This document is Addendum #1 for Invitation to Bid (ITB) #ODFW-735-051-25, issued by the Oregon Department of Fish and Wildlife (ODFW) in collaboration with the United States Forest Service for the GNA 1610-500 Road Drainage Improvement project. The addendum modifies the original ITB, providing updates to specified work at mile posts 4.64 and 4.95, including constructing drain dips, placing riprap, and replacing culverts. The ITB closing date remains unchanged at July 31, 2025, at 2:00 PM PST. Key clarifications from the pre-bid conference include that the winning contractor will be responsible for road maintenance in the work area, must coordinate road access with the Timber Sale Contractor, and will leave felled trees on-site.
The addendum notes that no bonds are requested for the project and that the Divide pit is not closed for turtles. The sourcing of crushed aggregate has been changed from Three Cabin quarry to Divide quarry, and several Tiller maps have been removed. The document specifies that this addendum constitutes a material change to the solicitation and must be acknowledged in Attachment A of the ITB. The project appears to focus on improving road drainage to protect spawning habitat for Oregon Coastal Coho and Winter Steelhead by minimizing sediment loading into Section Creek and reducing road failure risks during extreme weather events.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITB 735-051-25 – GNA 1610-500 Road Drainage Improvement OregonBuys # 63500-00014369
Date: July 23, 2025
ADDENDUM #1
ITB #ODFW-735-051-25
GNA 1610-500 Road Drainage Improvement
This addendum modifies the Invitation to Bid (ITB) document(s) for work only to the extent indicated herein. All other areas not specifically mentioned or affected by this addendum shall remain in full force. This addendum shall be added as a part of the original ITB document(s) and shall become part of the work required.
Deleted language is shown with strike through. New language is shown in Bold.
ADDENDUM
1. Changes to the Invitation to Bid document (s).
a. Specified Work Update:
MP
4.64
Construct drain dip per detail on sheet 6. Place 5 CY class 2 riprap on fill slope.
Conserve & reuse suitable road surfacing and road fill material as appropriate.
Remove 18" CMP and replace with drain dip per detail on sheet 6. Place 5 CY class 2 riprap on fill slope. Conserve & reuse suitable road Surfacing and road fill material as appropriate. Conserve and reuse Suitable culverts backfill at other sites under this contract as Appropriate.
MP
4.95
Remove 18" CMP and replace with drain dip per detail on sheet 6. Place 5 CY class 2 riprap on fill slope. Conserve & reuse suitable road Surfacing and road fill material as appropriate. Conserve and reuse Suitable culverts backfill at other sites under this contract as Appropriate.
Construct drain dip per detail on sheet 6. Place 5 CY class 2 riprap on fill slope. Conserve & reuse suitable road surfacing and road fill material as appropriate.
2. References to sourcing crushed aggregate from Three Cabin quarry on pages 2 and 3 of designs and changed to Divide quarry.
Remove:
− Map labeled Tiller Map#1 pg. 58
− Remove Map labeled Tiller Map#2 pg. 59
− Remove Map labeled Tiller Map#3 pg. 60
− Remove Map labeled Tiller Map#4 pg. 61
Add:
MP 5.03: See attached Drawing for Type B Earthen Barrier
ITB 735-051-25 – GNA 1610-500 Road Drainage Improvement OregonBuys # 63500-00014369
Prospective Bidders have until the end of day the day following posting of the addendum to submit written questions or protests regarding this Addendum.
Clarifications Discussed During Pre-Bid Conference
Road Maintenance: Winning Contractor will be responsible for repairing roads of any damage in Road 1610-500 work area. Road Maintenance in Timber Sale area will be completed by separate Contractor.
Coordination for road access: If Timber Sale Contractor is still working when this contract starts all use of the roads and passage through timber Sale site will coordinate with Timber Sale Contractor and USFS Timber Sale Administrator between contractors without the need of ODFW/USFS oversight.
All trees that Contractor falls during this project will be left on site.
No Bonds are requested for this project.
Divide pit is not closed for turtles.
ITB CLOSING DATE AND TIME:
Remains unchanged: July 31, 2025, at 2:00pm PST
This addendum constitutes a Material Change to the solicitation. Its receipt by the Offeror needs to be acknowledged in Attachment A, Bidder Information and Certifications Form of the ITB.
Addendum prepared by:
Jake E Howard
Contract Specialist III