About this file
This traffic control plan document is prepared for the City of Philadelphia in coordination with PennDOT (Pennsylvania Department of Transportation) for the Crescentville Road Signals and Pedestrian Improvements project located at the intersection of Crescentville Road (SR 1002), Adams Avenue (SR 1002), and Adams Run Boulevard. The project encompasses the installation of traffic signal equipment, video-radar detection systems, pedestrian signal facilities, curb ramps, sidewalk construction, and related infrastructure improvements across multiple construction stages. The work is staged in two primary phases, with Stage 1 involving construction of a channelizing island extension, bus stop facilities, sidewalk, and curbing in the northeast quadrant, followed by Stage 2 which includes installation of interconnected ITS equipment, additional signal installations, and sidewalk/curbing construction in the northwest and southwest quadrants. The contractor is responsible for maintaining traffic control throughout construction, coordinating with local municipalities, SEPTA, emergency services, and the PennDOT District 6-0 Traffic Management Center with advance notice requirements ranging from two days to two weeks depending on the type of work restriction. Traffic restrictions are prohibited during peak morning hours (6:00 AM–9:00 AM) and afternoon hours (3:00 PM–7:00 PM) on weekdays, with all restrictions removed by noon on days preceding legal holidays.
The project requires strict compliance with Act 229 of December 2002, PennDOT Publications (including Publication 213 for Temporary Traffic Control Guidelines and Publication 408-2020 for specifications), and the FHWA Manual on Uniform Traffic Control Devices (MUTCD). All temporary traffic control signage and channelizing devices must feature Type III or Type IV retroreflective sheeting conforming to PennDOT specifications, with drums and barricades reflectorized accordingly. Pedestrian facilities must maintain minimum 4-foot-wide walkways with maximum cross-slopes of 2.00% and gradients of 8.33% (12:1), with 5-foot passing zones provided every 200 feet. The contractor must inspect all traffic control devices prior to work commencement and obtain approval from the City's Resident Engineer. All work is to be performed within the legal right-of-way with erosion and sediment control BMPs installed per the sediment control plan. The contract estimate is between $1,000,000.00 and $2,000,000.00, with this solicitation initially for pre-qualification purposes, after which approved sellers will be invited to a closed bid solicitation.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL NOTES
1GENERAL NOTES
WITHIN PENNDOT'S RIGHT-OF-WAY.
THE CONTRACTOR SHALL COMPLY WITH ACT 229 OF DECEMBER 2002 DURING CONSTRUCTION ACTIVITIES
NOT FLAG A SIGNALIZED INTERSECTION WITHOUT THE MUNICIPALITY PLACING THE SIGNAL ON FLASH.
NOTIFY THE LOCAL MUNICIPALITY WHERE SIGNALIZED INTERSECTIONS FALL WITHIN THE WORK ZONE. DO
CONGESTION AND UNSAFE TRAFFIC CONDITIONS.
RESTRICTING TRAFFIC FLOW WITHIN THE WORK AREA SHALL BE MINIMIZED TO PREVENT TRAFFIC
PERIOD.
REMOVE ALL SHORT-TERM WORK ZONE TRAFFIC CONTROL SIGNING UPON COMPLETION OF THAT DAY'S WORK
408, SECTION 901.3(J).
DROPOFFS CREATED BY CONSTRUCTION OPERATIONS SHALL BE TREATED CONSISTENT WITH PUBLICATION
WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.
PROJECTS UNDER CONTRACT WITH PENNDOT OR THE CITY. ALL COSTS ASSOCIATED WITH COORDINATION
PROTECTION OF TRAFFIC WITH ALL CONTRACTORS AND SUBCONTRACTORS OF ADJACENT CONSTRUCTION
CONTRACTOR IS RESPONSIBLE FOR COORDINATING CONSTRUCTION ACTIVITIES AND MAINTENANCE AND
610-205-6700 AT LEAST 3 DAYS PRIOR TO THE START OF WORK.
IF A TRAFFIC SIGNAL IS WITHIN 500 FEET OF THE SITE, CALL THE DISTRICT TRAFFIC ENGINEER AT
ITEM # 0901-0001.
