03 Atch3 Volume II Unit Price Book.pdf
PDF 7 MB Posted
- Attached to
- Simplified Acquisition of Base Engineer Requirements (SABER)) Federal contract opportunity
- Solicitation number
- FA520523R0002
About this file
This award notice announces that the Department of the Air Force Pacific Air Forces has awarded Contract No. FA520523R0002 under Solicitation No. FA520523R0002 for Simplified Acquisition of Base Engineer Requirements (SABER) at Misawa Air Base in Japan. The logistics and engineering support services required under the contract include work in divisions 01 through 16, such as general requirements, site work, concrete, masonry, metals, wood, thermal and moisture protection, doors and windows, finishes, specialties, equipment, furnishings, special construction, conveyances, plumbing, HVAC, fire suppression, and electrical. The period of performance and pricing terms are not specified in the provided document.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 00 Contract - FA520524D0001.pdf | ||
| 02 Atch2 Specifications.pdf | ||
| 04 Atch4 TO Procedure Flow Chart.pdf | ||
| 01 Atch1 Other Contract Requirements.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
15 Dec 22
SABER
SIMPLIFIED ACQUISITION OF BASE ENGINEER
REQUIREMENTS
VOLUME II
UNIT PRICE BOOK (UPB)
MISAWA AIR BASE
JAPAN
Attachment 3, Contract No. FA520524D0001
DATE 12/15/22
UNIT PRICE BOOK - VOLUME II
INDEX
MAJOR
BASIC
MINOR
BASIC DESCRIPTION
DIVISION 01 GENERAL
01010 SUMMARY OF WORK
01020 ALLOWANCES
DIVISION 02 SITE WORK
02210 00000 SUBSURFACE BORING AND SAMPLING
02220 00000 SITE DEMOLITION
02221 00000 SELECTIVE DEMOLITION (1)
02222 00000 SELECTIVE DEMOLITION (2)
02223 00000 MISCELLANEOUS SITE MATERIALS
02224 00000 STRUCTURE MOVING
02231 00000 CLEANING AND GRUBBING
02301 00000 EARTHWORK FOR STRUCTURES AND PAVEMENTS
02302 00000 EXCAVATION, BACKFILLING, AND COMPACTING FOR
UTILITIES
02303 00000 FILLING
02304 00000 SHORING & UNDERPINNING
02305 00000 HAULING
02306 00000 SOIL STABILIZATION
02307 00000 SOIL TREATMENT
02308 00000 EROSION & SEDIMENTATION CONTROL
02309 00000 TUNNELING, BORING & JACKING
02405 00000 PRECAST/PRESTRESSED CONCRETE PILE
02510 00000 WATER DISTRIBUTION
02530 00000 SANITARY SEWERAGE
02630 00000 STORM DRAINAGE
02640 00000 SUBDRAINAGE
02741 00000 PAVEMENT REMOVAL AND REPLACEMENT
02745 00000 CURBS AND GUTTERS
02746 00000 TRAFFIC SIGNS & SIGNALS
02747 00000 SIDEWALKS
02748 00000 FLEXIBLE PAVEMENT COATING
02749 00000 ATHLETIC/RECREATIONAL SURFACES
02761 00000 PAVEMENT MARKINGS, COST INCLUDES PREPARATION,
MEASUREMENT, CLEAN UP, PRIMER, PAINT, AND CURING.
02821 00000 CHAIN LINK FENCE AND GATES
02823 00000 RETAINING WALLS
02824 00000 WALK/ROAD/PARKING APPURTENANCES
02870 00000 SITE FURNISINGS
02921 00000 TURF
02930 00000 EXTERIOR PLANTS
02931 00000 PLANT MAINTENANCE
02932 00000 TRANSPLANTING
02933 00000 PLANT PREPARATION
02934 00000 GENERAL PLANTING
22935 00000 PLANTING ACCESSORIES
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
DIVISION 00 INDEX Page 1
INDEX
MAJOR
BASIC
MINOR
BASIC DESCRIPTION
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
DIVISION 03 CONCRETE
03300 00000 CAST-IN-PLACE CONCRETE
DIVISION 04 MASONRY
04200 00000 UNIT MASONRY
04230 00000 REINFORCED MASONRY
DIVISION 05 METALS
05120 00000 STRUCTURAL STEEL
05500 00000 METAL FABRICATION
DIVISION 06 WOOD AND PLASTICS
06100 00000 ROUGH CARPENTRY
06200 00000 FINISH CARPENTRY
DIVISION 07 THERMAL AND MOISTURE PROTECTION
07121 00000 BUILT-UP BITUMINOUS ROOFING
07141 00000 FLUID-APPLIED WATERPROOFING
07216 00000 LOOSE FILL INSULATION
07232 00000 CEILING, WALL, AND FLOOR INSULATION
07410 00000 METAL ROOF AND WALL PANELS
07511 00000 BUILT-UP ASPHALT ROOFING (AGGREGATE SURFACED)
07571 00000 FOAMED INSULATION AND ROOFING
07600 00000 FLASHING AND SHEETMETAL
01000 SHEET METAL ROOFING
02000 FLASHING AND TRIM
03000 COPING
04000 GUTTERS AND DOWNSPOUTS
05000 GRAVEL STOP
07920 00000 JOINT SEALANTS
DIVISION 08 DOORS AND WINDOWS
08110 00000 STEEL DOOR AND FRAMES
08120 00000 ALUMINUM DOORS AND FRAMES
08210 00000 WOOD DOORS
08331 00000 ROLLING SERVICE AND FIRE DOOR
08342 00000 STEEL SLIDING HANGER DOOR
08520 00000 ALUMINUM WINDOWS
08550 00000 WOOD WINDOW
08710 00000 DOOR HARDWARE
08800 00000 GLAZING
DIVISION 00 INDEX Page 2
INDEX
MAJOR
BASIC
MINOR
BASIC DESCRIPTION
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
DIVISION 09 FINISHES
09100 00000 METAL SUPPORT ASSEMBLIES
09151 00000 CEMENT MORTAR AND WALL REPAIRS
09205 00000 FURRING AND LATHING
09212 00000 PLASTER AND STUCCO
09250 00000 GYPSUM BOARD
09510 00000 ACOUSTICAL CEILING
09651 00000 RESILIENT TILE FLOORING
09655 00000 RESILIENT SHEET FLOORING
09670 00000 CERAMIC AND QUARRY TILEING
09680 00000 CARPET
09670 00000 WALL COVERINGS
09900 00000 PAINTS AND COATINGS
DIVISION 10 SPECIALTIES
10153 TOILET PARTITIONS AND ACCESSORIES
10350 FLAGPOLES
10410 DIRECTORY AND BULLETIN BOARDS
10440 IDENTIFICATION DEVICES
10500 LOCKERS
10520 FIRE EXTINGUISHERS, CABINETS, AND ACCESSORIES
10617 METAL PARTITIONS
10670 STORAGE SHELVING
DIVISION 13 SPECIAL CONSTRUCTION
13121 PREENGINEERING MATAL BUILDING (RIGIT FRAME)
13125 METAL BUILDING SYSTEM
13281 ENGINEERING CONROL OF ASBESTOS CONTAINING
MATERIALS
13283 REMOVAL/CONTROL AND DISPOSAL OF PAINT WITH LEAD
13610 PRE CAST CONCRETE PRODUCT
13620 FOOD SERVICE EQUIPMENT
13622 COOKING EQUIPMENT
13623 DISHWASHING EQUIPMENT
13630 ATHLETIC EQUIPMENT
13640 INDUSTRIAL EQUIPMENT
13650 SHOP EQUIPMENT
13670 RESIDENTIAL EQUIPMENT
13672 RESIDENTIAL WASHING EQUIPMENT
13673 RESIDENTIAL ENVIRONMENTAL EQUIPMENT
13674 CONSTRUCTION AIDS
13680 HOISTS AND CRANES
13690 TEMPORARY SCAFFOLDING
DIVISION 15 MECHANICAL
DIVISION 00 INDEX Page 3
INDEX
MAJOR
BASIC
MINOR
BASIC DESCRIPTION
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
15010 GENERAL PROVISIONS
15100 PIPE AND PIPE FITTINGS
15110 STEEL PIPE
15120 LINING AND COATING STEEL PIPE
15130 CAST IRON PIPE AND FITTINGS
15140 COPPER PIPE AND FITTINGS
15160 STAINLESS STEEL PIPE
15170 CONDUIT PIPE
15180 PIPING ACCESSORIES
15200 PIPING SPECIALTIES
15210 VALVES FOR GENERAL PURPOSE
15220 VALVES FOR WATER SUPPLY
15230 CONTROL VALVES
15240 TEMPERATURE CONTROL VALVE
15260 PUMPS
15270 AIR COMPRESSOR AND DRYER
15300 PLUMBING FIXTURE
15310 BATHROOM, KITCHEN AND OTHER
15320 FAUCETS AND VALVES
15330 DRAINS
15340 DOMESTIC HOT WATER HEATERS
15350 HAND DRYERS
15360 STEEL TANKS
15370 SPECIAL PIPING SYSTEMS AND WASTE WATER DISPOSAL
AND TREATMENT SYSTEM
15400 VENTILATION
15410 FANS
15420 TAILPIPE EXHAUST EQUIPMENT
15421 DUST COLLECTORS
15500 HEATING AND AIR CONDITIONING
15510 BOILERS
15520 SPACE HEATING EQUIPMENT
15530 REFRIGERATION
15540 LIQUID HEAT TRANSFER
15550 PACKAGED AIR CONDITIONING EQUIPMENT
15560 AIR HANDLING UNITS
15570 CONTROL EQUIPMENT
15580 METER AND GAUGES
15600 AIR DISTRIBUTION
15610 DUCT WORK
15620 DIFFUSERS AND GRILLES
15630 DAMPERS
15700 MECHANICAL INSULATION WORK
15710 PIPE INSULATION
15720 DUCT INSULATION
15730 INSULATION FOR EQUIPMENT
15740 INSULATION FOR VALVES
15800 FIRE PROTECTION
15810 DELUGE AUTOMATIC SPRINKLER SYSTEMS
15820 HALON FIRE PROTECTION SYSTEMS
DIVISION 00 INDEX Page 4
INDEX
MAJOR
BASIC
MINOR
BASIC DESCRIPTION
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
15830 DRY CHEMICAL SPRINKLER SYSTEM
15840 SPRINKLER EQUIPMENT
15850 STANDPIPE AND FIRE HOSE EQUIPMENT
15860 FIRE HOSE CABINETS AND ACCESSORIES
15900 SNOW MELTING SYSTEM
15910 CROSSLINKED POLYETHYLENE PIPES
