GESPC II Project - Commissioning Services
Solicitation number
PE-92200-RFQ-2027-000000091
Issued by
Fulton County, Georgia

About this file

This is a mechanical and electrical design document for the Georgia World Congress Center (GWCC) Authority's GESPC II Building C Chilled Water Plant Upgrades project, prepared by TLC Engineering Solutions, Inc. The project involves comprehensive modifications to the existing chilled water plant located in Building C, including replacement of water-cooled chillers and hydronic pumps, as well as replacement of secondary heating hot water pumps. The scope encompasses three new Trane CVHF water-cooled chillers (one 1,300-ton unit rated at 4160V and two 1,000-ton units rated at 480V), multiple new circulating water pumps including primary and secondary chilled water pumps, condenser water pumps, and heating hot water pumps manufactured by Bell & Gosset. The design includes installation of new refrigerant monitoring panels compatible with R-514A refrigerant, electromagnetic insertion flowmeters (Onicon F-3500 or equivalent), temperature sensors, and BTU meter interface displays. New variable frequency drives with electronic bypass capability are specified for pump operation, and all equipment requires vibration isolation on concrete housekeeping pads with inertia bases. The electrical scope includes connection of existing feeders to new chillers, installation of new breakers and feeders for new equipment, and integration with the building automation system's direct digital controls (DDC) for monitoring operating KW and KWH.

The design specifies detailed mechanical and electrical demolition requirements, including removal of existing 1,100-ton water-cooled chillers, disconnection of refrigerant and electrical services, and reclamation of refrigerant prior to demolition activities. All equipment connections must be verified with manufacturer certified drawings, and field modifications such as piping or ductwork offsets required due to obstructions shall be provided at no additional cost to the contractor. The project requires coordination with existing building elements and other trades, with minimum 6-inch clearance maintained between ductwork and fire-rated partitions. All piping penetrations must be sleeved and sealed, and manual air vents shall be provided at high points in chilled and hot water systems. The electrical connection schedule indicates feeder sizes and circuit requirements for each piece of equipment, with copper conductors rated for MV-90 5KV service. A communication restriction is in effect for this procurement, prohibiting interested firms from communicating with Authority staff, GWCC officials, or their consultants except through formal question submission processes. Finalists and apparent awardees are further restricted from making public statements or press releases regarding their selection, with violations subject to submittal rejection.

View the file

Other files

File Type Posted
GESPCII COMMISSIONING SERVICES (003).pdf PDF
GESPC II Commissioning Fee Proposal Form.docx DOCX document
01KTW19HYAGV486HFH489XWFMW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTE: SOME SYMBOLS SHOWN ON THIS LEGEND MAY NOT PERTAIN TO THIS PROJECT

P

M

TS

SYMBOL DESCRIPTIONSYMBOL DESCRIPTIONSYMBOL DESCRIPTION SYMBOL DESCRIPTION

SYMBOL DESCRIPTIONSYMBOL DESCRIPTIONSYMBOL DESCRIPTION

SYMBOL DESCRIPTION

RHC-1-1

PCHWP-1

M-1

-TEMPERATURE SENSOR

-MOTORIZED CONTROL DAMPER

-THERMOSTAT/TEMPERATURE SENSOR

-REVISION REFERENCE

-DETAIL REFERENCE: TOP-DETAIL#,

BOTTOM-DRAWING# SHOWN ON

-PRESSURE SENSOR

-CONNECT TO EXISTING

-DEMOLISH TO POINT INDICATED

DDC -DIRECT DIGITAL CONTROLS

PRS -PRESSURE REDUCING STATION

SP -STATIC PRESSURE

-CFM (CUBIC FEET PER MINUTE)

P -CHANGE IN PRESSURE

CV -CONSTANT AIR VOLUME

RS/L -REFRIGERANT SUCTION & LIQUID LINES

CL

-VARIABLE AIR VOLUMEVAV

-SUPPLY AIRSA

-REHEAT COILRHC

-REVOLUTIONS PER MINUTERPM

-RETURN AIRRA

-POLYVINYL CHLORIDE PIPEPVC

-PSI GAUGEPSIG

-POUNDS PER SQUARE INCHPSI

-PRESSURE REDUCING VALVEPRV

-NOT TO SCALENTS

-NORMALLY OPENNO

-NORMALLY CLOSEDNC

-GALLONS PER MINUTEGPM

-FEET PER MINUTE

-ENTERING WATER TEMPERATURE

-DOWN

-CHANGE IN TEMPERATURE

-COOLING TOWER

-CEILING DIFFUSER

-CENTER LINE

-BRITISH THERMAL UNIT

-BRAKE HORSEPOWER

-BOTTOM OF PIPE

-ABOVE FINISHED FLOOR

FPM

EWT

DN

T

CT

CD

BTU

BOP

BHP

AFF

MBH -THOUSAND BTUs PER HOURAFD -ADJUSTABLE FREQUENCY DRIVE

KW -KILOWATT

MCA -MINIMUM CIRCUIT AMPS

MOCP -MAXIMUM OVER CURRENT PROTECTION

UNO

TSP -TOTAL STATIC PRESSURE

-VOLTS/PHASEV/PH

VFD -VARIABLE FREQUENCY DRIVE

-UNLESS NOTED OTHERWISE

FLA -FULL LOAD AMPS

-CONTROL VALVE

-45° PIPE RISE (R) / DROP (D)

