This solicitation notice describes a fixed-price construction contract to convert 8.75 miles of abandoned railroad grade to an accessible trail in Montana. Work includes reconstructing the subgrade, constructing three steel truss bridges between 70-85 feet long with precast concrete footings, installing one timber bridge provided by the Government, and constructing a 10-foot wide paved trail. Additional work consists of reconditioning 5 miles of access roads, building two staging areas, and installing barricades, signs and moving a gate. Optional work includes paving sections totaling over 5 miles. The total estimated value is between $1-5 million. The solicitation will be set aside for small businesses with a size standard of $39.5 million. Attention is directed to clauses regarding differing site conditions and site investigations. Interested parties are urged to inspect the site. The Department of Agriculture Forest Service will award the contract.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VICINITY MAP
LOCATION MAP
ENGINEERS
PLANNERS
SURVEYORS
MATERIAL SOURCES
GOVERNMENT FURNISHED
waste site riprap
KALISPELL
GLASGOW
GREAT FALLS
MISSOULA
HELENA
BILLINGS
HARDIN
BOZEMAN
DILLON
DEERLODGE
BUTTE
PROJECT
LOCATION
YELLOWSTONE
NATIONAL
PARK
DISTRICT RANGER
HEBGEN LAKE RANGER DISTRICT
RECOMMENDED:
DATE
FOREST ENGINEER
CUSTER GALLATIN NATIONAL FOREST
REVIEWED:
DATE
FOREST SUPERVISOR
CUSTER GALLATIN NATIONAL FOREST
APPROVED:
DATE
REGIONAL ENGINEER
NORTHERN REGION
DATE
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE, REGION 1
CUSTER GALLATIN NATIONAL FOREST
HEBGEN LAKE RANGER DISTRICT
GALLATIN COUNTY, MONTANA
CONSTRUCTION PLANS FOR:
YELLOWSTONE SHORTLINE
(RAIL) TRAIL BRIDGE
NFST 611 MP 2.27
R 5E
R 4E
T14S T13S
PROJECT
LOCATION
INDEX TO SHEETS
NO. DESCRIPTION
1 TITLE SHEET
ESTIMATED QUANTITIES &
GENERAL NOTES
3 SITE PHOTOS
TRAIL TYPICAL SECTION &
POINT TABLES
5 TRAIL PLAN & PROFILE
6 BRIDGE GENERAL LAYOUT
7 FOUNDATION PLAN
8 RIPRAP PLAN
9 - 10 ABUTMENT DETAILS
XS1 - XS2 TRAIL CROSS SECTIONS
BRIDGE
611-2.27
NFST 611
TRAIL 611
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
1/1 5/2
1 1 2:
M
IK
EJ
F :\7
7 O
RE
GO
N
SH
OR
TL
IN
E
RR
T
RA
IL
\D W
G\
BR
ID
GE
D
ES
IG
N\
YS
S
HO
RT
LI
NE
BR
ID
GE
6- 2.2
7 D
ES
IG
N.
DW
G;
REGION 1
NORTHERN REGION
ESTIMATED
QUANTITIES &
GENERAL NOTES
Jan-21
A. GROESBECK
A. GROESBECK
M. JENSEN
YELLOWSTONE
CUSTER GALLATIN
HEBGEN LAKE
SHORTLINE
(RAIL) TRAIL
RANGER DISTRICT
NATIONAL FOREST
BRIDGE 611-2.27
SPECIFICATIONS: Construct the project in compliance with
Federal Highway Administration Standard Specifications for
Construction of Road and Bridges on Federal Highway Projects
(FP-14) and applicable Forest Service Supplemental
Specifications (FSSS).
DEWATERING & EROSION CONTROL PLAN: Submit a
Dewatering and Soil Erosion and Sediment Control Plan to the
Contracting Officer for approval at least seven (7) days prior to beginning work. See Section 157 of the Supplemental
Specifications for details. Construct temporary means to divert the flow of the live stream as necessary to perform work. Do not pump water from excavations directly into the live stream.
STREAM CROSSINGS: The Contractor is allowed to cross the live stream during construction.
CONCRETE: Use Class A(AE) Concrete for Precast members.
The required 28-day compressive strength (F'c) is 5,000 psi with an entrained air content of 5% ± 1%. Finish all precast elements with an ordinary surface finish. Make all concrete in accordance with an approved mix design. Chamfer all exposed edges of concrete 3/4" and fillet all acute angles 3" unless otherwise noted.
REINFORCING STEEL: Use reinforcing steel of the deformed type conforming to AASHTO M31 (ASTM A615) Grade 60.
Concrete cover is as shown; where not shown it must conform to AASHTO. Cut and bend reinforcing steel in conformance with ACI 315. Lap splice bars 2' min.
HARDWARE AND STRUCTURAL STEEL: Use shapes, plates and bars meeting the requirements of ASTM A36, unless otherwise specified in these plans. Use hardware meeting the requirements of ASTM A325, except as noted in the drawings.
GENERAL NOTES
CQ= Contract Quantity (See SECTION 109.02(b) of the STANDARD SPECIFICATIONS)
SUMMARY OF ESTIMATED QUANTITIES
ITEM
NO.
ITEM DESCRIPTION UNIT
QUANTITY
COMMENTS
15101A MOBILIZATION
Lump Sum
ALL
15201A
CONSTRUCTION SURVEY AND STAKING, METHOD 1,
TOLERANCE A
Lump Sum
ALL
LICENSED SURVEYOR REQUIRED
15713A SOIL EROSION & POLLUTION CONTROL
Lump Sum
ALL
INCLUDES DEWATERING. SEE GENERAL NOTES.
20802A FOUNDATION FILL Cubic Yard 20 CQ
COMMERCIAL SOURCE. IN-PLACE QUANTITY NOT
ADJUSTED FOR SHRINK/SWELL. COMPACTION TESTING
REQUIRED
20806A STRUCTURE EXCAVATION
Lump Sum
All
INCLUDES SUBEXCAVATION FOR FOUNDATION FILL AND
ALL TRAIL WORK TO SUBGRADE
25101A
PLACED RIPRAP, CLASS 4
Cubic Yard 200 CQ
USE ROCK AS AVAILABLE ALONG TRAIL. INCLUDE COST
FOR COLLECTING AND HAULING ROCK IN COST OF
RIPRAP
25107A MORTARED RIPRAP FOR OUTLET SLOPES Cubic Yards 8 CQ
25208A SCULPTED ROCK WALL Linear Foot 100
USE ROCK AVAILABLE ALONG THE TRAIL. MINIMUM
ROCK SIZE AS SHOWN IN DETAILS.
27201A GEOCELL FOUNDATION STABILIZATION, 6" DEPTH Square Yard
19 CQ
CONTRACTOR FURNISHED COARSE GRANULAR
BACKFILL. INCLUDES GEOTEXTILE.
55217A
PRECAST CONCRETE MEMBER, ABUTMENT
Each 2
INCLUDES REINFORCING STEEL.. INCLUDES ALL
REQUIRED TESTING
57101A
STEEL PRE-FABRICATED BRIDGE SUPERSTRUCTURE -
DESIGN, FABRICATE, TRANSPORT, AND INSTALL
Lump Sum
ALL
INCLUDES TIMBER DECKING
62201A
EQUIPMENT RENTAL, HYDRAULIC EXCAVATOR WITH THUMB
Hours 16
62202A
EQUIPMENT RENTAL, LARGE DUMP TRUCK
Hours 16
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
LOOKING BACK ON-LINE
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
1/1 5/2
1 1 2:
M
IK
EJ
F :\7
7 O
RE
GO
N
SH
OR
TL
IN
E
RR
T
RA
IL
\D W
G\
BR
ID
GE
D
ES
IG
N\
YS
S
HO
RT
LI
NE
BR
ID
GE
6- 2.2
7 D
ES
IG
N.
