This document is a modification to a solicitation for a federal contract opportunity for the Library of Congress to replace an HVAC unit that conditions the Secured Storage Facility that houses the institution's National Treasures.
The key details are:
- The existing HVAC unit is 30 years old, has become unreliable, and poses unacceptable risk to the National Treasures. Replacement of the unit is required.
- The new HVAC unit must maintain temperature and humidity conditions to protect the National Treasures, integrate with the existing storage compartment and utilities, operate without building plumbing connections, and be removable for service.
- The contractor must complete a site visit, submit a project plan, factory test the unit, commission it for 30 days, provide documentation and warranty coverage, and be available for service during the warranty period.
- The solicitation follows a two-phase down-select process. Phase One quotations are due 12/02/2024; Phase Two responses are due 01/16/2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 030ADV25Q0042 0002.pdf | ||
| Attachment J2 - Responses to Offeror Questions - 11-22-2024.pdf | ||
| 030ADV25Q0042.pdf | ||
| Attachment J1 - Price Schedule 11-12-24 - 1 page.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODECODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 5
0001 11-20-2024 See SCHEDULE
Contracts and Grants Directorate Library of Congress
101 Independence Ave. SE LA 325 Washington DC 20540-9411
Contracts & Grants Directorate Library of Congress
LA 325
101 Independence Av SE Washington DC 20540-9411
To all Offerors/Bidders
030ADV25Q0042
11-14-2024
X
X X
See CONTINUATION Page
X
The purpose of this amendment is to revise section C.3.8. New text has been added to this section. The new text has been italicized and underlined for clarity.
Zwahlen, Jennifer
C.1 STATEMENT OF WORK
C.1. OVERVIEW / BACKGROUND
The Library of Congress (Library) requires a contractor to replace the independent HVAC unit that conditions the Secured Storage Facility (SSF) that holds the institution’s priceless National Treasures. The existing unit was first built 30 years ago and received an overhaul in 2006. In the past two years, loss of pressure has caused equipment malfunction.
When investigated, the drop in pressure was attributed to small leaks in the refrigeration system, which in turn has required the periodic addition of refrigerant to ensure maintenance of the prescribed collection environment. The constant addition of refrigerant is not a sustainable long-term strategy. Moreover, the process of adding refrigerant itself heightens the risk of creating more leaks.
Comprehensive refurbishment of the unit, if even possible, cannot be completed onsite as the service would require hot work in very close proximity to the National Treasures and would need to be conducted after hours. Finally, the existing electronic controls have become obsolete. Therefore, given the low reliability of having the unit comprehensively repaired, coupled with unacceptable risk to the Treasures, replacement of the existing HVAC unit is the safest and most effective strategy going forward.
Contractor must ensure technical resources exist to maintain and repair the new HVAC unit onsite at the Library under separate contract after the initial warranty period.
C.2. SCOPE
The Contractor shall design, fabricate, de-install the existing HVAC unit and install a new HVAC unit that will extend the life of the Library’s National Treasures by maintaining temperature and relative humidity conditions that protect against chemical deterioration and physical damage to these irreplaceable collection items.
C.3. TECHNICAL REQUIREMENTS FOR THE HVAC UNIT
The new HVAC unit must integrate with the existing Bally Box storage compartment and existing electrical utility and ductwork provided to carry heat from the unit to the building plenum. Deinstallation, removal and disposal of the existing equipment must occur during the same visit period as the installation period of the new unit to minimize disruption to the storage of the National Treasures. This visit period may require multiple days. The contractor shall supply all tools and equipment necessary for installation and service.
C.3.1 The contractor must complete a site visit to confirm measurements, utility details and delivery and installation logistics. The site visit shall be scheduled within 14 days of the start of the Period of Performance. (See section F.1:
Deliverable C.3.1)
C.3.2 The contractor must submit a final project plan within 28 days of the site visit. The government must respond to the final project schedule within 7 days of receipt. Contractor must deliver the revised project schedule, which shall include the COR’s revisions, within 7 days of receipt of the COR’s feedback. (See section F.1: Deliverable C.3.2)
C.3.3 The HVAC unit must be able to maintain 50°F +/- 3°F and 50% RH +/- 5% in an existing prefabricated storage compartment that is 439 ft: ft 8’ x 7’ x 7’10” The programmed set points will ensure that the dew point temperature remains above 32°F to avoid icing of coils and unreliable mechanical performance. The ambient environment in the mechanical antechamber is 72°F / 45% RH.
Note: There is no need for fresh air in this storage compartment. We anticipate the HVAC circulation to be a closed loop so that recovery to required conditions is only needed when the door is opened briefly to access collections.
C.3.4 Electronic components must be separated from the supply air circulation to prevent smoke entering the collection chamber during a malfunction.
C.3.5 The unit must include automatic shutdown thresholds on any components that will cause damage to the mechanical equipment if allowed to run during a malfunction.
C.3.6 The unit must be programmable with set points that trigger an alarm when conditions fall outside of the programmed low and high temperature and RH thresholds. The contractor is responsible for including a relay, which will provide contact closure during the alarm condition, and reset when conditions fall back within the thresholds. The Library will use this relay to wire the alarm status to an all-hours staffed monitoring station.
