and Pre-stressed Concrete Institute- Design Handbook (MNL 120-04) American Concrete Institute- Building Code Requirements for Masonry Structures (ACI 530) American Concrete Institute- Specifications for Masonry Structures (ACI 530.1) American Society of Heating Refrigeration and Air Conditioning (ASHRAE)

COMDTINST M6240.5 - WATER SUPPLY AND WASTEWATER DISPOSAL MANUAL

International Building Code (IBC) International Fire Code (IFC) International Plumbing Code (IPC) International Mechanical Code (IMC) Occupational Safety and Health Association (OSHA) Code of Federal Regulations (CFR) Illumination Engineering Society of North America (IESNA) Lighting Handbook (LHBK) National Fire Protection Association (NFPA) National Life Safety Code (NFPA 101) National Electrical Code (NEC, NFPA 70) National Electrical Safety Code (NESC, IEEE C2) National Electrical Contractors Association (NECA) National Electrical Installation Standards (NEIS) Telecommunications Industry Association (TIA/EIA -310D) Cabinets, Racks, Panels and Associated Equipment Telecommunications Industry Association/Electronics Industries Association TIA/EIA-568-B.1 Commercial Building Telecommunications Cabling Standard Part 1: General Requirements (May 2001).

Telecommunications Industry Association/Electronics Industries Association TIA/EIA-568-B.1-1 Commercial Building Telecommunications Cabling Standard Part 1: General Requirements Addendum 1 – Minimum 4- Pair UTP and 4-Pair ScTP Patch Cable Bend Radius (August 2001).

Telecommunications Industry Association/Electronics Industries Association TIA/EIA-568-B.2 Commercial Building Telecommunications Cabling Standard Part 2: Balanced Twisted-Pair Cabling Components (May 2001).

Telecommunications Industry Association/Electronics Industries Association TIA/EIA-568-B.3 Optical Cabling Components Standard (April 2000).

Telecommunications Industry Association/Electronics Industries Association (TIA/EIA-569-B)-Commercial Building Standard for Telecommunications Pathways and Spaces Telecommunications Industry Association/Electronics Industries Association (TIA/EIA-606-A) Administration Standard for the Commercial Telecommunications Infrastructure Telecommunications Industry Association/Electronics Industries Association (TIA/EIA-J-STD-607-A) Commercial Building Grounding (Earthing) and Bonding Requirements for Telecommunications Telecommunications Industry Association/Electronics Industries Association (TIA/EIA-758-A) Customer- Owned Outside Plant Telecommunications Standard Telecommunications Industry Association/Electronics Industries Association (TIA/EIA-526-7) Measurement of Optical Power Loss of Installed Single-Mode Fiber Cable Plant – OFSTP-7

SECTION 01158-1.1-3 - Page 1

SFRL No. 07-457957

Telecommunications Industry Association/Electronics Industries Association(TIA/EIA-526-14A) Optical Power Loss Measurements of Installed Multimode Fiber Cable Plant – OFSTP-14 Telecommunications Industry Association/Electronics Industries Association (TIA/EIA-598-C) Optical Fiber Cable Color Coding United Facilities Criteria UFC 4-159-03 Design- Moorings United Facilities Criteria UFC 4-152-01 Piers and Wharves

1.2 ROLE OF REQUEST FOR PROPOSAL (RFP) SPECIFICATIONS AND DRAWINGS

1.2.1 General:

Section 01158, "Design/Build Criteria," and Drawings contain abbreviated minimum facility requirements. The Contractor shall provide all necessary materials, equipment, labor and services required to provide a complete and useable facility for its intended purpose for homeporting new Fast Response Cutters (FRC) at BSU Miami.

1.2.2 Contractor-produced Construction Design Documents

The Contractor shall provide construction design documents in compliance with Section 01160 “Construction Design Documents”.