DW
G;
REGION 1
NORTHERN REGION
SITE PHOTOS
Jan-21
A. GROESBECK
A. GROESBECK
M. JENSEN
YELLOWSTONE
CUSTER GALLATIN
HEBGEN LAKE
SHORTLINE
(RAIL) TRAIL
RANGER DISTRICT
NATIONAL FOREST
BRIDGE 611-2.27
LOOKING AHEAD ON-LINE
EXAMPLE OF POTENTIAL ROCK SOURCE - MP 5.9
MATERIAL TO BE PROTECTED AND LEFT ON SITE
(MOVE AS DIRECTED BY CO)
REMOVE PILE TO
STREAMBED, TYP
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
CP-206
CP-207
CENTERLINE POINTS
POINT #
NORTHING
150489.1733
150486.1179
150479.2431
150465.4936
150458.6189
150443.3416
150435.7030
150356.1087
150342.5120
150333.1929
150326.3181
150312.5686
150305.6938
150296.6803
EASTING
1539199.1024
1539200.4348
1539203.4328
1539209.4287
1539212.4267
1539219.0888
1539222.4199
1539257.1297
1539263.0590
1539267.1229
1539270.1209
1539276.1168
1539279.1147
1539283.0454
ELEVATION
6641.35
6641.32
6641.27
6641.20
6641.21
6641.38
6641.50
6641.50
6641.29
6641.22
6641.23
6641.38
6641.46
6641.57
DESCRIPTION
STA 118+90
STA 118+93.33
STA 119+00.83
STA 119+15.83
STA 119+23.33
STA 119+40
STA 119+48.33
STA 120+35.17
STA 120+50
STA 120+60.17
STA 120+67.67
STA 120+82.67
STA 120+90.17
STA 121+00
LAYOUT POINTS
POINT #
NORTHING
150434.6336
150357.1781
EASTING
1539222.8862
1539256.6633
ELEVATION
6637.21
6637.21
DESCRIPTION
ABUTMENT 1 LAYOUT
ABUTMENT 2 LAYOUT
CONTROL POINT TABLE
POINT #
CP-206
CP-207
NORTHING
150495.06
150300.15
EASTING
1539203.64
1539284.62
ELEVATION
6641.80
6641.27
DESCRIPTION
SET-RPC
SET-RPC
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
1/1 5/2
1 1 2:
M
IK
EJ
F :\7
7 O
RE
GO
N
SH
OR
TL
IN
E
RR
T
RA
IL
\D W
G\
BR
ID
GE
D
ES
IG
N\
YS
S
HO
RT
LI
NE
BR
ID
GE
6- 2.2
7 D
ES
IG
N.
DW
G;
REGION 1
NORTHERN REGION
TRAIL TYPICAL
SECTION & POINT
TABLES
Jan-21
A. GROESBECK
A. GROESBECK
M. JENSEN
YELLOWSTONE
CUSTER GALLATIN
HEBGEN LAKE
SHORTLINE
(RAIL) TRAIL
RANGER DISTRICT
NATIONAL FOREST
BRIDGE 611-2.27
LEGEND
EXISTING FEATURES
Existing Edge of Water
Major Contour (5')
Minor Contour (1')
PROJECT CONTROL
Scale: 1" = 100'
New Crossing for
666-2.27 Bridge
CONTROL POINTS
* Abutment layout points are bottom of abutment elevations.
ABUTMENT LAYOUT POINTS
* Centerline Points are at Profile Grade at stations shown.
TRAIL CENTERLINE POINTS
* SET-RPC = Set Rebar with DJ&A Red Plastic Cap
TRAIL TYPICAL SECTION
Not to Scale
Centerline
Trail
Profile Grade
Clearing Limits
Clear to: Toe of fill, Cut daylight, or 5' min. shown.
1.5
1.5
Asphalt Concrete
Native Fill
Material, Typ.
Class 2 Seperation Geotextile Filter
(714.01) 25' Each Side of Bridge, Cost to be Included in Bid Item for Crushed
Aggregate Base, Typ.
5'-0" 5'-0"
10'-0"
1'-0" 1'-0" 5'-0" min.5'-0" min.
F
L
O
W
Crushed Aggregate Base
0% 0%
Asphalt and Crushed Aggregate Base per Trail Plans.
OBJECT MARKERS: Use 12"x 36" Type 3 object markers colored yellow and black cut to the width of the Truss Chord. Use material meeting MUTCD OM-3L or OM-3R specifications. Fasten to truss with (2) 1/4" Ø vandal resistant self tapping screws.
OBJECT MARKER TYPE 3
Not to Scale
Steel Top
Chord, Typ.
Bridge
Superstructure
Warning Signs and Markers
Match Truss Width
Bridge
Abutment
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
CP-206
CP-207
STA:118+93.33
STA:119+00.83
STA:119+23.33
STA:120+60.17
STA:120+67.67
STA:120+90.17
119+00 120+00 121+00
118+60 119+00 120+00 121+00 121+20
-0.66%
1.5 0% -1.50% 1.12%
S T A
E L
S T
E
S T
E
S T
E
PVI STA: 119+23.33
PVI ELEV: 6641.12
K: 13.86
LVC: 30.00
B V C S
B V C E
E V C S
E V C E
LOW PT. STA: 119+17.54
LOW PT ELEV: 6641.19
PVI STA: 120+60.17
PVI ELEV: 6641.12
K: 11.46
LVC: 30.00
B V C S
B V C E
E V C S
E V C E
LOW PT. STA: 120+62.36
LOW PT ELEV: 6641.22
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
1/1 5/2
1 1 2:
M
IK
EJ
F :\7
7 O
RE
GO
N
SH
OR
TL
IN
E
RR
T
RA
IL
\D W
G\
BR
ID
GE
D
ES
IG
N\
YS
S
HO
RT
LI
NE
BR
ID
GE
6- 2.2
7 D
ES
IG
N.
DW
G;
REGION 1
NORTHERN REGION
TRAIL PLAN &
PROFILE
Jan-21
A. GROESBECK
A. GROESBECK
M. JENSEN
YELLOWSTONE
CUSTER GALLATIN
HEBGEN LAKE
SHORTLINE
(RAIL) TRAIL
RANGER DISTRICT
NATIONAL FOREST
BRIDGE 611-2.27
PROFILE
Scale: 1" = 20'
PLAN
SCALE IN FEET
0 10 20
Existing Ground at
Centerline Trail
Centerline Trail
Finished Grade
STA 118+90
BEGIN TRAIL WORK
MATCH EXISTING
(BEGIN ASPHALT)
STA 121+00
END TRAIL WORK
MATCH EXISTING
(END ASPHALT)
26 CY Cut, 2 CY Fill 20 CY Cut, 7 CY Fill
New Edge of Asphalt
Centerline Trail
15'
15'
New Truss
Bridge
Precast Concrete
Abutments, Typ.
Centerline
Proposed Trail
Finished Grade, Typ.
TRAIL CONSTRUCTION NOTES:
1. Quantities shown are in-place, calculated to subgrade and not adjusted for shrink/swell.
2. Construct trail embankment in accordance with FP-14 Section 204.
3. Haul & dispose excess/unsuitable material to the waste site designated by the CO.
F
L
O
W
Sculpted
Rock, Typ.
Outline Rock
Wall, Typ.
Place Mortared Riprap, 2' deep, on slope as
Directed by CO at low point of Sag Curve, Typ.
25' Typ. Each End
Toe of Fill, Typ.
3'
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
120+00
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
1/1 5/2
1 1 2:
M
IK
EJ
F :\7
7 O
RE
GO
N
SH
OR
TL
IN
E
RR
T
RA
IL
\D W
G\
BR
ID
GE
D
ES
IG
N\
YS
S
HO
RT
LI
NE
BR
ID
GE
6- 2.2
7 D
ES
IG
N.
DW
G;
REGION 1
NORTHERN REGION
BRIDGE GENERAL
LAYOUT
Jan-21
A. GROESBECK
A. GROESBECK
M. JENSEN
YELLOWSTONE
CUSTER GALLATIN
HEBGEN LAKE
SHORTLINE
(RAIL) TRAIL
RANGER DISTRICT
NATIONAL FOREST
BRIDGE 611-2.27
Existing Ground at
Centerline Trail
84.50'
CL Abutment to CL Abutment
Centerline
Abutment 1
FG EL = 6641.50
Centerline Trail
Finished Grade
(FG)
SCALE IN FEET
0 10 20
S
F
M
D
I S
O
N
PLAN
ELEVATION
Scale: 1" = 20'
TYPICAL SECTION
Scale: 3/8" = 1'-0"
85' Total Truss Length
New Truss Bridge
Centerline
Trail
Class 4 Riprap, Typ.
Precast Concrete
Abutments, Typ.
Class 4 Riprap, Typ.
