02 - Gov Drawings - Pavement Repair and Markings.pdf

PDF 525 KB Posted

Attached to
Basewide Pavements & Markings
Solicitation number
S-24800-00014518
Issued by
Multnomah County, Oregon

About this file

The document is a set of technical drawings and specifications for a Basewide Pavement Repair project at the Portland Air National Guard Base in Oregon, dated 06/04/2025. The project encompasses four primary scopes of work: mill and overlay (5,000 sq ft), crack seal (1,000 linear feet), patch and repair (2,000 sq ft), and pavement markings for the East and West Aprons (11,850 and 14,650 sq ft respectively). The work is prioritized with different levels of urgency, with the airfield areas receiving the highest priority. Contractors will be required to obtain government escort for the duration of the project, complete FOD (Foreign Object Debris) training, provide their own sanitary facilities and water, and coordinate with the 142 SFS/Resource Protection Office for base access.

The project specifications include detailed technical requirements for pavement repair, including thorough cleaning and preparation of surfaces, specific sealant application methods, and adherence to standards such as ASTMD6690 and UFC 3-250-01. Contractors must submit manufacturer's instructions, conduct test sections, and follow strict guidelines for crack sealing, including temperature controls, cleaning procedures, and sealant application techniques. The project references multiple technical specifications, including UFGS 32 01 11.51 for paint removal and UFGS 32 17 23 for pavement markings. All debris must be disposed of off-base, with waste tickets submitted to the PANG Environmental Department, and work is to be completed in restricted areas with government oversight.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NAME: BASEWIDE PAVEMENT REPAIR

PROJECT NO: FY25C Date: 06/04/2025 Drawing No:

Drawing Title:

BASEWIDE PAVEMENT REPAIR

Portland Air National Guard Base, Oregon

COVER

G-01

SHEET INDEX

G-01 COVER

G-02 NOTES

D-03 DRAWINGS – MILL AND OVERLAY

D-04 DRAWINGS – CRACK SEAL

D-05 DRAWINGS – PATCH AND REPAIR

D-06 DRAWINGS – PAVEMENT MARKINGS

*DRAWINGS TO BE READ IN CONJUNCTION WITH SCOPE OF WORK IN THE ITB.

Drawing Title:

GENERAL SITE NOTES:

1. CONTRACTOR TO THROUGHLY DRY AND CLEAN THE CRACKS

AND ANY AREA TO BE PATCHED OR REPAIR, WITH

COMPRESSED AIR (100CFM OR GREATER) TO REMOVE

OXIDEZED PAVEMENT, LOOSE AGGREGATE AND FOREIGN

DEBRIS.

2. ALL DEBRIS TO BE DISPOSED OFF BASE. WASTE TICKETS TO

BE SUBMITTED TO PANG ENVIRONMENTAL DEPARTMENT.

3. SEALANTS TO CONFORM WITH ASTMD6690, TYPE II OR ASTM

D6690, TYPE I. PREFERRED BRAND: COLJOINT 6690 TYPE I

AND II OR APPROVED EQUAL.

4. BACKER ROD MATERIAL- WHEN REQUIRED, USE BACKER ROD

MATERIAL IN ALL CRACKS THAT OTHERWISE WOULD

REQUIRE EXCESSIVE SEALANT. PLACE THE BACKER ROD SO

THAT THE TOP OF THE BACKER ROD IS AT LEAST 3/4 INCH

BELOW THE TOP OF THE PAVEMENT. ENSURE THAT THE

BACKER ROD MATERIAL IS PLACED AT THE SPECIFIED DEPTH

AND IS NOT STRETCHED OR TWISTED DURING INSTALLATION.

5. RATE OF PROGRESS OF CRACK PREPARATION - LIMIT THE

STAGES OF CRACK PREPARATION, WHICH INCLUDE AIR

PRESSURE CLEANING AND PLACING OF THE BACKER ROD

MATERIAL, TO ONLY THAT LINEAR FOOTAGE THAT CAN BE

SEALED DURING THE SAME DAY.

6. PREPARATION OF SEALANT- DO NOT HEAT HOT-POURED

SEALANTS IN EXCESS OF THE SAFE HEATING TEMPERATURE

RECOMMENDED BY THE MANUFACTURER, AS SHOWN ON THE

SEALANT CONTAINERS. WITHDRAW AND WASTE SEALANT

THAT HAS BEEN OVERHEATED OR SUBJECTED TO

APPLICATION TEMPERATURES FOR OVER 4 HOURS OR THAT

HAS REMAINED IN THE APPLICATOR AT THE END OF THE

DAY'S OPERATION.

7. SUBMIT MANUFACTURER'S INSTRUCTIONS 3 DAYS PRIOR TO

THE USE OF THE MATERIAL ON THE PROJECT. INSTALLATION

OF THE MATERIAL WILL NOT BE ALLOWED UNTIL THE

INSTRUCTIONS ARE RECEIVED.

8. TIME OF APPLICATION - SEAL CRACKS IMMEDIATELY

FOLLOWING FINAL CLEANING AND DRYING OF THE CRACK

WALLS AND FOLLOWING THE PLACEMENT OF THE BACKER

ROD MATERIAL (WHEN REQUIRED). PLACE SEALANT ONLY

WHEN CRACKS ARE DRY. RECLEAN CRACKS THAT CANNOT BE

SEALED UNDER THE CONDITIONS SPECIFIED, OR WHEN RAIN

INTERRUPTS SEALING OPERATIONS, AND ALLOW TO DRY OR

DRY BY MECHANICAL MEANS PRIOR TO INSTALLING THE

SEALANT

9. SEALING THE CRACK - IMMEDIATELY PRECEDING, BUT NOT

MORE THAN 50 FEET AHEAD OF THE CRACK SEALING

OPERATIONS, PERFORM A FINAL CLEANING AND DRYING WITH

COMPRESSED AIR. CRACKS SHOULD BE FILLED NO HIGHER

THAN 1/8 INCH ABOVE THE PAVEMENT. REMOVE EXCESS OR

SPILLED SEALANT FROM THE PAVEMENT BY APPROVED

METHODS AND DISCARD IT. INSTALL THE SEALANT IN A

MANNER WHICH PREVENTS THE FORMATION OF VOIDS AND

ENTRAPPED AIR. SEVERAL PASSES WITH THE APPLICATOR

WAND MAY BE NECESSARY TO OBTAIN THE SPECIFIED

SEALANT DEPTH FROM THE PAVEMENT SURFACE. DO NOT

USE GRAVITY METHODS OR POURING POTS TO INSTALL THE

SEALANT MATERIAL. DO NOT PERMIT TRAFFIC OVER NEWLY

SEALED PAVEMENT UNTIL THE SEALANT HAS CURED. CHECK

CRACKS FREQUENTLY TO ENSURE THAT THE NEWLY

INSTALLED SEALANT IS CURED TO A TACK-FREE CONDITION

WITHIN 3 HOURS.

10. CRACK SEALANT INSTALLATION - TEST SECTION PRIOR TO THE

CLEANING AND SEALING OF THE CRACKS FOR THE ENTIRE

PROJECT, CONSTRUCT A TEST SECTION AT LEAST 200 FEET

LONG USING THE SPECIFIED MATERIALS AND APPROVED

EQUIPMENT TO DEMONSTRATE THE PROPOSED SEALING OF

ALL CRACKS OF THE PROJECT. FOLLOWING THE COMPLETION

OF THE TEST SECTION AND BEFORE ANY OTHER CRACK IS

SEALED, INSPECT THE TEST SECTION TO DETERMINE THAT

THE MATERIALS AND INSTALLATION MEET THE

REQUIREMENTS SPECIFIED. IF MATERIALS OR INSTALLATION

DO NOT MEET REQUIREMENTS, REMOVE THE MATERIALS AND

RE-CLEAN AND RESEAL THE CRACKS AT NO COST TO THE

GOVERNMENT.

11. CLEANUP - DAILY, REMOVE UNUSED MATERIALS FROM THE

SITE AND LEAVE THE PAVEMENT IN A CLEAN CONDITION.

GENERAL PROJECT NOTES:

1. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AND

ADJUST WORK PLAN ACCORDINGLY, PRIOR TO

BEGINNING CONSTRUCTION.

2. WORK TO BE COMPLETED IN RESTRICTED AREA.

GOVERNEMTN ESCORT REQUIRED FOR THE DURATION

OF THE PROJECT.

3. PROJECT SCHEDULE (DAYS AND TIMES) MUST BE

APPROVED 72 HOURS PRIOR TO START OF WORK, TO

SCHEDULE GOVERNMENT ESCORT.

4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR

COORDINATING WITH 142 SFS/RESOURCE PROTECTION

OFFICE FOR ACCESS TO PANG BASE (SEE ITB/CONTRACT

FOR DETAILS).

5. FOD TRAINING IS REQUIRED FOR ALL CONTRACTORS

WORKING PAST THE FLIGHTLINE. PANG WILL PROVIDE

FOD TRAINING.

6. CONTRACTOR TO PROVIDE SANITARY STATION.

7. CONTRACTOR TO PROVIDE WATER FOR PROJECT. NO

TRUCK OR EQUIPMENT WASHING IS APPROVED ON

BASE.

REFERENCES:

PAVEMENT REAPAIR

1. FFA ADVISORY CIRCLE DATED 10/10/2014 AC

NO:150/5380-6C

2. ASTMD6690

3. UFC 3-250-01

AIRFIELD MARKINGS

PLEASE REFER TO THE SPECIFICATIONS AND

REQUIREMENTS ON PREPARATION AND

INSTALLATION OF AIRFIELD MARKINGS AND SIGNS:

1. UFGS 32 01 11.51 (PAINT REMOVAL FROM

AIRFIELD PAVING)

2. UFGS 32 17 23 (PAVEMENT MARKINGS)

G-02

Notes

Drawing Title:

SCOPE OVERVIEW

D-03

1st Priority

MILL AND OVERLAY

PRIORITY LEVEL

2nd Priority

Airfield

FOR BIDDING PURPOSES:

SCOPE TO INCLUDE 5000 SQFT

Drawing Title:

SCOPE OVERVIEW

D-04

1st Priority

CRACK SEAL

PRIORITY LEVEL

2nd Priority

Airfield

FOR BIDDING PURPOSES:

SCOPE TO INCLUDE 1000 LNFT

Drawing Title:

SCOPE OVERVIEW

D-05

Highest Priority

PATCH AND REPAIR

PRIORITY LEVEL

Middle Priority

Airfield FOR BIDDING PURPOSES:

SCOPE TO INCLUDE 2000 SQFT

Drawing Title:

SCOPE OVERVIEW

D-06

Airfield NOTES:

1. REMOVE AND REPAINT MARKINGS

PAVEMENT MARKINGS

EAST AND WEST APRON

FOR BIDDING PURPOSES:

SCOPE TO INCLUDE

EAST APRON : 11,850

WEST APRON : 14,650

Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6