CONSTRUCTION AREAS. TEMPORARY ADJUSTMENTS TO LOCAL ROADS AND DRIVEWAYS IS INCIDENTAL TO
PROVIDE INGRESS AND EGRESS ABILITIES TO ALL LOCAL ROADS AND DRIVEWAYS SITUATED ADJACENT TO
RESTRICTIONS.
STAGE. CONTACT PHILADELPHIA STREETS DEPARTMENT AT (215)-686-5524 TO COORDINATE PARKING
PLACE TEMPORARY PARKING RESTRICTION SIGNS AS NEEDED FOR THE DURATION OF EACH CONSTRUCTION
INTERSECTING STREETS, DRIVES, ETC., AND/OR AS FIELD CONDITIONS DICTATE.
ALL ADVANCE WARNING SIGNS AND CHANNELIZING DEVICES MAY BE ADJUSTED BACK OR FORWARD DUE TO
OBSTRUCTED AT DRIVEWAYS OR SIDE STREETS.
KEEP DRIVEWAYS ACCESSIBLE AT ALL TIMES. LOCATE ALL SIGNS SO THAT SIGHT DISTANCE IS NOT
RETROREFLECTIVE SHEETING.
REFLECTORIZE ALL DRUMS AND BARRICADES USED FOR TRAFFIC CONTROL USING TYPE III OR TYPE IV
ARE TO BE TYPE VII RETROREFLECTIVE SHEETING CONFORMING TO THE DEPARTMENT'S SPECIFICATION.
TRAFFIC CONTROL PLAN AND IN ACCORDANCE WITH THE PROVISIONS OF PUBLICATION 213. ALL SIGNS
INSTALL AND MAINTAIN THE TEMPORARY SIGNS AND TRAFFIC CONTROL DEVICES AS INDICATED ON THE
SPECIFIED IN SECTION 901.3 (A) OF PUBLICATION # 408-2020.
THIS TRAFFIC CONTROL PLAN DOES NOT RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITY AS
ENGINEER OR HIS REPRESENTATIVE BEFORE WORK BEGINS.
ALL TRAFFIC CONTROL SIGNS AND DEVICES PLACED MUST BE INSPECTED BY THE CITY RESIDENT
TYPE "B" MOUNTED TRAFFIC CONTROL SIGNS, PULL ANCHOR POSTS.
IMMEDIATELY UPON COMPLETION OF THE WORK, REMOVE TRAFFIC CONTROL SIGNS AND DEVICES. FOR ALL
NOTED.
ALL LONG-TERM CONSTRUCTION SIGNING TO BE MOUNTED ON TYPE III BARRICADES UNLESS OTHERWISE
PHONE NUMBER IS (610) 205-6934.
THE START OF WORK. NOTIFY THE TMC WHEN THE ROAD IS RESTORED TO NORMAL OPERATION. THE TMC
PROPOSED LANE OR SHOULDER RESTRICTIONS OR ROAD CLOSURES, AND FIFTEEN (15) MINUTES PRIOR TO
NOTIFY THE DISTRICT 6-0 TRAFFIC MANAGEMENT CENTER (TMC) TWO (2) DAYS IN ADVANCE OF ANY
SIGNIFICANT LANE CLOSURES OR DETOURS.
NOTIFY THE DISTRICT 6-0 PRESS OFFICE AT (610) 205-6797 TWO (2) WEEKS IN ADVANCE OF ANY
DETOURS.
DISTRICT AND THE GENERAL PUBLIC AT LEAST TWO WEEKS PRIOR TO START OF WORK AND PRIOR TO
NOTIFY LOCAL EMERGENCY UNITS (POLICE, FIRE, MEDICAL, ETC.), SEPTA, BUSINESS, SCHOOL
FOR DEPARTMENT APPROVAL WHEN INADEQUACIES ARE DISCOVERED.
TERM OF THE CONTRACT. CONSTANTLY REVIEW THIS PLAN FOR ADEQUACY AND TO RECOMMEND CHANGES
MINIMUM AND ADDITIONAL PROTECTION MAY BE NEEDED IF PROBLEMS ARE ENCOUNTERED DURING THE
PROTECTION OF THE PUBLIC AND THE CONSTRUCTION PERSONNEL. THE STANDARDS PRESCRIBED ARE
REMINDED THAT THIS APPROVAL IS NOT INTENDED TO RELIEVE HIM OF THE RESPONSIBILITY FOR THE
PUBLICATION 213, CHAPTER 212 OF THE 67 PA CODE AS CURRENTLY AMENDED. THE CONTRACTOR IS
THESE PLANS HAVE BEEN REVIEWED AND ARE IN COMPLIANCE WITH STANDARDS PRESCRIBED IN
ALL WORK IS TO BE PERFORMED WITHIN THE LEGAL RIGHT-OF-WAY.
COVER OR REMOVE ALL CONFLICTING SIGNS AND ERADICATE ALL CONFLICTING PAVEMENT MARKINGS.
ALL SIGNS TO BE IN NEW CONDITION AND MAINTAINED AS SUCH.
TRAFFIC CONTROL DEVICES ERECTED BY DEPARTMENT FORCES.
REMOVE THESE DEVICES IMMEDIATELY UPON COMPLETION OF THE WORK. PENNDOT WILL REMOVE ANY
10. PENNDOT PUBLICATION NO. 408/2020 SPECIFICATIONS WITH REVISIONS
9. PENNDOT PUBLICATION 236, PA HANDBOOK OF APPROVED SIGNS
8. PENNDOT PUBLICATION NO. 213, TEMPORARY TRAFFIC CONTROL GUIDELINES
7. PENNDOT PUBLICATION NO. 212, OFFICIAL TRAFFIC-CONTROL DEVICES
STANDARDS
6. PENNDOT PUBLICATION NO. 111, TRAFFIC CONTROL PAVEMENT MARKING AND SIGNING
5. PENNDOT PUBLICATION NO. 72M, STANDARDS FOR ROADWAY CONSTRUCTION
4. PENNDOT PUBLICATION NO. 46, TRAFFIC ENGINEERING MANUAL
3. PENNDOT PUBLICATION NO. 35, APPROVED CONSTRUCTION MATERIALS (BULLETIN 15)
2. FHWA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD)
1. THE SPECIAL PROVISIONS OF THE CONTRACT
INDICATED ON THESE DRAWINGS AND,
DURING HOURS OF CONSTRUCTION AND AT ALL OTHER TIMES IN ACCORDANCE WITH THE METHODS
FURNISH, ERECT, PLACE, AND MAINTAIN TRAFFIC CONTROL SIGNS AND DEVICES AND MAINTAIN TRAFFIC
APPROACHING THE CONSTRUCTION AREA.
MAINTAIN THE SAFETY OF PEDESTRIANS AT ALL TIMES WITHIN THE LIMITS OF CONSTRUCTION AND
PUBLIC APPROACHING THE CONSTRUCTION AREA AND WITHIN THE LIMITS OF CONSTRUCTION.
THIS WORK CONSISTS OF THE MAINTENANCE OF TRAFFIC AND THE PROTECTION OF THE TRAVELING
THE DAY PRIOR TO THE LEGAL HOLIDAY.
ASSOCIATED WITH LEGAL HOLIDAYS. ALL RESTRICTIONS AND CLOSURES ARE TO BE REMOVED BY NOON ON
BETWEEN 3:00 PM AND 7:00 PM MONDAYS THROUGH FRIDAYS OR ON LEGAL HOLIDAYS AND WEEKENDS
NO TRAFFIC RESTRICTIONS OR LANE CLOSURES ARE PERMITTED BETWEEN 6:00 AM AND 9:00 AM AND
(BULLETIN 15).
RETROREFLECTIVE SHEETING. SHEETING SHALL BE APPROVED AND LISTED IN PENNDOT PUBLICATION 35
ALL CHANNELIZING DEVICES, BARRICADES, AND SIGNS SHALL HAVE TYPE III OR BETTER PRISMATIC
WORK.
PERMITTEE MUST ARRANGE FOR INSPECTION OF ALL TRAFFIC CONTROL DEVICES PRIOR TO START OF
DURING NON-WORK HOURS, PROTECT ALL EXCAVATION WITH 2A MATERIAL.
PEDESTRIAN FACILITIES
PROTECTION APPROVED BY THE CITY'S RESIDENT ENGINEER MUST BE IN PLACE.
