03_Bid Plans_Hwy 9 Sidewalk Improvements_25946.pdf

PDF 42 MB Posted

Attached to
Highway 9 Sidewalk Improvements
Solicitation number
25946
Issued by
Summit County, Colorado

About this file

The document is a bid plan set for the Highway 9 Retaining Wall and Sidewalks project located in the Town of Frisco, Summit County, Colorado. The project involves infrastructure improvements along Highway 9 between 10 Mile Drive and School Road, with construction work spanning approximately 9,000 linear feet (from Station 1+00.00 to 19+96.61). The project includes two primary sidewalk sections: the Walmart Sidewalk (Station 1+00.00 to 8+50.00) and the Frisco Sidewalk (Station 10+00.00 to 19+96.61), and encompasses two distinct retaining wall profiles - a Lower Wall (Station 4+00.00 to 8+96.95) and an Upper Wall (Station 15+00.00 to 19+50.00).

The project's scope includes comprehensive infrastructure upgrades such as removal of existing concrete, trees, and boulder retaining walls, followed by new construction of concrete sidewalks, modular block retaining walls, pedestrian railings, curb ramps, PVC conduit installation, erosion control, traffic control, and surveying. The bid plans are dated 2/29/2024 and are associated with project number 25946, indicating a current procurement process for municipal infrastructure improvements. The project appears to be funded through local municipal or county infrastructure budgets, with work concentrated in Lots B-1 and B-2 along the Highway 9 corridor in Frisco, Colorado.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HIGHWAY 9 RETAINING WALL AND SIDEWALKS

LOCATED ON WEST SIDE OF HIGHWAY 9 BETWEEN 10 MILE DR AND SCHOOL RD

TOWN OF FRISCO, SUMMIT COUNTY, STATE OF COLORADO

T5S R78W, A PART OF SECTION-26

PUBLIC IMPROVEMENT PLANS

BID PLAN SET

Know what's

2/29/2024

SITE

PROJECT NO. 25946

Know what's

2/29/2024

LS

EA 1

HWY 9

HWY 9

HWY 9

HWY 9

CR 1040

H W

Y 9

HAWN DR

10 MILE DR

H W

Y-9

HAWN DR

10 MILE DR

CR 1040

H W

Y 9

HAWN DR

10 MILE DR

H W

Y-9

SCHOOL RD

CR 1040

H W

Y 9

CR 1040

H W

Y 9

CR 1040

H W

Y 9

CR 1040

H W

Y 9

CR 1040

H W

Y 9

HAWN DR

10 MILE DR

WALMART SIDEWALK CL PROFILE

STA 1+00.00 TO 8+50.00

CR 1040

H W

Y 9

HAWN DR

10 MILE DR

FRISCO SIDEWALK CL PROFILE

STA 10+00.00 TO 19+96.61

SECTION A-A PROFILE

STA 0+00.00 TO 0+75.00

SECTION B-B PROFILE

STA 0+00.00 TO 0+75.00

CR 1040

H W

Y 9

HAWN DR

10 MILE DR

LOWER WALL PROFILE

STA 4+00.00 TO 8+96.95

UPPER WALL PROFILE

STA 15+00.00 TO 19+50.00

CR 1040

H W

Y 9

CR 1040

H W

Y 9

CR 1040

H W

Y 9

CR 1040

H W

Y 9

CR 1040

H W

Y 9

CR 1040

H W

Y 9

CR 1040

H W

Y 9

CR 1040

H W

Y 9

CR 1040

H W

Y 9

CR 1040

H W

Y 9

CR 1040

H W

Y 9

CR 1040

H W

Y 9

CR 1040

H W

Y 9

HAWN DR

10 MILE DR

LOT B-1

LOT B-2

CR 1040

H W

Y 9

CR 1040

H W

Y 9

HAWN DR

10 MILE DR

LO

T

B -1

LO

T

B -2

CR 1040

H W

Y 9

HAWN DR

10 MILE DR

LO

T

B -1

02/29/2024

File details come from the government source that posted it. Updated .