06 Atch J-3 PWS-FY20-IM Elev_Esca 9Jun20.pdf

PDF 782 KB Posted

Attached to
Inspection and Maintenance of Elevators and Escalators at Yokota Air Base and Tama Annex, Japan.
Solicitation number
FA520920Q0042
Issued by

About this file

This performance work statement solicits proposals for inspection and maintenance services for elevators and escalators at Yokota Air Base and Tama Annex in Japan. The contractor shall be responsible for monthly preventive inspection and maintenance of 89 elevators, 2 small lifts, and 4 escalators located across various facilities. Services include monthly inspection and maintenance, repair service calls within two hours for routine issues and one hour for emergencies, and annual inspections. The contractor must also provide level II repair and restoration services using a task order process with a maximum value of less than the simplified acquisition threshold per order. The contractor shall submit an annual work schedule and monthly reports on inspections and repairs. The performance period is for one year with options to extend for four additional years. The solicitation number is FA520920Q0042 and the point of contact is Mr. Hiroshi Yoshikawa at the Department of the Air Force Pacific Air Forces.

View the file

Other files

File Type Posted
07 Atch J-4 PP List.pdf PDF
04 Atch J-1 20Q0042 Exhibit.xlsx XLSX spreadsheet
02 Policies Procedures for Business Ltr.pdf PDF
03 FA520920Q0042.pdf PDF
05 Atch J-2 Other Cont Req 9Jun20.pdf PDF
01 Notice to Offerors1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. FA520920Q0042

Attachment J-3

PERFORMANCE WORK STATEMENT

FOR

INSPECTION AND MAINTENANCE OF

ELEVATORS/ESCALATORS

AT

YOKOTA AIR BASE AND TAMA ANNEX,

JAPAN

9 JUN 2020

PERFORMANCE WORK STATEMENT FOR

INSPECTION AND MAINTENANCE OF ELEVATORS/ESCALATORS AT

YOKOTA AIR BASE AND TAMA ANNEX, JAPAN

1. DESCRIPTION OF SERVICES/GENERAL INFORMATION. The Contractor shall provide all management, tools, supplies, equipment, and labor necessary to inspect and maintain all elevators, Small Lift (dumbwaiters) (collectively “elevators” hereafter) and escalators systems at Yokota Air Base and Tama Hills Recreation Area (Tama

Annex) in accordance with commercial practice, the applicable Japanese law and its supplemental regulations as it is stipulated in this Performance-based Work Statement

(PWS). A list of elevators, escalators, and their locations are shown in Appendix A.

1.1. MAINTENANCE SERVICES. The Contractor shall perform preventive

Inspection and Maintenance (I&M) service for all elevators and escalators. I&M services include 1) Monthly I&M, 2) Annual Inspection, 3) Repair Service Calls and 4) Level II

Work. Any repairs that are beyond the scope of this section shall be brought to the immediate attention of the Contracting Officer’s Representative (COR) for further coordination.

1.1.1. Monthly Inspection/Maintenance: The Contractor shall perform preventive monthly I&M services for all elevators and escalators listed in Appendix A in accordance with manufacturers’ specifications and any commercial practices. The service shall be performed at least once per month at not more than 30 day intervals, to ensure reliable and continuous safe operation until the next scheduled maintenance. The preventive maintenance work is identified as, but is not limited to the cleaning, the lubricating, the adjustment of system and the replacement of expendable parts as listed in Appendix A, replacement parts.

1.1.1.1. Work Schedule: The Contractor shall provide the COR & Contracting Officer

(KO) with an annual work schedule for the basic period of the contract not later than

(NLT) 10 working days prior to contract start date. The Contractor shall provide the work schedule for the following year NLT 10 working days prior to the end of the current contract year. The schedule shall show the building, time, and day of the I&M service as shown in the sample schedule in Appendix B. The COR will evaluate the Contractor’s schedule and will send recommendations to the KO for approval. The Contractor shall not deviate from the approved schedule without prior approval of the KO.

1.1.1.2. Report: The Contractor shall prepare and submit a written report in English within five (5) business days after the date of I&M performed. The report shall identify each elevator or escalator, the location, maintenance work performed, repairs needed, date of inspection, name of inspector, and overall condition of the elevators or escalators in accordance with manufactures’ report and any commercial practices.