See Sheet 8.
Centerline
Abutment 2
FG EL = 6641.50
Precast Concrete
Abutments, Typ.
30.9'
Weathering Steel
Non-Parallel Chord
Truss Bridge
M i n
A t
E n d o f
B r i d g e
12'-0"
Steel Top
Chord, Typ.
Steel Bottom
Chord, Typ.
Steel Diagonal
Truss Member, Typ.
Toe Plate, Typ.
1-1/2" Ipe' Timber
Decking, Typ.
Steel Stringer, Typ.
Steel
Floorbeam
SUPERSTRUCTURE: The information provided on this sheet and in the notes are intended to show the general configuration, materials, and loading requirements for the bridge superstructure. The superstructure must incorporate the elements shown in the TYPICAL SECTION on this sheet, and conform to the dimensions shown.
Fabricate all top and bottom chords, verticals, and diagonals, from square or rectangular weathering steel tubing.
Detailed shop drawings and design calculations for the final bridge design must be submitted for review a minimum of 6 weeks prior to fabrication. Refer to The Forest Service Supplemental Specifications, Section 555, for additional requirements.
DESIGN: The design of all prefabricated bridge superstructure elements shall comply with the AASHTO "LRFD Guide
Specifications for Design of Pedestrian Bridges", 2009, and AASHTO LRFD Bridge Design Specifications, 8th edition, with current interims. The final design shall be prepared by a licensed professional engineer whose signed seal shall be on the design documents.
Design notes as follows:
90 psf Pedestrian Live Load
20,000 lbs. Vehicular Live Load (H10)
165 psf Ground Snow Load
All other loads, combination of loads, deflection criteria, etc. shall be as specified in the Guide Specifications for
Design of Pedestrian Bridges. Provide camber for 100% of the full dead load deflection plus 1% of the full length of the bridge.
STEEL FABRICATION: The steel bridge truss shall be fabricated by a plant with AISC-Intermediate Bridge
Certification.
MATERIALS: Steel: Use steel shapes, plates and bars of weathering steel conforming to ASTM A588 or ASTM A242.
Use hollow steel shapes of weathering steel conforming to ASTM A847 or ASTM A606 (Fy= 50,000 psi). Minimum steel thicknesses shall be as specified in the Guide Specifications for Design of Pedestrian Bridges. Use high strength bolts conforming to AASHTO M164, Type 3, unless noted otherwise.
All welding shall conform to the Bridge Welding Code, AWS D1.5.
Timber Decking: Furnish decking of untreated, responsibly-sourced, Ipe (Tabebuia Spp Lapacho Group). Design properties are to be in accordance with U.S. Forest Products Laboratory publication; "Tropical Timbers of the World".
PREFABRICATED SUPERSTRUCTURE NOTES:
New Edge of Asphalt
Sculpted Rock, Typ.
See DETAIL A/8.
V a r i e s
R
I V
E
R
Existing
Beaver
Dam
Type 3 Object
Markers, Typ.
See Detail
Sheet 4.
Type 3 Object
Markers, Typ.
(1 ea. corner)
Sculpted
Rock, Typ.
Note: Chords of Truss are NOT parallel.
1-1/4"Ø galv. steel
Handrail, Typ.
Safety Rail, Typ.
T y p
T y p
T y p
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
Layout Pt.
Layout Pt.
120+00
EL 6637.21
Abutment
EL 6636.71
Geocell
EL 6636.71
Geocell
EL 6637.21
Abutment
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
1/1 5/2
1 1 2:
M
IK
EJ
F :\7
7 O
RE
GO
N
SH
OR
TL
IN
E
RR
T
RA
IL
\D W
G\
BR
ID
GE
D
ES
IG
N\
YS
S
HO
RT
LI
NE
BR
ID
GE
6- 2.2
7 D
ES
IG
N.
