01_Bidding Documents _ Contract_Hwy 9 Sidewalk Improvements_25946.pdf
PDF 1 MB Posted
- Attached to
- Highway 9 Sidewalk Improvements
- Solicitation number
- 25946
- Issued by
- Summit County, Colorado
About this file
The document is a comprehensive set of bidding documents for the Highway 9 Sidewalk Improvements project, issued by the Town of Frisco, Colorado, with Project No. 25946. The project involves removing existing concrete, trees, boulder retaining walls, and conducting excavation, followed by new construction including concrete sidewalks, modular block retaining walls, pedestrian railings, curb ramps, PVC conduit, erosion control, traffic control, and surveying. The bid is scheduled to be opened on April 22, 2024, at 10:00 am, with an optional pre-bid meeting on April 8, 2024, at 2:00 pm located at Frisco Public Works. The project is expected to commence on August 5, 2024, with substantial completion targeted for September 23, 2024, and final completion by September 30, 2024.
The bid is structured as a unit price contract, with bidders required to provide pricing for various line items such as clearing and grubbing, removal of existing structures, excavation, embankment, erosion control, concrete work, and traffic management. The Town requires a 5% bid security in the form of a certified check or corporate surety bond. Colorado labor must comprise at least 80% of the workforce, and the Town is exempt from Colorado state sales and use taxes. The contract includes provisions for progress payments (95% of completed work), performance and payment bonds, and liquidated damages for delays. The total project will be funded through the Town's appropriated funds, with the specific contract price to be determined based on the successful bidder's unit prices.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID
Highway 9 Sidewalk Improvements Project No. 25946
Advertisement Date: March 29, 2024 Bid Due Date: April 22, 2024
Town of Frisco PO Box 4100
Frisco, CO 80443
(970) 668-4579
TABLE OF CONTENTS
BIDDING DOCUMENTS
INVITATION TO BID
INSTRUCTIONS TO BIDDERS
BID FORM FOR CONSTRUCTION CONTRACT
CONSTRUCTION AGREEMENT
EXHIBIT A TO CONSTRUCTION AGREEMENT
PERFORMANCE BOND
PAYMENT BOND
NOTICE OF AWARD - SAMPLE
NOTICE TO PROCEED - SAMPLE
COLORADO BID BOND
OTHER BID FORMS (CDOT FORMS 604, 606, 1413).................................................…….44
CONDITIONS OF THE CONTRACT
CDOT PROJECT SPECIAL AND STANDARD PROVISIONS (Separate Document)
CDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION
(Separate Document) 2023 Edition
PLANS (Separate Document) Highway 9 Sidewalk Improvements: Bid Plans Dated February 29, 2024 Sheets 1 – 45
CDOT STANDARD CONSTRUCTION DETAILS (Separate Document)
APPENDICES
APPENDIX A: Geotechnical Report APPENDIX B: Environmental Report APPENDIX C: CDOT Intergovernmental Agreement
28, TOF.TWR.00269 1
INVITATION TO BID
Notice is hereby given that the Town of Frisco (the "Town") will receive sealed bids for Highway 9 Sidewalk Improvements and until, April 22nd, 2024, at 10:00 am.
The specifications and full contract documents for the construction of Highway 9 Sidewalk Improvements are currently available from www.bidnetdirect.com/townoffrisco or at the Town’s Public Works Department offices at 102 School Road, Frisco CO 80443. Each bidder may obtain one set of specifications.
The Town reserves the right to reject any and all bids, and to make final determination in the event of duplications.
No bid may be withdrawn for a period of sixty (60) days after the date set for opening thereof.
There will be an optional pre-bid meeting on Monday April 8th, 2024 at 2:00 pm. The meeting will be conducted at Frisco Public Works, 102 School Road, Frisco, CO 80443.
Colorado labor shall be employed to perform the work for which bids are requested herein to the extent of not less than eighty percent (80%) of each type or class of labor in the several classifications of skilled and common labor employed on such work, pursuant to C.R.S. § 8-17- 101.
The Town requires that a certified or cashier's check be deposited or that a corporate surety bond in the amount of five percent (5%) of the total bid amount be provided before the Town can accept or consider any bid. The bid and the deposit or bond shall be filed with the Town Clerk, securely sealed and endorsed on the outside with a brief statement as to the nature of the item or work for which the bid is provided. Upon a bid award, such deposit or bond shall be returned to the unsuccessful bidder(s). In the case of the successful bidder, the deposit or bid bond will be returned upon receipt of the required payment and performance bonds, each in the full amount of the contract price.