1.1.1.3. Training: The Contractor shall provide Annual Training for member of the

Yokota Fire and Emergency Services.

1.2. Annual Inspection: the Contractor shall also perform an annual inspection of all elevators and escalators in accordance with Japanese Industrial Standard (JIS) A4302, “Inspection Standard of Elevators and Escalators”, manufacturer’s inspection/test manuals and recommendations by a Certified Elevator Inspector. The contractor shall furnish an appropriate fully completed sticker placed in the elevator cab. The contractor shall submit the original signed summary inspection report to the COR and its copy to

KO. The summary inspection report is identified the amount of the actual test load, the date inspected, maintained and/or tested, maintenance company name, address, phone number, written name and signature of the inspector in accordance with manufactures’ inspection report and any commercial practices.

1.3. REPAIR SERVICE CALLS: In addition to the preventive monthly inspection and maintenance of elevators and escalators, on-site service shall be performed when the COR notifies the Contractor of a shutdown, imminent breakdown, malfunction of control device, or other operation failure of elevators or escalators. Such failures shall be remedied by repair at no additional cost to the Government for expendable replacement parts listed in Appendix

A, paragraph 3. Repair service calls will be classified as either “Routine Calls” or

“Emergency Calls”. The Contractor shall survey the defects and notify the COR of an estimated time for repair. All repair work shall be in accordance with manufacturers’ specifications and any commercial practices above and beyond the requirements of such specifications. Downtime of the elevator or escalator shall be kept to an absolute minimum.

The Contractor shall commence repair work after coordination with the COR. The

Contractor must notify the customer of all projected downtime and estimated time for repair.

The Contractor shall prepare and submit written report within two (2) business days after the repair services are completed. The report shall include the date and time of the service call, the location of the elevator or escalator, the repairs performed, and the name of the technician performing the repairs. If a repair is found to be beyond the scope of repair service call, the

Contractor shall withhold repair and provide the COR with diagnosis and recommended course of action to repair the defects.

1.3.1. Routine Calls: Routine calls are defined as repair service calls when the defective elevator or escalator is vacant and another elevator, escalator, or stairway is readily available within the facility. The Contractor shall respond to the work location within two (2) hours of notification during normal duty hours and within three (3) hours of notification outside normal duty hours.

1.3.2. Emergency Calls: Emergency calls are defined as repair service calls when a passenger is confined in the elevator or it is necessary to restore the failed elevator to the normal operation status at earliest possible time. The Contractor shall respond to the work location within one (1) hour of notification.

1.4. LEVEL II WORK: Level II Work is defined as any work that is not covered by paragraphs 1.1 thru 1.3. Level II work is the repair or restoration of elevators or escalators using parts or components beyond the scope of preventive maintenance, such as mandatory replacement parts, or for defects or damages caused by inappropriate use, damages or malfunctions caused by a natural disaster, and other factors that require the technical expertise necessary to rectify any elevator’s or escalator’s safety deficiencies., The performance period and cost of all level II work are subject to negotiation between the Contractor and the Government. Level II work will be issued by modification to this contract. Maximum amount for level II work is limited to the yen equivalent of an amount below the Simplified Acquisition Threshold (SAT) per each modification.

Material Submittals: The description of the information for parts to be used for Level

II work, other than consumable service parts, shall be submitted to the KO for approval prior to commencement of actual repair or replacement. Approval of materials shall be recorded using Air Force (AF) Form 3000, Material Approval Submittals. If replacement work was executed by emergency, and the parts did not have prior approval from the

Government, the Contractor shall include the information in a written report to be submitted no later than 14 calendar days after completion of such repair or replacement.

1.5. GENERAL INFORMATION

1.5.1. Quality Control: The Government shall inspect and evaluate the Contractor’s performance to ensure services are received in accordance with requirements set forth in this contract. The COR shall inspect by one of the following methods: observing performance, physically checking an attribute of the completed task, checking a management information report, investigating customer complaints, conferring with facility managers, or otherwise inspecting the task or its results to determine whether or not performance meets the standards contained in this PWS. The COR shall record the result of surveillance in accordance with para 2. of the Services Summary. Results of the surveillance then become the official Air Force record of the Contractor’s performance.