1.2.3 RFP Drawings

The design and design data indicated on the RFP drawings are the minimum requirements, i.e.; baseline drawing requirements, to be used by the Contractor to develop the project design. The Contractor shall add to, supplement, and complete these drawings to fully comply with the documentation requirements specified in Section 01160, "Construction Design Documents." The design and design data on the RFP drawings shall not be changed unless the requirements of paragraph "Deviations from Procurement Documents" of Section 01160, "Construction Design Documents" are met.

1.2.4 Precedence

In the event of conflict or inconsistency between provisions of the various portions of this contract (the reconciliation of which is not otherwise provided for herein), precedence shall be given in the following order.

The provisions of a particular portion shall prevail over those of a subsequently listed portion.

a. The provisions of the Requests For Proposal (RFP) issued in connection with this contract including all addenda, amendments, or other modifications issued there under.

b. The Government reviewed Contractor-produced Design Drawings and Specifications, except to the extent that any deviation therein has been specifically approved in writing pursuant to the provisions of Section 01160, "Construction Design Documents."

1.3 DESIGN RELATED PERMITS & CERTIFICATIONS

1.3.1 PERMITS

Timely acquisitions of all necessary design and construction related permits shall be the responsibility of the Contractor.

The contractor shall be responsible for identifying and obtaining all required permits, approvals, concurrences and certifications (hereafter called permits) from regulatory agencies. The Government will not delegate "Agent" authority to the contractor; the Coast Guard will sign all submissions to regulatory agencies. The Government will indemnify the contractor for all application fees on a cost basis.

SECTION 01158-1.1-3 - Page 2

SECTION 01158-1.1-3 - Page 3

As part of the first design submittal, provide a complete summary of all permits/approvals required for the project. As a minimum, the following information shall be provided for each required permit:

Name of Permit/Approval Regulatory Review Agency Regulatory Agency Address Regulatory Agency Point of Contact Regulatory Agency Phone Number Public Notice Required (Yes/No) Application Fee Approximate Review Period Public Meetings Required

The Contractor shall comment on any difficulties expected in obtaining approval for each permit/approval application.

Submit for the Government's review and approval the following:

a. Complete application.

b. Draft application cover letter.

c. Draft public notice advertisement (if any)

Within 7 days of review by the Government, incorporate all Government comments and provide the following for signature and submission (by the Coast Guard) to regulatory agency(s):

a. Completed application form(s)

b. Public notice (if any)

c. Application fees (certified check)

d. Proper number of exhibits/attachments (as required by regulatory agency) to application

Generally, the following text will be used for each application:

Applicant: United States of America in the Person of the U. S. Coast Guard, Facilities Design and Construction Center (Atlantic)

Signature: James M. Heinz, PE Captain, U. S. Coast Guard Commanding Officer Facilities Design and Construction Center (Atlantic)

The following statement is included below the signature: "The above signed has the authority to represent the U. S. Coast Guard."

Place all public notice type newspaper advertisements required for each application. Government will indemnify the A/E for the newspaper's direct billing cost of these advertisements. Advertisements shall be placed so as to properly coincide with permit/approval submission.

SFRL No. 07-457957

1.4 CIVIL AND SITEWORK DESIGN

Civil system design and construction shall comply with NFPA 70 and IBC, as applicable, unless specified otherwise. Install materials and equipment in compliance with applicable codes and manufacturers’ printed instructions. In each code and standard referenced, consider advisory provisions to be mandatory as though the word “shall” had been substituted for “should” everywhere “should” appears.

1.4.1 Existing Conditions: Existing water, fire protection, sanitary sewer, and compressed air service to Base Support Unit (BSU) Miami is provided by various local utility entities. Existing shore tie services include existing water and compressed air shore-tie outlets and sanitary sewer outlets. Standard fire hydrants are situated throughout the facilities closer to building structures than at particular existing shore ties.

A separate project, which is being administered by Coast Guard Civil Engineering Unit (CEU) Miami, will replace the existing 4.16 KV distribution system with a new 13.2 KV distribution system and will divest ownership of the new 13.2 KV high voltage distribution system and step down transformers from the Coast Guard to FPL. The existing 4.16 KV distribution system will be removed under that project except that the existing 1500 KVA transformer and a single 4.16 KV feeder serving existing transformers T3A, T4-1, T4-2, T4-3 AND T7A will remain in service in order to maintain power to the existing shore power services. Work under this project may require coordination with work under the separate project depending on their respective schedules.