Bids shall be received by 10:00 am on April 22nd, 2024, at 1 Main Street, Frisco, CO 80443 (Frisco Town Hall), and shall be opened publicly and tabulated by the Town.
Any questions regarding the project should be directed to Chris McGinnis, Project Manager, by 5:00 pm on April 12, 2024 in writing at the following e-mail address: chrism@townoffrisco.com.
Bid results shall be available after bid opening by emailing chrism@townoffrisco.com
/s/ Stacey Nell, CMC Town Clerk
DATE OF PUBLICATION: 3/29/2024
TOF.TWR.00269 2
INSTRUCTIONS TO BIDDERS
(EJCDC C-200)
ARTICLE 1—DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office—the office from which the Bidding Documents are to be issued, and which registers plan holders.
ARTICLE 2—BIDDING DOCUMENTS
2.01 Bidder shall obtain a complete set of Bidding Requirements and proposed Contract Documents (together, the Bidding Documents). See the Agreement for a List of the Contract Documents. It is Bidder’s responsibility to determine that it is using a complete set of documents in the preparation of a Bid. Bidder assumes sole responsibility for errors or misinterpretations resulting from the use of incomplete documents, by Bidder itself or by its prospective Subcontractors and Suppliers.
2.02 Bidding Documents are made available for the sole purpose of obtaining Bids for completion of the Project and permission to download or distribution of the Bidding Documents does not confer a license or grant permission or authorization for any other use. Authorization to download documents, or other distribution, includes the right for plan holders to print documents solely for their use, and the use of their prospective Subcontractors and Suppliers, provided the plan holder pays all costs associated with printing or reproduction. Printed documents may not be re-sold under any circumstances.
2.03 Owner has established a Bidding Documents Website as indicated in the Advertisement or invitation to bid. Owner recommends that Bidder register as a plan holder with the Issuing Office at such website, and obtain a complete set of the Bidding Documents from such website.
Bidders may rely that sets of Bidding Documents obtained from the Bidding Documents Website are complete, unless an omission is blatant. Registered plan holders will receive Addenda issued by Owner.
2.04 Electronic Documents
A. When the Bidding Requirements indicate that electronic (digital) copies of the Bidding Documents are available, such documents will be made available to the Bidders as Electronic Documents in the manner specified.
1. Bidding Documents will be provided in Adobe PDF (Portable Document Format) (.pdf) that is readable by Adobe Acrobat Reader Version 9 or later. It is the intent of the Engineer and Owner that such Electronic Documents are to be exactly representative of the paper copies of the documents. However, because
TOF.TWR.00269 3
the Owner and Engineer cannot totally control the transmission and receipt of Electronic Documents nor the Contractor’s means of reproduction of such documents, the Owner and Engineer cannot and do not guarantee that Electronic Documents and reproductions prepared from those versions are identical in every manner to the paper copies.
B. Unless otherwise stated in the Bidding Documents, the Bidder may use and rely upon complete sets of Electronic Documents of the Bidding Documents, described in Paragraph 2.06.A above. However, Bidder assumes all risks associated with differences arising from transmission/receipt of Electronic Documents versions of Bidding Documents and reproductions prepared from those versions and, further, assumes all risks, costs, and responsibility associated with use of the Electronic Documents versions to derive information that is not explicitly contained in printed paper versions of the documents, and for Bidder’s reliance upon such derived information.
ARTICLE 3—QUALIFICATIONS OF BIDDERS
3.01 To demonstrate Bidder’s qualifications to perform the Work, after submitting its Bid and within ten days of Owner’s request, Bidder must submit the following information:
A. Written evidence establishing its qualifications such as financial data, previous experience, and present commitments.
B. A written statement that Bidder is authorized to do business in the state where the Project is located, or a written certification that Bidder will obtain such authority prior to the Effective Date of the Contract.
C. Bidder’s state or other contractor license number, if applicable.
D. Subcontractor and Supplier qualification information.
E. Other required information regarding qualifications.
3.02 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.
3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.
ARTICLE 4—PRE-BID CONFERENCE
4.01 An optional pre-bid conference will be held at the time and location indicated in the Advertisement or invitation to bid. Representatives of Owner and Engineer will be present to discuss the Project. It is each Bidder’s responsibility to sign in at the pre-bid conference to verify its participation. Bidders must sign in using the name of the organization that will be submitting a Bid.
4.02 Information presented at the pre-Bid conference does not alter the Contract Documents.
Owner will issue Addenda to make any changes to the Contract Documents that result from discussions at the pre-Bid conference. Information presented, and statements made
TOF.TWR.00269 4
at the pre-bid conference will not be binding or legally effective unless incorporated in an Addendum.