When a performance threshold has not been met or Contractor performance has not been accomplished, the COR will initiate and provide the KO a Contract Discrepancy Report

(CDR) for issuance to the Contractor. The Contractor shall respond to the CDR in accordance with instructions provided and return it to the KO within 10 calendar days of receipt.

1.5.2. Hours of Operation: The Contractor shall perform the services required under this contract of the following hours:

Normal duty hours: Monday through Friday, 0700 to 1700 hours. (Except Repair Service

Call, refer to para 1.3.1 and 1.3.2.)

1.5.3. Holidays: The Contractor shall not schedule monthly inspection/maintenance service on the following holidays:

U.S. Holidays

1st January New Year’s Day

3rd Monday of January Martin Luther King, Jr’s Birthday

3rd Monday of February Washington’s Birthday

Last Monday of May Memorial Day

4th of July Independence Day

1st Monday of September Labor Day

2nd Monday of October Columbus Day

11th of November Veterans Day

4th Thursday of November Thanksgiving Day

25th of December Christmas Day

Note: Normally, holidays that fall in Saturday will be observed the preceding

Friday. Holidays falling on a Sunday will be observed the following Monday.

1.5.4. Warning Signs: When services are being performed, the Contractor shall provide proper warning signs and barricades to warn all persons of the dangers of entry into the elevator or escalator. The Contractor shall control and prevent persons from accessing the elevator or escalator when work is in progress.

1.5.5. Security Requirements/Base Passes: All Contractor employees will be issued base passes (identification cards) which shall be carried by the individual bearers at all times while on United States Government premises. The Contractor shall submit written requests for base pass issuance to the KO and shall be responsible for all base passes issued to his/her employees and employees of any subcontractors. The Contractor shall return all base passes to the Japanese Pass Section at Yokota Air Base upon termination of employment or completion of the contract.

1.6. SPECIAL QUALIFICATIONS.

1.6.1. Project Manager: The Contractor shall provide a Project Manager (PM) who shall act fully on behalf of the Contractor on all matters relating to daily operation of this contract and perform overall management of the entire work requirements. The PM shall meet the qualification of “Elevator or Escalator Inspectors (昇降機検査技師資格者)” issued by “Ministry of Land, Infrastructure and Transport and Tourism (国土交通省)” or other equivalent licenses/certificates in accordance with “Japanese Building Standards

Law (建築基準法)”, Article 12, para 3 and its supplemental regulations, to provide annual elevator inspection in accordance with “Japanese Industrial Standard (JIS)

A4302”, Inspection Standard of Elevator and Escalator, therefore PM shall possess a certificate of the “Technical Manager” as required in the aforementioned law. The name of this person, and Assistant Project Manager (APM), who shall act for the Contractor when the Project Manager is absent, shall be designated in writing to the KO. APM is required to possess the same level of certification as the PM.

1.6.1.1. Either the PM or APM shall be present at the I&M work site at all times. If the work is conducted same time at the multiple locations in Yokota AB, the PM or APM shall be present at one of the site and respond to other site upon request.

1.6.1.2. The PM and APM shall be designated in writing within five (5) days after notice of award and upon change of personnel. The letter of designation shall be supported by the copy of certificates/licenses and record of experience as proof of their qualifications.

The required licenses/certificates shall be current and updated when the changes occur.

1.6.1.3. The other than PM or APM workers are required minimum three (3) years experience of I&M Elevators and Escalators.

1.6.1.4. The PM and APM must be able to read, write, speak and understand English, or provide a translator.

1.6.2. Contractor Employees. The Contractor shall not employ persons for work on this contract if such employee is identified to the Contractor by the Contracting Officer as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population.

1.6.2.1. The Contractor employees shall present a neat appearance and be easily recognized as contractor employees. This may be accomplished by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges, which contain the company name and employee name.

1.7. PERFORMANCE OF SERVICES DURING CRISIS DECLARED BY THE

NATIONAL COMMAND AUTHORITY OR OVERSEAS COMBATANT

COMMANDER. The Contractor is not required to perform all services listed in this PWS during crisis.

2. SERVICES SUMMARY (SS).

Performance Objective

PWS

Para Performance Threshold

SS# 1: Preventive Maintenance

Elevators & Escalators are fully operational.

1.1.1.

95% of all elevators/escalators are operational at all times

SS# 2: Repair Service Call

Repairs are made in a timely manner;

Customers are informed of expected repair time.

Response and repair is made within the specified downtime

1.3.

1.3.1.

1.3.2.

100% of the repair service call are completed satisfactorily and no more than 3 failures to respond in the appropriate timeframe

SS#3. Submit Work Schedule, Maintenance and Repair Reports.

Work schedules and accurate repairs are delivered on time

1.1.1.1.

1.1.1.2.

1.2.

100% of the work schedules and accurate repairs are delivered on time and no more than 3 defects per month

SS#4. Level II Order.

Work will be initiated/completed within the negotiated performance period

1.4.

100% of the level II work is accomplished and no more than 2 failures to accomplish the work within the negotiated performance period

3. GOVERNMENT-FURNISHED PROPERTY AND SERVICES

3.1. Government-Furnished Utilities. For the performance of this contract, the

Government will provide the Contractor with electricity, water and sewage at facilities where available without cost.

3.1.1. The Contractor shall make sure employees practice utility conservation. The

Contractor shall be responsible for operating under conditions that prevent the waste of utilities.

3.1.2. Employees shall not adjust mechanical equipment controls for heating, ventilation, and air conditioning systems.

3.2. Following services are available in emergency by Defense Switched Network

(DSN) call 911:

a. Security Police

b. Fire Department

c. Hospital Emergency (Reimbursable Basis)

3.2.1. Any time the Contractor uses one of the above services, the PM shall immediately report to the COR with all of the details.

3.3. Key Control: The Contractor shall conduct a key inventory and submit the list of all keys (For elevator/Escalator control keys and/or mechanical room keys) issued by the

Government. The contractor shall ensure the keys are not lost, misplaced and/or, used by unauthorized persons. The Contractor shall not duplicate any keys issued by the

Government.

3.3.1. The Contractor shall immediately report to the COR or KO any occurrences of lost or duplicated keys.

3.3.2. In the event keys other than master keys, are lost or duplicated, the Contractor may be required, upon written direction of the KO, to re-key or replace the affected lock or locks without cost to the Government. The Government may, however, at its option, replace the affected lock or locks or perform re-keying and deduct the cost of such from the monthly payment due the Contractor.

3.3.3. The Contractor shall limit use of keys issued by the Government to the

Contractor’s or subcontractor’s employees. The Contractor shall control access with all

Government provided lock combinations to preclude unauthorized entry.

APPENDIX A

ESTIMATED WORKLOAD DATA

1. SUMMARY

a. Number of Elevators and Escalators

ITEM DESCRIPTION QUANTITY

Number of Passenger (P) and Passenger/Freight

(PF) Elevators

89 EA

2 Number of Small Lift (Dumbwaiter) 2 EA

3 Number of Escalators 4 EA

b. Historical Average Number of Service Calls per Year (Over 5 years period)

ITEM DESCRIPTION QUANTITY

1 Repair Service Calls for Elevators: Routine Calls 60 EA/Year

Repair Service Calls for Elevators: Emergency

Calls 48 EA/Year

3 Repair Service Calls for Escalators: Routine Calls 60 EA/Year

Repair Service Calls for Escalators: Emergency

Calls 2 EA/Year

Annual training Yokota Fire and Emergency

Services 2 EA/Year

2. LOCATION AND SPECIFICATIONS OF ELEVATORS / ESCALATORS

a. Operation and Maintenance (O&M) Facilities:

Bldg.

No.