1.4.2 General Scope of Work

1.4.2.1 Provide new water, sewer, and compressed air services for the new Fast Response Cutters (FRC’s) and existing vessels at BSU Miami based on the proposed vessel mooring plan shown on the RFP drawings.

Provide all items required for the new shore tie services served from the existing available services. The work will be required to be sequenced in accordance with requirements of specification Section 01110. These utility shore ties will coincide with the new electrical shore-tie stations (ST) for mooring vessels that are associated with the new berthing locations shown on the RFP drawings as follows.

Berth 1 (ST-1): 87 WPB Berth 2 (ST-2): 87 WPB and FRC Berth 3 (ST-3): 87 WPB and FRC Berth 4 (ST-4): FRC Berth 5 (ST-5): 87 WPB and FRC Berth 6 (ST-6): FRC Berth 7 (ST-7): FRC Berth 8 (ST-8): FRC Berth 9 (ST-9): FRC Berth 10 (ST-10): 270 WMEC Berth 11 (ST-11): FRC Berth 12: WLIC

1.4.2.1.1 The mooring plan on the RFP drawings is intended to show all vessels that could potentially be moored at specific berthing areas along the waterfront and is not intended to indicate that all the vessels shown on the plan would be moored simultaneously along the entire waterfront or that as many vessels as shown would be “nested” (i.e. moored outboard of each other) in specific berthing areas due to the limited mooring space along the waterfront. The design shall provide to accommodate vessels moored in berthing areas of the waterfront as follows:

Berths 1-2: No nesting of vessels; either two 87 WPB’s or one FRC.

Berths 3-4: Two vessels nested; any combination of two FRC’s and one 87 WPB.

Berths 5-6: Two vessels nested; any combination of two FRC’s and one 87 WPB.

Berths 7-8: Two FRC’s nested.

Berths 9-11: No nesting of vessels; either two 87 FRC’s or one 270 WMEC (worst case).

SECTION 01158_1.4 - Page 1

SFRL No. 07-457957

Berth 12: No nesting of vessels; WLIC only.

Locate water, sewer and compressed air connections in coordination with the locations of electrical shore power enclosures, other waterfront structures such as cleats and bollards, proposed vessel mooring and gangway locations, points of utility connections on the vessels, etc.

1.4.3 Design Requirements Overview

Location of existing utilities indicated on the site survey and utility maps is approximate only. The Contractor shall scan the construction site with electromagnetic or sonic equipment, and mark the surface of the ground where existing underground utilities are discovered. The Contractor shall contact commercial utility companies (i.e.; telephone, cable TV, gas, etc.) to obtain commercial utility information. The Contractor shall obtain approved station digging permits prior to excavating. Request for digging permits shall be in accordance with current USCG Facilities Engineer’s Office policies. All design work shall be in accordance with applicable codes and standards. For general design requirements refer to Section 01160 Construction Design Documents.

1.4.4 Water System

Contractor shall install a new 6” distribution system to supply new shore ties. The new loop water line shall connect to the nearest existing 6” water line. Provide all materials, equipment, labor, testing, and miscellaneous related items for each new shore tie.

1.4.4.1 Water Distribution System

1.4.4.1.1 Contractor shall coordinate all new Water Shore Ties to be in close proximity to other utility shore ties and to follow the requirements of the RFP shore tie locations and distances from particular ships. New water shore ties shall be constructed and housed in accordance with referenced DRWG 3405 Bulkhead Repairs, Sheet 16.

1.4.4.1.2 All new water shore ties shall have minimum 1½ inch water service lines from main distribution system. Provide water service line appurtenances as specified and where indicated.

1.4.4.2 Piping Materials

1.4.4.2.1 Steel Pipe and Associated Fittings

Water service lines shall be steel pipe or match the existing water service material. Pipe to have exterior epoxy coating in accordance with AWWA C210 for the service intended.