ARTICLE 5—SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION
OF SITE; OWNER’S SAFETY PROGRAM; OTHER WORK AT THE SITE
5.01 Site and Other Areas
A. The Site is identified in the Bidding Documents. The Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.
5.02 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions
1. The Supplementary Conditions identify the following regarding existing conditions at or adjacent to the Site:
a. Those reports of explorations and tests of subsurface conditions at or adjacent to the Site that contain Technical Data.
b. Those drawings known to Owner of existing physical conditions at or adjacent to the Site, including those drawings depicting existing surface or subsurface structures at or adjacent to the Site (except Underground Facilities), that contain Technical Data.
c. Technical Data contained in such reports and drawings.
2. Owner will make copies of reports and drawings referenced above available to any Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.
B. Underground Facilities: Underground Facilities are shown or indicated on the Drawings,. Information and data regarding the presence or location of Underground Facilities are not intended to be categorized, identified, or defined as Technical Data.
5.03 Site Visit and Testing by Bidders
A. Bidder is encouraged to visit the Site and conduct a thorough visual examination of the Site and adjacent areas. During the visit, the Bidder must not disturb any ongoing operations at the Site.
TOF.TWR.00269 5
B. A Site visit is scheduled following the pre-bid conference. Maps to the Site will be available at the pre-Bid conference.
C. Bidders visiting the Site are required to arrange their own transportation to the Site.
D. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.
E. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder general access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site. Bidder is responsible for establishing access needed to reach specific selected test sites.
F. Bidder must comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.
G. Bidder must fill all holes, clean up, and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.
5.04 Owner’s Safety Program
A. Site visits and work at the Site may be governed by an Owner safety program. If an Owner safety program exists, it will be noted in the Supplementary Conditions.
5.05 Other Work at the Site
A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.
ARTICLE 6—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS
6.01 Express Representations and Certifications in Bid Form, Agreement
A. The Bid Form that each Bidder will submit contains express representations regarding the Bidder’s examination of Project documentation, Site visit, and preparation of the Bid, and certifications regarding lack of collusion or fraud in connection with the Bid.
Bidder should review these representations and certifications and assure that Bidder can make the representations and certifications in good faith, before executing and submitting its Bid.
B. If Bidder is awarded the Contract, Bidder (as Contractor) will make similar express representations and certifications when it executes the Agreement.
TOF.TWR.00269 6
ARTICLE 7—INTERPRETATIONS AND ADDENDA
7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing at chrism@townoffrisco.com by 5:00 pm on April 12, 2024.
Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders.
7.02 Only responses set forth in an Addendum will be binding. Oral and other interpretations or clarifications will be without legal effect. Responses to questions are not part of the Contract Documents unless set forth in an Addendum that expressly modifies or supplements the Contract Documents.
ARTICLE 8—BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of 5 percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a Bid bond issued by a surety meeting the requirements of the General Conditions. Such Bid bond will be issued in the form included in the Bidding Documents.
8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract, furnished the required Contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract and furnish the required Contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited, in whole in the case of a penal sum bid bond, and to the extent of Owner’s damages in the case of a damages-form bond. Such forfeiture will be Owner’s exclusive remedy if Bidder defaults.
8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of 7 days after the Effective Date of the Contract or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.
8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within 7 days after the Bid opening.
ARTICLE 9—CONTRACT TIMES
9.01 Bidder must set forth in the Bid the time by which Bidder must achieve Substantial Completion, subject to the restrictions established in Paragraph 13.07 of these Instructions.
The Owner will take Bidder’s time commitment regarding Substantial Completion into consideration during the evaluation of Bids, and it will be necessary for the apparent mailto:chrism@townoffrisco.com
TOF.TWR.00269 7
Successful Bidder to satisfy Owner that it will be able to achieve Substantial Completion within the time such Bidder has designated in the Bid. Bidder must also set forth in the Bid its commitments regarding the achievement of Milestones and readiness for final payment.
The Successful Bidder’s time commitments will be entered into the Agreement or incorporated in the Agreement by reference to the specific terms of the Bid.
9.02 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.
ARTICLE 10—SUBSTITUTE AND “OR EQUAL” ITEMS
10.01 The Contract for the Work, as awarded, will be based on materials and equipment specified or described in the Bidding Documents without consideration during the bidding and Contract award process of possible substitute or “or-equal” items. In cases in which the Contract allows the Contractor to request that Engineer authorize the use of a substitute or “or-equal” item of material or equipment, application for such acceptance may not be made to and will not be considered by Engineer until after the Effective Date of the Contract.