Type Qty. Specifications/ Manufacturer

Date

Installed

TOSHIBA ELEVATORS

445 (P) 1 Rope w/ M, 1000 kg, 15Persons, 2 Stops Jun-02

620 (P) 1 Rope w/ M, 900 kg, 13 Persons, 2 Stops Oct-88

(N) (PF) 1 Rope w/ M, 1200 kg, 18 Persons, 3 Stops Sep-03

(S) (PF) 1 Rope w/ M, 1200 kg, 18 Persons, 3 Stops Nov-03

3260 (P) 1 Rope w/ M, 1000 kg, 15 Persons, 2 Stops Oct-00

3266 (PF) 1 Rope w/ M, 1200 kg, 18 Persons, 2 Stops Feb-04

(P) 1 Rope w/ M, 750 kg, 11 Persons, 11 Stops Oct-05

(PF) 1 Rope w/ M, 2200 kg, 33 Persons, 11 Stops Dec-05

(P) 1 Rope w/o M, 1300kg, 20 persons, 4 stops Oct-11

(P) 1 Rope w/o M, 1000kg, 15 persons, 4 stops Oct-11

30 (P) 1 Rope w/o M, 1000kg, 15 persons, 4 stops Aug-11

71 (P) 1 Rope w/ M, 1000kg, 15 Persons, 2 stops Sep-11

(P) 1 Rope w/ M, 750 kg, 11 Persons, 11 Stops

Oct-03 (PF) 1 Rope w/ M, 1450 kg, 22 Persons, 11 Stops

(P) 1 Rope w/ M, 750 kg, 11 Persons, 11 Stops

Oct-03 (PF) 1 Rope w/ M, 1450 kg, 22 Persons, 11 Stops

(P) 1 Rope w/ M, 750 kg, 11 Persons, 11 Stops

Oct-03 (PF) 1 Rope w/ M, 1450 kg, 22 Persons, 11 Stops

(P) 1 Rope w/ M, 750 kg, 11 Persons, 11 Stops

Feb-91 (PF) 1 Rope w/ M, 1450 kg, 22 Persons, 11 Stops

(P) 1 Rope w/ M, 750 kg, 11 Persons, 11 Stops

Feb-91 (PF) 1 Rope w/ M, 1450 kg, 22 Persons, 11 Stops

(P) 1 Rope w/ M, 750 kg, 11 Persons, 11 Stops

Jan-05 (PF) 1 Rope w/ M, 1450 kg, 22 Persons, 11 Stops

(P) 1 Rope w/ M, 750 kg, 11 Persons, 10 Stops

(PF) 1 Rope w/ M, 1450 kg, 22 Persons, 11 Stops

3005 (P) 1 Rope w/ M, 750 kg, 11 Persons, 11 Stops Jul-93

(PF) 1 Rope w/ M, 1450 kg, 22 Persons, 11 Stops

HITACHI ELEVATORS (PF)