C.3.7 The unit will be located in an antechamber located directly outside the storage compartment (bally box). Heat generated by the unit will be directed into the building plenum using existing building ductwork. The overall size of the antechamber is 8.7” x 5’10’ x 9’(h) however the installed HVAC unit footprint is limited to approximately 3.5’ x 4’ to allow access to wall mounted panels. The antechamber door opening is 6’10’ x 3’5”. The contractor shall confirm final measurements onsite equipment design commences. The contractor is responsible for ensuring that the new equipment will fit through this the antechamber door.
C.3.8 The unit must operate without connection to building plumbing. Any water required must be held in a reservoir that is easily detached by Library staff for refill. The water reservoir must be large enough so that it does not need to be emptied on a regular basis.
Note: The available electrical feed to the HAVC equipment is 208v, 3phase, 60hz, 30amp.
C.3.9 The unit must not require building drains. Any condensate must be captured in a sufficient tray beneath the unit.
No drainage in the room is possible.
C.3.10 The unit must be removable for service if required—see 3.3 for room size and door frame access. Supply and return ducting to the storage compartment (bally box) must be detachable for service.
To facilitate removal for service, the unit must be mounted on casters or a wheeled support.
C.3.11 Mechanical and electronic systems must be factory built to avoid brazing or any hot work onsite. Connections made onsite must be threaded or mechanically coupled. Final assembly of the unit, such as attaching flexible ducting, can be accomplished onsite to accommodate the size of the door frame into the space.
C.3.12 The unit must trend performance data to verify set points, existing temperature and RH conditions, and additional mechanical indicators (e.g. fan status, system status, refrigeration high or low pressure, low air flow) required to allow diagnostic analysis. Sensors used to track supply or return air must be NIST certified and exchangeable for regular calibration. The unit must include a sensor located in the return air duct connected to a readable display unit mounted on a masonry wall outside of the Bally Box to allow for quick check of conditions without entering the secured storage space using an existing wiring conduit.
C.3.13 The unit must be factory tested prior to installation at the Library. The contractor shall provide data from the unit to demonstrate successful operation and the ability to supply the required conditions for 14 days.
C.3.14 The contractor shall be responsible for creation, manufacture, delivery and installation of the unit. The contractor shall remain in the local area for a minimum of 48 hours after installation to ensure same day response to address any equipment malfunctions. (See section F.1: Deliverable C.3.14)
C.3.15 The contractor will be responsible for de-installing, physical removal, disposal of the existing HVAC unit from the Library, in its entirety, prior to installation of the new unit. (See Section F.1: Deliverable C.3.15)
C.3.16 The commissioning period of the unit extends through the first 30 days of operation as installed at the Library.
The contractor must remedy any failures including conditions falling outside the required conditions identified in
3.1 above, shutdown or malfunction of equipment, or loss of data collection from the unit within the commissioning period.
During commissioning and while the contractor is onsite for installation, the Library will cut and then restore power to the unit to create a testing situation when the building loses power. The unit must be able to automatically restart upon restoration of power.
Conditions must be restored to the acceptable temperature and RH range specified in 3.1 within 3 hours after unit operation is restored after an outage due to loss of power or after correction of malfunction. (See section F.1: Deliverable C.3.16)
C.3.17 The contractor is responsible for providing all system documentation of the unit including construction, mechanical and electronic systems. (See section F.1: Deliverable C.3.17a) The documentation must include user operations and maintenance, explanation of controls, safety information and common troubleshooting FAQs. As part of the documentation, the contractor shall submit as-built wiring diagrams and a parts list for components inside the unit. (See section F.1 : Deliverable C.3.17b)
C.3.18 The Library requires one service visit during the base warranty period. The initial warranty must cover all parts and labor to ensure full functionality of the equipment for one year beginning after the 30-day commissioning period. All system documentation in C.3.16 (above) must be delivered and accepted by the COR prior to payment for the warranty period. The contractor is responsible for all costs related to travel required to service the unit under the warranty period. (See section F.1: Deliverable C.3.18)
After being notified of a malfunction, contractor must begin service within 72 hours of notification.
C.4. DATA VERIFICATION
The contractor shall submit calibration certificates for the sensors as described above in 3.2a. The contractor shall submit information on any replaced parts that are covered by a written warranty. After inspection and acceptance of these requirements, the COR will provide written approval. The contractor shall submit a temperature and relative humidity data trend to verify that the mechanical unit achieved pre-installation conditions as specified in C.3.10 - C.3.12 above.
C.5. CONTRACTOR PERSONNEL. Contractor must ensure that all contractor staff assigned to perform any work under this contract must be qualified to install, diagnose, and repair equipment malfunctions.
C.6. CONTRACTOR TRAVEL
The Library does not reimburse for travel and lodging expenses. These unit costs shall be pre-built into the price of the contract.
End of Document
C.1 STATEMENT OF WORK
File details come from the government source that posted it. Updated .