HISTORICAL DATA
OF
PRESENT CONTRACT
Attachment 5 to RFP No. FA520523R0002
Summary of Construction Project, Contract No. FA520518D0004
As of 18 Oct 22 Total Project
Contract Year Contract Period Nr. Amount
Basic Period 19 Jun 18 - 19 Oct 19 29 461,272,607
Option Year I 19 Oct 19 - 18 Oct 20 13 400,877,265
Option Year II 19 Oct 20 - 18 Oct 21 21 552,021,398
Option Year III 19 Oct 21 - 18 Oct 22 37 1,372,427,956
Aggregate Amount 100 2,786,599,226
Average per Year 23 643,061,360
Individual Task Order
Highest ¥216,551,139
Lowest ¥229,500
Average ¥27,865,992
List of Task Orders issued in Basic Period
TO – Task Order
Step – Task Order Procedures, 1-Step Construction, or 2-Step Survey/Construction, ref. RFP, Atch. 1, Other
Contract Requirements, para. 6.H004
Awd Date – Award Date
P.P. – Performance Period
TO# Project Description Work Site Step Award Date TO Amount (¥) P.P.
FA520518F0044 Survey/Repair Roof and Widen Roll-up Door, B1743 Industrial Fac 2-Survey 06/19/18 ¥229,500 14
FA520518F0068 Repair Roof and Widen Roll-up Door, B1743 Industrial Fac 2-Const 07/17/18 ¥28,934,801 120
FA520518F0071 Survey/Maintain Exterior Main Base MFH 100s Area MFH 2-Survey 07/20/18 ¥306,000 48
FA520518F0072 Survey /Repair Roof, B1341 Industrial Fac 2-Survey 07/20/18 ¥306,000 48
FA520518F0073 Survey/Repair SOQs (B2104 and B2110) MFH 2-Survey 07/20/18 ¥918,000 49
FA520518F0074 Survey/Pressure Reducing Valves, MFH North Area MFH 2-Survey 07/25/18 ¥459,000 35
FA520518F0075 Repair Conduit for Fiber Lines, B1940 to B3003 Industrial Fac 1 07/28/18 ¥39,084,853 180
FA520518F0083 Pressure Reducing Valves, MFH North Area MFH 2-Const 08/27/18 ¥9,157,786 135
FA520518F0085 Construct Pad for Boulder Misc. 1 09/05/18 ¥1,274,058 110
FA520518F0087 Repair Hangar Entrance Canopy, B970 Industrial Fac 1 09/07/18 ¥8,583,691 135
FA520518F0089 Repair Roof, B1341 Industrial Fac 2-Const 09/07/18 ¥2,267,803 110
FA520518F0095 Add Drainage, SMDC JTAGS Area Industrial Fac 1 09/12/18 ¥6,496,678 232
FA520518F0102 Repair SOQs (B2104 and B2110) MFH 2-Const 09/24/18 ¥109,014,085 511
FA520518F0120 Repair Gate Heater Control System, 87211 HAS/Airfield 1 09/25/18 ¥25,285,251 420
FA520518F0122 Maintain Exterior Main Base MFH 100s Area MFH 2-Const 09/25/18 ¥15,836,536 180
FA520519FA011 Survey/Add Combined Array, MSOC MSOC 2-Survey 03/04/19 ¥1,306,090 51
FA520519FA013 Survey/Renovate Room 1137, B485, Misawa Club Misc. 2-Survey 03/15/19 ¥612,000 56
FA520519FA014 Survey/Repair ITT, NCO B485 Rm 1131 Misc. 2-Survey 03/15/19 ¥306,000 56
FA520519FA026 Survey/Repair Roof, B928 Misc. 2-Survey 05/14/19 ¥459,000 45
FA520519FA029 Repair ITT, NCO B485 Rm 1131 Misc. 2-Const 06/10/19 ¥8,439,688 150