-CONDENSER WATER SUPPLY

-CONDENSER WATER RETURN

-CHILLED WATER SUPPLY

-CHILLED WATER RETURN

-HOT WATER RETURN

-HOT WATER SUPPLY

-REFRIGERANT LIQUID

-REFRIGERANT SUCTION

-VALVE ON RISER

-CAP

-CONNECTION, BOTTOM

-CONNECTION, TOP

-COUPLING

-ELBOW, 90°

-ELBOW, 45°

-ELBOW, TURNED DOWN

-ELBOW, TURNED UP

-TEE, OUTLET DOWN

-TEE, OUTLET UP

CWS

CWR

CHWS

CHWR

RL

RS

-FLOW SWITCH

-CHECK VALVE

-PSI REG.

-SOLENOID VALVE

-STRAINER

-GAS COCK

-BUTTERFLY VALVE

-CALIBRATING BALANCING VALVE

-BALL VALVE

-GATE VALVE

-UNION

DD

-SLOPE DIRECTION (DOWN)

-FLEX CONNECTION

-O.S.&Y. GATE VALVE

-THREE-WAY CONTROL VALVE

-THERMOMETER

- P-TRAP

-TWO-WAY CHECK VALVE

EQUIP.

-MANUAL VENT

-PRESSURE GAUGE

-RELIEF VALVE

-FLOW METER

-WATER METER

-INLINE PUMP

-INLINE PUMP

-PRIMARY CHILLED WATER PUMP

-REHEAT COIL

MOD -MOTOR OPERATED CONTROL DAMPER (MOD)

-CONCENTRIC REDUCER

-ECCENTRIC REDUCER

-STEAM TRAP

-FLOW DIRECTION

-SHEET NOTE CALLOUT

-SHEET NOTE CALLOUT

-SHEET NOTE CALLOUT

-ABOVE FINISHED ROOFAFR

HVAC GENERAL NOTESHVAC ABBREVIATIONSHVAC SYMBOL LEGEND

HVAC EQUIPMENT TAGS

HVAC PIPING SYMBOL LEGEND

HWR

HWS

1. CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH MANUFACTURER'S CERTIFIED DRAWINGS. TRANSITIONS TO ALL

EQUIPMENT SHALL BE VERIFIED AND PROVIDED FOR EQUIPMENT FURNISHED.

2. DIMENSIONS SHALL BE FIELD-VERIFIED AND COORDINATED PRIOR TO PROCUREMENT OR FABRICATION. COORDINATE THE WORK WITH OTHER TRADES INVOLVED. FIELD MODIFICATIONS SUCH AS OFFSETS IN PIPING OR DUCTWORK (INCLUDING DIVIDED DUCTWORK) NEEDED DUE TO OBSTRUCTIONS OR INTERFERENCES SHALL BE PROVIDED AT NO ADDITIONAL COST. FOR PROJECTS INVOLVING RENOVATION, COORDINATE NEW WORK WITH EXISTING ELEMENTS SUCH AS THE BUILDING STRUCTURE AND ARCHITECTURAL FEATURES, SPRINKLER PIPING, LIGHTS, PLUMBING, AND ELECTRICAL

CONDUIT.

3. ALL EQUIPMENT, SHALL BE SUPPORTED AS DETAILED AND/OR SPECIFIED. PROVIDE ADDITIONAL SUPPORTS AS REQUIRED

TO PROVIDE A VIBRATION-FREE, RIGID INSTALLATION.

4. REFER TO TYPICAL DETAILS FOR PIPING AND INSTALLATION OF EQUIPMENT.

5. ALL PIPING IS SHOWN SCHEMATICALLY. PROVIDE ALL TRANSITIONS, TURNING VANES, ELBOWS, FITTINGS, ETC., TO ALLOW SMOOTH FLOWS. ALL SPLIT DUCT FITTINGS SHALL TRANSITION TO FULL SIZE OF THE SUM OF BOTH BRANCHES, UPSTREAM OF SPLIT.

6. PROVIDE CONCRETE HOUSEKEEPING PAD UNDER ALL FLOOR-MOUNTED EQUIPMENT. REFER TO SPECIFICATIONS FOR

DETAILED REQUIREMENTS.

7. INTERRUPTIONS TO EXISTING SERVICES SHALL BE SCHEDULED WIT OWNER. SUCH INTERRUPTIONS TO SERVICES SHALL NOT BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER'S REPRESENTATIVE AND PROPER COORDINATION WITH OTHER TRADES. PRE-WORK SHALL BE PERFORMED TO MAKE THE SHUTDOWN PERIOD AS BRIEF AS POSSIBLE.

8. ALL EQUIPMENT TO BE REMOVED SHALL REMAIN PROPERTY OF THE OWNER OR DISPOSED OF LEGALLY, AS DIRECTED BY

OWNER.

9. MAINTAIN CLEARANCE OF A MINIMUM OF 6" BETWEEN DUCTWORK, PIPING, EQUIPMENT, ETC., AND ALL FIRE RATED AND

FIRE/SMOKE RATED PARTITIONS, TO ALLOW FOR INSPECTIONS OF RATED WALLS.

10. UNLESS OTHERWISE NOTED, ALL EQUIPMENT AND VALVE DRAINS SHALL BE INDEPENDENTLY PIPED FULL SIZE TO THE

NEAREST PLUMBING DRAIN.

