03_Bid Plans_Hwy 9 Sidewalk Improvements_25946.pdf
PDF 42 MB Posted
- Attached to
- Highway 9 Sidewalk Improvements
- Solicitation number
- 25946
- Issued by
- Summit County, Colorado
About this file
The document is a bid plan set for the Highway 9 Retaining Wall and Sidewalks project located in the Town of Frisco, Summit County, Colorado. The project involves infrastructure improvements along Highway 9 between 10 Mile Drive and School Road, with construction work spanning approximately 9,000 linear feet (from Station 1+00.00 to 19+96.61). The project includes two primary sidewalk sections: the Walmart Sidewalk (Station 1+00.00 to 8+50.00) and the Frisco Sidewalk (Station 10+00.00 to 19+96.61), and encompasses two distinct retaining wall profiles - a Lower Wall (Station 4+00.00 to 8+96.95) and an Upper Wall (Station 15+00.00 to 19+50.00).
The project's scope includes comprehensive infrastructure upgrades such as removal of existing concrete, trees, and boulder retaining walls, followed by new construction of concrete sidewalks, modular block retaining walls, pedestrian railings, curb ramps, PVC conduit installation, erosion control, traffic control, and surveying. The bid plans are dated 2/29/2024 and are associated with project number 25946, indicating a current procurement process for municipal infrastructure improvements. The project appears to be funded through local municipal or county infrastructure budgets, with work concentrated in Lots B-1 and B-2 along the Highway 9 corridor in Frisco, Colorado.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HIGHWAY 9 RETAINING WALL AND SIDEWALKS
LOCATED ON WEST SIDE OF HIGHWAY 9 BETWEEN 10 MILE DR AND SCHOOL RD
TOWN OF FRISCO, SUMMIT COUNTY, STATE OF COLORADO
T5S R78W, A PART OF SECTION-26
PUBLIC IMPROVEMENT PLANS
BID PLAN SET
Know what's
2/29/2024
SITE
PROJECT NO. 25946
Know what's
2/29/2024
LS
EA 1
HWY 9
HWY 9
HWY 9
HWY 9
CR 1040
H W
Y 9
HAWN DR
10 MILE DR
H W
Y-9
HAWN DR
10 MILE DR
CR 1040
H W
Y 9
HAWN DR
10 MILE DR
H W
Y-9
SCHOOL RD
CR 1040
H W
Y 9
CR 1040
H W
Y 9
CR 1040
H W
Y 9
CR 1040
H W
Y 9
CR 1040
H W
Y 9
HAWN DR
10 MILE DR
WALMART SIDEWALK CL PROFILE
STA 1+00.00 TO 8+50.00
CR 1040
H W
Y 9
HAWN DR
10 MILE DR
FRISCO SIDEWALK CL PROFILE
STA 10+00.00 TO 19+96.61
SECTION A-A PROFILE
STA 0+00.00 TO 0+75.00
SECTION B-B PROFILE
STA 0+00.00 TO 0+75.00
CR 1040
H W
Y 9
HAWN DR
10 MILE DR
LOWER WALL PROFILE
STA 4+00.00 TO 8+96.95
UPPER WALL PROFILE
STA 15+00.00 TO 19+50.00
CR 1040
H W
Y 9
CR 1040
H W
Y 9
CR 1040
H W
Y 9
CR 1040
H W
Y 9
CR 1040
H W
Y 9
CR 1040
H W
Y 9
CR 1040
H W
Y 9
CR 1040
H W
Y 9
CR 1040
H W
Y 9
CR 1040
H W
Y 9
CR 1040
H W
Y 9
CR 1040
H W
Y 9
CR 1040
H W
Y 9
HAWN DR
10 MILE DR
LOT B-1
LOT B-2
CR 1040
H W
Y 9
CR 1040
H W
Y 9
HAWN DR
10 MILE DR
LO
T
B -1
LO
T
B -2
CR 1040
H W
Y 9
HAWN DR
10 MILE DR
LO
T
B -1
02/29/2024
File details come from the government source that posted it. Updated .