FA520519FA033 Add Combined Array, MSOC MSOC 2-Const 06/10/19 ¥76,313,209 210
FA520519FA043 Survey/Repair CATM Berm, Draughon Range Draugh-Range 2-Survey 06/25/19 ¥612,000 56
FA520519FA062 Survey/Construct RTB Containment At FAC 1150 Industrial Fac 2-Survey 08/08/19 ¥306,000 50
FA520519FA063 Survey/Repair Radio Over Intrnet Protocol (ROIP) MFH 2-Survey 08/09/19 ¥927,003 49
FA520519FA064 Repair Conduit for Fiber Optic, B918 to B3001 Misc. 1 08/27/19 ¥19,556,649 360
FA520519FA066 Repair Conduit for Fiber Optic, B12 to B653 Misc. 1 08/27/19 ¥5,309,498 120
FA520519FA067 Repair ITT, NCO B485 Rm 1131 Misc. 2-Const 09/13/19 ¥482,431 150
FA520519FA085 Repair Radio Over Internet Protocol (ROIP) MFH 2-Const 09/25/19 ¥25,273,232 358
FA520519FA086 Repair CATM Berm, Draughon Range Draugh-Range 2-Const 09/30/19 ¥73,215,765 360
List of Task Orders issued in Option Year One
TO# Project Description Work Site Step Award Date TO Amount (¥) P.P.
FA520520F0009 Repair Roof, B928 Misc. 2-Const 10/25/19 ¥23,450,212 258
FA520520F0025 Survey/Convert Storage Room to Office Space, B793 Misc. 2-Survey 02/21/20 ¥972,776 76
FA520520F0028 Survey/Repair Munition Drop Area, Rokkasho Vil Misc. 2-Survey 03/11/20 ¥2,777,052 93
FA520520F0049 Survey/Repair Iron Hand Community Fitness, B1006 (Bay3)Misc. 2-Survey 05/19/20 ¥819,776 64
FA520520F0081 Repair Iron Hand Community Fitness, B1006 (Bay3) Misc. 2-Const 07/28/20 ¥20,082,526 150
FA520520F0085 Construct RTB Containment At FAC 1150 Industrial Fac 2-Const 08/06/20 ¥10,571,765 300
FA520520F0086
FA520520F0087
Renovate Room 1137, B485, Misawa Club Misc. 2-Const 08/10/20 ¥10,248,580 150
FA520520F0089 Add Antenna Pad, MSOC MSOC 1 08/10/20 ¥1,925,855 75
FA520520F0090 Repair Lightning Protection System, B1501 MSOC 1 08/10/20 ¥4,529,311 90
FA520520F0092 Repair Steam System, B973 Weasel's Den Industrial Fac 1 08/31/20 ¥216,551,139 850
FA520520F0093 Repair Product Saver Tank Piping Industrial Fac 1 08/26/20 ¥1,163,602 120
FA520520F0094 Repair Chilled Water System, Chiller #1, B1525 MSOC 1 09/01/20 ¥105,626,334 225
FA520520F0096 Repair Domestic Hot Water Tank B539 Industrial Fac 1 08/31/20 ¥2,158,337 90
List of Task Orders issued in Option Year Two
FA520521F0040
FA520521F0042
Survey/Repair Mokuteki Café, B626 Misc. 2-Survey 03/02/21 ¥963,774 57
FA520521F0046 Survey/Repair Interior/Exterior JROTC, B740 Rooms 29 & 30 Misc. 2-Survey 03/08/21 1514321 64
FA520521F0047 Repair Interior/Exterior JROTC, B740 Rooms 29 & 30 Misc. 2-Const 06/04/21 ¥50,458,808 225
FA520521F0052
FA520521F0077
Repair Mokuteki Café, B626 Misc. 2-Const 03/08/21 ¥19,711,794 150
FA520521F0074 Survey/Repair A/C, Drom B672 Misc. 2-Survey 04/02/21 ¥1,055,321 67
