05_-_FIO.pdf
PDF 3 MB Posted
- Attached to
- B027-23 Oregon Road Bridge Replacement
- Solicitation number
- State Project No. L079-0004-Oregon Road Bridge No. 04184
- Issued by
- New Haven County, Connecticut
About this file
This document is a For Information Only (FIO) drawing index and utility coordination plan for the City of Meriden, Connecticut's Oregon Road Bridge Replacement project (Project No. L079-0004, Bridge No. 04184). The file contains an index of contract plan drawings including water main standards, sanitary sewer standards, and detailed utility relocation information prepared by GM2 Associates, Inc. The project involves replacing utility infrastructure in conjunction with the bridge replacement work, with multiple drawing sheets referenced for water main standards (FIO-01, FIO-02), sanitary sewer standards (FIO-03, FIO-04), and utility coordination details (FIO-05).
The document includes specific Eversource Electric utility coordination requirements involving eight poles along Oregon Road in Meriden and Cheshire, with detailed instructions for pole replacement, relocation, and wire reconfiguration. Work is divided into two moves: Move 1 involves replacing and relocating poles 91929 and 91930 to the south side of Oregon Road for bridge replacement, with a 1-phase tap replacement from pole 91930 to pole 2523; Move 2, with locations to be finalized at a later date, includes relocating pole 91929 closer to the road for truck access and adding anchors to pole 91930. The document was last saved on 5/12/2026 and indicates coordination between multiple utility providers and the bridge contractor to ensure proper sequencing and completion of all utility work associated with the Oregon Road Bridge replacement project.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EVERSOURCE ELECTRIC FIO-05
SANITARY SEWER STANDARDS - 2FIO-04
SANITARY SEWER STANDARDS - 1FIO-03
WATER MAIN STANDARDS - 2FIO-02
WATER MAIN STANDARDS - 1FIO-01
INDEX OF DRAWINGSIDX-01
DRAWING TITLEDRAWING NUMBERDRAWING TITLEDRAWING NUMBER
INDEX OF DRAWINGS
05 - FOR INFORMATION ONLY
GLASTONBURY, CT 06033
115 GLASTONBURY BLVD.
GM2 ASSOCIATES, INC.
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
5/12/2026
SIGNATURE BLOCK: DRAWING TITLE:
IDX-01
TOWN(S):
CITY OF MERIDEN
ROAD OVER QUINNIPIAC RIVER
REPLACEMENT OF BRIDGE NO. 04184 CARRYING OREGON
PLOTTED DATE:
M:\41097_Oregon_Rd_Meriden\300_Engineering & Design\310-Bridge\Contract Plans\SB_CP_41097_04184_FIO_IDX.dgn FILE NAME: PBarbosa LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
IO
N
L079-0004
DESIGNER/DRAFTER: PBR CHECKED BY: GA
INDEX OF DRAWINGS
05.01
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
5/12/2026
SIGNATURE BLOCK: DRAWING TITLE:
FIO-01
REPLACEMENT OF BRIDGE NO. 04184 CARRYING OREGON
PLOTTED DATE:
M:\41097_Oregon_Rd_Meriden\300_Engineering & Design\310-Bridge\Contract Plans\SB_CP_41097_04184_FIO_WMS-1.dgn FILE NAME: PBarbosa LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
DESIGNER/DRAFTER: CHECKED BY:
WATER MAIN STANDARDS - 1
05.02
5/12/2026
SIGNATURE BLOCK: DRAWING TITLE:
FIO-02
REPLACEMENT OF BRIDGE NO. 04184 CARRYING OREGON
PLOTTED DATE:
M:\41097_Oregon_Rd_Meriden\300_Engineering & Design\310-Bridge\Contract Plans\SB_CP_41097_04184_FIO_WMS-2.dgn FILE NAME: PBarbosa LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
WATER MAIN STANDARDS - 2
05.03
5/12/2026
SIGNATURE BLOCK: DRAWING TITLE:
FIO-03
REPLACEMENT OF BRIDGE NO. 04184 CARRYING OREGON
PLOTTED DATE:
M:\41097_Oregon_Rd_Meriden\300_Engineering & Design\310-Bridge\Contract Plans\SB_CP_41097_04184_FIO_SMS-1.dgn FILE NAME: PBarbosa LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
SEWER MAIN STANDARDS -1
05.04
5/12/2026
SIGNATURE BLOCK: DRAWING TITLE:
FIO-04
REPLACEMENT OF BRIDGE NO. 04184 CARRYING OREGON
PLOTTED DATE:
M:\41097_Oregon_Rd_Meriden\300_Engineering & Design\310-Bridge\Contract Plans\SB_CP_41097_04184_FIO_SMS-2.dgn FILE NAME: PBarbosa LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
SEWER MAIN STANDARDS -1
05.05 https://en.oryxlearning.com/question/maths/6th-grade/angle-relationships
TT
EE
EE
EE
EE
EE
EE
EE
EE
EE
OREGON RD
MERIDEN CHESHIRE HWY
CHESHIRE RD
POLE 91928 (INSTALL, PERMANENT)
-Replace pole with 45' -Pole to be relocated approx. 15' east of existing location -Remove overhead wires to existing Pole 91929
POLE 91928S
-Install 35' stub pole & anchor
POLE 91929 (INSTALL, TEMPORARY)
-Install 50' pole & anchor -Pole 91929 to be replaced & relocated closer to road after construction is complete for permanent line truck access (Move 2)
POLE 91929
(REMOVE)
POLE 91930
(REMOVE)
POLE 91930 (INSTALL, PERMANENT?)