10.02 All prices that Bidder sets forth in its Bid will be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.
ARTICLE 11—SUBCONTRACTORS, SUPPLIERS, AND OTHERS
11.01 A Bidder must be prepared to retain specific Subcontractors and Suppliers for the performance of the Work if required to do so by the Bidding Documents or in the Specifications. If a prospective Bidder objects to retaining any such Subcontractor or Supplier and the concern is not relieved by an Addendum, then the prospective Bidder should refrain from submitting a Bid.
11.02 The apparent Successful Bidder, and any other Bidder so requested, must submit to Owner a list of the Subcontractors or Suppliers proposed for the following portions of the Work within five days after Bid opening.
11.03 If requested by Owner, such list must be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor or Supplier. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor or Supplier, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute, in which case apparent Successful Bidder will submit a substitute, Bidder’s Bid price will be increased (or decreased) by the difference in cost occasioned by such substitution, and Owner may consider such price adjustment in evaluating Bids and making the Contract award.
11.04 If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors and
TOF.TWR.00269 8
Suppliers. Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor or Supplier, so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in the General Conditions.
ARTICLE 12—PREPARATION OF BID
12.01 The Bid Form is included with the Bidding Documents.
A. All blanks on the Bid Form must be completed in ink and the Bid Form signed in ink.
Erasures or alterations must be initialed in ink by the person signing the Bid Form. A Bid price must be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.
B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then Bidder may enter the words “No Bid” or “Not Applicable.”
12.02 If Bidder has obtained the Bidding Documents as Electronic Documents, then Bidder shall prepare its Bid on a paper copy of the Bid Form printed from the Electronic Documents version of the Bidding Documents. The printed copy of the Bid Form must be clearly legible, printed on 8½ inch by 11-inch paper and as closely identical in appearance to the Electronic Document version of the Bid Form as may be practical. The Owner reserves the right to accept Bid Forms which nominally vary in appearance from the original paper version of the Bid Form, providing that all required information and submittals are included with the Bid.
12.03 A Bid by a corporation must be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation must be shown.
12.04 A Bid by a partnership must be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign.
The official address of the partnership must be shown.
12.05 A Bid by a limited liability company must be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm must be shown.
12.06 A Bid by an individual must show the Bidder’s name and official address.
12.07 A Bid by a joint venture must be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The joint venture must have been formally established prior to submittal of a Bid, and the official address of the joint venture must be shown.
12.08 All names must be printed in ink below the signatures.
12.09 The Bid must contain an acknowledgment of receipt of all Addenda, the numbers of which must be filled in on the Bid Form.
12.10 Postal and e-mail addresses and telephone number for communications regarding the Bid must be shown.
TOF.TWR.00269 9
12.11 The Bid must contain evidence of Bidder’s authority to do business in the state where the Project is located, or Bidder must certify in writing that it will obtain such authority within the time for acceptance of Bids and attach such certification to the Bid.
ARTICLE 13—BASIS OF BID
13.01 Unit Price
A. Bidders must submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.
B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity,” which Owner or its representative has set forth in the Bid Form, for the item and the corresponding “Bid Unit Price” offered by the Bidder. The total of all unit price Bid items will be the sum of these “Bid Prices;” such total will be used by Owner for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with the General Conditions.
C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
ARTICLE 14—SUBMITTAL OF BID
14.01 The Bidding Documents include one separate unbound copy of the Bid Form, and, if required, the Bid Bond Form. The unbound copy of the Bid Form is to be completed and submitted with the Bid security and the other documents required to be submitted under the terms of Article 2 of the Bid Form.
14.02 A Bid must be received no later than 10:00 am on April 22nd, 2024 and must be enclosed in a plainly marked package with the Project title, the name and address of Bidder, and must be accompanied by the Bid security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid must be enclosed in a separate package plainly marked on the outside with the notation “BID ENCLOSED.” A mailed Bid must be addressed to the location designated in the Advertisement.
14.03 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the Bidder unopened.
ARTICLE 15—MODIFICATION AND WITHDRAWAL OF BID
15.01 An unopened Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. Upon receipt of such notice, TOF.TWR.00269 10 the unopened Bid will be returned to the Bidder.
15.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 15.01 and submit a new Bid prior to the date and time for the opening of Bids.
15.03 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, the Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, the Bidder will be disqualified from further bidding on the Work.
ARTICLE 16—OPENING OF BIDS
16.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.
ARTICLE 17—BIDS TO REMAIN SUBJECT TO ACCEPTANCE
17.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 18—EVALUATION OF BIDS AND AWARD OF CONTRACT
18.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner also reserves the right to waive all minor Bid informalities not involving price, time, or changes in the Work.