1.4.4.3 Insulating Joints

Joints between pipes of dissimilar metals shall have a rubber-gasketed or other suitable approved type of insulating joint or dielectric coupling which will effectively prevent metal-to-metal contact between adjacent sections of piping.

1.4.4.4 Gate Valves

Gate valves smaller than 3 inch size MSS SP-80, Class 150, solid wedge, nonrising stem. Valves shall have flanged or threaded end connections, with a union on one side of the valve.

1.4.4.5 Pipe Hangers and Supports

Provide pipe hangers and supports in accordance with MSS SP 58 and 69, unless shown otherwise on the drawings. Use clamps or clevis type hangers where pipe hangs, compatible with pipe size. Consider

SECTION 01158_1.4 - Page 2

SECTION 01158_1.4 - Page 3 insulation, jackets, and sleeves where applicable. Hangers, bolts, washers, and nuts to have hot dip galvanized zinc plating.

1.4.4.6 Disinfect new water piping and existing water piping affected by the Contractor's operations in accordance with AWWA C651.

1.4.5 Ship Sanitary Sewer

Contractor responsible for determining which existing sanitary sewer shore tie locations can be refurbished to meet the requirements of the proposed mooring plan and which ones will need to be demolished. New shore ties shall connect to the nearest existing sanitary collection system. New sewer shore ties shall be constructed and housed in accordance with referenced DRWG 3405 Bulkhead Repairs, Sheet 16. It is anticipated that the pier and new berthing sewer system will tie into the two existing lift station near existing Berth 5 (414-D) and existing Berth 8 (414-B) as shown on the RFP drawings. Contractor shall confirm that all downstream existing sanitary lift stations are capable of handling the additional wastewater and bilge water FRC contributions.

Provide all materials, equipment, labor, testing, and miscellaneous related items to provide sanitary sewage lines necessary for distribution and services to all new berthings as depicted on the RFP drawings. The following materials are not allowed for sanitary sewer piping: clay pipe and fittings, concrete pipe and fittings, steel pipe, or asbestos-cement pipe. Ductile iron pipe shall conform to ASTM A746 with AWWA C110 or AWWA C153 fittings. PVC pipe shall conform to ASTM D3034 or F949 with pipe and fittings made from material that conforms to ASTM D1784. No-hub fittings shall not be allowed for installations below grade.

Ensure that piping and components are treated/protected for corrosive conditions.

The vessel sewerage shall originate from vessel pumping operations. The sewerage will be pumped to new dock sanitary sewer connections which shall be provided to coincide with the proposed RFP mooring plan.

Each connection shall have a horizontal 4-inch bronze check valve and a 4-inch bronze full port ball valve and a “Cam-Lok” (or approved equal) fitting with chained dust cap. The supports at the valve assembly/connection point will be designed to withstand the pitching and yawing forces of the new FRC. The connections shall be painted gold color indicating sewer piping. 4-inch by 3-inch connection adapters will also be provided. Vessel grey water will be discharged through the same gold painted connections as the sanitary sewer and into the 8-inch gravity sanitary sewer.

1.4.6 Concrete Trench Boxes, Pavement and Sidewalks

Materials and methods shall be in accordance with the local government jurisdiction. The minimum concrete pavement section for areas subject to vehicular traffic is 10”. Minimum concrete strength shall be 3,000 psi.

1.4.7 Compressed Air

Compressed air service: Provide new compressed air branch lines and manifold with a minimum of 6 quick disconnect service outlets with pressure gauge and branch isolation valve at each new metal box shore tie, similar to existing compressed air outlets. Piping shall be galvanized steel and installed in accordance with applicable codes. No additional air compressor supply system other than that existing in Building 4 is anticipated.

Test piping to 150% of maximum operating pressure.