FA520521F0075 Survey/Repair A/C, Drom B673 Misc. 2-Survey 04/02/21 ¥1,208,321 67
FA520521F0080 Add Led Light, Soccer Field 74999 Misc. 1 05/06/21 ¥29,226,202 135
FA520521F0082 Survey/Repair Mechanical System, HAS B3141 HAS/Airfield 2-Survey 04/30/21 ¥850,503 63
FA520521F0083 Survey/Repair Mechanical System, HAS B3295 HAS/Airfield 2-Survey 04/30/21 ¥850,503 63
FA520521F0085 Survey/Repair Exterior Lighting, B1501, B1522, B1523 MSOC 2-Survey 05/13/21 ¥459,000 43
FA520521F0086 Survey/Repair Exterior Lighting, MSOC RADOMES MSOC 2-Survey 05/13/21 ¥561,000 47
FA520521F0089 Repair A/C, Drom B673 Misc. 2-Const 05/25/21 ¥58,647,448 360
FA520521F0090 Repair A/C, Drom B672 Misc. 2-Const 05/25/21 ¥51,240,603 360
FA520521F0092 Repair Thaw System, HAS B3220 HAS/Airfield 1 06/10/21 ¥26,434,870 326
FA520521F0099 Repair Exterior Lighting, B1501, B1522, B1523 MSOC 2-Const 06/23/21 ¥42,512,000 360
FA520521F0100 Repair Mechanical System, HAS B3295 HAS/Airfield 2-Const 06/24/21 ¥80,109,155 450
FA520521F0101 Repair Mechanical System, HAS B3141 HAS/Airfield 2-Const 06/24/21 ¥133,074,238 540
FA520521F0111 Repair Electrical Panel, B626 Mokuteki Misc. 1 08/06/21 ¥7,483,687 110
FA520521F0112 Survey/Repair ODR, B486 Misc. 2-Survey 08/06/21 ¥1,514,321 46
FA520521F0113 Survey/Repair Conduit for Fiber Optic, B600 Area Misc. 2-Survey 08/06/21 ¥703,547 46
FA520521F0130 Repair ODR, B486 Misc. 2-Const 09/14/21 ¥43,441,982 240
List of Task Orders issued in Option Year Three
FA520522F0015 Repair Exterior Lighting, B1523 MSOC 1 12/07/21 ¥2,611,752 210
FA520522F0032 Survey/Repair Mechanical System, HAS B3049 HAS/Airfield 2-Survey 03/02/22 ¥635,358 26
FA520522F0049 Repair Mechanical System, HAS B3048 HAS/Airfield 1 03/21/22 ¥85,410,218 510
FA520522F0050 Survey/Repair Electric Power Receiving Station, B229 Misc. 2-Survey 03/15/22 ¥2,130,290 44
FA520522F0053 Repair Mechanical System, HAS B3049 HAS/Airfield 2-Const 03/28/22 ¥105,888,359 630
FA520522F0056 Survey/Repair AHU in Paint Booth, B3130 HAS/Airfield 2-Survey 03/31/22 ¥1,324,550 70
FA520522F0059 Repair Conduit for Fiber Optic, B600 Area Misc. 2-Const 04/21/22 ¥13,222,400 170
FA520522F0063 Add Asphalt Road, MSOC MSOC 1 05/10/22 ¥15,327,915 150
FA520522F0065 Survey/Repair HVAC, B660 Misc. 2-Survey 05/19/22 ¥657,774 36
FA520522F0066 Survey/Repair HVAC, B661 Misc. 2-Survey 05/19/22 ¥657,774 36
FA520522F0067 Survey/Repair HVAC, B665 Misc. 2-Survey 05/19/22 ¥657,774 36
FA520522F0068 Survey/Repair HVAC, B667 Misc. 2-Survey 05/19/22 ¥657,774 36
FA520522F0069 Survey/Repair HVAC, B668 Misc. 2-Survey 05/19/22 ¥657,774 36
FA520522F0070 Survey/Repair Smokehouse B485 Misc. 2-Survey 05/26/22 ¥703,547 49