18.02 Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible.
18.03 If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, whether in the Bid itself or in a separate communication to Owner or Engineer, then Owner will reject the Bid as nonresponsive.
18.04 If Owner awards the contract for the Work, such award will be to the responsible Bidder submitting the lowest responsive Bid.
18.05 Evaluation of Bids
A. In evaluating Bids, Owner will consider whether the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.
B. For the determination of the apparent low Bidder when unit price bids are submitted, Bids will be compared on the basis of the total of the products of the estimated quantity of each item and unit price Bid for that item, together with any lump sum items.
TOF.TWR.00269 11
18.06 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.
18.07 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.
ARTICLE 19—BONDS AND INSURANCE
19.01 The General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds, other required bonds (if any), and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it must be accompanied by required bonds and insurance documentation.
19.02 Article 8, Bid Security, of these Instructions, addresses any requirements for providing bid bonds as part of the bidding process.
ARTICLE 20—SIGNING OF AGREEMENT
20.01 When Owner issues a Notice of Award to the Successful Bidder, it will be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within 15 days thereafter, Successful Bidder must execute and deliver the required number of counterparts of the Agreement and any bonds and insurance documentation required to be delivered by the Contract Documents to Owner. Within 15 days thereafter, Owner will deliver one fully executed counterpart of the Agreement to Successful Bidder, together with printed and electronic copies of the Contract Documents as stated in the General Conditions.
ARTICLE 21—SALES AND USE TAXES
21.01 Owner is exempt from COLORADO state sales and use taxes on materials and equipment to be incorporated in the Work. (Exemption No. 98-03536). Said taxes must not be included in the Bid.
TOF.TWR.00269 12
BID FORM FOR CONSTRUCTION CONTRACT
(EJCDC C-410)
The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.
ARTICLE 1—OWNER AND BIDDER
1.01 This Bid is submitted to:
Town of Frisco
PO Box 4199
Frisco, CO 80443
1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
ARTICLE 2—ATTACHMENTS TO THIS BID
2.01 The following documents are submitted with and made a condition of this Bid:
A. Required Bid security (Colorado Bid Bond);
B. CDOT Form 604;
C. CDOT Form 606;
D. CDOT Form 1413;
E. CDOT Form 1414.
TOF.TWR.00269 13
ARTICLE 3—BASIS OF BID—UNIT PRICES
3.01 Unit Price Bids
A. Bidder will perform the following Work at the indicated unit prices:
ITEM
CODE DESCRIPTION QTY UNIT UNIT COST TOTAL COST
201-00000 CLEARING AND GRUBBING 1 LS
202-00090 REMOVE DELINEATOR 30 EACH
202-00150 REMOVAL OF WALL 1 LS
202-00200 REMOVAL OF SIDEWALK 520 SY
202-00203 REMOVAL OF CURB AND GUTTER 14 LF
202-00206 REMOVAL OF CONCRETE CURB RAMP 3 SY
202-01000 REMOVAL OF FENCE 50 LF
203-00000 UNCLASSIFIED EXCAVATION (COMPLETED
IN PLACE) 390 CY
203-00060 EMBANKMENT MATERIAL (COMPLETE IN
PLACE) 884 CY
203-01597 POTHOLING 15 HOUR
206-00100 STRUCTURE BACKFILL (CLASS 1) 1188 CY
207-00205 TOPSOIL 687 CY
208-00002 EROSION LOG TYPE 1 (12 INCH) 958 LF
208-00020 SILT FENCE 266 LF
208-00035 AGGREGATE BAG 72 LF
208-00046 PRE-FABRICATED CONCRETE WASHOUT
STRUCTURE (TYPE 1) 2 EACH
208-00051 STORM DRAIN INLET PROTECTION (TYPE I) 30 LF
208-00052 STORM DRAIN INLET PROTECTION (TYPE II) 20 LF
208-00075 PRE-FABRICATED VEHICLE TRACKING PAD 4 EACH
208-00207 EROSION CONTROL MANAGEMENT 35 DAY
212-00006 SEEDING (NATIVE) 0.5 ACRE
213-00011 MULCHING (HYDRAULIC) 0.5 ACRE
240-00000 WILDLIFE BIOLOGIST 10 HOUR
240-00010 REMOVAL OF NESTS 10 HOUR
304-06007 AGGREGATE BASE COURSE (CLASS 6) 533 TON
504-03500 RETAINING WALL (GRAVITY) 4035 SF
514-00042 PEDESTRIAN RAILING (42 INCH) 300 LF
607-11450 FENCE SPLIT CEDAR 50 LF
TOF.TWR.00269 14
607-11525 FENCE (PLASTIC) 1748 LF
608-00006 CONCRETE SIDEWALK (6 INCH) 1780 SY
608-00010 CONCRETE CURB RAMP 13 SY
612-00002 DELINEATOR (TYPE II) 17 EACH
613-00200 2 INCH ELECTRICAL CONDUIT 3142 LF
613-07001 TYPE ONE PULL BOX 4 EACH
625-00000 CONSTRUCTION SURVEYING 1 LS
626-00000 MOBILIZATION 1 LS
630-00000 FLAGGING 300 HR
630-00007 TRAFFIC CONTROL INSPECTION 12 DAY
630-00012 TRAFFIC CONTROL MANAGEMENT 35 DAY
630-00016 TRAFFIC CONTROL (SPECIAL) 1 LS
630-80355 PORTABLE MESSAGE SIGN PANEL 1 EA
700-70010 F/A MINOR CONTRACT REVISIONS 1 F/A
$50,000.00
$50,000.00
TOTAL BID PRICE: __________________________________________
B. Bidder acknowledges that:
1. Each Bid Unit Price includes an amount considered by Bidder to be adequate to cover Contractor’s overhead and profit for each separately identified item, and
2. Estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Work will be based on actual quantities, determined as provided in the Contract Documents.