-Install 50' pole -Anchor to be added to Pole 91930 on Move 2
POLE 2523
-Pole to be replaced with 45/1 -Pole to be relocated approx. 10' south of existing location -Remove overhead wires to existing Pole 91930 & install wires to Pole 6550
POLE 2524
POLE 6550
-FTR pole to be removed -Eversource to install new 40' pole
POLE 92380
EE
EE
P
160'
*MOVE 1*
-Replace & relocate Poles 91929 & 91930 to south side of Oregon Rd for bridge replacement -Replace 1PH tap to Pole 92380 from Pole 91930 to Pole 2523
*PROPOSED MOVE 2*
-Replace & relocate Pole 91929 closer to road for truck access -Pole 91929 to be tangent, add anchor to Pole 91930
*MOVE 2 LOCATIONS TO BE FINALIZED AT LATER DATE*
P
POLE 2525 EE EE P
POLE 2526 POLE 2527
OH PRIMARY & SECONDARY WIRE
OH PRIMARY FUTURE (MOVE 2)
OH 3PH PRI & SECONDARY REMOVAL
90'
EE
EE
120'
OREGON RD
MERIDEN CHESHIRE HWY
CHESHIRE RD
POLE 91928
EE
EE
210'
60' https://en.oryxlearning.com/question/maths/6th-grade/angle-relationships
TT
EE
EE
EE
EE
EE
EE
EE
EE
EE
OREGON RD
MERIDEN CHESHIRE HWY
CHESHIRE RD
POLE 91928 (INSTALL, PERMANENT)
-Replace pole with 45' -Pole to be relocated approx. 15' east of existing location -Remove overhead wires to existing Pole 91929
POLE 91928S
-Install 35' stub pole & anchor
POLE 91929 (INSTALL, TEMPORARY)
-Install 50' pole & anchor -Pole 91929 to be replaced & relocated closer to road after construction is complete for permanent line truck access (Move 2)
POLE 91929
(REMOVE)
POLE 91930
(REMOVE)
POLE 91930 (INSTALL, PERMANENT?)
-Install 50' pole -Anchor to be added to Pole 91930 on Move 2
POLE 2523
-Pole to be replaced with 45/1 -Pole to be relocated approx. 10' south of existing location -Remove overhead wires to existing Pole 91930 & install wires to Pole 6550
POLE 2524
POLE 6550
-FTR pole to be removed -Eversource to install new 40' pole
POLE 92380
EE
EE
P
160'
*MOVE 1*
-Replace & relocate Poles 91929 & 91930 to south side of Oregon Rd for bridge replacement -Replace 1PH tap to Pole 92380 from Pole 91930 to Pole 2523
*PROPOSED MOVE 2*
-Replace & relocate Pole 91929 closer to road for truck access -Pole 91929 to be tangent, add anchor to Pole 91930
*MOVE 2 LOCATIONS TO BE FINALIZED AT LATER DATE*
P
POLE 2525 EE EE P
POLE 2526 POLE 2527
OH PRIMARY & SECONDARY WIRE
OH PRIMARY FUTURE (MOVE 2)
OH 3PH PRI & SECONDARY REMOVAL
90'
EE
EE
120'
OREGON RD
MERIDEN CHESHIRE HWY
CHESHIRE RD
POLE 91928
EE
EE
210'
60'
| 05 - FIO |
| 05.01 |
| 05.02 |
| 05.03 |
| 05.04 |
| 05.05 |
| 05.06 |
File details come from the government source that posted it. Updated .