06-10-21 Well 21 Addendum I.docx
DOCX document 14 KB Posted
- Attached to
- Materials and Equipment for Well 21 Repair
- Solicitation number
- FA488721Q0025
About this file
This addendum provides clarification for a solicitation seeking materials and labor for the construction of a new water well at Luke Air Force Base. The scope of work involves two phases, with Phase 1 covering drilling and installation of the well casing to be performed with assistance from the Arizona Army National Guard, and Phase 2 encompassing well testing to be undertaken by the contractor providing all necessary materials, labor, and equipment. Specific clarifications include removing copper piping from the list of required materials, deleting 640 feet of cable from the statement of work, and adding a contingency for hourly welder services during well casing installation. The contractor is expected to consult with the Guard as needed and have a technical representative available 24 hours a day during Phase 1. Projected well flows are estimated between 320 and 400 gallons per minute at a pumping level depth of around 538 feet below ground surface, with actual pump placement to be determined through testing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA488721Q00250002 SF 30.pdf | ||
| 06-11-21 Well 21 Contractor Unit Price Spreadsheet.xlsx | XLSX spreadsheet | |
| REV V SOW El Mirage Well 21 - 11 June 2021.docx | DOCX document | |
| 06-10-21 Well 21 RFIs 1-14.xlsx | XLSX spreadsheet | |
| Solicitation Amendment FA488721Q00250001 SF 30.pdf | ||
| Solicitation - FA488721Q0025.pdf | ||
| SOW El Mirage Well 21 - 4 June 2021.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM CLARIFICATIONS FOR WELL 21
JUNE 10, 2021
1. Bidding contractors are instructed to not provide this item in the list of materials:
| 50 |
| Each |
| 20’ LENGTHS OF 4” DIAMETER COPPER BEARING STEEL PLATE PIPING |
2. There are two phases for the Project:
Phase 1: The Contractor will provide expertise and supervision to assist the AZ ARNG in drilling the well and installing the well casing, grouting the well, etc., to get the well ready for testing.
Phase 2: The Contractor will provide all materials, labor and equipment necessary to test the well. The AZ ARNG will not be involved in the testing phase.
3. The 640 LF of cable in the Luke AFB On-Hand Material List has been deleted from the SOW.
4. When the well casing is installed the AZ ARNG may need an experienced welder available. Please provide a contingency unit cost (hourly cost) to provide a welder in your estimate.
5. Project Contractor consultation with AZ ARNG is as Contractor deems necessary to produce a successful project. The projected times are for the Contractor have a representative check in with the drilling team once every eight our shift and have a technical expert available to answer questions 24 hours a day through Phase 1, as described above in Item #2.
6. Projected (estimated) flows from the new well are between 320 GPM – 400 GPM. The estimated pumping level depth is approximately 538 VF. Actual pump depth will be determined by the testing of the well.