15920 CROSSLINKED POLYETHYLENE PIPES FITTING
15930 SNOW MELTING SYSTEM, ASSEMBLY
DIVISION 16 ELECTRICAL
16050 BASIC ELECTRICAL MATERIALS AND METHODS
16100 INTERIOR AND EXTERIOR DISTRIBUTION SYSTEM
16110 RACEWAYS
16120 CABLE TRAYS
16130 CONDUITS
16140 WIRE AND CABLE
16150 WIRE CONNECTION DEVICES
16160 WIRING DEVICES
16170 MOTOR CONTROL DEVICES
16180 HEATING DEVICES
16200 POWER GENERATION
16234 STANDBY GENERATORS
16300 POWER TRANSMISSION
16310 PAD-MOUNTED TRANSFORMERS
16320 PRIMARY AND SECONDARY POWER STATIONS
16400 SERVICE AND DISTRIBUTION
16420 OVERHEAD TRANSMISSION AND DISTRIBUTION
16430 UNDERGROUND TRANSMISSION AND DISTRIBUTION
16440 GROUNDING
16450 BOX-TYPE SWITCHGEAR ASSEMBLIES FOR POWER
DISTRIBUTION PURPOSE
16460 SPECIALIZED MOTOR CONTROL PANEL
16470 SPECIALIZED LIGHTING CONTROL PANEL
16480 EXPLOSION-PROOF ASSEMBLED CIRCUIT BREAKERS
16500 LIGHTING
16510 INTERIOR LIGHTING
16511 RESIDENTIAL FIXTURES
16512 COMMERCIAL FIXTURES
16513 WORKSHOP FIXTURES
16514 INDUSTRIAL FIXTURES
16550 EXTERIOR LIGHTING
16551 AREA LIGHTING
16552 TRAFFIC LIGHTING
16570 EMERGENCY/EXIT LIGHTING
16580 EXIT LIGHTING
16700 FIRE DETECTION AND ALARM SYSTEM
16710 DETECTION AND ALARM
16800 COMMINUCATIONS
16820 CLOCK AND PROGRAM SYSTEMS
DIVISION 00 INDEX Page 5
INDEX
MAJOR
BASIC
MINOR
BASIC DESCRIPTION
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
16830 PUBLIC ADDRESS SYSTEMS
16840 LAN SYSTEMS
16850 TV SYSTEMS
16900 OTHER MISCELLANEOUS
16910 REINSTALLATION / MISCELLANEOUS WORK
16920 GP INSTALLATION WORK
DIVISION 00 INDEX Page 6
DIVISION 01 GENERAL
BASIC SUFFIX DESCRIPTION
UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
01000 0000 GENERAL REQUIREMENT
01010 0000 SUMMARY OF WORK
01010 1000 CONSTRUCTION FINAL CLEAN-UP
01010 1100 GENERAL
01010 1101 SWEEP DEBRIS M2 438 542
01010 1200 FLOORS
01010 1201 CLEAN & POLISH TILE/WOOD FLOORS M2 314 389
01010 1202 VACUUM CARPET FLOORS M2 259 321
01010 1203 STEAM CLEAN CARPET M2 821 1,017
01010 1300 GLASS
01010 1301 CLEAN GLASS SURFACES M2 314 389
01010 2000 IDENTIFICATION SIGN
01010 2001 CONSTRUCTION SIGN EA 58,965 63,278
01020 0000 ALLOWANCES
01020 1000 SPECIAL PROJECT PROCEDURES
01020 1100
01020 1101 CIVIL SHOP DRAWINGS AND QUANTITY
CALCULATION
JOB 460,000 460,000
01020 1102 ARCHITECT SHOP DRAWINGS AND
QUANTITY CALCULATION
JOB 460,000 460,000
01020 1103 STRUCTURAL SHOP DRAWINGS AND
QUANTITY CALCULATION
JOB 460,000 460,000
01020 1104 MECHANICAL SHOP DRAWINGS AND
QUANTITY CALCULATION
JOB 460,000 460,000
01020 1105 ELECTRICAL SHOP DRAWINGS AND
QUANTITY CALCULATION
JOB 460,000 460,000
01020 1200
01020 1201 CIVIL SHOP DRAWINGS AND QUANTITY
CALCULATION
JOB 172,500 172,500
01020 1202 ARCHITECT SHOP DRAWINGS AND
QUANTITY CALCULATION
JOB 172,500 172,500
01020 1203 STRUCTURAL SHOP DRAWINGS AND
QUANTITY CALCULATION
JOB 172,500 172,500
01020 1204 MECHANICAL SHOP DRAWINGS AND
QUANTITY CALCULATION
JOB 172,500 172,500
01020 1205 ELECTRICAL SHOP DRAWINGS AND
QUANTITY CALCULATION
JOB 172,500 172,500
01020 1300
01020 1301 MISCELLANEOUS SHOP DRAWINGS AND
QUANTITY CALCULATION
JOB 86,250 86,250
01020 1400
01020 1401 GENERAL OFFICE WOKER HR 2,890 3,612
01020 1402 CONSTRUCTION SPECIAL WORKER HR 3,934 4,917
01020 1403 CONSTRUCTION GENERAL WORKER HR 2,890 3,612
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
SURVEY AND TEST - QUANTITY SURVEY REPORT AND SHOP DRAWINGS (1 JOB =
APPROXIMATELY TEN A1 SIZE SHEETS OR EQUIVALENT EFFORT)
SURVEY AND TEST - QUANTITY SURVEY REPORT AND SHOP DRAWINGS (1 JOB =
APPROXIMATELY FIVE A1 SIZE SHEETS OR EQUIVALENT EFFORT)
SURVEY AND TEST - QUANTITY SURVEY REPORT AND SHOP DRAWINGS (1 JOB =
APPROXIMATELY THREE A1 SIZE SHEETS OR EQUIVALENT EFFORT)
ADDITIONAL COORDINATION EFFORT/SUPPLEMENTAL LABOR REQUIRED FOR SPECIAL
PROJECT IN THE AIRFIELD OR OTHER HIGH SECURITY AREAS
DIVISION 01 GENERAL REQUIREMENT Page 7
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
02200 0000 SITE PREPARATION
02210 0000 SUBSURFACE BORING AND SAMPLING
02210 1000 02210 1100
02210 1101 2-1/2 IN (64MM) DIA. LF 10,396 12,215
02210 1102 4 IN (100MM) DIA. LF 15,353 18,042
02210 1200
02210 1201 2-1/2 IN (64MM) DIA. LF 31,937 37,529
02210 1202 4 IN (100MM) DIA. LF 36,896 43,356
02210 2000 02210 2100
02210 2101 NO SAMPLING LF 19,814 23,285
02210 2102 WITH CASING AND SAMPLING LF 41,357 48,600
02210 2200
02210 2201 NO SAMPLING LF 33,145 38,949
02210 2202 WITH CASING AND SAMPLING LF 54,689 64,265
02210 3000 02210 3100
02210 3101 LIGHT SOIL CY 5,770 7,186
02210 3102 HEAVY SOIL CY 10,384 12,932
02220 0000 SITE DEMOLITION
02220 1000 BUILDING DEMOLITION
02220 1100
02220 1101 CHUTE-PREFAB-STEEL M 9,868 11,207
02220 1200 WOODEN BUILDING
02220 1201 RESIDENTIAL BUILDING, BY HAND M2 5,270 6,203
02220 1202 RESIDENTIAL BUILDING, BY HAND AND
MACHINE
M2 3,727 4,387
02220 1203 COMMERCIAL BUILDING, BY HAND AND
MACHINE
M2 3,214 3,783
02220 1300
02220 1301 BY HEAVY EQUIPMENTS M3 6,394 7,296
02220 1302 BY HAND TOOLS M3 19,280 22,695
02220 1303 BY HEAVY EQUIPMENTS AND HAND TOOLS M3 12,854 15,131
02220 1400
02220 1401 BY HEAVY TOOLS M3 8,314 9,484
02220 1500
02220 1501 HEAVY STRUCTURE M2 7,841 9,230
02220 1502 INTERMEDIATE STRUCTURE M2 6,041 7,110
02220 1503 LIGHT STRUCTURE M2 3,600 4,238
02220 1600
02220 1601 BY HEAVY EQUIPMENTS M3 4,476 5,108
02220 1602 BY HAND TOOLS M3 15,424 18,156
02220 1603 BY HEAVY EQUIPMENTS AND HAND TOOLS M3 6,941 8,170
02220 2000 02220 2100
02220 2101 WOODEN BUILDING, BY HAND M3 24,423 28,748
CHUTE INSTALLATION;
NOTE --- PRICES INCLUDE ALL MATERIALS AND ERECTION COST FOR A COMPLETE
BORINGS
AUGER HOLES IN EARTH, NO SAMPLE
CASED BORINGS IN EARTH, WITH SAMPLES
DRILLING IN ROCK, NX CORE
TEST PITS
TEST PITS - HAND-DUG
DRILLING, CORE
DRILLING IN ROCK, BX CORE
RC BUILDING
SRC BUILDING
S BUILDING
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
CONCRETE FLOOR SLAB
FOOTINGS AND FOUNDATIONS DEMOLITION
FOUNDATION OF BUILDING
DIVISION 02 SITE WORK Page 8
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
02220 2102 WOODEN BUILDING, BY HAND AND MACHINE M3 15,424 18,156
02220 2103 WOODEN BUILDING, BY MACHINE M3 9,915 11,392
02220 2104 S/RC/SRC, BY HAND M3 26,992 31,773
02220 2105 S/RC/SRC, BY HAND AND MACHINE M3 16,710 19,670
02220 2106 S/RC/SRC, BY MACHINE M3 10,449 11,925
02220 2200 02220 2210
02220 2211 CONCRETE PLAIN, BY MACHINE M3 8,399 9,716
02220 2212 CONCRETE PLAIN, BY HAND M3 36,313 44,339
02220 2213 CONCRETE REINF, BY MACHINE M3 14,895 17,281
02220 2214 CONCRETE REINF, BY HAND M3 54,748 67,237
02220 2220
02220 2221 CONCRETE PLAIN, BY MACHINE M3 6,231 7,317
02220 2222 CONCRETE PLAIN, BY HAND M3 29,196 36,120
02220 2223 CONCRETE REINF, BY MACHINE M3 11,787 13,880
02220 2224 CONCRETE REINF, BY HAND M3 47,633 59,021
02220 4000
02220 4100
02220 4101 50 MM THICK M2 1,164 1,371
02220 4102 100 MM THICK M2 1,286 1,515
02220 4103 200 MM THICK M2 1,876 2,209
02220 4104 300 MM THICK M2 2,415 2,842
02220 4200
02220 4201 50 MM (2 IN) THICK M2 1,401 1,651
02220 4202 100 MM (4 IN) THICK M2 1,736 2,044
02220 4203 200 MM (8 IN) THICK M2 2,328 2,740
02220 4204 300 MM (12 IN) THICK M2 2,935 3,455
02220 4300
02220 4301 CONCRETE CURBING M 998 1,157
02220 4302 CONCRETE GUTTER M 1,267 1,468
02220 4303 CONCRETE GUTTER W/CURBING M 1,551 1,798
02220 4400
02220 4401 15 MM (5/8 IN) THICK M2 6,958 8,209
02220 4402 30 MM (1-1/4 IN) THICK M2 9,275 10,941
02220 4500
02220 4501 MASONRY OR CONCRETE, ABANDON EA 20,620 23,888
02220 4502 MASONRY 5 FT (1.5M) DEEP -4 FT (1.2M) DIA.
REMOVE
EA 36,086 41,803
02220 4503 CONCRETE 5 FT (1.5M) DEEP -4 FT (1.2M) DIA.
REMOVE
EA 36,086 41,803
02220 4600
02220 4601 REMOVE RAILROAD TRACK AND TIES M 3,005 3,495
02220 4602 REMOVE AND RE-INSTALL TIE AND TRACK
WITH NEW BOLTS AND SPIKES
M 13,185 15,540
02220 4603 REMOVE BALLAST M3 526 621
02220 4604 TURNOUTS WITH NEW BOLTS AND SPIKES EA 200,949 236,849
02220 4700
02220 4701 REMOVE FENCE AND LOADING ON TRUCK M 1,736 2,087
CONCRETE CHIPPING
REMOVE ASPHALT PAVEMENT
MORE THAN 10M3 (VOLUME)
SITE DEMOLITION
OTHER CONCRETE STRUCTURAL DEMOLITION
UP TO 10M3 (VOLUME)
NOTE --- PRICE INCLUDE MACHINE BREAK-UP AND LOADING
CONCRETE PAVEMENT
CURBING REMOVED AND LOADED
CATCH BASINS OR MANHOLE
RAILROAD TRACKAGE
FENCE REMOVALS - CHAIN LINK
DIVISION 02 SITE WORK Page 9
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
02220 4702 REMOVE AND RESET M 2,632 3,166
02221 0000 SELECTIVE DEMOLITION (1)
02221 1000 02221 1100
02221 1101 PLYWOOD, GYPSUM BOARD M2 1,680 2,020
02221 2000 02221 2100
02221 2101 ELEVATED SLABS WITH LIGHT REINFORCING
UNDER 6 CF (.17M3)
M3 61,946 75,263
02221 2102 ELEVATED SLABS WITH LIGHT REINFORCING
OVER 6 CF (.17M3)
M3 51,617 62,737
02221 2103 ELEVATED SLABS WITH BAR REINFORCING
UNDER 6 CF (.17M3)
M3 92,906 112,893
02221 2104 ELEVATED SLABS WITH BAR REINFORCING
OVER 6 CF (.17M3)
M3 77,415 94,081
02221 2105 WALLS-BAR REINF. UNDER 6 CF (.17M3) M3 77,415 94,081
02221 2106 WALLS-BAR REINF. OVER 6 CF (.17M3) M3 71,503 86,882
02221 2200
02221 2201 4 IN (100MM) THICK M2 5,382 6,542
02221 2202 8 IN (200MM) THICK M2 6,565 7,978
02221 2203 12 IN (305MM) THICK M2 7,365 8,949
02221 2300
02221 2301 4 IN (100MM) THICK M2 4,898 5,952
02221 2302 8 IN (200MM) THICK M2 5,971 7,263
02221 2303 12 IN (305MM)THICK M2 6,691 8,128
02221 2400
02221 2401 4 IN (100MM) THICK M2 5,137 6,240
02221 2402 8 IN (200MM) THICK M2 6,266 7,615
02221 2403 12 IN (305MM) THICK M2 7,035 8,545
02221 2500
02221 2501 WALL M2 2,384 2,965
02221 2502 CEILING M2 2,514 3,125
02221 4000 02221 4100
02221 4101 100MM THICK, UP TO 50M2 M2 4,854 5,835
02221 4102 100MM THICK, UP TO 100M2 M2 3,884 4,670
02221 4103 100MM THICK, ABOVE 100M2 M2 1,942 2,337
02221 4104 150MM THICK, UP TO 50M2 M2 5,511 6,626
02221 4105 150MM THICK, UP TO 100M2 M2 4,407 5,298
02221 4106 150MM THICK, ABOVE 100M2 M2 2,206 2,652
02221 4200
02221 4201 CHIPPING CONCRETE FLOOR 30MM THICK M2 5,511 6,626
02221 4202 SANDING CONCRETE FLOOR (MEARASHI) M2 1,831 2,201
02221 4203 TRENCH CUT, 60 X 60MM M 2,820 3,391
02221 4204 TRENCH CUT, 90 X 90MM M 3,608 4,338
02221 4205 TRENCH CUT, 100 X 100MM M 4,198 5,048
CEILING DEMOLITION
BRICK OR BLOCK WALLS
NOTE --- OVER 4 SF FOR DOORS AND WINDOWS, NOT INCLUDING TOOTHING.
CHIPPING
CEILING
CUTOUT DEMOLITION
NOTE --- NOT INCLUDING TOOTHING TO 4 SF (.37M2) OPENING
NOTE --- NOT INCLUDING TOOTHING TO 4 SF (.37M2) OPENING
STUCCO, GYPSUM BOARD OR WOOD
FLOOR DEMOLITION
REINFORCED CONCRETE FLOOR
CONCRETE
BRICK WALLS
CONCRETE BLOCK WALLS
DIVISION 02 SITE WORK Page 10
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
02221 4300
02221 4301 CERAMIC OR QUARRY TILE M2 3,872 4,814
02221 4302 VINYL M2 2,206 2,741
02221 4303 WOOD M2 2,442 3,037
02221 7000 02221 7100
02221 7101 METAL M2 1,898 2,222
02221 7102 WATERRPROOF MATERIAL M2 2,337 2,748
02221 8000
NOTE --- PRICE INCLUDES KNOCK DOWN
02221 8100
02221 8101 100MM THICK M2 2,811 3,381
02221 8102 150MM THICK M2 3,791 4,558
02221 8200
02221 8201 150MM THICK M2 5,084 6,112
02221 8300
02221 8301 4 IN (100MM) THICK TO 12 IN (310MM) THICK M3 21,127 25,681
02221 8400
02221 8401 METAL OR WOOD WITH DRYWALL BOTH
SIDES
M2 2,707 3,370
02221 8500
02221 8501 GYPSUM WALL BOARD M2 1,763 2,120
02221 8502 TILE (INCLUDES MORTAR) M2 3,583 4,309
02221 8600
02221 8601 MORTAR 30MM THICK M2 3,247 3,904
02221 8602 TILE 30MM THICK M2 3,640 4,376
02221 8603 CONCRETE 30MM THICK M2 5,807 6,982
02222 0000 02222 1000
02222 1001 WALL M2 4,623 5,444
02222 2000 02222
02222 2001 SURPLUS SOIL M3 1,106 1,106
02222 2002 CONCRETE DEBRIS M3 3,375 3,375
02222 2003 TREE, STUMPS, AND WEED TON 17,850 17,850
02222 2004 BUILDING MATERIAL M3 11,248 11,248
02222 2005 METALLIC SCRAP TON 28,119 28,119
02222 2006 GYPSUM BOARD TON 60,737 60,737
02222 2007 FIBROUS - GLASS/ROCK WOOL TON 155,400 155,400
02222 2008 PLASTICS - EXPANDED POLYSTYRENE,
URETHANE FOAM
TON 275,566 275,566
02222 2009 POLYETHYLENE PIPE KG 78 78
02222 2010 GLASS, PORCELAIN, TILE TON 48,300 48,300
02222 3000 02222 3100
02222 3101 MACHINE LOADING TO TRUCK M3 421 496
02222 3102 HAND LOADING TO TRUCK M3 2,219 2,668
02222 5000 02222 5100
CONCRETE BLOCK PARTITIONS
CONCRETE PARTITIONS CAST IN PLACE
FLOORING REMOVAL
ROOFING AND SIDING DEMOLITION
ROOFING
WALLS AND PARTITIONS DEMOLITION
NOTE --- IF IT IS NEEDED TO ADD TRANSPORT TO DISPOSAL PLACE, SEE 02305-1000
RUBBISH HANDLING (MATL VOL)
SAW CUTTING, PER 50MM
RUBBISH HANDLING
SAW CUTTING
BRICK MASONRY PARTITIONS
STUD PORTIONS
WALL SURFACE REMOVAL
WALL CHIPPING
SELECTIVE DEMOLITION (2)
MASONRY DEMOLITION (MATL VOL)
DISPOSAL ONLYSEE 02320-1000
DIVISION 02 SITE WORK Page 11
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
02222 5101 BITUMINOUS PAVING M 216 241
02222 5102 CONCRETE PAVING M 902 976
02222 5103 CONCRETE SLABS PLAIN M 775 836
02222 5104 CONCRETE SLABS -MESH REINF M 1,138 1,233
02222 5105 CONCRETE SLABS -ROD REINF M 1,349 1,464
02222 5106 CONCRETE WALLS -LIGHT REINF M 2,992 3,305
02222 5107 CONCRETE WALLS -ROD REINF M 5,213 5,757
02222 5108 BLOCK MASONRY M 1,247 1,353
02222 5109 BRICK MASONRY M 1,434 1,556
02222 6000 02222 6100
02222 6101 STEEL PLATE -TORCH CUT M 1,999 2,380
02223 0000 02223 1000 02223 1100
02223 1101 GUARD FENCE, 1800MM HEIGHT M 430 448
02223 1102 MINI FENCE, 1200MM HEIGHT M 356 380
02223 1103 A TYPE BARRICADE M 280 296
02223 1104 LIGHT EA 274 291