FA520522F0071 Repair Electrical Panel, B1517 MSOC ECP Misc. 1 05/27/22 ¥6,404,875 120
FA520522F0073 Repair Electric Power Receiving Station, B229 Misc. 2-Const 06/02/22 ¥34,744,711 180
FA520522F0075 Repair AHU in Paint Booth, B3130 HAS/Airfield 2-Const 06/13/22 ¥128,515,901 360
FA520522F0076 Repair HVAC, B660 Misc. 2-Const 06/16/22 ¥74,093,269 360
FA520522F0077 Repair HVAC, B661 Misc. 2-Const 06/16/22 ¥73,322,530 360
FA520522F0078 Repair HVAC, B665 Misc. 2-Const 06/16/22 ¥83,657,027 360
FA520522F0080 Repair HVAC, B667 Misc. 2-Const 06/16/22 74530959 360
FA520522F0081 Repair HVAC, B668 Misc. 2-Const 06/16/22 ¥60,564,127 360
FA520522F0083 Repair Exterior Lighting, MSOC RADOMES MSOC 2-Const 06/21/22 ¥81,850,424 420
FA520522F0090 Repair Floors, B740 Misc. 1 07/06/22 ¥5,080,620 60
FA520522F0092
FA520522F0093
Repair Smokehouse B485 Misc. 2-Const 07/08/22 ¥9,762,929 115
FA520522F0082 Repair Interior and Lighting, B486 Misc. 1 06/16/22 ¥9,510,026 100
FA520522F0098 Survey/Repair Fire Suppression, B1404 HAS/Airfield 2-Survey 07/27/22 ¥1,162,547 47
FA520522F0099 Survey/Repair HAS Door, B3140 HAS/Airfield 2-Survey 07/28/22 ¥774,003 60
FA520522F0100 Survey/Repair Arts & Crafts, B486 Misc. 2-Survey 07/28/22 ¥933,047 47
FA520522F0107 Survey/Repair Dining Facility, B624 Misc. 2-Survey 08/19/22 ¥1,361,321 42
FA520522F0108 Survey/Repair Helping Agencies, B220 Misc. 2-Survey 08/19/22 ¥1,055,321 42
FA520522F0117 Repair HAS Door, B3140 HAS/Airfield 2-Const 09/30/22 ¥135,792,596
FA520522F0118 Repair Fire Suppression, B1404 HAS/Airfield 2-Const 09/07/22 ¥64,923,017 330
FA520522F0123 Repair Arts & Crafts, B486 Misc. 2-Const 09/13/22 ¥27,007,764 260
FA520522F0127 Repair Dining Facility, B624 Misc. 2-Const 09/26/22 ¥161,290,012 315
FA520522F0128 NAVY VOIP Misc. 1 09/20/22 ¥2,294,931 80
FA520522F0129 Repair Helping Agencies, B220 Misc. 2-Const 09/20/22 ¥103,252,740 240
Summary of Total Direct Cost per Range
Aggregate (Past Nine-Year and 4-Month)
Total Direct Cost Range Nr. Total (¥) Share on Nr Share on
Amount
¥10,000,000 and below 157 415,859,565 55% 6%
¥10,000,001 - ¥50,000,000 85 2,105,011,916 30% 33%
¥50,000,001 - ¥100,000,000 32 2,226,746,211 11% 35%
¥100,000,001 and above 12 1,701,495,606 4% 26%
Aggregate Amount 286 6,449,113,298 100% 100%
Average per Year Typical Total Direct Cost Range
(Basic 1-Yr + 4 Opt Yr + 6 Mo = 5.5-Yr)
(Typical TDC Formula: UPB Cost Ave/yr
Total x 5.5) Total Direct Cost Range Nr. Total (¥)
¥10,000,000 and below 16.8 44,556,382 245,060,101
¥10,000,001 - ¥50,000,000 9.1 225,536,991 1,240,453,450
¥50,000,001 - ¥100,000,000 3.4 238,579,951 1,312,189,731
¥100,000,001 and above 1.3 182,303,101 1,002,667,054
Aggregate Amount 30.6 690,976,425 3,800,370,336