DW
G;
REGION 1
NORTHERN REGION
FOUNDATION PLAN
Jan-21
A. GROESBECK
A. GROESBECK
M. JENSEN
YELLOWSTONE
CUSTER GALLATIN
HEBGEN LAKE
SHORTLINE
(RAIL) TRAIL
RANGER DISTRICT
NATIONAL FOREST
BRIDGE 611-2.27
NOTES:
1. All dimensions are typical.
2. Layout points are shown on Sheet 4.
SCALE IN FEET
0 5 10
PLAN
SECTION
Not to Scale
ABUTMENT 1
GEOCELL NOTES:
1. Place Geocell on undisturbed subgrade or compacted structural backfill.
2. Install Geocell in accordance with Forest Service Supplemental
Specifications (FSSS) 272.06, holding lines and grades in place with suitable side forms (i.e. "stretcher frames" or steel stakes) to ensure cells are expanded to the minimum dimension required by the manufacturer.
3. Backfill Geocell with coarse granular backfill per FSSS Subsection
703.03(c).
4. Place Class 1, Type A Separation Geotextile under Geocell and wrap over top after backfilling (incidental to Item 27201).
5. Extend Geocell 1' minimum beyond limits of grade beam on all sides.
G e o c e l l
1 2
1 2
84.50'
Centerline Bearing to Centerline Bearing
2'-2" 2'-2"
4'-4"
Existing
Ground
17'-3" Abutment
1'-0" 1'-0"
Upstream
End
A b u t m e n t
1 2
1 2
1'-2" 1'-2"
2'-4"
Outline of
Geocell, Typ.
Outline of
Abutment, Typ.
S T A
C e n t e r l i n e
B e a r i n g
A b u t m e n t
S T A
C e n t e r l i n e
B e a r i n g
A b u t m e n t
Centerline Trail
Downstream
End
Centerline Trail
Centerline Structure
TYPICAL GEOCELL
A
DETAIL
Scale: 1/4" = 1'-0"
A
6"
Geocell
Bridge
Superstructure
Precast Concrete
Abutment.
See Abutment
Details
4'-4" Geocell
See Geocell Note 1
1'-0"
Typ.
SECTION
Not to Scale
ABUTMENT 2
Finished Grade
Geotextile
See Note 4
(1) Layer of
6"Geocell
19'-3" Geocell
Precast Concrete
Abutment
Existing
Ground
Upstream
End
Downstream
End
Centerline Trail
Centerline Structure
6"
Geocell
Precast Concrete
Abutment
Subexcavate to 2' below bottom of geocell and 1' beyond the edges of geocell. Backfill with Foundation Fill, Item 20802.
2'-0"
Subexcavation
17'-3" Abutment
1'-0" 1'-0"19'-3" Geocell
2'-0"
Subexcavation
6'-4" Subexcavation
& Backfill
S u b e x c a v a t i o n
Foundation
Fill
Foundation
Fill
Foundation
Fill
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
120+00
EL 6637.21
Abutment
EL 6637.21
Abutment
EL 6631.40
Riprap
EL 6631.40
Riprap
EL 6637.21
Abutment
EL 6637.21
Abutment
EL 6631.40
Riprap
EL 6631.40
Riprap
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
1/1 5/2
1 1 2:
M
IK
EJ
F :\7
7 O
RE
GO
N
SH
OR
TL
IN
E
RR
T
RA
IL
\D W
G\
BR
ID
GE
D
ES
IG
N\
YS
S
HO
RT
LI
NE
BR
ID
GE
6- 2.2
7 D
ES
IG
N.
DW
G;
REGION 1
NORTHERN REGION
RIPRAP PLAN
Jan-21
A. GROESBECK
A. GROESBECK
M. JENSEN
YELLOWSTONE
CUSTER GALLATIN
HEBGEN LAKE
SHORTLINE
(RAIL) TRAIL
RANGER DISTRICT
NATIONAL FOREST
BRIDGE 611-2.27
SCALE IN FEET
0 10 20
F
L
O
W
PLAN
B e n c h
B e n c h
Class 4 Riprap, Typ.
Precast Concrete
Abutments, Typ.
Centerline Trail
SECTION
No Scale
RIPRAP LAYOUT
3'
8.8' 10.9' 20.6'31'
3'
Class 4 Riprap, Typ.
Precast Concrete
Abutments, Typ.
H
V
10.9'
SECTION
No Scale
RIPRAP LAYOUT
3'
17.2'
Bench
9.9' 11.4'32.2' 11.5'
Bench
Class 4 Riprap, Typ.
Precast Concrete
Abutments, Typ.