IF CONSTRUCTION MATERIALS ARE LIFTED OVER ACTIVE PEDESTRIAN FACILITIES THEN OVERHEAD
THE CITY'S RESIDENT ENGINEER MUST APPROVE THE FENCE BARRIER DESIGN PRIOR TO INSTALLATION.
PROVIDE A CONTINUOUS SURFACE OR UPPER RAIL AT A 36" MINIMUM HEIGHT ABOVE THE WALKWAY SURFACE.
CONTINUOUS BOTTOM EDGE 6 INCHES ABOVE THE WALKWAY SURFACE. THE PEDESTRIAN BARRIER SHALL ALSO
THE PEDESTRIAN BARRIERS SHALL BE CONTINUOUS, STABLE AND NON-FLEXIBLE WITH A DETECTABLE, THAN 2 FEET OR AS DIRECTED BY THE REPRESENTATIVE.
PROVIDE A 4 FT FENCE BARRIER MADE OF PLASTIC OR METAL. USE METAL FENCE FOR DROP OFFS GREATER
WHERE PEDESTRIANS ARE ADJACENT TO ONGOING CONSTRUCTION OR WITHIN 4-FT OF A TRAVEL LANE, MAINTAIN IN PLACE PEDESTRIAN FACILITIES UNTIL OPENING MODIFIED PEDESTRIAN PATTERNS.
AMERICANS WITH DISABILITIES ACT (ADA), PENNDOT AND CITY REQUIREMENTS.
PERMITTED IN THE WALKWAYS AND CROSSWALKS BUT MAY BE COVERED WITH A SUITABLE MATERIAL MEETING
WALKWAYS SURFACES MUST BE STABLE AND SLIP RESISTANT. INLET GRATES AND UTILITY CASTING ARE NOT
8.33% (12:1) INCLUDING RAMP AREAS TO ROADWAYS.
ALL PEDESTRIAN WALKWAYS MUST HAVE A MAXIMUM CROSS-SLOPE OF 2.00% AND A MAXIMUM GRADIENT OF
WIDE WALKWAY CAN BE PROVIDED THROUGHOUT THE LENGTH.
FEASIBLE. EVERY 200-FT A 5-FT WIDE X 5-FT LONG PASSING ZONE MUST BE PROVIDED UNLESS A 5-FT
PEDESTRIAN WALKWAYS MUST BE A MINIMUM OF 4-FT IN WIDTH. PROVIDE MINIMUM 5-FT WIDTH WHEREVER
PROTRUDE INTO THE PEDESTRIAN WALKWAY.
COORDINATE WITH SEPTA FOR TEMPORARY BUS STOP RELOCATIONS. NOTHING SHALL BE PERMITTED TO
MAINTAIN ACCESS TO ALL BUILDING ENTRANCES AND DRIVEWAYS. MAINTAIN ACCESS TO ALL BUS STOPS.
DETOURS UTILIZING PATAS: 217, 218, OR 219 FROM PENNDOT PUBLICATION 213.
STAGE CONSTRUCTION TO MAINTAIN PEDESTRIAN WALKWAYS THROUGH WORK ZONES OR PROVIDE PEDESTRIAN
DISTRICT COUNTY ROUTE SECTION SHEET
DATE BYREVISIONS
D A
T E
TRAFFIC CONTROL PLAN
O P
E R
A T
O R
F I L
E N
A M
E P
H L
F S
P
H L
P r o j e c t s P
A C i t y o f P h i l a T
O I T
S C r e s c e n t v i l l e R o a d S i g n a l s C
A D
D P l a n S e t T r a f f i c T
C M
P T
G e n N o t e s .d g n
D A
T E
NUMBER
REVISION
6-0 PHILADELPHIA 1002 SBS
CITY OF PHILADELPHIA
O
C T
OF 6
VLYS
N N
E
A N
I
ENGINEER
REGISTERED
PROFESSIONALC
P
M
O M
N AEW
O
A
H
O F
LT
JEANNETTE J. QUIRUS
057049-E
SEQUENCE OF CONSTRUCTION
SEQUENCE OF CONSTRUCTION
STAGE 2
THE INTERCONNECT PLANS.
INSTALL ALL NECESSARY ITS EQUIPMENT AND WIRING AS SHOWN ON
AND 120 DURING ALLOWABLE WORKING HOURS.