02223 1105 TRAFFIC LIGHT INCLUDES GENERATOR SET 12,418 13,279
02223 1200
02223 1201 FLAG MAN, PER DAY DAY 11,198 13,520
02223 2000
02223 2100
02223 2101 UNDER ONE MONTH USING M2 3,281 3,623
02223 2102 OVER ONE MONTH USING, ADD COST PER
ONE MONTH
M2 326 327
02223 2200
02223 2201 UNDER ONE MONTH USING M2 5,222 5,738
02223 2202 OVER ONE MONTH USING, ADD COST PER
ONE MONTH
M2 1,935 2,127
02223 3000
02223 3001 CURRING SHEET (BLUE SHEET) M2 362 429
02223 3002 PLYWOOD CURRING ONE SIDE M2 2,975 3,526
02223 3003 PLYWOOD CURRING BOTH SIDES M2 4,269 5,058
02224 0000 02224 1000
02224 1001 WOOD OR STEEL FRAME BUILDING, BASED
ON GROUND FLOOR AREA
M2 75,023 88,903
02224 1002 ADD TO MOVING, PER 100 LF M2 3,936 4,659
02231 0000 02231 1000 02231 1100
02231 1101 LIGHT TREES TO 6 IN (150MM) DIA. CUT A 30,834 37,074
02231 1102 GRUB STUMPS AND REMOVE A 15,744 18,929
STRUCTURE MOVING
CUT TREES - GRUB ROOTS AND STUMP
NOTE --- ONE DAY MOVE, UP TO 24 FT WIDE. RESET ON NEW FOUNDATIONS, PATCH AND HOOK
CLEARING AND GRUBBING
CLEAR AND GRUB
FLAG MAN
COVERING PLATE FOR ACCESS
SAFETY MATERIALS, PER ONE WEEK
NOTE --- THE COST INCLUDES LOAD/UNLOAD
METAL PLATE
TORCH CUTTING
TORCH CUTTING
MISCELLANEOUS SITE MATERIALS
SAFETY MATERIALS
ROAD DECKING PANEL
MOVING BUILDING
CURRING MATERIALS
DIVISION 02 SITE WORK Page 12
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
02231 1103 MEDIUM TREES TO 10 IN (25CM)DIA. CUT A 37,390 44,957
02231 1104 GRUB STUMPS AND REMOVE A 21,354 25,675
02231 1105 HEAVY TREES TO 16 IN (41CM) DIA. CUT A 77,412 93,080
02231 1106 GRUB STUMPS AND REMOVE A 33,065 39,756
02300 0000 EARTHWORK
02301 1000 02301 1100
02301 1101 ROADWAY CLEARING OR GENERAL AREA
GRADING WITH GRADER (ROUGH)
A 19,726 22,972
02301 1102 SUBGRADE -FINE GRADING +/- .1FT A 22,269 25,933
02301 1103 CUT + EMBANKMENT SLOPES INCLUDES
DITCHES TO 3 FT (lM) DEEP AND SLOPES TO 1V/2H
M3 991 1,155
02301 1104 ROUGH GRADING LARGE AREA WITH DOZER M3 702 746
02301 1105 ROUGH GRADING SMALL AREA WITH DOZER M3 1,130 1,334
02301 1106 GENERAL AREA CLEARING BY DOZER IN
ROUGH TERRAIN OR HARD SOIL MATERIAL
A 8,235 8,746
02301 1200
02301 1201 SUBGRADE OR SUBBASE COURSES A 8,017 9,336
02301 1202 FINISH GRADE -BASE OR LEVELNG A 15,652 18,228
02301 1300 02301 1310
02301 1311 WITH DOZER 140 HP PUSH TO PILE M3 298 335
02301 1320
02301 1321 WITH GRADER WINDROW EXCESS M2 426 497
02301 1322 HAND CLEAN FOR CONCRETE PLACING OR
PIPE BEDDING
M2 701 870
02301 2000 02301 2100
02301 2101 TRIM AND SHAPE MACHINE EXCAVATED
AREAS BY HAND
M2 675 843
02301 2102 TRIM AND SHAPE FOR SLAB ON GRADE M2 1,172 1,460
02301 2103 FINE GRADE GRAVEL BEDDING BY HAND M2 701 870
02301 2104 FINE GRADE GRAVEL M2 283 353
02301 2200 02301 2210
02301 2211 ROUGH GRADE A 25,580 28,359
02301 2220
02301 2221 SEMI GRADE 2 PASSES A 29,494 34,346
02301 2222 FINE GRADE 3 PASSES A 58,989 68,696
02301 3000 02301 3100 02301 3110
02301 3111 TRENCH DRAIN 2 FT X 3 FT EXC. M3 1,888 2,187
02301 3112 12 IN (36CM) CORRUGATED METAL PIPE.
INSTALL AND REMOVE W/EXCAV (ASSUME 3
USES)
M 11,035 12,080
ROUGH GRADE FOR STRUCTURES AND SLABS
HAND DIGGING AND GRADING
WITH DOZER
DEWATERING
TEMPORARY DRAINAGE SYSTEMS GRAVITY RUN-OFF SYSTEM
FINISH GRADE FOR STRUCTURES AND SLABS
FINISH GRADING FOR STRUCTURES AND SLABS
MACHINE OPERATIONS
WITH GRADER
SAND DRAINS
GRADING
STRUCTURE GRADING
SITE GRADING
ROADWAY GRADING
DIVISION 02 SITE WORK Page 13
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
02301 3113 18 IN CORRUGATED METAL PIPE. INSTALL
AND REMOVE W/EXCAV. (ASSUME 3 USES)
M 13,910 15,109
02301 4000 WELLS
02301 4100
02301 4101 UNLINED HOLE M3 7,507 8,519 10%
02301 4102 12 IN (36CM) DIA. W/CORRUGATED METAL
LINER
M 17,182 18,899 10%
02301 4103 15 IN (38CM) DIA. W/CORRUGATED METAL
LINER
M 21,361 23,544 10%
02301 4104 24 IN (61CM) DIA. W/CORRUGATED METAL
LINER
M 34,033 37,034 10%
02301 4105 WOOD LINED HOLE UP TO 4 FT X 4 FT
(CONTACT AREA)
M2 8,670 9,979 10%
02301 4200
02301 4201 50MM (2") 300L/M (79 GPM) EA 91,007 96,241 10%
02301 4202 65MM (2-1/2") 360 L/M (95 GPM) EA 242,916 250,769 10%
02301 4203 80 MM (3") 500 L/M (132 GPM) EA 304,720 324,078 10%
02301 4204 100 MM (4" ) 600 L/M (159 GPM) EA 391,282 420,321 10%
02301 4300 02301 4310
02301 4311 50 MM DIA EA 2,737 3,089
02301 4312 75 (80) MM DIA EA 3,603 3,955
02301 4313 100 MM DIA EA 4,312 4,664
02301 4314 150 MM DIA EA 5,807 6,159
02301 4315 200 MM DIA EA 7,225 7,578
02301 4320
02301 4321 50 MM DIA EA 3,288 3,640
02301 4322 75 (80) MM DIA EA 4,076 4,428
02301 4323 100 MM DIA EA 4,863 5,215
02301 4324 150 MM DIA EA 6,831 7,184
02301 4325 200 MM DIA EA 8,406 8,758
02301 4330
02301 4331 50 MM DIA EA 4,076 4,428
02301 4332 75 (80) MM DIA EA 4,863 5,215
02301 4333 100 MM DIA EA 7,225 7,578
02301 4334 150 MM DIA EA 12,343 12,696
02301 4400
02301 4401 40 MM DIA M 481 583
02301 4402 50 MM DIA M 500 600
02301 4403 65 MM DIA M 562 671
02301 4404 75 MM DIA M 610 714
02301 4405 100 MM DIA M 685 796
02301 4406 125 MM DIA M 782 907
02301 4407 150 MM DIA M 967 1,101
02301 4408 200 MM DIA M 1,274 1,433
02301 4409 250 MM DIA M 1,715 1,898
02301 4410 300 MM DIA M 2,220 2,426
02302 0000
TEMPORARY PUMPS, PER ONE WEEK - SUBMERSIBLE, STARTER, LEVEL CONTROL
PUMPS - SUBMERSIBLE, STARTER, LEVEL CONTROL - 20 FT (6.1M) HEAD
RELIEF WELLS, SUMP HOLE CONSTRUCTION INCLUDES EXCAVATION AND GRAVEL
10 M HEAD
15 M HEAD
30 M HEAD
TEMPORARY PIPE, PVC
EXCAVATION, BACKFILLING, AND COMPACTING FOR UTILITIES
DIVISION 02 SITE WORK Page 14
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
02302 1000
02302 1100 02302 1110
02302 1111 SAND OR SANDY SOIL M3 446 513
02302 1112 GRAVELLY SOIL OR CLAY M3 446 513
02302 1113 BLASTED ROCK OR COBBLE STONE M3 593 681
02302 1120
02302 1121 SAND OR SANDY SOIL M3 315 361
02302 1122 GRAVELLY SOIL OR CLAY M3 315 361
