02110 - Site Clearing.pdf
PDF 130 KB Posted
- Attached to
- Stone Creek Golf Course Irrigation Project
- Solicitation number
- S-C01010-00016773
- Issued by
- Oregon
About this file
This is a Site Clearing specification document for the Clackamas County Stone Creek Golf Club Irrigation Renovation Project in Oregon. The scope of work includes removal of surface debris, clearing plant life and grass, and removal of existing site items as indicated on project drawings. The contractor must remove debris, rock, concrete, asphalt, trees, and extracted plant life from the site, with all waste materials disposed of off-site. Dust control measures using water sprinkling are required to prevent dust spread to adjacent properties, and work must be coordinated with utility companies. Protection of existing improvements, utilities, benchmarks, trees, structures, and irrigation infrastructure is mandated throughout the clearing process.
The specification establishes regulatory compliance requirements for debris disposal and establishes quality standards for site protection and dust mitigation. No specific pricing information, contract terms, renewal options, funding sources, or award dates are provided in this technical specification document. The contractor is responsible for all excavation of organic root fibers and removal of root fibers from the site, as well as compliance with applicable codes for waste disposal.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BID 2026-24 Stone Creek Golf Irrigation.pdf | ||
| 25014 - Bid Set.pdf | ||
| 02811 - Golf Course Irrigation.pdf | ||
| 02211 - Rough Grading.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Clackamus County Stone Creek Golf Club
Irrigation Renovation Project 02110/1 10/25
SECTION 02110
SITE CLEARING
PART 1 – GENERAL
1.1 SUMMARY
A. Section Includes
1. Remove surface debris.
2. Clear site of plant life and grass.
3. Remove existing site items as noted on the drawings.
1.2 REGULATORY REQUIREMENTS
A. Conform to applicable code for disposal of debris.
1.3 SEQUENCING AND SCHEDULING
A. Coordinate clearing Work with utility companies.
1.4 QUALITY ASSURANCE - NOT USED.
1.5 DELIVERY, STORAGE AND HANDLING - NOT USED.
1.6 PROJECT/SITE CONDITIONS
A. Protection of Existing Improvements: Provide protection necessary to prevent damage to existing improvements indicated to remain in place.
B. Dust Control: The amount of dust from clearing and grubbing shall be controlled to prevent the spread of dust to adjacent properties. Water sprinkling shall be used to control release of dust during clearing and grubbing.
PART 2 – PRODUCTS - NOT USED.
PART 3 – EXECUTION
3.1 EXECUTION
A. Clearing
1. Clear areas required for access to site and execution of Work.
B. Removal
1. Remove debris, rock, concrete, asphalt, trees and extracted plant life from site.
Excavate organic root fibers. Remove root fibers from site. Remove existing site items as indicated on the drawings.
C. Dispose of waste materials, including trash, debris concrete, pipe, etc. off site.
3.2 PROTECTION
A. Protect utilities that remain, from damage.
B. Protect bench marks, trees and existing structures from damage or displacement.
C. Protect irrigation structures and underground piping.
END OF SECTION 02110