H
V
H
V
* Note: 1.5H:1V typical slope from toe of riprap. Actual slope in view varies.
H
V
* Note: 1.5H:1V typical slope from toe of riprap. Actual slope in view varies.
Blend Bench Into Existing
Ground, Typ. Each Corner of Abutment.
14.1'
4'
4.9711'
24.8'
TYPICAL SCULPTED ROCK
A
DETAIL
Not to Scale
Scupted Rock.
Minimum dimensions to be 3' x 3' x 5' long.
Use mechanical means to sculpt "flat" surfaces for all exposed faces.
Asphalt Trail
±4'-0"
Existing Ground
Representative
Finished Ground
Crushed Base
Native Material (Fill)
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
1/1 3/2
1 1 5:
A
MM
ON
F :\7
7 O
RE
GO
N
SH
OR
TL
IN
E
RR
T
RA
IL
\D W
G\
BR
ID
GE
D
ES
IG
N\
YS
S
HO
RT
LI
NE
BR
ID
GE
D
ET
AI
LS
.D
W G;
REGION 1
NORTHERN REGION
ABUTMENT DETAILS
Jan-21
A. GROESBECK
A. GROESBECK
M. JENSEN
YELLOWSTONE
CUSTER GALLATIN
HEBGEN LAKE
SHORTLINE
(RAIL) TRAIL
RANGER DISTRICT
NATIONAL FOREST
BRIDGE 611-2.27
ABUTMENT PLAN
Scale: 3/8" = 1'-0"
ABUTMENT 1 SHOWN
ABUTMENT 2 SIMILAR
ABUTMENT ELEVATION
Scale: 3/8" = 1'-0"
LOOKING BACK ON-LINE
ABUTMENT 1 SHOWN, ABUTMENT 2 SIMILAR
SECTION
Scale: 3/4" = 1'-0"
ABUTMENT 1 SHOWN
ABUTMENT 2 SIMILAR
ABUTMENT REINFORCEMENT
Symmetrical about
Centerline Structure
Centerline
Bearing
17'-3"
1'-10"
6'-9
6'-3"
2'-4
Steel Cap
Plate
See DETAIL
B
10" Typ.
Steel Cover
Plate
See DETAIL
C
2'-7
6'-0"
Horizontal
U-Bar, Typ.
Bridge Anchor Bolts
& Bearing per
Fabricator
5'-6"
A
Precast Concrete
Abutment
Abutment to
Bridge
Superstructure
Connection
See DETAIL
A
Toe Plate
Bridge Anchor Bolts
& Bearing per
Fabricator
Precast Concrete
Abutment
See DETAIL
A
A
DETAIL
Scale: 3/4" = 1'-0"
P e r
F a b r i c a t o r
U s e d f o r
D e t a i l i n g
10" 4"
(3) Equal Spaces
(4) #8 Bars Top & Bottom
#4 Bar, Each Face
2"
Clr. Typ.
2'-4"
24"
#4 Hoop
14"
E q u a l
S p a c e s
H o r i z o n t a l
U
B a r
#4 Vert. at 12" oc.
#4 Horizontal
U-Bar, Typ.
16'-10"
10"
Steel Cap
Plate
See DETAIL
B
A
2"
(10) Spaces at 6" oc. = 5'-0" (3) Spaces at 12" oc. 3'-0"
Finish Grade
Stream Face of Abutment
Fill To Spill
Around End of Abutment
Fill Slope
Behind
17'-3" Out-to-Out Abutment
Steel Cap
Plate
See DETAIL
B
(14) #4 Hoops
(Symmetrical About CL Structure)
Symmetrical about
Centerline Structure
Precast Concrete
Abutment
Ipe' Timber
Decking
Steel Truss
Ipe' Timber
Decking
Steel Bottom
Chord
Steel
Floorbeam
Steel Stringer
Steel Handrail
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
1/1 3/2
1 1 5:
A
MM
ON
F :\7
7 O
RE
GO
N
SH
OR
TL
IN
E
RR
T
RA
IL
\D W
G\
BR
ID
GE
D
ES
IG
N\
YS
S
HO
RT
LI
NE
BR
ID
GE
D
ET
AI
LS
.D
W G;
REGION 1
NORTHERN REGION
ABUTMENT DETAILS
Jan-21
A. GROESBECK
A. GROESBECK
M. JENSEN
YELLOWSTONE
CUSTER GALLATIN
HEBGEN LAKE
SHORTLINE
(RAIL) TRAIL
RANGER DISTRICT
NATIONAL FOREST
BRIDGE 611-2.27
ABUTMENT TO BRIDGE SUPERSTRUCTURE CONNECTION
A
DETAIL
Scale: 1 1/2" = 1'-0"
CAP PLATE
B
DETAIL
Scale: 3/4" = 1'-0"
COVER PLATE
C
DETAIL
Scale: 3/4" = 1'-0"
Precast Concrete
Abutment
1/2"Ø A325 Bolt
(Countersunk)
Steel Cap
Plate
Loop Ferrule
Insert
1/8"
Beveled
Edge
1/8"
Beveled
Edge
9/16"Ø Countersunk
Hole, Typ.