02302 1123 BLASTED ROCK OR COBBLE STONE M3 420 482
02302 1200 02302 1210
02302 1211 SAND OR SANDY SOIL M3 237 271
02302 1212 CLAY M3 237 271
02302 1213 GRAVELLY SOIL, BLASTED ROCK OR COBBLE
STONE
M3 314 360
02302 1220
02302 1221 SAND OR SANDY SOIL M3 857 983
02302 1222 CLAY M3 1,057 1,212
02302 1223 GRAVELLY SOIL, BLASTED ROCK OR COBBLE
STONE
M3 1,057 1,212
02302 1230
02302 1231 SAND OR SANDY SOIL M3 916 1,051
02302 1232 CLAY M3 1,140 1,308
02302 1233 GRAVELLY SOIL, BLASTED ROCK OR COBBLE
STONE
M3 1,140 1,308
02302 1240
02302 1241 SAND OR SANDY SOIL M3 998 1,146
02302 1242 CLAY M3 1,241 1,424
02302 1243 GRAVELLY SOIL, BLASTED ROCK OR COBBLE
STONE
M3 1,241 1,424
02302 2000 02302 2100 02302 2110
02302 2111 SAND OR SANDY SOIL M3 581 640
02302 2112 GRAVELLY SOIL OR CLAY M3 617 683
02302 2113 BLASTED ROCK OR COBBLE STONE M3 650 722
02302 2120
02302 2121 SAND OR SANDY SOIL M3 412 471
02302 2122 GRAVELLY SOIL OR CLAY M3 448 515
02302 2123 BLASTED ROCK OR COBBLE STONE M3 481 553
02302 2130
02302 2131 SAND OR SANDY SOIL M3 356 416
02302 2132 GRAVELLY SOIL OR CLAY M3 392 458
02302 2132 BLASTED ROCK OR COBBLE STONE M3 425 496
02302 4000 02302 4100
90 DEGREE TURNING
BACKHOE
0.60M3 CAPACITY
CLAMSHELL
45 DEGREE TURNING
135 DEGREE TURNING
0.35M3 CAPACITY
EXCAVATING
NOTE--- BULK BANK MEASURE, INCLUDE DIGGING PILING OR LOADING ON TRUCKS
135 DEGREE TURNING
EXCAVATING, BULK, DOZER
EXCAVATION WITH PUSHING SOIL BY DOZER
UP TO 200M3 VOLUME
500M3 VOLUME
MORE THAN 1,000M3 VOLUME
EXCAVATING, STRUCTURAL
NOTE --- ONLY AROUND OBSTRUCTIONS AND UTILITIES
EXCAVATION BY HAND
DIVISION 02 SITE WORK Page 15
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
02302 4101 UNCLASSIFIED, INCLUDING SLOPE HAND
TRIMMING
M3 3,412 4,104
02302 4102 TEST PIT, UNCLASSIFIEED, INCLUDING HAND
WORK FOR UTILITIES
M3 7,165 8,615
02302 4200
02302 4201 LESS THAN 1.0M DEPTH M3 975 1,147
02302 4202 MORE THAN 1.0M AND LESS THAN 3.0M
DEPTH
M3 1,080 1,271
02302 4203 MORE THAN 3.0M AND LESS THAN 6.0M M3 1,326 1,562
02302 4204 MORE THAN 6.0M M3 1,542 1,816
02302 4300
02302 4301 BY HAND M2 663 796
02302 4302 BY MACHINE M2 410 482
02302 5000 02302 5100
02302 5101 UP TO D= 0.5M M3 8,528 10,238
02302 5102 UP TO D= 1.0M M3 9,375 11,255
02302 5103 UP TO D= 2.0M M3 11,718 14,069
02302 5200
02302 5201 UP TO 10M3 M3 3,059 3,673
02302 5202 UP TO 50M3 M3 2,294 2,754
02302 5203 UP TO 100M3 M3 1,912 2,296
02302 5204 ABOVE 100M3 M3 1,528 1,834
02302 5300
02302 5301 BY HAND M2 3,844 4,615
02302 5302 BY MACHINE M2 847 1,017
02302 5400
02302 5401 BY HAND M2 795 954
02302 5402 BY MACHINE M2 572 687
02302 5500
02302 5510
02302 5511 BY HAND M3 4,434 5,324
02302 5512 BY MACHINE M3 1,130 1,356
02302 5520
02302 5521 NORMAL SOIL, BY HAND M3 5,726 6,726
02302 5522 NORMAL SOIL, BY MACHINE M3 3,940 4,629
02302 5523 NON FROST SOIL, BY HAND M3 7,162 8,413
02302 5524 NON FROST SOIL, BY MACHINE M3 5,286 6,209
02302 5600
02302 5610
02302 5611 BY HAND M3 4,705 5,649
02302 5612 BY MACHINE M3 1,637 1,967
02302 5620
02302 5621 NORMAL SOIL, BY HAND M3 6,616 7,772
02302 5622 NORMAL SOIL, BY MACHINE M3 4,034 4,739
EXCAVATED SOIL
DELIVERED SOIL
NOTE --- INCLUDES MACHINE DELIVERY COST
ARCHITECTURAL EARTHWORK
NOTE --- ONLY AROUND OBSTRUCTIONS AND UTILITIES
EXCAVATION BY MACHINE
NOTE --- INCLUDES COMPACTION
TRIM BOTTOM OF EXCAVATION
EXCAVATION BY HAND
GRADING
TRIM BOTTOM OF EXCAVATION
BACKFILLING
EXCAVATION BY MACHINE
NOTE --- INCLUDES LOADING ON TRUCK
FILLING
NOTE --- INCLUDES COMPACTION
EXCAVATED SOIL
DELIVERED SOIL
DIVISION 02 SITE WORK Page 16
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
02302 5623 NON FROST SOIL, BY HAND M3 7,914 9,298
02302 5624 NON FROST SOIL, BY MACHINE M3 5,145 6,043
02302 5700 02302 5700
02302 5701 BY HAND M3 9,305 10,931
02302 5702 BY MACHINE M3 7,350 8,634
02302 5800
02302 5801 POLYSTYRENE FILM, 0.1MM M2 262 308
02302 5802 POLYSTYRENE FILM, 0.15MM M2 356 419
02302 5803 POLYSTYRENE FORM, 20MM M2 1,357 1,598
02302 5804 POLYSTYRENE FORM, 25MM M2 1,589 1,871
02302 5805 POLYSTYRENE FORM, 50MM M2 2,391 2,816
02302 6000 02302 6100
02302 6110
02302 6111 D-9 CAT W/DOUBLE SHANK RIPPER M3 312 329
02302 6112 D-8 CAT W/SINGLE SHANK RIPPER M3 327 345
02302 6120
02302 6121 D-9 CAT W/DOUBLE SHANK RIPPER M3 312 329
02302 6122 D-8 CAT W/SINGLE SHANK RIPPER M3 327 345
02302 6130
02302 6131 D-9 CAT W/DOUBLE SHANK RIPPER M3 381 400
02302 6132 D-8 CAT W/SINGLE SHANK RIPPER M3 430 457
02302 6140
02302 6141 D-9 CAT W/DOUBLE SHANK RIPPER M3 430 457
02302 6142 D-8 CAT W/SINGLE SHANK RIPPER M3 641 675
02302 6150 02302
02302 6151 D-9 CAT W/DOUBLE SHANK RIPPER M3 512 539
02302 6152 D-8 CAT W/SINGLE SHANK RIPPER M3 1,068 1,127
02302 6200
02302 6201 VERY DENSE ROCK M3 4,411 5,299
02302 6202 MEDIUM DENSITY ROCK M3 3,527 4,238
02302 6203 SOFT ROCK M3 2,822 3,390
02302 7000 02302 7100 02302 7100
02302 7101 UNCLASSIFIED, INCLUDING SLOPE HAND
TRIMMING
M3 3,412 4,104
02302 7102 TEST PIT, UNCLASSIFIEED, INCLUDING HAND
WORK FOR UTILITIES
M3 7,820 9,404
02302 7200
02302 7201 LESS THAN 1.0M DEPTH M3 1,055 1,241
02302 7202 MORE THAN 1.0M AND LESS THAN 3.0M
DEPTH
M3 1,105 1,301
02302 7203 MORE THAN 3.0M AND LESS THAN 6.0M M3 1,248 1,470
02302 7204 MORE THAN 6.0M M3 1,683 1,980
NOTE - ADD FOR LOADING
NOTE --- ONLY AROUND OBSTRUCTIONS AND UTILITIES
NOTE --- INCLUDES LOADING ON TRUCK
EXCAVATING, TRENCH
EXCAVATION BY HAND
EXCAVATION BY MACHINE
ROCK BREAKING BY RIPPER
CLAYS
GLACIAL TILLS
METAMORPHIC ROCK (SLATE)
IGNEOUS ROCK (GRANITE, BASALT) HIGHLY WEATHERED-WEATHERED ROCK. NON-
WEATHERED ROCK IS BLASTED
COSTS TO USE AIR OPERATED HAMMERS TO BREAK UP ROCK
CRUSHED STONE
RIPPING
NOTE --- COSTS ARE PER TYPE OF MATERIAL W/O LOAD OR HAUL
SEDIMENTARY ROCKS (SHALE, SANDSTONE, LIMESTONE)
NOTE --- INCLUDES COMPACTION
INSULATION AND MOISTURE PROOFING
DIVISION 02 SITE WORK Page 17