314 (P) 1 Rope w/ M, 1000 kg, 15 Persons, 2 Stops Apr-96

315 (P) 1 Rope w/ M, 900 kg, 13 Persons, 3 Stops Mar-92

316 (P) 1 Rope w/ M, 1000 kg, 15 Persons, 2 Stops Jul-93

430 (P) 1 Rope w/ M, 750 kg, 11 Persons, 2 Stops Aug-96

602 (P) 1 Rope w/ M, 1000 kg, 15 Persons, 2 Stops Aug-00

653 (P) 1 Rope w/ M, 1000 kg, 15 Persons, 3 Stops Jul-93

714 (P) 1 Rope w/ M, 1000 kg, 15 Persons, 3 Stops Mar-95

920 (P) 1 Rope w/ M, 900 kg, 13 Persons, 2 Stops Feb-91

937 (P) 1 Rope w/ M, 1000 kg, 15 Persons, 2 Stops 2000

(PF) 2 Rope w/ M, 1400 kg, 21 Persons, 3 Stops Mar 2001

(PF) 2 Rope w/ M, 1000 kg, 15 Persons, 3 Stops Mar 2001

Escalator 1 7300mm, 1st FL-2nd FL 2000

Escalator 1 7300mm, 1st FL-2nd FL 2000

Escalator 1 6900mm, 2nd FL-Roof top 2000

Escalator 1 6900mm, 2nd FL-Roof top 2000

610 (P) 1 Rope w/o M, 1000kg, 15 Persons, 2 Stops Feb 2015

SANSEI ELEVATORS

1371 (PF) 1 Rope w/o M, 600 kg, 9 Persons, 8 Stops Sep-09

(PF) 1 Rope w/ M, 1450 kg, 22 Persons, 4 Stops 2001

(P) 1 Rope w/ M, 1000 kg, 15 Persons, 4 Stops 2001

FUJITECH ELEVATOR

90 (P) 1 Rope w/ M, 1000 kg, 15 Persons, 2 Stops Nov-03

812 (P) 1 Rope w/o M, 1000 kg, 15 Persons, 4 Stops 2012

OTIS ELEVATOR

564 Small Lift 1 Rope w/ M, 300 kg, 2 Stops 1989

RYOUDEN ELEVATOR

375 Small Lift 1 Rope w/ M, 500 kg, 2 Stops Mar-99

MITSUBISHI ELEVATOR

720 (P) 1 Rope w/ M, 1000 kg, 15 Persons, 2 Stops 2003

4125 (P) 1 Rope w/ M, 1000 kg, 15 Persons, 2 Stops 2002

703 (P) 1 Rope w/ M, 1000 kg, 15 Persons, 3 Stops 2002

580 (P) 1 Rope w/o M, 1000 kg, 15 Persons, 2 Steps Nov-09

993 (P) 1 Rope w/o M, 1000 kg, 15 Persons, 2 stops Oct-11

202 (P) 1 Rope w/ M, 1000kg, 15 Persons, 2 stops 2011

210 (P) 1 Rope w/o M, 1000kg, 15 Persons, 2 stops Dec-16

CHUO ELEVATOR

665 (PF) 1 Rope w/o M, 950 kg, 14 Persons, 2 Stops 2008

MORIYA ELEVATOR

(P) 1 Rope w/o M, 1000 kg, 15 Persons, 4 Stops 2014

(P) 1 Rope w/o M, 750 kg, 11 Persons, 4 Stops 2014

DAIKO ELEVATORS

912 (P) 1 Rope w/o M, 1200 kg, 18 Persons, 2 Stops 2019

b. Military Family Housing (MFH) Facilities:

Type Qty. Specifications/ Manufacturer

Date

Installed

TOSHIBA ELEVATORS

(P) 1 Rope w/ M, 750 kg, 11 Persons, 11 Stops

Oct-02 (PF) 1 Rope w/ M, 2200 kg, 33 Persons, 11 Stops

(P) 1 Rope w/ M, 750 kg, 11 Persons, 11 Stops

May-92 (PF) 1 Rope w/ M, 1450 kg, 22 Persons, 11 Stops

(P) 1 Rope w/ M, 750 kg, 11 Persons, 11 Stops

May-92 (PF) 1 Rope w/ M, 1450 kg, 22 Persons, 11 Stops

(P) 1 Rope w/ M, 750 kg, 11 Persons, 10 Stops

Oct-98 (PF) 1 Rope w/ M, 1450 kg, 22 Persons, 11 Stops

(P) 1 Rope w/ M, 750 kg, 11 Persons, 11 Stops

Jul-93 (PF) 1 Rope w/ M, 1450 kg, 22 Persons, 11 Stops

(P) 1 Rope w/ M, 750 kg, 11 Persons, 10 Stops

Apr-99 (PF) 1 Rope w/ M, 1450 kg, 22 Persons, 11 Stops

(P) 1 Rope w/ M, 750 kg, 11 Persons, 11 Stops

(PF) 1 Rope w/ M, 2200 kg, 33 Persons, 11 Stops

(P) 1 Rope w/ M, 750 kg, 11 Persons, 11 Stops

(PF) 1 Rope w/ M, 2200 kg, 33 Persons, 11 Stops

(P) 1 Rope w/ M, 750 kg, 11 Persons, 11 Stops

Dec-05 (PF) 1 Rope w/ M, 2200 kg, 33 Persons, 11 Stops

(P) 1 Rope w/ M, 750 kg, 11 Persons, 11 Stops

Apr-06 (PF) 1 Rope w/ M, 2200 kg, 33 Persons, 11 Stops

(P) 1 Rope w/ M, 750 kg, 11 Persons, 11 Stops

Apr-06 (PF) 1 Rope w/ M, 2200 kg, 33 Persons, 11 Stops

(P) 1 Rope w/ M, 750 kg, 11 Persons, 11 Stops

Oct-02 (PF) 1 Rope w/ M, 2200 kg, 33 Persons, 11 Stops

c. Department of Defense Dependent School (DODDS) Facilities:

Type Qty. Specifications/ Manufacturer

Date

Installed

DOVER ELEVATORS

4319 (P) 1 Hydraulic, 818 kg, 13 Persons, 30m/min, 2 Stops 1984

4157 (PF) 1 Hydraulic, 818 kg, 13 Persons, 2 Stops 1985

1239 (PF) 1 Hydraulic, 818 kg, 13 Persons, 2 Stops 1983

DAIKO ELEVATORS

4155 (PF) 2 Rope w/ M, 1150 kg, 17 Persons, 2 Stops 2000

MITSUBISHI ELEVATOR

4320 (P) 1 Rope w/ M, 900 kg, 13 Persons, 2 Stops 1989

OTIS ELEVATOR

4173 (PF) 1 Rope w/o M, 1588 kg, 21 Persons, 2 Stops 2017

Rope w/ M: Rope Type & Mechanical Room

Rope w/o M: Rope Type & Mechanical Room Less

3. REPLACEMENT OF EXPENDABLE PARTS. The preventive maintenance work is identified as, but is not limited to the cleaning, the lubricating, the adjustment of system and the replacement of expendable parts as listed below:

Lead wire

Fuse

Traveling contact of floor selector

Tape cleaner of floor selector

Carbon brush

Fluorescent lamp

Incandescent lamp

Lubricant

Comb

Acrylic cover of Emergency stop button

Rag

4. EXCEPTIONS TO MONTHLY INSPECTION & MAINTENANCE. The following items are not included in the monthly unit price of the contract:

a. Repairs required due to carelessness, vandalism, unsuitable use, earthquake, fire, explosion or other accidents.

b. Repair of Building Equipment in Machine Room.

c. Repair of Hoist way Walls.

d. Repaint, re-plating, repair or replacement of:

(1) Elevator Car (including rubber tile)

(2) Landing Doors

(3) Jamb

(4) Sill

5. SPECIFICATIONS. The specifications, drawings, current and past inspection and maintenance reports, and record of repair or replacement of parts for the elevators cited in this Performance-based Work Statement are not available for distribution but may be examined at the following location:

374 CES/CEOES, Service Contract

Building 838, Yokota Air Base, Fussa-shi, Tokyo, Japan

POC: Contracting Officer’s Representative (COR)

Telephone: 042-552-2511 (Ex. 5-8124)

APPENDIX B

SAMPLE

WORK SCHEDULE

CONTRACT NO.: FA5209-XX-C-XXXX

INSPECTION & MAINTENANCE OF ELEVATORS/ESCALATORS AT YOKOTA AIR BASE AND

TAMA ANNEX

Color-cord of Elevators/Escalators manufactures:

Toshiba Ryoden Sansei M Mitsubishi Fujitec Dover

Hitachi Chuo Daiko Moriya Otis

1. MONTHLY I&M: MONTH, DATE, BLDG NO. and TIME

OCT-20XX

Start Time 0700 0800 0900 1000 1100 1300 1400 1500

Day 1

Bldg. 570 (Elevator) B2000 B2091

B2080 B2085

Bldg. 570 (Escalator)

B1561 B1562

B1371 B4173 B4320 B1563

B4302 B4303 B4304 Day 2 B375 B4155 B4157 B4125 B993

B714 B714N B714S B564 B816 B812

Day X

NOV-20XX

SEP-20XX

Day << Time >>

<< Bldg. No. >>

Day

< Same as above >

2. ANNUAL INSPECTION: MONTH, DATE, BLDG NO. and TIME

Month-20XX

<< Time >>

<< Bldg. No. >>

< Same as above >

Submitted by:

Name

Company Name

Phone No.

Reviewed by: Approved / Disapproved by:

COR Name, COR KO / CA Name

374 CES/CEOES 374 CONS/PKBA

Yokota Air Base, Japan Yokota Air Base, Japan

File details come from the government source that posted it. Updated .