A
A
1/2" Plate
See DETAIL
B
Steel Cover Plate
See DETAIL
C
SECTION A-A
5"
1"
1 2
6"
(8) Spaces at 15" oc. = 10'-0"
6"
11'-0"
9/16"Ø Countersunk
Hole, Typ.
SECTION A-A
1'-0"
(8) Spaces at 15" oc. = 10'-0"
Loop Ferrule Spacing
1'-0"
" 4
12'-0"
A
A
3" Typ.
C10x15.3
1/2" x 4" Headed
Concrete Anchor, Typ.
Loop Ferrule
Insert, Typ.
Headed Concrete
Anchor, Typ.
Note: Loop Ferrule Insert not shown for clarity.
(9) Spaces at 15" oc. Staggered = 11'-3"
Headed Concrete Anchor Spacing
Ipe' Timber Decking
Field Cut 2" x 4"
As Required
Steel Stringer
3"
Steel
Floorbeam
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
118+90.00
118+93.33
119+48.33
119+00.83
119+15.83
119+23.33
119+40.00
119+49.50
6' 6'
-20 0 20
-20 0 20
-20 0 20
-20 0 20
-20 0 20
-20 0 20
-20 0 20
-20 0 20
Match Existing Cross Slopes
Typical Cross Slopes
Existing Ground, Typ.
Typical Fill Slope
1.5
Finished Ground at Bridge, Typ.
6' 6'
6' 6.5'
6' 10.5'
6' 10.5'
6' 6.5'
6' 6'
6' 6'
Mortared Riprap Slope
0.0%0.0%
BRIDGE 611-2.27
TRAIL CROSS SECTIONS
YELLOWSTONE SHORTLINE TRAIL
ENGINEERS
PLANNERS
SURVEYORS
AutoCAD SHX Text
PREPARED BY :
SHEET XS1 OF XS2
120+34.00
120+35.17
120+90.17
121+00.00
120+82.67
120+67.67
120+60.17
120+50.00
-20 0 20
-20 0 20
-20 0 20
-20 0 20
-20 0 20
-20 0 20
-20 0 20
-20 0 20
Existing Ground, Typ.
1.5
Finished Ground at Bridge, Typ.
6' 6'
6' 6'
6' 6'
6' 6.5'
Typical Cross Slopes
6' 10.5'
6' 10.5'
6' 6.5'
6' 6'
Match Existing Cross Slopes
0.0% 0.0%
Mortared Riprap
Slope, Typ.
BRIDGE 611-2.27
TRAIL CROSS SECTIONS
YELLOWSTONE SHORTLINE TRAIL
ENGINEERS
PLANNERS
SURVEYORS
AutoCAD SHX Text
PREPARED BY :
SHEET XS2 OF XS2
| Sheets and Views |
| 1 COVER |
| 2 ESTIMATED QUANTITIES & GENERAL NOTES |
| 3 SITE PHOTOS |
| 4 TRAIL TYPICAL SECTION & POINT TABLES |
| 5 TRAIL PLAN & PROFILE |
| 6 BRIDGE GENERAL LAYOUT |
| 7 FOUNDATION PLAN |
| 8 RIPRAP PLAN |
| 9 ABUTMENT DETAILS |
| 10 ABUTMENT DETAILS |
| XS1 XS1 |
| XS2 XS2 |