3. Work required in this section includes all expenses to complete the individual bid items per the plans and specifications. Unit bid prices, as quoted in the bid schedule, shall constitute full compensation for materials, labor, equipment, rentals, permits, overhead, profit, incidentals, risk, loss, damage, and all other items of work and expense required for the complete construction of each pay item per the plans and specifications. Any items or like item not specifically mentioned as a bid item is considered incidental to the project and all costs associated with these items must be included in the bid items listed.
TOF.TWR.00269 15
ARTICLE 4—BIDDER’S ACKNOWLEDGEMENTS: ACCEPTANCE PERIOD,
INSTRUCTONS, AND RECEIPT OF ADDENDA
4.01 Bid Acceptance Period
A. This Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.
4.02 Instructions to Bidders
A. Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security.
4.03 Receipt of Addenda
A. Bidder hereby acknowledges receipt of the following Addenda:
Addendum Number Addendum Date
ARTICLE 5—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS
5.01 Bidder’s Representations
A. In submitting this Bid, Bidder represents the following:
1. Bidder has examined and carefully studied the Bidding Documents, including Addenda.
2. Bidder has visited the Site, conducted a thorough visual examination of the Site and adjacent areas, and become familiar with the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
3. Bidder is familiar with all Laws and Regulations that may affect cost, progress, and performance of the Work.
4. Bidder has carefully studied the reports of explorations and tests of subsurface conditions at or adjacent to the Site and the drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, with respect to the Technical Data in such reports and drawings.
5. Bidder has considered the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Technical Data identified in the Supplementary Conditions or by definition, with respect to the effect of such information, observations, and Technical Data on (a) the cost, progress, and performance of the Work; (b) the means, methods, techniques, sequences, and
TOF.TWR.00269 16
procedures of construction to be employed by Bidder, if selected as Contractor; and
(c) Bidder’s (Contractor’s) safety precautions and programs.
6. Based on the information and observations referred to in the preceding paragraph, Bidder agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract.
7. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.
8. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and of discrepancies between Site conditions and the Contract Documents, and the written resolution thereof by Engineer is acceptable to Contractor.
9. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.
10. The submission of this Bid constitutes an incontrovertible representation by Bidder that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.
5.02 Bidder’s Certifications
A. The Bidder certifies the following:
1. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation.
2. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid.
3. Bidder has not solicited or induced any individual or entity to refrain from bidding.
4. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 8.02.A:
a. Corrupt practice means the offering, giving, receiving, or soliciting of anything of value likely to influence the action of a public official in the bidding process.
b. Fraudulent practice means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition.
c. Collusive practice means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels.
TOF.TWR.00269 17
d. Coercive practice means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.
TOF.TWR.00269 18
BIDDER hereby submits this Bid as set forth above:
Bidder:
(typed or printed name of organization)
By:
(individual’s signature) Name:
(typed or printed) Title:
(typed or printed)
Date:
(typed or printed)
If Bidder is a corporation, a partnership, or a joint venture, attach evidence of authority to sign.
Attest:
(individual’s signature)
Name:
(typed or printed)
Title:
(typed or printed)
Date:
(typed or printed)
Address for giving notices:
Bidder’s Contact:
Name:
(typed or printed)
Title:
(typed or printed)
Phone:
Email:
Address:
Bidder’s Contractor License No.: (if applicable)
TOF.TWR.00269 19
CONSTRUCTION AGREEMENT
THIS CONSTRUCTION AGREEMENT is made and entered into this ____ day of
____________, 2024, by and between the TOWN OF FRISCO, a Colorado home rule municipal corporation with an address of 1 Main Street, Frisco, CO 80443 (the “Town”), and ___________, a ________ ("Contractor") (collectively the "Parties").
For the consideration described herein, the receipt and sufficiency of which is hereby acknowledged, the Parties hereby agree as follows:
Scope of Work. Contractor shall perform the following described work (the "Project"), in accordance with this Agreement and the Contract Documents, which Contract Documents are as defined in the General Conditions attached hereto and incorporated herein by this reference as Exhibit “A”. The Project is generally described as follows:
The project is located in Frisco, Colorado and includes removal of concrete, trees, boulder retaining walls, and excavation. New construction work includes concrete sidewalks, modular block retaining walls, pedestrian railings, curb ramps, pvc conduit, erosion control, traffic control, and surveying.
1. Bonds. Within ten (10) days of the date of this Agreement, Contractor shall provide the performance and payment bonds and certificate of insurance required by the Contract Documents.
2. Commencement and Completion of Work. Contractor shall commence the Project beginning August 5th, 2024 and no later than August 16th. Substantial Completion of the Project shall be accomplished by September 23rd, 2024 unless the period for completion is extended otherwise in accordance with the Contract Documents. Final Completion of the Project shall be accomplished by September 30th, 2024.
3. Compensation/Contract Price. The Town agrees to pay Contractor, subject to all of the terms and conditions of the Contract Documents, for the Project, in accordance with the bid unit prices listed on form C410 of the contract documents. The Town shall pay Contractor in the manner and at such times as set forth in the General Conditions such amounts as required by the Contract Documents. The Town has appropriated funds equal to or in excess of the Contract Price.
4. Governing Law and Venue. This Agreement shall be governed by the laws of the State of Colorado, and any legal action concerning the provisions hereof shall be brought in Summit County, Colorado.
5. No Waiver. Delays in enforcement or the waiver of any one or more defaults or breaches of this Agreement by the Town shall not constitute a waiver of any of the other terms or obligation of this Agreement.
TOF.TWR.00269 20
6. Integration. This Agreement and any attached exhibits constitute the entire Agreement between Contractor and the Town, superseding all prior oral or written communications.
7. Third Parties. There are no intended third-party beneficiaries to this Agreement.
8. Notice. Any notice under this Agreement shall be in writing, and shall be deemed sufficient when directly presented or sent pre-paid, first class United States Mail, addressed to:
The Town: Chris McGinnis Project Manager
P.O. Box 4100
Contractor: _________________________
9. Severability. If any provision of this Agreement is found by a court of competent jurisdiction to be unlawful or unenforceable for any reason, the remaining provisions hereof shall remain in full force and effect.
10. Modification. This Agreement may only be modified upon written agreement of the Parties.
11. Assignment. Neither this Agreement nor any of the rights or obligations of the Parties hereto, shall be assigned by either party without the written consent of the other.
12. Governmental Immunity. The Town, its officers, and its employees, are relying on, and do not waive or intend to waive by any provision of this Agreement, the monetary limitations (presently three hundred eighty-seven thousand dollars ($387,000) per person and one million ninety-three thousand dollars ($1,093,000) per occurrence) or any other rights, immunities, and protections provided by the Colorado Governmental Immunity Act, C.R.S. § 24- 10-101, et seq., as amended, or otherwise available to the Town and its officers or employees.
13. Rights and Remedies. The rights and remedies of the Town under this Agreement are in addition to any other rights and remedies provided by law. The expiration of this Agreement shall in no way limit the Town's legal or equitable remedies, or the period in which such remedies may be asserted, for work negligently or defectively performed.
TOF.TWR.00269 21
IN WITNESS WHEREOF, this Construction Agreement has been executed by the Parties as of the date first above written, whether or not the date of signing is some other date.
TOWN OF FRISCO, COLORADO
____________________, Mayor
ATTEST:
Town Clerk
CONTRACTOR
By: ___________________________________ Its:__________________
STATE OF COLORADO )
) ss.