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
02302 7300
02302 7301 BY HAND M2 719 846
02302 7302 BY MACHINE M2 444 522
02303 0000 02303 1000 02303 1100
02303 1101 BY HAND M3 3,240 3,896
02303 1102 DUMPED AND PLACED BY MACHINE M3 919 1,084
02303 1103 FILLED BY DOZER M3 357 398
02303 1104 FILLED BY LOADER M3 1,025 1,197
02303 2000 02303 2100
02303 2101 STABILIZED AGGREGATE MATERIAL M3 7,224 7,804
02303 2102 CRUSHER RUN M3 5,912 6,387
02303 2200
02303 2201 150-100 MM M3 9,277 10,021
02303 2202 200-150 MM M3 9,741 10,523
02303 2300
02303 2301 NON FROST MATERIAL M3 3,731 4,030
02303 2302 SATISFACTORY FILL MATERIAL M3 2,754 2,974
02303 3000 02303 3100
02303 3101 LARGE AREAS 150MM LIFT M3 258 277
02303 3012 LARGE AREAS 200MM LIFT M3 308 332
02303 3200
02303 3201 LARGE AREAS 150MM LIFT M3 155 182
02303 3202 LARGE AREAS 200MM LIFT M3 143 169
02303 3203 LARGE AREAS 250MM LIFT M3 133 158
02303 3300 02303 3310
02303 3311 UP TO 1 ON 4 SLOPE M2 232 273
02303 3312 ABOVE 1 ON 4 SLOPE M2 401 474
02303 3320
02303 3321 UP TO 1 ON 4 SLOPE M2 325 391
02303 3322 ABOVE 1 ON 4 SLOPE M2 427 513
02303 4000 02303 4100 02303 4100
02303 4101 BY HAND WITH AIR TAMPER M3 1,259 1,482
02303 4102 BY HAND WITH VIB PLATE HAND TAMPER M3 678 799
02303 4103 BY HAND WITH 1 TON ROLLER M3 340 400
02303 5000 02303 5100 02303 5110
02303 5111 DENSITY OF SOIL BY NUCLEAR METHOD
ASTM D2922-71 (3 MINIMUM)
EA 51,628 54,566
NOTE --- COMPACTION IN 150MM LAYERS
SOIL COMPACTION CONTROL
IN PLACE TESTS
FILLING
TRIM BOTTOM OF EXCAVATION
BEDDING, COMPACTED MATERIAL VOLUME
CRUSHED ROCK
BACKFILL, STRUCTURAL
BACKFILLING FOUNDATION, COMPACTED MATERIAL VOLUME
NOTE --- COST INCLUDES PLACING AND SPREADING MATERIAL
COMPACTION
NOTE --- COST INCLUDES PLACING AND SPREADING MATERIAL
COBBLESTONE
NOTE --- COST INCUDES DELIVERED AND SCREEN
SOIL
COMPATION BY DOZER
COMPACTION BY TIRE ROLLER
FOR SHAPING SLOPES OF EMBANKMENT ONLY
BY MACHINE
COMPACTION OF BACKFILL AROUND STRUCTURES OR IN TRENCH
FIELD DENSITY TESTS
BY HAND
COMPACTION, STRUCTURAL
DIVISION 02 SITE WORK Page 18
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
02303 5120
02303 5121 BY SAND CONE -ASTM D1556064 BY RUBBER
BALLOON METHOD -ASTM D2167-66
EA 42,000 43,834
02303 5130
02303 5131 MOISTURE DENSITY RELATION OF SOILS -
STD PROCTOR
EA 3,327 3,976
02303 6000 02303 6100
02303 6101 BY HAND M3 3,661 4,403
02303 6102 BY MACHINE M3 912 1,073
02304 0000 02304 1000 02304 1100
02304 1200
02304 1210
02304 1211 UNDER ONE MONTH USING TON 76,862 86,154
02304 1212 OVER ONE MONTH USING, ADD COST PER
ONE MONTH
TON 2,235 2,271
02304 1220
02304 1221 UNDER ONE MONTH USING TON 111,116 125,294
02304 1222 OVER ONE MONTH USING, ADD COST PER
ONE MONTH
TON 2,268 2,305
02304 1300 H-STEEL PILE
02304 1301 LEFT IN PLACE MATERIAL, COST INCLUDES
MATERIAL/EQUIPMENT TRANSPORT
TON 135,004 142,925
02304 1302 CUT PILE EA 4,527 5,003
02304 1310
02304 1311 UNDER ONE MONTH USING TON 124,355 136,875
02304 1312 OVER ONE MONTH USING, ADD COST PER
ONE MONTH
TON 2,257 2,297
02304 1400
02304 1401 UNDER ONE MONTH USING TON 185,775 205,685
02304 1402 OVER ONE MONTH USING, ADD COST PER
ONE MONTH
TON 7,363 7,544
02304 2000 02304 2100
02304 2101 TO 2.0M DEEP EXCAVATION M2 3,068 3,626
02304 2102 2.0M TO 3.0M DEEP EXCAVATION M2 3,380 4,017
02304 2103 3.0M TO 4.0M DEEP EXCAVATION M2 3,684 4,354
02304 2104 4.0M TO 5.0M DEEP EXCAVATION M2 4,033 4,765
STEEL SHEET PILE LEFT IN PLACE MATERIAL,
STANDARD METHODS
LAB TEST
BACKFILL AND COMPACTION, TRENCH
BACKFILL WITH COMPACTION IN 150MM LAYERS
SHORING & UNDERPINNING
SHEET PILING
NOTE--- COST INCLUDES MATERIAL/EQUIPMENT TRASPORTATION.
STEEL SHEET PILE FOR TEMPORARY SHORING WORK,
NOTE--- COST INCLUDES MATERIAL/EQUIPMENT TRANSPORT, AND BACKFILLING AFTER
REMOVED PILES.
VIBROHAMMER, DIESEL HAMMER
PILE JACKING
H-STEEL PILE
NOTE--- FOR TEMPORARY SHORING, WALING, STRUT AND OTHER MISC. MATERIALS - COST
INCLUDES MATERIAL/EQUIPMENT TRANSPORT
SHORING
WOOD SHEATHING INSTALLATION AND PULL OUT,
NOTE--- FOR TEMPORARY SHORING WORK, COST INCLUDES MATERIAL/EQUIPMENT TRANSPORT,
AND BACKFILLING AFTER REMOVED PILES.
STEEL SUPPORT
NOTE---- COST INCLUDES WALES, CONNECTIONS AND STRUTS, W/TURNBUCKLE
DIVISION 02 SITE WORK Page 19
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
02304 2105 5.0M TO 6.0M DEEP EXCAVATION M2 4,417 5,220
02304 2200
02304 2201 UNDER ONE MONTH USING M2 8,461 9,810
02304 2202 OVER ONE MONTH USING, ADD COST PER
ONE MONTH
M2 1,972 2,039
02304 2300
02304 2310
02304 2311 UP TO 3.5M DEEP EXCAVATION M2 4,817 5,596
02304 2312 4.0M TO 4.5M DEEP EXCAVATION M2 5,025 5,836
02304 2313 5.0M TO 6.5M DEEP EXCAVATION M2 5,235 6,081
02304 2320
02304 2321 UP TO 4.5M DEEP EXCAVATION M2 5,446 6,326
02304 2322 5.0M DEEP EXCAVATION M2 5,654 6,566
02304 2323 5.5M DEEP EXCAVATION M2 5,863 6,809
02304 2324 6.0M DEEP EXCAVATION M2 6,074 7,054
02305 0000 02305 1000 02305 1100
02305 1101 1 KM HAUL M3 153 180
02305 1102 2 KM HAUL M3 287 335
02305 1103 3 KM HAUL M3 416 488
02305 1104 4 KM HAUL M3 534 626
02305 1105 5 KM HAUL M3 653 765
02305 1106 8 KM HAUL M3 1,024 1,198
02305 1107 10 KM HAUL M3 1,254 1,467
02305 1108 15 KM HAUL M3 1,856 2,173
02305 1109 20 KM HAUL M3 2,366 2,770
02305 1110 30 KM HAUL M3 3,454 4,045
02305 1111 ADD HAULING COST PER 10 KM M3 1,151 1,348
02306 0000 02306 1000 02306 1100
02306 1001 SOIL STABILIZATION: LIME SLURRY 10 PCT
BY VOLUMN
M3 9,387 10,330
02306 1200
02306 1201 MAXIMUM OUTPUT M 3,768 4,306
02306 1202 MINIMUM OUTPUT M 2,261 2,585
02307 0000 SOIL TREATMENT
02307 1000 02307 1100
02307 1101 SOIL POISONING EA 12,355 15,390
NOTE--- THE COST INCLUDES ANY SUPPORTING COMPONENTS, INSTALLATION, PULL OUT, AND
TRANSPORTATION.
METAL PANEL TYPED
NOTE--- THE COST INCLUDES ANY SUPPORTING COMPONENTS, INSTALLATION, PULL OUT, AND
TRANSPORTATION.
