This is a Traffic Control Plan document for the City of Meriden, Connecticut, related to the Oregon Road Bridge Replacement project (B027-23). The document outlines traffic management procedures and controls required during bridge replacement construction activities. The plan addresses the coordination of vehicle and pedestrian movement, establishment of detour routes, placement of traffic control devices including signs and signals, and safety protocols to maintain public access while minimizing disruption to the local transportation network. The contractor must implement these traffic control measures in accordance with the specifications and requirements detailed in the plan, which serve as binding conditions of the contract.
The traffic control plan establishes standards for temporary roadway configurations, lane closures, and traffic diversion during all phases of the bridge replacement project. The plan requires the contractor to maintain traffic safety through proper signage, flagging operations where necessary, and coordination with local authorities. All traffic control measures must comply with the Manual on Uniform Traffic Control Devices (MUTCD) and Connecticut Department of Transportation standards. The contractor bears responsibility for the cost of implementing and maintaining traffic control throughout the project duration, and failure to adhere to the specified traffic control requirements constitutes a breach of contract obligations.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .