This document is a detailed technical specification (Section 02 41 00) for demolition work, specifically outlining requirements for demolishing and removing buildings, structures, utilities, and debris from a medical center site. The specification provides comprehensive guidelines for the contractor, including protection measures, utility service handling, and debris disposal protocols. Key requirements include:
Demolition must be performed with strict safety precautions, including preventing hazards to personnel and property, minimizing interference with adjacent areas, and maintaining protective barriers. The contractor is responsible for surveying the site, avoiding damage to existing items, coordinating with other work, and ensuring structural integrity. All debris, including brick, concrete, stone, and metals, becomes the contractor's property and must be disposed of daily off the medical center property in compliance with federal, state, and local regulations. The work must be completed to the satisfaction of the Project Engineer, leaving the site in a clean condition with all non-essential materials removed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Direct Bury Pipe - Salient Characteristics.pdf | ||
| B-118 HV1.00.pdf | ||
| B118 outside power and water.jpg | JPG image | |
| B-115 M-01.pdf | ||
| B-118 HV200.pdf | ||
| Building 118 Basement Photos.docx | DOCX document | |
| Electrical Distribution Plan B115 B118 B400.docx | DOCX document | |
| 312011 earthwork.docx | DOCX document | |
| B-400 M-02.pdf | ||
| 015719 Temp Environ Cont.docx | DOCX document | |
| Building 400 Basement Photos.docx | DOCX document | |
| 36C25025B0032 A00005.pdf | ||
| Contractor Areas.jpg | JPG image | |
| Pre-Bid RFIs Answers.xlsx | XLSX spreadsheet | |
| Building 115 Basement Photos.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
08-01-17
02 41 00 - 1
SECTION 02 41 00
DEMOLITION
PART 1 - GENERAL
1.1 DESCRIPTION:
This section specifies demolition and removal of buildings, portions of buildings, utilities, other structures and debris from trash dumps shown.
1.2 RELATED WORK:
A. Demolition and removal of roads, walks, curbs, and on-grade slabs outside buildings to be demolished: // Section 31 20 00, EARTH MOVING
// Section 31 20 11, EARTH MOVING (SHORT FORM) //.
B. Safety Requirements: Section 01 35 26 Safety Requirements Article, ACCIDENT PREVENTION PLAN (APP).
C. Disconnecting utility services prior to demolition: Section 01 00 00, GENERAL REQUIREMENTS.
D. Reserved items that are to remain the property of the Government:
Section 01 00 00, GENERAL REQUIREMENTS.
G. Environmental Protection: Section 01 57 19, TEMPORARY ENVIRONMENTAL
CONTROLS.
H. Construction Waste Management: Section 01 74 19 CONSTRUCTION WASTE
MANAGEMENT.
I. Infectious Control: Section 01 35 26, SAFETY REQUIREMENTS.
1.3 PROTECTION:
A. Perform demolition in such manner as to eliminate hazards to persons and property; to minimize interference with use of adjacent areas, utilities and structures or interruption of use of such utilities; and to provide free passage to and from such adjacent areas of structures.
Comply with requirements of GENERAL CONDITIONS Article, ACCIDENT
PREVENTION.
B. Provide safeguards, including warning signs, barricades, temporary fences, warning lights, and other similar items that are required for protection of all personnel during demolition and removal operations.
Comply with requirements of Section 01 00 00, GENERAL REQUIREMENTS, Article PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES AND IMPROVEMENTS.
C. Maintain fences, barricades, lights, and other similar items around exposed excavations until such excavations have been completely filled.
02 41 00 - 2
E. Prevent spread of flying particles and dust. Sprinkle rubbish and debris with water to keep dust to a minimum. Do not use water if it results in hazardous or objectionable condition such as, but not limited to; ice, flooding, or pollution. Vacuum and dust the work area daily.
G. Before beginning any demolition work, the Contractor shall survey the site and examine the drawings and specifications to determine the extent of the work. The contractor shall take necessary precautions to avoid damages to existing items to remain in place, to be reused, or to remain the property of the Medical Center; any damaged items shall be repaired or replaced as approved by the Project Engineer. The
Contractor shall coordinate the work of this section with all other work and shall construct and maintain shoring, bracing, and supports as required. The Contractor shall ensure that structural elements are not overloaded and shall be responsible for increasing structural supports or adding new supports as may be required as a result of any cutting, removal, or demolition work performed under this contract. Do not overload structural elements. Provide new supports and reinforcement for existing construction weakened by demolition or removal works.
Repairs, reinforcement, or structural replacement must have Resident
Engineer’s approval.
H. The work shall comply with the requirements of Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS.
I. The work shall comply with the requirements of Section 01 00 00, GENERAL REQUIREMENTS and Section 01 35 26, SAFETY REQUIREMENTS.
1.4 UTILITY SERVICES:
A. Demolish and remove outside utility service lines shown to be removed.
B. Remove abandoned outside utility lines that would interfere with installation of new utility lines and new construction.
PART 2 - PRODUCTS (NOT USED)
PART 3 – EXECUTION
3.1 DEMOLITION:
A. Completely demolish and remove buildings and structures, including all appurtenances related or connected thereto, as noted below:
1. As required for installation of new utility service lines.
2. To full depth within an area defined by hypothetical lines located
1500 mm (5 feet) outside building lines of new structures.
02 41 00 - 3
B. Debris, including brick, concrete, stone, metals and similar materials shall become property of Contractor and shall be disposed of by him daily, off the Medical Center Property to avoid accumulation at the demolition site. Materials that cannot be removed daily shall be stored in areas specified by the Project Engineer. Break up concrete slabs below grade that do not require removal from present location into pieces not exceeding 600 mm (24 inches) square to permit drainage.
Contractor shall dispose debris in compliance with applicable federal, state or local permits, rules and/or regulations.
D. Remove and legally dispose of all materials, other than earth to remain as part of project work, from any trash dumps shown. Materials removed shall become property of contractor and shall be disposed of in compliance with applicable federal, state or local permits, rules and/or regulations. All materials in the indicated trash dump areas, including above surrounding grade and extending to a depth of 1500mm
(5feet) below surrounding grade, shall be included as part of the lump sum compensation for the work of this section. Materials that are located beneath the surface of the surrounding ground more than 1500 mm
(5 feet), or materials that are discovered to be hazardous, shall be handled as unforeseen. The removal of hazardous material shall be referred to Hazardous Materials specifications.
E. Remove existing utilities as indicated or uncovered by work and terminate in a manner conforming to the nationally recognized code covering the specific utility and approved by the Resident Engineer.
When Utility lines are encountered that are not indicated on the drawings, the Resident Engineer shall be notified prior to further work in that area.
3.2 CLEAN-UP:
On completion of work of this section and after removal of all debris, leave site in clean condition satisfactory to Project Engineer.
Clean-up shall include off the Medical Center Property disposal of all items and materials not required to remain property of the Government as well as all debris and rubbish resulting from demolition operations.
- - - E N D - - -
| PART 1 - GENERAL |
| 1.1 DESCRIPTION: |
| 1.2 RELATED WORK: |
| 1.3 PROTECTION: |
| 1.4 UTILITY SERVICES: |
| PART 2 - PRODUCTS (Not Used) |
| PART 3 – EXECUTION |
| 3.1 DEMOLITION: |
| 3.2 CLEAN-UP: |