UP TO 3.0M WIDTH EXCAVATION, PER ONE MONTH
HAULING
SOIL STABILIZATION: LIME
3.0M TO 4.7M WIDTH EXCAVATION, PER ONE MONTH
HAULING
HAULING - INCLUDES TIME FOR LOADING, TRAVEL, DUMP AND MISC
NOTE --- PRICING DOES NOT INCLUDE COST FOR EXCAVATION AND LOADING
SHEET PILE TYPE
SOIL STABILIZATION
SOIL STABILIZATION
SOIL TREATMENT
SOIL STABILIZATION: VIBROFLOATION
TERMITE PRETREATMENT
DIVISION 02 SITE WORK Page 20
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
02308 0000 02308 1000 02308 1100
02308 1101 3/8 TO 1/4 CY PIECES M3 39,794 46,545
02308 1200
02308 1201 GALVANIZED STEEL MESH BOXES STONE
FILLED, LIGHT WEIGHT
M3 28,892 31,519
02308 1202 GALVANIZED STEEL MESH BOXES STONE
FILLED, MIDDLE WEIGHT
M3 40,623 44,315
02308 1203 GALVANIZED STEEL MESH BOXES STONE
FILLED, HEAVY WEIGHT
M3 55,790 60,861
02308 2000 02308 2100
02308 2101 JUTE MESH M2 334 349
02308 2102 PLASTIC NETTING M2 205 221
02308 2103 POLYPROPYLENE MESH M2 811 826
02308 2200
02308 2201 NON-WOVEN FILTER FABRIC, 10MM THICK M2 1,032 1,127
02308 2202 IMPERVIOUS SHEET M2 2,919 3,183
02308 2300
02308 2301 SOIL CEMENT -INCLUDES MATERIALS AND
PLACEMENT (PORTLAND CEMENT CONTENT
7 PCT)
M3 58,767 66,733
02309 0000 02309 1000 02309 1100
02309 1101 24 IN (61CM) DIA. CASING -.25 IN WALL M 95,029 104,457
02309 1102 36 IN (91CM) DIA. CASING -.375 IN WALL M 158,966 173,103
02309 1103 48 IN (122CM) DIA. CASING -.375 IN WALL M 206,965 225,138
02309 1200
02309 1201 4 IN (100 MM) NOM SIZE ELEC CONDUIT M 41,083 45,327
02309 1202 24 IN (61CM) DIA. CASING -.25 IN WALL M 120,668 133,393
02309 1203 36 IN (91CM) DIA. CASING -.375 IN WALL M 213,906 235,108
02309 1204 48 IN (122CM) DIA. CASING -.375 IN WALL M 264,216 289,661
02450 0000 02450 1000
02450 1100 02450 1110
02450 1111 D=300MM EA 98,444 108,811
02450 1112 D=350MM EA 113,866 124,764
02450 1113 D=400MM EA 134,795 146,472
02450 1114 D=450MM EA 158,384 171,045
02450 1115 D=500MM EA 190,618 204,302
02450 1116 D=600MM EA 244,124 259,200
02450 1120
02450 1121 D=300MM EA 187,876 206,353
PRECAST /PRESTRESSED CONCRETE PILE
NOTE --- INCLUDES ALL MATERIAL COST
PRECAST CONCRETE PILE
L=20M
RAILROAD WORK
EROSION & SEDIMENTATION CONTROL
RIP-RAP
RANDOM - FILTER STONE DUMPED FROM TRUCKS
NOTE--- MACHINE PLACED SLOPE PROTECTION (KEYED)
NETTING - 100 SY (83.6M2) PER ROLL 4 FT (1.2M) WIDE - STAPLED
SHEETING FOR EROSION CONTROL
TUNNELING, BORING & JACKING
HORIZONTAL BORING
ROADWORK
GALVANIZED STEEL MESH BOXES, STONE FILLED
EROSION CONTROL
SOIL CEMENT SURFACING
PRE BORING WITH DROP HAMMER
L=10M
DIVISION 02 SITE WORK Page 21
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
02450 1122 D=350MM EA 218,882 238,465
02450 1123 D=400MM EA 260,742 281,883
02450 1124 D=450MM EA 312,177 336,349
02450 1125 D=500MM EA 375,010 400,820
02450 1126 D=600MM EA 476,448 503,652
02450 1130
02450 1131 D=350MM EA 311,609 336,805
02450 1132 D=400MM EA 378,003 406,434
02450 1133 D=450MM EA 454,993 487,931
02450 1134 D=500MM EA 553,664 590,168
02450 1135 D=600MM EA 703,858 741,959
02450 1200 02450 1210
02450 1211 D=300MM EA 103,659 123,530
02450 1212 D=350MM EA 119,763 141,408
02450 1213 D=400MM EA 142,297 167,648
02450 1214 D=450MM EA 168,745 200,291
02450 1215 D=500MM EA 201,745 235,708
02450 1216 D=600MM EA 260,308 304,882
02450 1220
02450 1221 D=300MM EA 198,354 235,932
02450 1222 D=350MM EA 232,273 276,264
02450 1223 D=400MM EA 275,217 322,741
02450 1224 D=450MM EA 334,410 399,106
02450 1225 D=500MM EA 397,187 463,420
02450 1226 D=600MM EA 508,029 592,794
02450 1230
02450 1231 D=350MM EA 331,594 393,218
02450 1232 D=400MM EA 402,496 475,575
02450 1233 D=450MM EA 489,816 586,230
02450 1234 D=500MM EA 586,893 683,963
02450 1235 D=600MM EA 746,310 861,792
02450 1300 02450 1310
02450 1311 D=400MM EA 201,984 230,458
02450 1312 D=450MM EA 222,623 251,343
02450 1313 D=500MM EA 253,711 283,168
02450 1314 D=600MM EA 302,463 332,125
02450 1320
02450 1321 D=400MM EA 376,930 427,117
02450 1322 D=450MM EA 417,550 468,065
02450 1323 D=500MM EA 475,138 525,980
02450 1324 D=600MM EA 573,135 624,510
02450 1330
02450 1331 D=450MM EA 625,423 700,968
02450 1332 D=500MM EA 712,787 789,071
02450 1333 D=600MM EA 859,539 936,560
02510 0000 02510 1000
L=30M
PREBORING WITH CEMENT MILK
L=10M
L=20M
L=30M
L=20M
WATER DISTRIBUTION
PREBORING WITH AUGER AND BUCKET
L=10M
L=30M
PIPING, WATER DISTRIBUTION, DUCTILE IRON
DIVISION 02 SITE WORK Page 22
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
02510 1100
02510 1101 4 IN (100MM) DIA. M 8,191 9,150 22%
02510 1102 6 IN (150MM) DIA. M 10,834 11,932 22%
02510 1103 8 IN (21CM) DIA. M 13,993 15,270 22%
02510 1104 10 IN (25CM) DIA. M 14,801 16,337 22%
02510 1105 12 IN (31CM) DIA. M 18,594 20,516 22%
02510 1106 14 IN (36CM) DIA. M 23,861 26,165 22%
02510 1107 16 IN (41CM) DIA. M 28,264 31,033 22%
02510 1108 18 IN (46CM) DIA. M 33,022 36,482 22%
02510 1109 20 IN (51CM) DIA. M 34,803 37,770 22%
02510 1200
02510 1201 4 IN (100MM) EA 25,223 28,233 22%
02510 1202 6 IN (150MM) EA 34,863 39,080 22%
02510 1203 8 IN (21CM) EA 48,077 53,345 22%
02510 1204 10 IN (25CM) EA 67,102 74,127 22%
02510 1205 12 IN (31CM) EA 87,269 95,699 22%
02510 1206 14 IN (36CM) EA 136,646 147,183 22%
02510 1207 16 IN (41CM) EA 150,764 161,855 22%
02510 1208 18 IN (46CM) EA 237,168 250,340 22%
02510 1209 20 IN (51CM) EA 273,730 289,943 22%
02510 1300
02510 1301 4 IN (100MM) EA 24,323 27,333 22%
02510 1302 6 IN (150MM) EA 33,513 37,729 22%
02510 1303 8 IN (21CM) EA 44,702 49,972 22%
02510 1304 10 IN (25CM) EA 61,478 68,503 22%
02510 1305 12 IN (31CM) EA 78,947 87,376 22%
02510 1306 14 IN (36CM) EA 110,776 121,313 22%
02510 1307 16 IN (41CM) EA 131,193 142,284 22%
02510 1308 18 IN (46CM) EA 198,701 211,874 22%
02510 1309 20 IN (51CM) EA 229,865 246,077 22%
02510 1400
02510 1401 4 IN (100MM) EA 24,436 27,445 22%
02510 1402 6 IN (150MM) EA 33,513 37,729 22%
02510 1403 8 IN (21CM) EA 44,702 49,972 22%
02510 1404 10 IN (25CM) EA 61,253 68,277 22%
02510 1405 12 IN (31CM) EA 79,171 87,601 22%
02510 1406 14 IN (36CM) EA 110,776 121,313 22%
02510 1407 16 IN (41CM) EA 131,643 142,735 22%
02510 1408 18 IN (46CM) EA 200,052 213,224 22%
02510 1409 20 IN (51CM) EA 230,990 247,201 22%
02510 1500
02510 1501 4 IN X 3 IN EA 36,915 41,496 22%
02510 1502 4 IN X 4 IN EA 37,815 42,396 22%
02510 1503 6 IN X 3 IN EA 49,973 56,560 22%
02510 1504 6 IN X 4 IN EA 50,760 57,347 22%
02510 1505 6 IN X 6 IN EA 53,347 59,933 22%
02510 1506 8 IN X 4 IN EA 65,509 73,316 22%
02510 1507 8 IN X 6 IN EA 68,434 76,240 22%
02510 1508 8 IN X 8 IN EA 71,808 79,613 22%
02510 1509 10 IN X 4 IN EA 84,404 95,495 22%
MECHANICAL JOINT
45 DEGREE ELBOW
22-1/2 DEGREE ELBOW
MECHANICAL JOINT TEE
90 DEGREE ELBOW
DIVISION 02 SITE WORK Page 23
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
02510 1510 10 IN X 6 IN EA 95,651 106,743 22%
02510 1511 10 IN X 8 IN EA 97,563 108,655 22%
02510 1512 10 IN X 10 IN EA 108,023 119,115 22%
02510 1513 12 IN X 4 IN EA 109,961 121,668 22%