SFRL No. 07-457957

1.5 GEOTECHNICAL DESIGN

1.5.1 Geotechnical Site Data

Except for past geotech reports indicated in Section 00102, the Government has not conducted any subsurface investigations for this project. The Contractor shall retain the services of a geotechnical consultant registered as a Professional Engineer and obtain subsurface explorations and test data as necessary for final design. The geotechnical consultant shall be experienced with soil conditions in the local region. Geotechnical investigations shall be coordinated with the Contracting Officer and shall not interfere with normal Coast Guard operations. The cost of the required geotechnical work shall be included in the Contract Sum.

1.5.2 Assumed Foundation Type

For bidding purposes, assume the following regarding foundation design:

1.5.2.1 Bollard foundations:

Assume bollards will be supported by timber piles.

1.5.2.2 Electrical Equipment shelters (Substations) foundation :

Assume shallow foundations will be used for support of the buildings.

1.5.3 Actual Foundation Type

The actual foundation type, capacity, etc. will be determined after contract award by the Contractor's geotechnical consultant based on the actual loads and geotechnical data. The Contractor shall bear all costs of the actual foundation provided, except under circumstances where adjustments in contract award price may be made under the provisions of Contract Clause FAR 52.236-2, "Differing Site Conditions".

SECTION 01158_1.5 - Page 1

SFRL No. 07-457957

1.6 LANDSCAPING DESIGN

NOT USED

1.7 ARCHITECTURAL DESIGN

NOT USED

SECTION 01158_1.6-7 - Page 1

SFRL No. 07-457957

1.8 STRUCTURAL DESIGN

The structural work for this project includes design and installation of mooring devices and protective fenders.

In addition foundations are required for two electrical equipment shelters. Auxiliary equipment support pads may be required also.

The existing mooring devices include Standard Navy bollards and 18 inch cleats. Refer to Mooring Details shown on supplemental Drawing 3405 Sheet No. 8/24. The existing fendering equipment includes 12”x12” hollow rubber fender and 5’ diameter x 8’ long foam filled fender. Refer to typical fender details shown on supplemental Drawing M0444-D Sheet No. 7/7.

The Bollards are supported by wood piles independent of the waterfront bulkhead. The cleats and fenders are attached to concrete bulkhead cap. The Contractor is responsible for verifying the adequacy of the bulkhead where new cleats and fenders are installed. See supplemental drawings 3405 Sheets 1-24 for bulkhead information (berths 1-6)

1.8.1 Design Load Criteria

Determine the mooring forces and berthing energy based upon the following vessels:

Vessel Length at Waterline (ft) Weight (long ton)

Wind Presentment Area (sq-ft)

FRC 145.5 353.4 2186

WPB 87 93.5 918

WMEC 270 1825 7440

Approach velocity shall be 1.5 feet per second at an angle of 15 degrees to the longitudinal axis of the bulkhead.

In general calculation of berthing energy and mooring forces shall be in accordance with applicable provisions of UFC 4-152-01 and UFC 4-159-03 respectively. Use Mooring Service Type IIB, Table 3.4, UFC 4-159-03.

1.8.2 Mooring Installation

General: New fenders and mooring devices shall meet or exceed the quality and specifications of existing devices and shall be in accordance with applicable requirements of UFC 4-159-03. Fenders shall be SeaGuard marine fenders or equal. Bollards shall be 44.5 inches high Navy Standard or equal. Cleats shall be 18 inches or better.

The mooring plan on the RFP drawings is intended to show all vessels that could potentially be moored at specific berthing areas along the waterfront and is not intended to indicate that all the vessels shown on the plan would be moored simultaneously along the entire waterfront or that as many vessels as shown would be “nested” (i.e. moored outboard of each other) in specific berthing areas due to the limited mooring space along the waterfront. The design shall provide fenders and mooring devices to accommodate vessels moored in berthing areas of the waterfront as follows:

Berths 1-2: No nesting of vessels; either two 87 WPB’s or one FRC.

Berths 3-4: Two vessels nested; any combination of two FRC’s and one 87 WPB.

Berths 5-6: Two vessels nested; any combination of two FRC’s and one 87 WPB.

Berths 7-8: Two FRC’s nested.

Berths 9-11: No nesting of vessels; either two 87 FRC’s or one 270 WMEC (worst case).

SECTION 01158_1.8 - Page 1

SECTION 01158_1.8 - Page 2

1.8.2.1 Bollards described in 1.8 above exist for new Berths 7 through 11. Cleats as described in 1.8 above exist for new berths 1 through 6. The Contractor is responsible for reviewing the layout and spacing of the existing devices and determine the requirements for the new mooring devices based on the new mooring plan. Contractor shall provide bollards or additional cleats as required to accommodate the FRC’s. Provide additional devices as required for the new calculated forces (new Berths 1-6). Provide a minimum of 4 cleats and bollards for each FRC.

1.8.2.2 Foam filled fenders as described in 1.8 above exist for berths new 7 through 11. Hollow rubber fenders as described in 1.8 above exist for new berths 1 through 6. The Contractor is responsible for reviewing the layout and spacing of the existing fenders and determine the requirements for the new fenders.

Provide new fenders as required for new calculated berthing energy (berths 1-6). In any case, existing fenders for berths 1 through 6 shall be removed and replaced with foam filled 5 feet diameter by 8 feet long fenders.

Fender spacing shall be such that a minimum standoff distance of 4 feet from the face of the bulkhead cap shall be maintained under maximum operational compression. This is a condition stipulated in the permitting requirements for protection of manatees. Spacing should also provide a minimum of three fenders for the 87 feet WPB boats.

1.8.2.3 Corrosion Protection: Cleats, bollards and supporting piles, fenders, and all mounting hardware shall receive appropriate protection for marine environment.

1.8.2.3.1 Cleats and Bollards shall be coated with coal tar epoxy; hot-dip galvanized, or be of stainless steel.

Timber piles shall conform to ASTM D25, AWPA C3, and CCA treated.

1.8.2.3.2 All mounting hardware including but not limited to anchor bolts, pad eyes, chains, shackles, etc shall be 304/304L stainless steel

1.8.3 Equipment Shelters

See Specification Section 01158 Paragraph 1.13.14 for requirements on the shelters. It is anticipated that the shelters will be supported on shallow foundations. See Paragraph 1.5 Geo-technical Design for further information.

SFRL No. 07-457957

1.9 DEMOLITION

1.9.1 Dust and Debris Control

Prevent the spread of dust and debris to avoid the creation of a nuisance or hazard in the surrounding area.

Do not use water if it results in hazardous or objectionable conditions such as, but not limited to, ice, flooding, or pollution.

1.9.2 Existing Work

Protect existing work, which is to remain in place, be reused, or remain the property of the Government.

Repair items that are to remain and which are damaged during performance of the work to their original condition, or replace with new. Do not overload structural elements. Provide new supports and reinforcement for existing construction weakened by demolition or removal work. Repairs, reinforcement, or structural replacement must have Contracting Officer approval.

1.9.2 Utility Demolition

All existing at or above ground utility related structures that are presently abandoned in place or are to be abandoned under this project shall be completely removed from the concrete embedment and properly disposed of off the BSU facility. The affected concrete area shall be saw cut a minimum 12" from the outer most point of the appurtenance. No acute angle saw cuts will be allowed such that the resultant concrete patch must consist only of right angle corners (any other corner variation must be approved by the COR).

Concrete patch shall match existing concrete in all aspects including, but not limited to, strength, type, and color. Any related material, including but not limited to piping, and/or conduit, may be abandoned in place unless such material will conflict with new work under this project. All communication and power wiring shall be totally removed from the demolished structure back to the originating source. Source locations shall be approved by the COR. See plans for any additional information.

1.9.3 Required Data

Submit a demolition plan that shall include procedures for careful removal and disposition of materials specified to be salvaged, coordination with other work in progress, a disconnection schedule of utility services, a detailed description of methods and equipment to be used for each operation and of the sequence of operations.

SECTION 01158_1.9 - Page 1

HOMEPORT FRC AT CAUSEWAY ISLAND

Coast Guard Base Support Unit, Miami FL SFRL No. 07-457957

1.10 FIRE PROTECTION

Th…