213 PATA FIGURES 101-A, 102, 107, 109-F, 109-L, 118, 119,
AS SHOWN ON INTERCONNECT PLAN UTILIZING PENNDOT PUBLICATION
CRESCENTVILLE ROAD (SR 1002) & CHELTENHAM AVENUE (SR 1002)
INSTALL VIDEO-RADAR DETECTION SYSTEM AT THE INTERSECTION OF
WORKING HOURS.
110-J, 110-R, 110-T, 118, 119, AND 120 DURING ALLOWABLE
PENNDOT PUBLICATION 213 PATA FIGURES 101-A, 102, 107, 110-H,
RUN BOULEVARD AS SHOWN ON TRAFFIC SIGNAL PLAN UTILIZING
CRESCENTVILLE ROAD (SR 1002) & ADAMS AVENUE (SR 1002)/ADAMS
INSTALL SIGNAL EQUIPMENT AT THE INTERSECTION OF
119, 120, AND 128 DURING ALLOWABLE WORKING HOURS.
PENNDOT PUBLICATION 213 PATA FIGURES 101-A, 102, 107, 118,
PEDESTRIAN SIGNAL, AS SHOWN ON TRAFFIC SIGNAL PLAN UTILIZING
INSTALL SIGNAL EQUIPMENT AND CURB RAMPS AT THE MIDBLOCK
HOURS.
CHANNELIZING DEVICES ADJACENT TO CURB DURING NON-WORKING
102, 110-H, 110-J, 110-R, AND 110-T AS NECESSARY. PLACE
INTERSECTION UTILIZING PENNDOT PUBLICATION 213 PATA FIGURES
1002)/ADAMS AVENUE (SR 1002)/ADAMS RUN BOULEVARD
NORTHWEST AND SOUTHWEST QUADRANTS OF CRESCENTVILLE ROAD (SR
CONSTRUCT PROPOSED SIDEWALK, CURBING, AND CURB RAMPS IN THE
7+58.55 IN ACCORDANCE WITH THE STAGE 2 TRAFFIC CONTROL PLANS.
CONSTRUCT PROPOSED SIDEWALK AND CURBING FROM STA 2+00.00 TO
TRAFFIC CONTROL PLANS.
INSTALL THE TRAFFIC CONTROL DEVICES AS SHOWN ON STAGE 2
REMOVE ALL TRAFFIC CONTROL DEVICES ASSOCIATED WITH STAGE 1.
STAGE 1
DURING NON-WORKING HOURS.
NECESSARY. PLACE CHANNELIZING DEVICES ADJACENT TO CURB
UTILIZE PENNDOT PUBLICATION 213 PATA FIGURE 102 AS
50+40.00 TO STA 50+80.00 AND STA 58+73.80 TO STA 59+04.98.
CONSTRUCT PROPOSED BUS STOP, SIDEWALK, AND CURBING FROM STA
STAGE 1 TRAFFIC CONTROL PLANS.
PENNDOT PUBLICATION 213 PATA FIGURES IN ACCORDANCE WITH THE
AVENUE (SR 1002)/ADAMS RUN BOULEVARD INTERSECTION UTILIZING
NORTHEAST QUADRANT OF CRESCENTVILLE ROAD (SR 1002)/ADAMS
CONSTRUCT PROPOSED CHANNELIZING ISLAND EXTENSION IN
TRAFFIC CONTROL PLANS.
INSTALL THE TRAFFIC CONTROL DEVICES AS SHOWN ON STAGE 1
SEDIMENT CONTROL PLAN.
INSTALL EROSION AND SEDIMENT CONTROL BMPs PER EROSION &
TEMPORARY TRAFFIC CONTROL
STAGE 2 (CONT.)
CONTROL BMPs.
STABILIZATION NOTES AND REMOVAL OF EROSION AND SEDIMENT
REFER TO EROSION AND SEDIMENT CONTROL PLANS FOR PERMANENT
WORK.
REMOVE ALL TRAFFIC CONTROL DEVICES AFTER THE COMPLETION OF
DURING ALLOWABLE WORKING HOURS.
119, 120, 128, AND 130 (TEMPORARY CROSSWALK NOT PERMITTED)
FIGURES 101-A, 102, 107, 110-H, 110-J, 110-R, 110-T, 118,
SHOWN ON SIGNAL PLANS UTILIZING PENNDOT PUBLICATION 213 PATA
REMOVE EXISTING AND INSTALL PROPOSED PAVEMENT MARKINGS AS
ADJACENT TO CURB DURING NON-WORKING HOURS.
PATA FIGURE 102 AS NECESSARY. PLACE CHANNELIZING DEVICES
58+07.21 TO STA 58+28.33. UTILIZE PENNDOT PUBLICATION 213
CONSTRUCT PROPOSED SIDEWALK, CURBING, AND ADA RAMP FROM STA
WITH AT LEAST 60 DAYS NOTICE PRIOR TO BUS STOP RELOCATION.
FROM EXISTING LOCATIONS TO PROPOSED LOCATIONS. PROVIDE SEPTA
AFTER SIGNAL IS ACTIVATED, RELOCATE SEPTA BUS STOP SIGNAGE
DISTRICT COUNTY ROUTE SECTION SHEET
DATE BYREVISIONS
E R
A T
O R
F I L
E N
A M
E P
H L
F S
P
H L
P r o j e c t s P
A C i t y o f P h i l a T
O I T
S C r e s c e n t v i l l e R o a d S i g n a l s C
A D
D P l a n S e t T r a f f i c T
C M
P T
G e n N o t e s .d g n
D A
T E
NUMBER
REVISION
6-0 PHILADELPHIA 1002 SBS
CITY OF PHILADELPHIA
N
O V
OF 6
VLYS
N N
E
A N
I
ENGINEER
REGISTERED
PROFESSIONALC
P
M
O M
N AEW
O
A
H
O F
LT
JEANNETTE J. QUIRUS
057049-E
GRAVEL S
E
E S
H E
T
F
STAGE 1
VLYS
N N
E
A N
I
ENGINEER
REGISTERED
PROFESSIONALC
P
M
O M
N AEW
O
A
H
O F
LT
JEANNETTE J. QUIRUS
057049-E
PATA FIGURE 129
PUBLICATION 213
PENNDOT
ACCESS UTILIZING
PROVIDE PEDESTRIAN
LP
TLP
LP
TLP
S
S
W
TLP
D Y
H
W
S
S
S
TLP
S
EM
S °3
'1 "E
DISTRICT COUNTY ROUTE SECTION SHEET
DATE BYREVISIONS
D A
T E
E R
A T
O R
F I L
E N
A M
E P
H L
F S
P
H L
P r o j e c t s
P
A
C i t y o f P h i l a
T O
I T
S
C r e s c e n t v i l l e
R o a d
S i g n a l s
C
A D
D P l a n
S e t T r a f f i c T
C
M
P T
S t a g e
.d g n
D A
T E
NUMBER
REVISION
6-0 PHILADELPHIA 1002 SBS
CITY OF PHILADELPHIA
N
O V
OF 6
CRESCENTVILLE ROAD
CRESCENTVILLE ROAD (SR 1002)
A D
A M S
A V
E N
U E
S
R
R O
AD
W
O R
K
W 20-1
36"X 36"
AHEAD
EN
D
R O
AD
W
O R
K 36"X
18"
G 20-2
ROAD WORK
36"X18"
G20-2
END
30"X 30"
R 3-8A
(LS
-R
ONLY
D E Y /4
NEWTRAFFIC
PATTERN
AHEAD
W 23-2
36"X 36"
T Y P
I
N
BACKGROUND
ORANGE (REFLECTORIZED)
LEGEND AND BORDER ON
BLACK (NON-REFLECTORIZED)
NOTE:
LEGEND
SIGN AND SUPPORT
CHANNELIZING DEVICEor
TRAFFIC FLOW
AREA
PROPOSED LONG TERM WORK
SCO
E
E S
H E
F
STAGE 1
VLYS
N N
E
A N
I
ENGINEER
REGISTERED
PROFESSIONALC
P
M
O M
N AEW
O
A
H
O F
LT
JEANNETTE J. QUIRUS
057049-E
SCOSCOSCO
W W
GG
WW
SCO
W
SCO
GG
WW
W
G
D
Y
H
WW
G
W
SW
S
S
W
S
W W
S
S
D
Y
H
57 58 59 61 6260
DISTRICT COUNTY ROUTE SECTION SHEET
DATE BYREVISIONS
D A
T E
E R
A T
O R
F I L
E N
A M
E P
H L
F S
P
H L
P r o j e c t s
P
A
C i t y o f P h i l a
T O
I T
S
C r e s c e n t v i l l e
R o a d
S i g n a l s
C
A D
D P l a n
S e t T r a f f i c T
C
A
M
P T
S t a g e
.d g n
D A
T E
NUMBER
REVISION
6-0 PHILADELPHIA 1002 SBS
CITY OF PHILADELPHIA
N
O V
OF 6
CRESCENTVILLE ROAD (SR 1002)
LEGEND
SIGN AND SUPPORT
CHANNELIZING DEVICEor
TRAFFIC FLOW
GRAVEL
E
E S
H E
STAGE 2
VLYS
N N
E
A N
I
ENGINEER
REGISTERED
PROFESSIONALC
P
M
O M
N AEW
O
A
H
O F
LT
JEANNETTE J. QUIRUS
057049-E
LP
TLP
LP
TLP
S
S
W
TLP
D Y
H
W
W
S
S
S
TLP
S
EM
S °3
'1 "E
DISTRICT COUNTY ROUTE SECTION SHEET
DATE BYREVISIONS
D A
T E
E R
A T
O R
F I L
E N
A M
E P
H L
F S
P
H L
P r o j e c t s
P
A
C i t y o f P h i l a
T O
I T
S
C r e s c e n t v i l l e
R o a d
S i g n a l s
C
A D
D P l a n
S e t T r a f f i c T
C
M
P T
S t a g e
.d g n
D A
T E
NUMBER
REVISION
6-0 PHILADELPHIA 1002 SBS
CITY OF PHILADELPHIA
N
O V
OF 6
CRESCENTVILLE ROAD
CRESCENTVILLE ROAD (SR 1002)
A D
A
A V
E N
U E
S
R
ADAMS RUN BOULEVARD
R -2
Y
IELD
X
R O
A D
W O
R K
W -1
"X
AH
EAD
W -1
R "X
R O
AD
W
O R
K
W 20-1
36"X 36"
AHEAD
W -2
X
60'30' (TYP.)
T
Y P
200'
I
N
LEGEND
SIGN AND SUPPORT
CHANNELIZING DEVICEor
TRAFFIC FLOW
SCO
E
E S
H E
STAGE 2
VLYS
N N
E
A N
I
ENGINEER
REGISTERED
PROFESSIONALC
P
M
O M
N AEW
O
A
H
O F
LT
JEANNETTE J. QUIRUS
057049-E
SCOSCOSCO
W W
GG
WW
SCO
W
SCO
GG
WW
W
G
D
Y
H
WW
G
W
SW
S
S
W
S
W W
S
S
D
Y
H
57 58 59 61 6260
DISTRICT COUNTY ROUTE SECTION SHEET
DATE BYREVISIONS
D A
T E
E R
A T
O R
F I L
E N
A M
E P
H L
F S
P
H L
P r o j e c t s
P
A
C i t y o f P h i l a
T O
I T
S
C r e s c e n t v i l l e
R o a d
S i g n a l s
C
A D
D P l a n
S e t T r a f f i c T
C
M
P T
S t a g e
.d g n
D A
T E
NUMBER
REVISION
6-0 PHILADELPHIA 1002 SBS
CITY OF PHILADELPHIA
N
O V
OF 6
CRESCENTVILLE ROAD (SR 1002)
E N
D
R O
A D
W O
R K
X
G
-2
60' (TYP.) 50'
LEGEND
SIGN AND SUPPORT
CHANNELIZING DEVICEor
TRAFFIC FLOW
| 01-MPT Gen Notes-Default-000 |
| 02-MPT Gen Notes-Default-000 |
| 03-MPT-Stage 1-2D Metric Design-000 |
| 03A-MPT-Stage 1-2D Metric Design-000 |
| 04-MPT-Stage 2-2D Metric Design-000 |
| 05-MPT-Stage 3-2D Metric Design-000 |
| 2026-02-03T13:42:32-0500 | |
| Jeannette J Quirus |
File details come from the government source that posted it. Updated .