02510 1514 12 IN X 6 IN EA 113,336 125,043 22%
02510 1515 12 IN X 8 IN EA 116,710 128,417 22%
02510 1516 12 IN X 10 IN EA 126,833 138,540 22%
02510 1517 12 IN X 12 IN EA 131,895 143,602 22%
02510 1518 14 IN X 4 IN EA 143,800 157,396 22%
02510 1519 14 IN X 6 IN EA 144,362 157,957 22%
02510 1520 14 IN X 8 IN EA 146,274 159,869 22%
02510 1521 14 IN X 10 IN EA 148,524 162,120 22%
02510 1522 14 IN X 12 IN EA 158,647 172,243 22%
02510 1523 14 IN X 14 IN EA 168,769 182,365 22%
02510 1524 16 IN X 4 IN EA 186,359 201,970 22%
02510 1525 16 IN X 6 IN EA 187,483 203,094 22%
02510 1526 16 IN X 8 IN EA 189,733 205,345 22%
02510 1527 16 IN X 10 IN EA 191,421 207,032 22%
02510 1528 16 IN X 12 IN EA 194,907 210,518 22%
02510 1529 16 IN X 14 IN EA 212,229 227,840 22%
02510 1530 16 IN X 16 IN EA 222,352 237,963 22%
02510 1531 18 IN X 6 IN EA 256,161 273,722 22%
02510 1532 18 IN X 8 IN EA 258,860 276,422 22%
02510 1533 18 IN X 10 IN EA 273,483 291,044 22%
02510 1534 18 IN X 12 IN EA 276,856 294,418 22%
02510 1535 18 IN X 14 IN EA 302,726 320,288 22%
02510 1536 18 IN X 16 IN EA 312,849 330,411 22%
02510 1537 18 IN X 18 IN EA 340,968 358,530 22%
02510 1538 20 IN X 6 IN EA 295,787 316,863 22%
02510 1539 20 IN X 8 IN EA 296,912 317,987 22%
02510 1540 20 IN X 10 IN EA 313,783 334,858 22%
02510 1541 20 IN X 12 IN EA 314,908 335,983 22%
02510 1542 20 IN X 14 IN EA 344,152 365,226 22%
02510 1543 20 IN X 16 IN EA 353,150 374,225 22%
02510 1544 20 IN X 18 IN EA 389,142 410,217 22%
02510 1545 20 IN X 20 IN EA 393,641 414,716 22%
02510 1600
02510 1601 4 IN X 3 IN EA 44,702 49,972 22%
02510 1602 4 IN X 4 IN EA 47,514 52,783 22%
02510 1603 6 IN X 3 IN EA 56,079 63,104 22%
02510 1604 6 IN X 4 IN EA 59,228 66,253 22%
02510 1605 6 IN X 6 IN EA 64,627 71,652 22%
02510 1606 8 IN X 4 IN EA 73,772 82,202 22%
02510 1607 8 IN X 6 IN EA 79,396 87,826 22%
02510 1608 8 IN X 8 IN EA 87,269 95,699 22%
02510 1609 10 IN X 4 IN EA 100,892 112,936 22%
02510 1610 10 IN X 6 IN EA 107,641 119,684 22%
02510 1611 10 IN X 8 IN EA 114,389 126,432 22%
02510 1612 10 IN X 10 IN EA 130,136 142,179 22%
02510 1613 12 IN X 4 IN EA 122,443 135,615 22%
MECHANICAL JOINT CROSS
DIVISION 02 SITE WORK Page 24
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
02510 1614 12 IN X 6 IN EA 128,067 141,239 22%
02510 1615 12 IN X 8 IN EA 133,691 146,863 22%
02510 1616 12 IN X 10 IN EA 150,562 163,734 22%
02510 1617 12 IN X 12 IN EA 159,560 172,731 22%
02510 1618 14 IN X 4 IN EA 182,353 197,407 22%
02510 1619 14 IN X 6 IN EA 182,353 197,407 22%
02510 1620 14 IN X 8 IN EA 182,353 197,407 22%
02510 1621 14 IN X 10 IN EA 187,977 203,030 22%
02510 1622 14 IN X 12 IN EA 195,850 210,903 22%
02510 1623 14 IN X 14 IN EA 219,471 234,524 22%
02510 1624 16 IN X 4 IN EA 203,972 221,535 22%
02510 1625 16 IN X 6 IN EA 213,082 230,644 22%
02510 1626 16 IN X 8 IN EA 217,245 234,806 22%
02510 1627 16 IN X 10 IN EA 223,993 241,555 22%
02510 1628 16 IN X 12 IN EA 227,367 244,930 22%
02510 1629 16 IN X 14 IN EA 250,762 268,325 22%
02510 1630 16 IN X 16 IN EA 263,359 280,921 22%
02510 1631 18 IN X 6 IN EA 290,163 311,239 22%
02510 1632 18 IN X 8 IN EA 293,537 314,612 22%
02510 1633 18 IN X 10 IN EA 313,783 334,858 22%
02510 1634 18 IN X 12 IN EA 327,280 348,355 22%
02510 1635 18 IN X 14 IN EA 338,528 359,603 22%
02510 1636 18 IN X 16 IN EA 358,774 379,849 22%
02510 1637 18 IN X 18 IN EA 415,012 436,087 22%
02510 1638 20 IN X 6 IN EA 326,777 350,195 22%
02510 1639 20 IN X 8 IN EA 330,151 353,568 22%
02510 1640 20 IN X 10 IN EA 354,896 378,314 22%
02510 1641 20 IN X 12 IN EA 366,031 389,449 22%
02510 1642 20 IN X 14 IN EA 372,330 395,746 22%
02510 1643 20 IN X 16 IN EA 392,013 415,430 22%
02510 1644 20 IN X 18 IN EA 467,372 490,790 22%
02510 1645 20 IN X 20 IN EA 471,871 495,289 22%
02510 1700 02510 1710
02510 1711 4 IN (100MM) DIA. M 8,069 9,108 22%
02510 1712 6 IN (150MM) DIA. M 9,195 10,471 22%
02510 1713 8 IN (21CM) DIA. M 11,501 12,931 22%
02510 1714 10 IN (25CM) DIA. M 14,663 16,388 22%
02510 1715 12 IN (31CM) DIA. M 18,210 20,244 22%
02510 1716 14 IN (36CM) DIA. M 21,932 24,097 22%
02510 1717 16 IN (41CM) DIA. M 24,734 26,961 22%
02510 1718 18 IN (46CM) DIA. M 28,170 30,553 22%
02510 1720
02510 1721 4 IN (100MM) DIA. EA 21,862 24,340 22%
02510 1722 6 IN (150MM) DIA. EA 31,305 34,818 22%
02510 1723 8 IN (21CM) DIA. EA 41,724 45,940 22%
02510 1724 10 IN (25CM) DIA. EA 59,445 65,467 22%
02510 1725 12 IN (31CM) DIA. EA 74,974 82,000 22%
02510 1726 14 IN (35CM) DIA. EA 130,010 138,440 22%
02510 1727 16 IN (41CM) DIA. EA 151,953 160,922 22%
STAB JOINT - NO FITTINGS
STAB JOINT - NO FITTINGS
STAB JOINT ELBOW
DIVISION 02 SITE WORK Page 25
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
02510 1728 18 IN (46CM) DIA. EA 226,626 237,164 22%
02510 1730
02510 1731 4 IN (100MM) DIA. EA 32,570 36,235 22%
02510 1732 6 IN (150MM) DIA. EA 45,827 51,096 22%
02510 1733 8 IN (200MM) DIA. EA 61,643 67,934 22%
02510 1734 10 IN (25CM) DIA. EA 92,652 101,433 22%
02510 1735 12 IN (31CM) DIA. EA 113,838 123,204 22%
02510 1736 14 IN (36CM) DIA. EA 157,741 168,548 22%
02510 1737 16 IN (41CM) DIA. EA 211,107 223,504 22%
02510 1738 18 IN (46CM) DIA. EA 325,414 339,464 22%
02510 1740
02510 1741 4 IN (100MM) DIA. EA 10,348 11,778 22%
02510 1742 6 IN (150MM) DIA. EA 12,640 14,262 22%
02510 1743 8 IN (200MM) DIA. EA 17,701 20,179 22%
02510 1744 10 IN (25CM) DIA. EA 19,530 22,341 22%
02510 1745 12 IN (31CM) DIA. EA 24,555 28,068 22%
02510 1746 14 IN (36CM) DIA. EA 29,506 33,521 22%
02510 1747 16 IN (41CM) DIA. EA 39,824 44,510 22%
02510 1748 18 IN (46CM) DIA. EA 52,359 58,382 22%
02510 2000 02510 2100
02510 2101 3/4 IN (19MM) DIA. M 978 1,147 22%
02510 2102 1 IN (25MM) DIA. M 1,410 1,661 22%
02510 2103 1-1/2 IN (37MM) DIA. M 2,185 2,512 22%
02510 2104 2 IN (50MM) DIA. M 3,078 3,454 22%
02510 2105 2-1/2 IN (63MM) DIA. M 4,644 5,181 22%
02510 2106 3 IN (76MM) DIA. M 6,029 6,618 22%
02510 3000
02510 3100
02510 3101 8 IN (21CM) DIA. -3/16 IN WALL M 11,961 12,538 9%
02510 3102 10 IN (25CM) DIA. -3/16 IN WALL M 14,523 15,150 9%
02510 3103 12 IN (31CM) DIA. -1/4 IN WALL M 20,258 20,948 9%
02510 3104 14 IN (36CM) DIA. -1/4 IN WALL M 23,016 23,880 9%
02510 3105 16 IN (41CM) DIA. -1/4 IN WALL M 25,440 26,255 9%
02510 3106 18 IN (46CM) DIA. -5/16 IN WALL M 31,904 32,670 5%
02510 3107 24 IN (61CM) DIA. -3/8 IN WALL M 52,346 53,954 5%
02510 3108 30 IN (76CM) DIA. -3/8 IN WALL M 76,696 78,480 5%
02510 3109 36 IN (91CM) DIA. -3/8 IN WALL M 91,264 93,272 5%
02510 3110 42 IN (106CM) DIA. -1/2 IN WALL M 125,650 127,945 5%
02510 3111 48 IN (122CM) DIA. -1/2 IN WALL M 153,326 155,621 5%
02510 4000 02510 4100
02510 4101 PT 3/4 EA 36,127 37,108 11%
02510 4102 PT 1 EA 70,212 71,333 11%
02510 4200
02510 4201 PT 3/4 EA 17,482 18,195 11%
02510 4202 PT 1 EA 17,867 18,740 11%
ADAPTER, HEIGHT ADJUSTER SPRINKLER HEAD
PIPING, WATER DISTRIBUTION, COPPER
COPPER TUBING
STAB JOINT TEE
STAB JOINT…