COUNTY OF )
The foregoing instrument was subscribed, sworn to and acknowledged before me this ___ day of ___________________, 2024, by ________________, as ___________ of
My commission expires:
(S E A L)
Notary Public
TOF.TWR.00269 22
EXHIBIT A TO CONSTRUCTION AGREEMENT
GENERAL CONDITIONS
PART 1. DEFINITIONS
1.01 CONTRACT DOCUMENTS:
A. Invitation to Bid;
B. Bid Form (Form C410) C. Bid Schedule (Form C410) D. Construction Agreement;
E. General Conditions;
F. Project Special Provisions;
G. Standard Special Provisions;
H. CDOT Standard Specifications for Road and Bridge Construction;
I. Notice of Award;
J. Notice to Proceed;
K. Payment Bond;
L. Performance Bond;
M. Construction Drawings;
N. CDOT Standard Construction Details;
N. Documentation submitted by Contractor prior to Notice of Award; and O. Addenda ___ through ____.
1.02 CHANGE ORDER:
A written order issued by the Town after execution of the Construction Agreement authorizing an addition, deletion or revision in the Work, or an adjustment in the Contract Price or the Contract Time.
1.03 CONTRACT:
The entire written agreement covering the performance of the Work described in the Contract Documents including all supplemental agreements thereto and all general and special provisions pertaining to the Work and materials therefor.
1.04 CONTRACT PRICE:
The amount set forth in document C410 of the contract documents.
1.05 CONTRACT TIME:
The time for completion of the Project as set forth in Paragraph 2 of the Construction Agreement.
1.06 DAY:
Calendar day, unless otherwise specified. When the last day for the occurrence of an event falls on a Saturday, Sunday or legal holiday as recognized by the Town, the time for performance shall be automatically extended to the next business day.
TOF.TWR.00269 23
1.07 FINAL COMPLETION:
The date as certified by the Project Manager when all of the Work on the Project is completed and final payment may be made.
1.08 PROJECT:
The construction task or tasks more fully described in the “Scope of Work” provisions (Exhibit B) of the Construction Agreement.
1.09 PROJECT MANAGER:
The Town's duly authorized representative in connection with the Project.
1.10 SUBCONTRACTOR:
Any person, firm or corporation with a direct contract with Contractor who acts for or in behalf of Contractor in executing any part of the Contract, excluding one who merely furnishes material.
1.11 SUBSTANTIAL COMPLETION:
The date as certified by the Project Manager when the Town occupies or takes possession of all or substantially all of the Project, or when the Town may occupy or take possession of all or substantially all of the Project and put it to beneficial use for its intended purposes.
1.12 TOWN
The Town of Frisco, Colorado, a Colorado municipal corporation.
1.13 WORK:
All the work specified, indicated, shown or contemplated in the Contract Documents to construct the Project, including all alterations, amendments or extensions thereto made by supplemental agreements or written orders of the Project Manager.
PART 2. TIME
2.01 TIME OF THE ESSENCE:
All times stated in the Contract Documents are of the essence.
2.02 FINAL ACCEPTANCE:
Upon Final Completion, the Project Manager will issue final acceptance.
2.03 CHANGES IN THE WORK:
The Town reserves the right to order changes in the Work, in the nature of additions, deletions or modifications, without invalidating the Contract, and to make corresponding adjustments in the Contract Price and the Contract Time. All changes shall be authorized by a written Change Order signed by the Project Manager. The Change Order shall include appropriate changes in the Contract Documents and the Contract Time. The Work shall be changed and the Contract Price and Contract Time modified only as set forth in the written Change Order. Any adjustment in the Contract Price resulting in a credit or a charge to the Town shall be determined by mutual agreement of the parties before the work set forth in the Change Order is commenced. If a Change Order results in an increase in the Contract Price, approval of the Frisco Town Council may be required.
TOF.TWR.00269 24
The Town shall provide Contractor with written assurance of additional appropriations should any change in the Work result in an increase in the Contract Price exceeding the amount originally appropriated for the Work.
2.07 DELAYS:
A. If Contractor is delayed in the progress of the Work by fire, unusual delay in transportation, adverse weather conditions not reasonably to be anticipated, or other unavoidable casualties beyond Contractor's control, the Contract Time shall be extended for a reasonable period of time.
B. Any request for extension of the Contract Time shall be made in writing to the Project Manager not more than seven (7) days after commencement of the delay; otherwise it shall be waived. Any such request shall contain an estimate of the probable effect of such delay on the progress of the Work.
C. Contractor shall not be entitled to any increase in the Contract Price, or to damages, or to additional compensation as a consequence of any such delays.
2.08 NO DAMAGES FOR DELAY:
The Town shall not amend the Contract Price nor shall Contractor be entitled to additional compensation of any sort for costs or damages incurred as a result of any delays in performance unless such delay is the direct result of the acts or omissions of the Town or persons acting on behalf of the Town, in accordance with…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .