05 FY2026AUG1 Project Request Form.pdf
PDF 987 KB Posted
- Attached to
- TCSG-430-DP Design Professional - Advanced Manufacturing & Engineering Bldg. Augusta Tech College
- Solicitation number
- PE-40900-RFQC-2026-000000154
- Issued by
- Clayton County, Georgia
About this file
This is a FY2026 Capital Outlay Project Request Form (PRF) for Augusta Technical College in Grovetown, Georgia, detailing the planning and programmatic requirements for a new Advanced Manufacturing & Engineering Technology Building (Project Number: FY2026AUG1). The project encompasses comprehensive facility planning across multiple functional areas totaling 88 rooms with 37,126 net square feet and 55,689 gross square feet of new construction. The building program is organized into five primary categories: Administrative Services (37 rooms, 15,696 GSF), Auditorium/Lecture facilities (7 rooms, 5,625 GSF), Construction Technology programs (34 rooms, 27,468 GSF), and General Classroom Space (9 rooms, 6,900 GSF). Construction Technology spaces include dedicated laboratories and instructional areas for Welding and Joining Technology, Machine Tool Technology, Air Conditioning/Industrial Maintenance Technology, Chemical Technology, 3D Printing/Additive Manufacturing, and various engineering disciplines including Mechanical and Electrical/Computer Engineering Technology.
The project request form details specific space allocations and programmatic requirements for each functional department, with net areas multiplied by a 1.5 factor to calculate gross square footage. Administrative Services provisions include presidential offices, conference rooms, economic development incubator space, and student services areas. The Construction Technology section represents the largest allocation, featuring two welding laboratories (2,500 SF each), machine shops, specialized classrooms, and faculty offices. The document includes provisions for labor market analysis and industry surveying to support program justification, though specific enrollment data, salary information, and funding sources are not populated in the provided sections of this planning document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AUG Project Location Map.pdf | ||
| HighestRankedFirm.docx | DOCX document | |
| 20_18_02 ATC Masterplan.pdf | ||
| 00 AUG 1_2_pager FY2026 _ Updated JAN 2025.docx | DOCX document | |
| TCSG_430_DP RFQ.docx | DOCX document | |
| Shortlisted Firms.pdf | ||
| Q_A Step I.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Copy of FY26 Capital Outlay PRF86-Augusta Technical College-Advanced Mfg Bldg.xlsm
FY 2026 PRF - Building Program Summary
College: Augusta Technical College Campus Location: Grovetown
Project Name:
Advanced Manufacturing & Engineering Technology Bldg
Project Number: FY2026AUG1
3 Administrative Services Quantity Subtotal Net Area
(NSF)
Subtotal Gross Area
(GSF)
Presidents Office 7 3,150 4,725
Administrative Services 6 3,550 5,325 Economic Development Programs 2 1,260 1,890 Instructional Services 10 920 1,380 Student Services 10 984 1,476 Student Center 2 600 900
Subtotal 37 10,464 15,696
5 Auditorium/Lecture Quantity Subtotal Net Area
(NSF)
Subtotal Gross Area
(GSF)
Technology Annex 6 3,500 5,250 Enter Sub-Program Name here 1 250 375
Subtotal 7 3,750 5,625
11 Construction Technology Quantity Subtotal Net Area
(NSF)
Subtotal Gross Area
(GSF)
Welding and Joining Technology 10 7,250 10,875 Machine Tool Technology 4 2,050 3,075 Air Conditioning Technology / Industrial Maintenance Technology 4 2,050 3,075 0 16 6,962 10,443
Subtotal 34 18,312 27,468
15 General Classroom Space Quantity Subtotal Net Area
(NSF)
Subtotal Gross Area
(GSF)
Instructional Space (Undesignated) 4 2,050 3,075 General Instructional Space 5 2,550 3,825
Subtotal 9 4,600 6,900
Adustment to Gross Square Footage to match architect's GSF
TOTAL NET/GROSS SQUARE FOOTAGE - New Construction 88 37,126 55,689
Page 4 of 48 6/4/2024 9:15 AM
FY 2026 PRF - Building Program College:
Augusta Technical College
Campus Location: Grovetown, Columbia
Project Name:
Advanced Manufacturing & Engineering Technology Bldg
Project Number: FY2026AUG1
Administrative Services
Presidents Office Net Area (SF) x Quantity = Subtotal Net Area
(NSF)
Subtotal Gross Area
(GSF)
Waiting Room / Lobby 750 1 750
Presidents Office -
Administration -
File Room -
Marketing office -
Marketing Storage -
Board Room -
Work Room -
Executive Toilet -
Mechanical Rooms-Air Handling Units/Mechanical Rm (Pumps) Ground Floor 500 4 2,000
Telecom MDF (Ground Floor), Telecom IDF (Second Floor) 200 2 400
Subtotal for Presidents Office 7 3,150 x 1.5 = 4,725
Administrative Services Net Area (SF) x Quantity = Subtotal Net Area
(NSF)
Subtotal Gross Area
(GSF)
Vice President's Office -
Conference Room / Library 1,000 1 1,000
Staff Office -
Offices -
Records Room -
Production Room -
Bookstore -
Bookstore Office -
Staff Supplies and Receiving -
Dean's Office 150 1 150
Restrooms 600 4 2,400
Subtotal for Administrative Services 6 3,550 x 1.5 = 5,325
Economic Development Programs Net Area (SF) x Quantity = Subtotal Net Area
(NSF)
Subtotal Gross Area
(GSF)
Consumer Laboratory -
Computer Laboratory -
Classroom -
Vice President's Office -
Conference Room -
Secretary's Office -
Instructor's Office -
Work Room -
Advanced Mfg Incubator/Economic Dev Soft Landing Space 1,250 1 1,250
Mailroom 10 1 10
Subtotal for Economic Development Programs 2 1,260 x 1.5 = 1,890
Cells highlighted in yellow are the unlocked, data input boxes.
Columns N thru Z are unlocked for your convenience. You can use this area for your notes & calculations.
Page 5 of 48 6/4/2024 9:15 AM
College:
Augusta Technical College
Campus Location: Grovetown, Columbia
Project Name:
Advanced Manufacturing & Engineering Technology Bldg
Project Number: FY2026AUG1
Administrative Services
Cells highlighted in yellow are the unlocked, data input boxes.
Columns N thru Z are unlocked for your convenience. You can use this area for your notes & calculations.
Instructional Services Net Area (SF) x Quantity = Subtotal Net Area
(NSF)
Subtotal Gross Area
(GSF)
Vice President's Office -
Directors Office -
Staff Office -
Secretary Office 200 1 200
Storage Room 100 4 400
Staff Lounge -
Technical Support Office -
Technical Support Office (for assistant) -
Technical Support Head-end Room -
Technical Support Storage Room -
Faculty Offices -
Adjunct Cubicles 64 5 320
Subtotal for Instructional Services 10 920 x 1.5 = 1,380
Student Services Net Area (SF) x Quantity = Subtotal Net Area
(NSF)
Subtotal Gross Area
(GSF)
Reception -
Staff Office's -
Vice President / Director's Office -
Director's Office (Carrier Placement Office) -
Director's Office Admission Co. Office -
Vault -
Registrar, Director's Office -
Financial Aid Director's Office -
Staff Office's -
File/Storage Room -
Work Room -
Student Breakroom 300 2 600
Career Center -
Electrical Rooms 48 8 384
Subtotal for Student Services 10.00 984.00 x 1.5 = 1,476
Student Center Net Area (SF) x Quantity = Subtotal Net Area
(NSF)
Subtotal Gross Area
(GSF)
Dining Room -
Vending Area -
Food Preparation -
Food Sales Area -
Supply Storage -
Display Window -
Student Collaborative Area 300 2 600
Subtotal for Student Center 2 600 x 1.5 = 900
Page 6 of 48 6/4/2024 9:15 AM
College:
Augusta Technical College
Campus Location: Grovetown, Columbia
Project Name:
Advanced Manufacturing & Engineering Technology Bldg
Project Number: FY2026AUG1
Administrative Services
Cells highlighted in yellow are the unlocked, data input boxes.
Columns N thru Z are unlocked for your convenience. You can use this area for your notes & calculations.
Media Center Net Area (SF) x Quantity = Subtotal Net Area
(NSF)
Subtotal Gross Area
(GSF)
Media Room -
Office -
Food Preparation -
Food Sales Area -
Supply Storage -
Display Window -
Subtotal for Media Center - - x 1.5 = -
IT/Instructional Support Net Area (SF) x Quantity = Subtotal Net Area
(NSF)
Subtotal Gross Area
(GSF)
Information Technology - Server Room -
IT Workroom and Storage -
Web/Multimedia & Online Support -
Network Administrator's Office -
Data Administrator's Office -
IT Storage -
Recording Room -
Editing Room -
Equipment & Checkout Room -
Director of Technology Office -
Secretary to Director of Technology -
Conference Room -
IT Technician Office -
A/V Master Control Room -
Reception/Check-out -
Subtotal for IT/Instructional Support - - x 1.5 = -
Enter Sub-Program Name here Net Area (SF) x Quantity 1 Subtotal Net Area
(NSF)
Subtotal Gross Area
(GSF)
Subtotal for Enter Sub-Program Name here - - x 1.5 = -
TOTAL 'ADMINISTRATIVE SERVICES' SQUARE FOOTAGE 37 10,464 15,696
Page 7 of 48 6/4/2024 9:15 AM
College:
Augusta Technical College
Campus Location: Grovetown, Columbia
Project Name:
Advanced Manufacturing & Engineering Technology Bldg
Project Number: FY2026AUG1
Auditorium/Lecture
Technology Annex Net Area (SF) x Quantity = Subtotal Net Area
(NSF)
Subtotal Gross Area
(GSF)
Classroom 600 2 1,200
Computer Lab 600 2 1,200
Coordinator's Office -
Food Service's 400 -
GSAMS Room -
Lecture Hall/Auditorium -
Technical Support -
Work Room -
Prefunction/Exhibitor's Space -
Multi-Purpose Room 850 1 850
Table & Chair Storage 250 1 250
Subtotal for Technology Annex 6 3,500 x 1.5 = 5,250
Enter Sub-Program Name here Net Area (SF) x Quantity = Subtotal Net Area
(NSF)
Subtotal Gross Area
(GSF)
Catering Setup 250 1 250
Subtotal for Enter Sub-Program Name here 1 250 x 1.5 = 375
TOTAL 'AUDITORIUM/LECTURE' SQUARE FOOTAGE 7 3,750 5,625
Cells highlighted in yellow are the unlocked, data input boxes.
Columns N thru Z are unlocked for your convenience. You can use this area for your notes & calculations.
Page 1 of 1 6/4/2024 9:20 AM
College:
Augusta Technical College
Campus Location: Grovetown, Columbia
Project Name:
Advanced Manufacturing & Engineering Technology Bldg
Project Number: FY2026AUG1
Construction Technology If this Construction Technology Program is existing, please provide the program enrollment and growth trends for the last 3 years.
College Level AY 2021 Data
College Level AY 2022 Data
College Level AY 2023 Data
Similar Program is offered at following location Campus
List the local industries surveyed and/or Labor Market Data used and the total number of graduates of this program they could hire in the time frame
# of Jobs for Graduates in yrs
If this Construction Technology Program is NEW, please provide the number of graduates & salary.
Number of graduates
Construction Technology Net Area (SF) x Quantity = Subtotal Net Area
(NSF)
Subtotal Gross Area
(GSF)
Construction Laboratory -
Classroom -
Instructor's Office -
Sheltered Work Area -
Supply Room -
Tool Room -
Storage Area (Lumber) -
Subtotal for Construction Technology - - x 1.5 = -
Welding and Joining Technology Net Area (SF) x Quantity = Subtotal Net Area
(NSF)
Subtotal Gross Area
(GSF)
Welding Laboratory 2,500 2 5,000
Classroom 500 3 1,500
Instructor's Office 150 5 750
Sheltered Work Area and Exterior Storage -
Supply Room -
Tool Room -
NOTE: Welding/Joining & Robotics (Grovetown & Augusta) -
Subtotal for Welding and Joining Technology 10 7,250 x 1.5 = 10,875
Machine Tool Technology Net Area (SF) x Quantity = Subtotal Net Area
(NSF)
Subtotal Gross Area
(GSF)
Shop Area 1,250 1 1,250
Classroom 500 1 500
Instructor's Office 150 2 300
Tool Room -
Storage Area -
AKA CNC/Precision Manufacturing -
Subtotal for Machine Tool Technology 4 2,050 x 1.5 = 3,075
Salary
Program Growth Trend Campus Level AY 2021 Data
Campus Level AY 2022 Data
Campus Level AY 2023 Data
Cells highlighted in yellow are the unlocked, data input boxes.
Columns N thru Z are unlocked for your convenience.
You can use this area for your notes & calculations.
Page 19 of 48 6/4/2024 9:15 AM
College:
Augusta Technical College
Campus Location: Grovetown, Columbia
Project Name:
Advanced Manufacturing & Engineering Technology Bldg
Project Number: FY2026AUG1
Construction Technology
Cells highlighted in yellow are the unlocked, data input boxes.
Columns N thru Z are unlocked for your convenience.
You can use this area for your notes & calculations.
Radiology Technology Net Area (SF) x Quantity = Subtotal Net Area
(NSF)
Subtotal Gross Area
(GSF)
Laboratory -
Classroom -
Instructor's Office -
Storage Area -
Subtotal for Radiology Technology - - x 1.5 = -
Drafting Net Area (SF) x Quantity = Subtotal Net Area
(NSF)
Subtotal Gross Area
(GSF)
Drafting / CAD Laboratory -
Office -
Storage -
Plotter / Printer Room -
Plotter / Printer Storage -
Subtotal for Drafting - - x 1.5 = -
Electronics Technology Net Area (SF) x Quantity = Subtotal Net Area
(NSF)
Subtotal Gross Area
(GSF)
Laboratory -
Classroom -
Computer Center -
Multipurpose Classroom -
Work Room -
Tool Room -
Offices -
Subtotal for Electronics Technology - - x 1.5 = -
Printing & Graphics Technology Net Area (SF) x Quantity = Subtotal Net Area
(NSF)
Subtotal Gross Area
(GSF)
Printing & Graphics Laboratory -
18 Student Classroom -
Dedicated Storage -
Hazardous Materials Storage (Separate Structure) -
College Print Shop -
Print Shop Staff Office -
Faculty Office -
Subtotal for Printing & Graphics Technology - - x 1.5 = -
Page 20 of 48 6/4/2024 9:15 AM
College:
Augusta Technical College
Campus Location: Grovetown, Columbia
Project Name:
Advanced Manufacturing & Engineering Technology Bldg
Project Number: FY2026AUG1
Construction Technology
Cells highlighted in yellow are the unlocked, data input boxes.
Columns N thru Z are unlocked for your convenience.
You can use this area for your notes & calculations.
Industrial Electrical Technology Net Area (SF) x Quantity = Subtotal Net Area
(NSF)
Subtotal Gross Area
(GSF)
IET Laboratory -
20 Student Classroom -
Dedicated Storage -
Faculty Office -
Subtotal for Industrial Electrical Technology - - x 1.5 = -
Electrical Construction & Maintenance Net Area (SF) x Quantity = Subtotal Net Area
(NSF)
Subtotal Gross Area
(GSF)
EMC Laboratory -
20 Student Classroom -
Dedicated Storage -
Faculty Office -
Subtotal for Electrical Construction & Maintenance - - x 1.5 = -
Telecommunications Net Area (SF) x Quantity = Subtotal Net Area
(NSF)
Subtotal Gross Area
(GSF)
Telecommunications Laboratory -
20 Student Classroom -
Dedicated Storage -
Faculty Office -
Subtotal for Telecommunications - - x 1.5 = -
Air Conditioning Tech / Industrial Maintenance Tech Net Area (SF) x Quantity = Subtotal Net Area
(NSF)
Subtotal Gross Area
(GSF)
Air Conditioning Technology Laboratory -
Industrial Maintenance Technology Laboratory 1,250 1 1,250
Tool Room -
Storage Room -
Classrooms 500 1 500
Instructor's Office 150 2 300
Mechatronics Robotics/Pneumatics/Hydraulics/PLC Controllers Share Space -
Subtotal for Air Conditioning Tech / Industrial Maintenance Tech 4 2,050 x 1.5 = 3,075
Net Area (SF) x Quantity = Subtotal Net Area
(NSF)
Subtotal Gross Area
(GSF)
Chemical Technology Classroom 500 1 500
Page 21 of 48 6/4/2024 9:15 AM
College:
Augusta Technical College
Campus Location: Grovetown, Columbia
Project Name:
Advanced Manufacturing & Engineering Technology Bldg
Project Number: FY2026AUG1
Construction Technology
Cells highlighted in yellow are the unlocked, data input boxes.
Columns N thru Z are unlocked for your convenience.
You can use this area for your notes & calculations.
Chemical Technology Lab with Exhaust Hoods 1,250 1 1,250
Chemical Technology Lab Instructor's Office 150 2 300
3D Printing/Additive Manufacturing/IOT Classroom 500 1 500
3D Printing/Additive Manufacturing/IOT Lab 1,250 1 1,250
3D Printing/Additive Manufacturing/IOT Office 150 2 300
Mechanical Engineering Technology Classroom 500 1 500
Mechanical Engineering Technology Lab 12 1 12
Mechanical Engineering Office 150 2 300
Electrical/Computer Engineering Technology Classroom 1,250 1 1,250
Electrical/Computer Engineering Technology Lab 500 1 500
Electrical/Computer Office 150 2 300
Subtotal for 16 6,962 x 1.5 = 10,443
TOTAL 'CONSTRUCTION TECHNOLOGY' SQUARE FOOTAGE 34 18,312 27,468
Page 22 of 48 6/4/2024 9:15 AM
College:
Augusta Technical College
Campus Location: Grovetown, Columbia
Project Name:
Advanced Manufacturing & Engineering Technology Bldg
Project Number: FY2026AUG1
General Classroom Space
Instructional Space (Undesignated) Net Area (SF) x Quantity = Subtotal Net Area
(NSF)
Subtotal Gross Area
(GSF)
Lecture Classroom 500 1 500
Multipurpose Laboratory/Computer Classroom -
Faculty Work Room/Lounge -
Faculty Offices 150 2 300
Seminar/Meeting Rooms -
Nuclear Engineering Technology Lab 1,250 1 1,250
Subtotal for General Classroom Space 4 2,050 x 1.5 = 3,075
Non-Instructional Space Net Area (SF) x Quantity = Subtotal Net Area
(NSF)
Subtotal Gross Area
(GSF)
Computer Network Distribution -
Copy/Printing Center -
Vending Lounge -
Student Bookstore -
Student Government/Activity Office (Open) (@85sf) 85 -
Student Activity Space -
Student Activity Storage -
Student Commons -
Subtotal for Computer Network Distribution - - x 1.5 = -
General Instructional Space Net Area (SF) x Quantity = Subtotal Net Area
(NSF)
Subtotal Gross Area
(GSF)
Classroom/Computer Lab (General Education) -
Workforce Development Center (Multipurpose Room) -
Food Service/Catering Kitchen -
Workforce Development Seminar Room -
Workforce Development Office -
Seminar/Meeting Room -
Faculty Work Room/Lounge -
File Room -
Instructional Officer -
Faculty Offices 150 2 300
Architectural/Drafting Engineering/Civil Engineering Lab 1,250 1 1,250
Architectural/Drafting Engineering/Civil Engineering Classroom 500 2 1,000
Subtotal for Food Service/Catering Kitchen 5 2,550 x 1.5 = 3,825
Enter Sub-Program Name here Net Area (SF) x Quantity = Subtotal Net Area
(NSF)
Subtotal Gross Area
(GSF)
Cells highlighted in yellow are the unlocked, data input boxes.
Columns N thru Z are unlocked for your convenience. You can use this area for your notes & calculations.
Page 28 of 48 6/4/2024 9:15 AM
College:
Augusta Technical College
Campus Location: Grovetown, Columbia
Project Name:
Advanced Manufacturing & Engineering Technology Bldg
Project Number: FY2026AUG1
General Classroom Space
Cells highlighted in yellow are the unlocked, data input boxes.
Columns N thru Z are unlocked for your convenience. You can use this area for your notes & calculations.
Subtotal for Enter Sub-Program Name here - - x 1.5 = -
TOTAL 'GENERAL CLASSROOM SPACE' SQUARE FOOTAGE 9 4,600 6,900
Page 29 of 48 6/4/2024 9:15 AM
File details come from the government source that posted it. Updated .