02 - Govt Drawings - Pavement Repair and Markings - updated.pdf

PDF 635 KB Posted

Attached to
Basewide Pavements & Markings
Solicitation number
S-24800-00014518
Issued by
Multnomah County, Oregon

About this file

This document is a project bid package for Basewide Pavement Repair at the Portland Air National Guard Base in Oregon, dated 06/04/2025. The project involves comprehensive pavement maintenance across the base, with four primary scopes: mill and overlay (5,000 sqft), crack seal (1,000 linear feet), patch and repair (2,000 sqft), and pavement markings for the East and West Aprons (11,850 and 14,650 sqft respectively). The work will be conducted in restricted areas requiring government escort, with prioritized zones identified for each repair type, and includes specific technical requirements for crack sealing, debris removal, and sealant application.

The project specifications include detailed technical guidelines such as using compressed air for cleaning, specific sealant types (ASTM D6690, Type I and II), and precise application methods. The contractor must coordinate with base security (142 SFS/Resource Protection Office), complete FOD (Foreign Object Debris) training, provide sanitary facilities and water, and follow FAA Advisory Circular AC 150/5380-6C and other referenced standards. The repair work involves removing and replacing asphalt up to 6 inches deep, milling 2 inches, and reapplying 2 inches of asphalt, with careful attention to crack sealing techniques and pavement marking restoration.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NAME: BASEWIDE PAVEMENT REPAIR

PROJECT NO: FY25C Date: 06/04/2025

Drawing No:

Drawing Title:

BASEWIDE PAVEMENT REPAIR

Portland Air National Guard Base, Oregon

COVER

G-01

SHEET INDEX

G-01 COVER

G-02 NOTES

D-03 DRAWINGS – MILL AND OVERLAY

D-04 DRAWINGS – CRACK SEAL

D-05 DRAWINGS – PATCH AND REPAIR

D-06 DRAWINGS – PAVEMENT MARKINGS

*DRAWINGS TO BE READ IN CONJUNCTION WITH SCOPE OF WORK IN THE ITB.

Drawing No:

Drawing Title:

GENERAL SITE NOTES:

1. CONTRACTOR TO THROUGHLY DRY AND CLEAN THE CRACKS AND

ANY AREA TO BE PATCHED OR REPAIR, WITH COMPRESSED AIR

(100CFM OR GREATER) TO REMOVE OXIDEZED PAVEMENT, LOOSE

AGGREGATE AND FOREIGN DEBRIS.

2. ALL DEBRIS TO BE DISPOSED OFF BASE. WASTE TICKETS TO BE

SUBMITTED TO PANG ENVIRONMENTAL DEPARTMENT.

3. SEALANTS TO CONFORM WITH ASTMD6690, TYPE II OR ASTM D6690,

TYPE I. PREFERRED BRAND: COLJOINT 6690 TYPE I AND II OR

APPROVED EQUAL.

4. BACKER ROD MATERIAL- WHEN REQUIRED, USE BACKER ROD

MATERIAL IN ALL CRACKS THAT OTHERWISE WOULD REQUIRE

EXCESSIVE SEALANT. PLACE THE BACKER ROD SO THAT THE TOP

OF THE BACKER ROD IS AT LEAST 3/4 INCH BELOW THE TOP OF THE

PAVEMENT. ENSURE THAT THE BACKER ROD MATERIAL IS PLACED

AT THE SPECIFIED DEPTH AND IS NOT STRETCHED OR TWISTED

DURING INSTALLATION.

5. RATE OF PROGRESS OF CRACK PREPARATION - LIMIT THE STAGES

OF CRACK PREPARATION, WHICH INCLUDE AIR PRESSURE

CLEANING AND PLACING OF THE BACKER ROD MATERIAL, TO ONLY

THAT LINEAR FOOTAGE THAT CAN BE SEALED DURING THE SAME

DAY.

6. PREPARATION OF SEALANT- DO NOT HEAT HOT-POURED SEALANTS

IN EXCESS OF THE SAFE HEATING TEMPERATURE RECOMMENDED

BY THE MANUFACTURER, AS SHOWN ON THE SEALANT

CONTAINERS. WITHDRAW AND WASTE SEALANT THAT HAS BEEN

OVERHEATED OR SUBJECTED TO APPLICATION TEMPERATURES

FOR OVER 4 HOURS OR THAT HAS REMAINED IN THE APPLICATOR

AT THE END OF THE DAY'S OPERATION.

7. SUBMIT MANUFACTURER'S INSTRUCTIONS 3 DAYS PRIOR TO THE

USE OF THE MATERIAL ON THE PROJECT. INSTALLATION OF THE

MATERIAL WILL NOT BE ALLOWED UNTIL THE INSTRUCTIONS ARE

RECEIVED.

8. TIME OF APPLICATION - SEAL CRACKS IMMEDIATELY FOLLOWING

FINAL CLEANING AND DRYING OF THE CRACK WALLS AND

FOLLOWING THE PLACEMENT OF THE BACKER ROD MATERIAL

(WHEN REQUIRED). PLACE SEALANT ONLY WHEN CRACKS ARE DRY.

RECLEAN CRACKS THAT CANNOT BE SEALED UNDER THE

CONDITIONS SPECIFIED, OR WHEN RAIN INTERRUPTS SEALING

OPERATIONS, AND ALLOW TO DRY OR DRY BY MECHANICAL MEANS

PRIOR TO INSTALLING THE SEALANT

9. SEALING THE CRACK - IMMEDIATELY PRECEDING, BUT NOT

MORE THAN 50 FEET AHEAD OF THE CRACK SEALING

OPERATIONS, PERFORM A FINAL CLEANING AND DRYING WITH

COMPRESSED AIR. CRACKS SHOULD BE FILLED NO HIGHER

THAN 1/8 INCH ABOVE THE PAVEMENT. REMOVE EXCESS OR

SPILLED SEALANT FROM THE PAVEMENT BY APPROVED

METHODS AND DISCARD IT. INSTALL THE SEALANT IN A

MANNER WHICH PREVENTS THE FORMATION OF VOIDS AND

ENTRAPPED AIR. SEVERAL PASSES WITH THE APPLICATOR

WAND MAY BE NECESSARY TO OBTAIN THE SPECIFIED

SEALANT DEPTH FROM THE PAVEMENT SURFACE. DO NOT

USE GRAVITY METHODS OR POURING POTS TO INSTALL THE

SEALANT MATERIAL. DO NOT PERMIT TRAFFIC OVER NEWLY

SEALED PAVEMENT UNTIL THE SEALANT HAS CURED. CHECK

CRACKS FREQUENTLY TO ENSURE THAT THE NEWLY

INSTALLED SEALANT IS CURED TO A TACK-FREE CONDITION

WITHIN 3 HOURS.

10. CRACK SEALANT INSTALLATION - TEST SECTION PRIOR TO THE

CLEANING AND SEALING OF THE CRACKS FOR THE ENTIRE

PROJECT, CONSTRUCT A TEST SECTION AT LEAST 200 FEET

LONG USING THE SPECIFIED MATERIALS AND APPROVED

EQUIPMENT TO DEMONSTRATE THE PROPOSED SEALING OF

ALL CRACKS OF THE PROJECT. FOLLOWING THE COMPLETION

OF THE TEST SECTION AND BEFORE ANY OTHER CRACK IS

SEALED, INSPECT THE TEST SECTION TO DETERMINE THAT

THE MATERIALS AND INSTALLATION MEET THE

REQUIREMENTS SPECIFIED. IF MATERIALS OR INSTALLATION

DO NOT MEET REQUIREMENTS, REMOVE THE MATERIALS AND

RE-CLEAN AND RESEAL THE CRACKS AT NO COST TO THE

GOVERNMENT.

11. CLEANUP - DAILY, REMOVE UNUSED MATERIALS FROM THE

SITE AND LEAVE THE PAVEMENT IN A CLEAN CONDITION.

GENERAL PROJECT NOTES:

1. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AND

ADJUST WORK PLAN ACCORDINGLY, PRIOR TO

BEGINNING CONSTRUCTION.

2. WORK TO BE COMPLETED IN RESTRICTED AREA.

GOVERNEMTN ESCORT REQUIRED FOR THE DURATION

OF THE PROJECT.

3. PROJECT SCHEDULE (DAYS AND TIMES) MUST BE

APPROVED 72 HOURS PRIOR TO START OF WORK, TO

SCHEDULE GOVERNMENT ESCORT.

4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR

COORDINATING WITH 142 SFS/RESOURCE PROTECTION

OFFICE FOR ACCESS TO PANG BASE (SEE ITB/CONTRACT

FOR DETAILS).

5. FOD TRAINING IS REQUIRED FOR ALL CONTRACTORS

WORKING PAST THE FLIGHTLINE. PANG WILL PROVIDE

FOD TRAINING.

6. CONTRACTOR TO PROVIDE SANITARY STATION.

7. CONTRACTOR TO PROVIDE WATER FOR PROJECT. NO

TRUCK OR EQUIPMENT WASHING IS APPROVED ON

BASE.

REFERENCES:

PAVEMENT REAPAIR

1. FFA ADVISORY CIRCLE DATED 10/10/2014 AC

NO:150/5380-6C

2. ASTMD6690

3. UFC 3-250-01

AIRFIELD MARKINGS

PLEASE REFER TO THE SPECIFICATIONS AND

REQUIREMENTS ON PREPARATION AND

INSTALLATION OF AIRFIELD MARKINGS AND SIGNS:

1. UFGS 32 01 11.51 (PAINT REMOVAL FROM

AIRFIELD PAVING)

2. UFGS 32 17 23 (PAVEMENT MARKINGS)

G-02

Notes

UPDATED PROJECT SPECIFICATIONS:

1. FOG SEAL: FOLLOW THE FAA SPECIFICATION P-608

2. MILL AND OVERLAY: 2" MILL WITH 2" ASPHALT PLACED BACK

3. PATCH AND REPAIR: REMOVAL OF ASPHALT UP TO 6" AND

REPLACEMENT WITH ASPHALT TO MATCH THE EXISTING THICKNESS

UP TO 6"

Drawing No:

Drawing Title:

SCOPE OVERVIEW

D-03

1st Priority

MILL AND OVERLAY

PRIORITY LEVEL

2nd Priority

Airfield

FOR BIDDING PURPOSES:

SCOPE TO INCLUDE 5000 SQFT

Drawing No:

Drawing Title:

SCOPE OVERVIEW

D-04

1st Priority

CRACK SEAL

PRIORITY LEVEL

2nd Priority

Airfield

FOR BIDDING PURPOSES:

SCOPE TO INCLUDE 1000 LNFT

Drawing No:

Drawing Title:

SCOPE OVERVIEW

D-05

Highest Priority

PATCH AND REPAIR

PRIORITY LEVEL

Middle Priority

Airfield FOR BIDDING PURPOSES:

SCOPE TO INCLUDE 2000 SQFT

Drawing No:

Drawing Title:

SCOPE OVERVIEW

D-06

Airfield NOTES:

1. REMOVE AND REPAINT MARKINGS

PAVEMENT MARKINGS

EAST AND WEST APRON

FOR BIDDING PURPOSES:

SCOPE TO INCLUDE

EAST APRON : 11,850

WEST APRON : 14,650

Slide 1
Slide 2
Slide 3
Slide 4
Slide 5
Slide 6

File details come from the government source that posted it. Updated .