11. SLEEVE AND SEAL ALL PIPING PENETRATIONS THROUGH BUILDING PARTITIONS. PROVIDE MANUAL AIR VENTS AT ALL

HIGH POINTS IN CHILLED WATER AND HOT WATER PIPING.

12. PIPING, LEAK PROTECTION APPARATUS, OR OTHER EQUIPMENT FOREIGN TO ELECTRICAL SWITCHBOARDS, PANELBOARDS, DISTRIBUTION BOARDS, OR MOTOR CONTROL CENTERS SHALL NOT BE INSTALLED WITHIN THE REQUIRED SPACE FOR WORKING CLEARANCES OR DEDICATED SPACES OF THE ELECTRICAL EQUIPMENT, EXTENDING IN FRONT OF AND FROM FLOOR TO STRUCTURAL CEILING WITH A WIDTH AND DEPTH OF THE ELECTRICAL EQUIPMENT IN ACCORDANCE

WITH NEC-110.26.

13. DDC SYSTEM SHALL MONITOR AND TREND OPERATING KW AND KWH FOR CHILLED WATER PLANT PUMPS (PRIMARY AND SECONDARY), CONDENSER WATER PUMPS, WATER-COOLED CHILLERS AND COOLING TOWER FANS. OPERATING KW AND KWH FOR FANS AND PUMPS SHALL BE OBTAINED THOUGH INTERFACE WITH FAN OR PUMP MOTOR VFD. OPERATING KW AND KWH FOR WATER-COOLED CHILLERS SHALL BE OBTAINED THROUGH CHILLER SERIAL INTERFACE.

S

MV

FM

M

T

PUMP NUMBER

AHU NUMBER COIL NUMBER

CFM

PROJECT SCOPE OF WORK

THIS PROJECT INCLUDES MECHANICAL AND ELECTRICAL MODIFICATIONS TO THE EXISTING CHILLED WATER PLANT LOCATED IN BUILDING C OF THE GEORGIA WORLD CONGRESS CENTER. MODIFICATIONS TO THE CHILLED WATER PLANT INCLUDE REPLACEMENTS OF WATER-COOLED CHILLERS AND HYDRONIC PUMPS, AS INDICATED IN THESE DOCUMENTS. ADDITIONALLY, SCOPE OF WORK INCLUDES REPLACEMENT OF EXISTING SECONDARY HEATING HOT WATER PUMPS, AS INDICATED IN THESE DOCUMENTS.

PROJECT SCOPE OF WORK

THIS PROJECT INCLUDES MECHANICAL AND ELECTRICAL MODIFICATIONS TO THE EXISTING CHILLED WATER PLANT LOCATED IN BUILDING C OF THE GEORGIA WORLD CONGRESS CENTER. MODIFICATIONS TO THE CHILLED WATER PLANT INCLUDE REPLACEMENTS OF WATER-COOLED CHILLERS AND HYDRONIC PUMPS, AS INDICATED IN THESE DOCUMENTS. ADDITIONALLY, SCOPE OF WORK INCLUDES REPLACEMENT OF EXISTING SECONDARY HEATING HOT WATER PUMPS, AS INDICATED IN THESE DOCUMENTS.

4360 Chamblee Dunwoody Rd.

Suite 210

Atlanta, GA 30341 P 770.451.6757 www.tlc-engineers.com

© Copyright 2022 TLC Engineering Solutions, Inc.

TLC Project No.:

Seal

Drawing No.:

Scale:

Revisions:

Drawing Title:

Approved By:

Issue Date:

Project No.:

Drawn By:

Consultants:

12" = 1'-0"

/1

/2

:4 :0

P

M L

-J o b s \8

-G

W C

C P h a s e

I G

A a n d

P re lim D e s ig n \R e v it -C e n tr a l\

M E

P R

.r v t

G W

C C

G E

S P

C I

I

B U

IL

D

IN

G

C C

H

IL

L E

D W

A T

E R

P L

A N

T S

U P

G R

A D

E S

A n d re w

Y o u n g I n te rn a ti o n a l B lv d

N W

A tl a n ta

G

A

824273

07/11/2025

R. COONS

R. PARKINS

MECHANICAL

SYMBOLS, LEGEND,

NOTES AND INDEX

M001

824273

No. Date Description

NEW WATER-COOLED CHILLER SCHEDULE

NOTES & ACCESSORIES:

1. AHRI AND ETL/cETL APPROVAL.

2. ASME VESSEL CODE.

3. CAPACITY CONTROL VIA VARIABLE FREQUENCY DRIVE AND INLET GUIDE VANES.

4. SINGLE POINT POWER CONNECTION.

5. DOOR-MOUNTED CIRCUIT BREAKER ON VARIABLE FREQUENCY DRIVE.

6. GROOVED PIPE CONNECTIONS, EVAPORATOR AND CONDENSER.

7. THERMAL DISPERSION FLOW SWITCH (IFM), EVAPORATOR AND CONDENSER.

8. UNIT MOUNTED LOW VOLTAGE ADAPTIVE FREQUENCY DRIVE (NEMA 1 ENCLOSURE).

9. R-514A WORKING REFRIGERANT.

10. ADAPTI-VIEW CONTROL PANEL.

11. NEOPRENE VIBRATION ISOLATORS AT BASE OF UNIT.

12. CHILLER SHALL BE CAPABLE OF INTERFACING WITH BUILDING AUTOMATION SYSTEM (NEW OR EXISTING). COORDINATE WITH EXISTING CONDITIONS AND REQUIREMENTS OF PROJECT.

13. COMPRESSOR INLET GUIDE VANES.

14. 65,000 AMP WITHSTAND/AIC RATING, CHILLER AND VARIABLE FREQUENCY DRIVE.

15. FACTORY STARTUP SHALL BE INCLUDED.

16. STANDARD 3/4" UNIT INSULATION PACKAGE, FACTORY-PROVIDED 3/4" (MINIMUM) THERMAL INSULATION ON EVAPORATOR SHELL.

17. STANDARD 3/4" UNIT INSULATION PACKAGE, FACTORY-PROVIDED 3/4" (MINIMUM) THERMAL INSULATION ON SUCTION PIPING COMPRESSOR INLET, MOTOR BARREL & HIGH HUMIDITY.

18. FACTORY INSULATE EVAPORATOR RETURN & CONNECTION HEADS.

19. FACTORY DISCONNECT SWITCH AND GROUND FAULT PROTECTION WITH VARIABLE FREQUENCY DRIVE.

20. HYDRONIC FLUID - WATER, NO GLYCOL.

21. TWO (2) CONDENSER WATER TUBE PASSES.

22. TWO (2) EVAPORATOR WATER TUBE PASSES.

23. RUPTUREGUARD-RELIEF VALVE-FIELD INSTALL.

24. FACTORY DISCONNECT SWITCH.

C-12 1,2,4,6,7,9,10,11,12,14,15,16,17,18,20,21,22,23,24,25,26

NOTES & ACCESSORIESTAG ENTERING

WATER

TEMPERATURE

56.0°F

UNIT WEIGHT

OPERATING

CONDITIONS

LBS.

COMPRESSORS

TYPE QUANTITY

CENTRIFUGAL 1

ELECTRICAL

SERVICE

4160V

DESIGN BASIS

RATED

TONNAGE

1,300

FULL

LOAD

KW/TON

0.5662

NPLV W/ TOWER

RELIEF

(PER AHRI 550/590)

EVAPORATOR

LEAVING

WATER

TEMPERATURE

42.0°F

WATERFLOW

GPM

2,218

MAXIMUM WATER

PRESSURE

DROP @ DESIGN

CONDITIONS

(FT. W.G.)

19.5

FOULING

FACTOR

0.00010

ENTERING

WATER

TEMPERATURE

95.0°F

CONDENSER

LEAVING

WATER

TEMPERATURE

85.0°F

MAXIMUM WATER

PRESSURE

DROP @ DESIGN

CONDITIONS

(FT. W.G.)

22.1

FOULING

FACTOR

0.00025

MINIMUM DESIGN

522.2

WATERFLOW

GPM

3,668

MINIMUM DESIGN

1,479 38,0000.4704

MAXIMUM

3,809

MAXIMUM

5,425 TRANE CVHF

C-13 4160V 38,000TRANE CVHF 1,2,4,6,7,9,10,11,12,14,15,16,17,18,20,21,22,23,24,25,26

C-11 56.0°F CENTRIFUGAL 1 480V1000 0.5759 42.0°F 1,706 18.0 0.00010 95.0°F 85.0°F 23.9 0.00025420.7 2,819968.1 32,0000.3774 3,069 3,550 TRANE CVHF 1070 1 THRU 23

NEW CIRCULATING WATER PUMPS

NOTES & ACCESSORIES:

1. PROVIDE SPARE SEAL KIT.

2. STAINLESS STEEL SHAFT, CAST IRON CASING, CONFINED NON-ASBESTOS FIBER CASING GASKET.

3. SHAFT GROUNDING RING.

4. PREMIUM EFFICIENT, INVERTER DUTY PUMP MOTOR.

5. SUCTION DIFFUSER AT PUMP INLET.

6. PROVIDE THERMAL SENSORS FOR ADDITIONAL PROTECTION OF PUMP MOTOR. THERMAL SENSORS SHALL BE INTERLOCKED WITH PUMP MOTOR VARIABLE

FREQUENCY DRIVE CONTROL CIRCUIT. THIS REQUIREMENT IS IN ADDITION TO THE STANDARD OVERCURRENT PROTECTION REQUIRED AT MOTORS.

NOTES &

ACCESSORIES

DESCRIPTIONTAG

DEVELOPE

D HEAD

(FEET W.G.)

SERVICE

IMPELLER

DIAMETER

(INCHES)

GPM HP

PUMP

EFFICIENCY

AT DUTY POINT

ELECTRICAL

SERVICE

(VOLTS / PHASE)

MANUFACTURER

DESIGN BASIS

MANUFACTURER

DESIGN SERIES

MANUFACTURER

DESIGN MODEL

PCHWP-4-3 70.0HORIZONTAL SPLIT CASE CHILLED WATER, PRIMARY MAXIMUM 2,685 460 / 3 BELL & GOSSET60.0 83.7 E-HSC 8 x 10 x 16 1 THRU 7

PHWP-4-1 HEATING HOT WATER, PRIMARY 1,100 45.0 460 / 3

PHWP-4-2

PHWP-4-3

MAXIMUM

PHWP-4-4

81.6

OPERATING

SPEED AT

DESIGN DUTY

POINT

1,180

1099 BELL & GOSSET E-HSC 5 x 8 x 12

PCHWP-4-4 CHILLED WATER, PRIMARY

PCHWP-4-5 CHILLED WATER, PRIMARY

PCHWP-4-6 CHILLED WATER, PRIMARY

CONDENSER WATER

HEATING HOT WATER, PRIMARY 1,100 45.0MAXIMUM

HEATING HOT WATER, PRIMARY 1,100 45.0MAXIMUM

HEATING HOT WATER, PRIMARY 1,100 45.0MAXIMUM

20.0

1 THRU 7

1 THRU 7

MAXIMUM 460 / 3 BELL & GOSSET E-HSC

MAXIMUM 460 / 3 BELL & GOSSET E-HSC

MAXIMUM 460 / 3 BELL & GOSSET E-HSC

85.0MAXIMUM 3,668 460 / 3 BELL & GOSSET100.0 89.4 E-HSC 10 x 12 x 15.51,162

PHWP-4-5 HEATING HOT WATER, PRIMARY 1,100 45.0MAXIMUM

460 / 381.6 1099 BELL & GOSSET E-HSC 5 x 8 x 1220.0

460 / 381.6 1099 BELL & GOSSET E-HSC 5 x 8 x 1220.0

460 / 381.6 1099 BELL & GOSSET E-HSC 5 x 8 x 1220.0

460 / 381.6 1099 BELL & GOSSET E-HSC 5 x 8 x 1220.0

HORIZONTAL SPLIT CASE

HORIZONTAL SPLIT CASE

HORIZONTAL SPLIT CASE

HORIZONTAL SPLIT CASE

HORIZONTAL SPLIT CASE

HORIZONTAL SPLIT CASE

HORIZONTAL SPLIT CASE

HORIZONTAL SPLIT CASE

HORIZONTAL SPLIT CASE

56.0°F CENTRIFUGAL 11,300 0.5662 42.0°F 2,218 19.5 0.00010 95.0°F 85.0°F 22.1 0.00025522.2 3,6681,4790.4704 3,809 5,425

7. PROVIDE STAINLESS STEEL DRAIN PAN UNDER PUMP HEAD WITR DRAIN LINE PIPED TO FLOOR DRAIN.

70.02,685 60.0 83.7

70.02,685 60.0 83.7

70.02,685 60.0 83.7

CWP-4-3

1,180

1,180

1,180

CONDENSER WATER 85.0MAXIMUM 3,668 460 / 3 BELL & GOSSET100.0 89.4 E-HSC1,162HORIZONTAL SPLIT CASECWP-4-4

CONDENSER WATER 85.0MAXIMUM 3,668 460 / 3 BELL & GOSSET100.0 89.4 E-HSC1,162HORIZONTAL SPLIT CASECWP-4-5

CONDENSER WATER 85.0MAXIMUM 3,668 460 / 3 BELL & GOSSET100.0 89.4 E-HSC1,162HORIZONTAL SPLIT CASECWP-4-6

8 x 10 x 16 1 THRU 7

8 x 10 x 16 1 THRU 7

8 x 10 x 16 1 THRU 7

1 THRU 710 x 12 x 15.5

1 THRU 710 x 12 x 15.5

1 THRU 710 x 12 x 15.5

1 THRU 7

1 THRU 7

1 THRU 7

1 THRU 7

25. NON-MARINE WATER BOX ON CHILLER EVAPORATOR.

26. MARINE WATER BOX ON CHILLER CONDENSER.

4360 Chamblee Dunwoody Rd.

Suite 210

Atlanta, GA 30341 P 770.451.6757 www.tlc-engineers.com

© Copyright 2022 TLC Engineering Solutions, Inc.

TLC Project No.:

Seal

Drawing No.:

Scale:

Revisions:

Drawing Title:

Approved By:

Issue Date:

Project No.:

Drawn By:

Consultants:

1/4" = 1'-0"

/1

/2

:4 :0

P

M L

-J o b s \8

-G

W C

C P h a s e

I G

A a n d

P re lim D e s ig n \R e v it -C e n tr a l\

M E

P R

.r v t

G W

C C

G E

S P

C I

I

B U

IL

D

IN

G

C C

H

IL

L E

D W

A T

E R

P L

A N

T S

U P

G R

A D

E S

A n d re w

Y o u n g I n te rn a ti o n a l B lv d

N W

A tl a n ta

G

A

824273

07/11/2025

R. COONS

R. PARKINS

MECHANICAL

SCHEDULES

M002

824273

No. Date Description

12.6

G

M

K.8

K

F

14.3 14y 13.6 13.3 13y13.4

M101

CH-9 CH-10 CH-11 CH-12 CH-13

B-7 B-8 B-9 B-10

ET

R

0V

0A

S W

IT

C

HB

O

AR

D

ETR 480V 4000A SWITCHBOARD

4360 Chamblee Dunwoody Rd.

Suite 210

Atlanta, GA 30341 P 770.451.6757 www.tlc-engineers.com

© Copyright 2022 TLC Engineering Solutions, Inc.

TLC Project No.:

Seal

Drawing No.:

Scale:

Revisions:

Drawing Title:

Approved By:

Issue Date:

Project No.:

Drawn By:

Consultants:

1/8" = 1'-0"

/1

/2

:4 :1

P

M L

-J o b s \8

-G

W C

C P h a s e

I G

A a n d

P re lim D e s ig n \R e v it -C e n tr a l\

M E

P R

.r v t

G W

C C

G E

S P

C I

I

B U

IL

D

IN

G

C C

H

IL

L E

D W

A T

E R

P L

A N

T S

U P

G R

A D

E S

A n d re w

Y o u n g I n te rn a ti o n a l B lv d

N W

A tl a n ta

G

A

824273

07/11/2025

R. COONS

R. PARKINS

MECHANICAL LEVEL

1 OVERALL -

EXISTING

M100

824273

No. Date Description

1/8" = 1'-0"

LEVEL 1 OVERALL- EXISTING

K.8

K

14.3 14y 13.6 13.4

2 2 1 1 1

CH-9 CH-10 CH-11 CH-12 CH-13

6" REFRIGERANT RELIEF

4"

10"CHWS10"CHWS 10"CHWS 10"CHWS

14"CWR

14"CWS

14"CWR

10"CHWR

14"CWR14"CWS

5 5 5 55

6 6 6 6 6

EXISTING ELECTRICAL ON CONCRETE PADS. REFER TO SHEET E101 & E201 FOR ELECTRICAL SCOPE OF WORK

4360 Chamblee Dunwoody Rd.

Suite 210

Atlanta, GA 30341 P 770.451.6757 www.tlc-engineers.com

© Copyright 2022 TLC Engineering Solutions, Inc.

TLC Project No.:

Seal

Drawing No.:

Scale:

Revisions:

Drawing Title:

Approved By:

Issue Date:

Project No.:

Drawn By:

Consultants:

1/4" = 1'-0"

/1

/2

:4 :1

P

M L

-J o b s \8

-G

W C

C P h a s e

I G

A a n d

P re lim D e s ig n \R e v it -C e n tr a l\

M E

P R

.r v t

G W

C C

G E

S P

C I

I

B U

IL

D

IN

G

C C

H

IL

L E

D W

A T

E R

P L

A N

T S

U P

G R

A D

E S

A n d re w

Y o u n g I n te rn a ti o n a l B lv d

N W

A tl a n ta

G

A

824273

07/11/2025

R. Coons

R. PARKINS

MECHANICAL LEVEL

1- EXISTING CHILLER

PLANT ENLARGED

M101

824273

No. Date Description

1/4" = 1'-0"

LEVEL 1 CHILLER PLANT ENLARGED - EXISTING

MECHANICAL DEMOLITION KEYNOTES:

1. EXISTING 1,100-TON WATER-COOLED CHILLER SHALL BE DEMOLISHED. PRIOR TO DEMOLITION OF CHILLER, EXISTING CHILLED AND CONDENSER WATER PIPING SHALL BE DISCONNECTED FROM CHILLER AND REMOVED BACK TO SHUT-OFF VALVE OR FURTHER AS REQUIRED FOR DEMOLITION OF CHILLER. EXISTING CHILLER ISOLATION/SHUT-OFF SHUT-OFF VALVE SHALL BE OPERATED TO THE CLOSED POSITION PRIOR TO DEMOLITION OF CHILLER OR HYDRONIC PIPING. DISCONNECT ELECTRICAL SERVICE AND REFRIGERANT RELIEF PIPING PRIOR TO CHILLER DEMOLITION. DEMOLISH EXISTING REFRIGERANT RELIEF PIPING BACK TO REFRIGERANT RELIEF MAIN AND CAP.

2. EXISTING 1,100-TON WATER-COOLED CHILLER SHALL BE DEMOLISHED. PRIOR TO DEMOLITION OF CHILLER, EXISTING CHILLED PIPING AND EXISTING CONDENSER WATER PIPING SHALL BE DISCONNECTED FROM CHILLER AND DEMOLISHED BACK TO SHUT-OFF VALVE OR FURTHER AS REQUIRED FOR DEMOLITION OF CHILLER. EXISTING CHLLER ISOLATION/SHUT-OFF VALVE SHALL BE OPERATED TO TEH CLOSED POSITION PRIOR TO DEMOLITION OF CHILLER OR HYDRONIC PIPINGG. INSTALL BLIND FLANGE AT OPEN ENDS OF PIPING. DISCONNECT ELECTRICAL SERVICE AND REFRIGERANT RELIEF PIPING PRIOR TO CHILLER DEMOLITION.

3. EXISTING REFRIGERANT DETECTORS SHALL BE DEMOLISHED. DEMOLISH EXISTING TUBING/WIRING BETWEEN EXISTING REFRIGERANT MONITORING PANEL AND REFRIGERANT DETECTORS. EXISTING CONDUIT, WHERE WIRING OR TUBING HAS

BEEN DEMOLISHED, CAN BE REUSED IF SUITABLE.

4. EXISTING REFRIGERANT MONITORING PANEL SHALL BE DEMOLISHED. DEMOLISH EXISTING TUBING/WIRING BETWEEN EXISTING REFRIGERANT MONITORING PANEL AND REFRIGERANT DETECTORS. EXISTING CONDUIT, WHERE WIRING OR TUBING

HAS BEEN DEMOLISHED, CAN BE REUSED IF SUITABLE. SEE SHEET M201 FOR NEW WORK..

5. EXISTING CONCRETE PAD SHALL REMAIN.

6. REFRIGERANT SHALL BE RECLAIMED FROM WATER-COOLED CHILLERS PRIOR TO START OF DEMOLITION ACTIVITIES.

R

EF

ER

T

O S

HE

ET

M

14.4 12.6

M

K.8

K

F

14.3 14y 13.6 13.3 13y13.4

PHWP-4-5 PHWP-4-4 PHWP-4-3 PHWP-4-2 PHWP-4-1

CWP-4-1

CWP-4-2 CWP-4-3 CWP-4-4 CWP-4-5 CWP-4-6

CWP-C-1

CWP-C-2

SHWP-4-1 SHWP-4-2 SHWP-4-3

PCHWP-4-2 PCHWP-4-3 PCHWP-4-4 PCHWP-4-5

PCHWP-4-6

PCHWP-4-1

SCHWP-4-1 SCHWP-4-2 SCHWP-4-3 SCHWP-4-4

SCHWP-4-5

M103

M104

4360 Chamblee Dunwoody Rd.

Suite 210

Atlanta, GA 30341 P 770.451.6757 www.tlc-engineers.com

© Copyright 2022 TLC Engineering Solutions, Inc.

TLC Project No.:

Seal

Drawing No.:

Scale:

Revisions:

Drawing Title:

Approved By:

Issue Date:

Project No.:

Drawn By:

Consultants:

1/8" = 1'-0"

/1

/2

:4 :2

P

M L

-J o b s \8

-G

W C

C P h a s e

I G

A a n d

P re lim D e s ig n \R e v it -C e n tr a l\

M E

P R

.r v t

G W

C C

G E

S P

C I

I

B U

IL

D

IN

G

C C

H

IL

L E

D W

A T

E R

P L

A N

T S

U P

G R

A D

E S

A n d re w

Y o u n g I n te rn a ti o n a l B lv d

N W

A tl a n ta

G

A

824273

07/11/2025

R. COONS

R. PARKINS

MECHANICAL LEVEL

2 OVERALL -

EXISTING

M102

824273

No. Date Description

1/8" = 1'-0"

LEVEL 2 OVERALL - EXISTING

ELECTRICAL SCOPE NARRATIVE: (BOILER ROOM)

1. CONTRACTOR SHALL REFER TO THE ELECTRICAL DEMO / RENO NOTES ON SHEET M001.

2. CONTRACTOR SHALL DISCONNECT EXISTING BOILERS CONTROLS, FEEDERS, ELECTRICAL CONNECTIONS, ETC. FROM

BOILER UNITS THAT ARE BEING DEMOLISHED.

3. CONTRACTOR SHALL SECURE AND STORE FEEDERS OUT OF THE WAY FOR DEMOLITION OF THE BOILER UNIT.

4. CONTRACTOR SHALL CONNECT EXISTING FEEDERS TO NEW VFD.

5. CONTRACTOR SHALL PURCHASE AND INSTALL A NEW BREAKER AND FEEDERS FOR NEW PRIMARY HOT WATER PUMP FOR

NEW HEAT PUMP CHILLER HP-CH-1.

14.4

M

K.8

K

14.3 14y 13.6 13.4

30"CWS 24"CWS 20"CWS 16"CWS

20"CWR14"CWR 24"CWR 30"CWR 30"CWR

10"CHWS16"CHWS20"CHWS24"CHWS

20"CHWS 24"CHWS

24"CHWR20"CHWR

"C

HW

S

"C

H W

R

"C

HW

S

"C

H W

R

14"CWS

20"CWR

"C

H W

R

CWP-4-1 CWP-4-2 CWP-4-3 CWP-4-4 CWP-4-5 CWP-4-6

SCHWP-4-1 SCHWP-4-2 SCHWP-4-3 SCHWP-4-4 SCHWP-4-5

PCHWP-4-6PCHWP-4-5PCHWP-4-4PCHWP-4-3PCHWP-4-2PCHWP-4-1

EXISTING PUMP DISCONNECT SWITCH

(TYPICAL, UNLESS NOTED OTHERWISE)

EXISTING VFD

EXISTING PUMP DISCONNECT SWITCH

(TYPICAL)

SCHWP-4-6

4360 Chamblee Dunwoody Rd.

Suite 210

Atlanta, GA 30341 P 770.451.6757 www.tlc-engineers.com

© Copyright 2022 TLC Engineering Solutions, Inc.

TLC Project No.:

Seal

Drawing No.:

Scale:

Revisions:

Drawing Title:

Approved By:

Issue Date:

Project No.:

Drawn By:

Consultants:

1/4" = 1'-0"

/1

/2

:4 :2

P

M L

-J o b s \8

-G

W C

C P h a s e

I G

A a n d

P re lim D e s ig n \R e v it -C e n tr a l\

M E

P R

.r v t

G W

C C

G E

S P

C I

I

B U

IL

D

IN

G

C C

H

IL

L E

D W

A T

E R

P L

A N

T S

U P

G R

A D

E S

A n d re w

Y o u n g I n te rn a ti o n a l B lv d

N W

A tl a n ta

G

A

824273

07/11/2025

R. COONS

R. PARKINS

MECHANICAL LEVEL

2 ENLARGED PART A

- EXISTING

M103

824273

No. Date Description

1/4" = 1'-0"

LEVEL 2 ENLARGED PART A - EXISTING

R

EF

ER

T

O S

HE

ET

M

4 4 5

5 5

44 2 2 2 2

MECHANICAL DEMOLITION KEYNOTES:

1. EXISTING PUMP SHALL BE DEMOLISHED. POWER SHALL BE DISCONNECTED FROM PUMP AND PUMP DISCONNECT. EXISTING PIPING TO/FROM PUMP SHALL BE DEMOLISHED BACK TO SHUT-OFF VALVES, WITH SHUT-OFF VAVES OPERATED TO THE CLOSED POSITON. EXISTING CONCRETE PAD AND INERTIA BASE SHALL REMAIN. EXISTING DISCONNECT SWITCH SHALL BE DEMOLISHED

2. EXISTING PRIMARY CHILLED WATER PUMP SHALL BE DEMOLISHED. POWER SHALL BE DISCONNECTED FROM PUMP AND PUMP DISCONNECT. EXISTING CHILLED WATER PIPING TO/FROM PUMP SHALL BE DEMOLISHED BACK TO CLOSEST SHUT- OFF VALVE OR AS REQUIRED FOR DEMOLITION OF PUMP. EXISTING CONCRETE PAD AND INERTIA BASE TO REMAIN. EXISTING DISCONNECT SWITCH SHALL BE DEMOLISHED. UNISTRUT SUPPORTING DISCONNECT SHALL REMAIN.

3. EXISTING SECONDARY CHILLED WATER PUMPS TO REMAIN. EXISTING PUMP VARIABLE FREQUENCY DRIVE TO REMAIN.

4. EXISTING HYDRONIC PUMPS TO REMAIN. EXISTING MEANS OF DISCONNECTION FOR PUMP (ELECTRICAL DISCONNECT OR VARIABLE FREQUENCY DRIVE) SHALL REMAIN.

5. EXISTING CONDENSER WATER PUMP SHALL BE DEMOLISHED. POWER SHALL BE DISCONNECTED FROM PUMP AND PUMP DISCONNECT OR VFD. EXISTING CONDENSER WATER PIPING TO/FROM PUMP SHALL BE DEMOLISHED BACK TO CLOSEST SHUT-OFF VALVE OR AS REQUIRED FOR DEMOLITION OF PUMP. EXISTING CONCRETE PAD AND INERTIA BASE TO REMAIN. EXISTING DISCONNECT OR VFD SWITCH SHALL BE DEMOLISHED. UNITSTRUT SUPPORTING DICONNECT SHALL REMAIN.

6. EXISTING PRIMARY CHILLED WATER PUMP SHALL BE DEMOLISHED. POWER SHALL BE DISCONNECTED FROM PUMP AND PUMP DISCONNECT. EXISTING CHILLED WATER PIPING TO/FROM PUMP SHALL BE DEMOLISHED BACK SHUT-OFF VALVES, WITH SHUT-OFF VALVES OPERATED TO THE CLOSED POSITION WITH ADDED BLIND FLANGE. EXISTING CONCRETE PAD AND INERTIA BASE TO REMAIN. EXISTING DISCONNECT SWITCH SHALL BE DEMOLISHED

7. EXISTING VFD SERVING SECONDARY CHILLED WATER PUMPS SHALL REMAIN

3 3

3 3

7 7 7 7

M

K.8

K

13.3 13y

EXISTING PUMP DISCONNECT SWITCH (TYPICAL)

EXISTING PUMP DISCONNECT

SWITCH (TYPICAL)

SHWP-4-1 SHWP-4-2 SHWP-4-3

PHWP-4-5 PHWP-4-4 SHWP-4-4 PHWP-4-3 PHWP-4-2 PHWP-4-1

16"HWS10"HWS

12"HWR14"HWR 8"HWR16"HWR

"H

W R

16"HWS 14"HWS 12"HWS

"H

W S

"H

W S

8" H

W S

8" H

W S

8" H

W S

8" H

W S

4360 Chamblee Dunwoody Rd.

Suite 210

Atlanta, GA 30341 P 770.451.6757 www.tlc-engineers.com

© Copyright 2022 TLC Engineering Solutions, Inc.

TLC Project No.:

Seal

Drawing No.:

Scale:

Revisions:

Drawing Title:

Approved By:

Issue Date:

Project No.:

Drawn By:

Consultants:

1/4" = 1'-0"

/1

/2

:4 :2

P

M L

-J o b s \8

-G

W C

C P h a s e

I G

A a n d

P re lim D e s ig n \R e v it -C e n tr a l\

M E

P R

.r v t

G W

C C

G E

S P

C I

I

B U

IL

D

IN

G

C C

H

IL

L E

D W

A T

E R

P L

A N

T S

U P

G R

A D

E S

A n d re w

Y o u n g I n te rn a ti o n a l B lv d

N W

A tl a n ta

G

A

824273

07/11/2025

R. COONS

R. PARKINS

MECHANICAL LEVEL

2 ENLARGED PART B

- EXISTING

M104

824273

No. Date Description

1/4" = 1'-0"

LEVEL 2 ENLARGED PART B - EXISTING

R

EF

ER

T

O S

HE

ET

M

MECHANICAL DEMOLITION KEYNOTES:

1. EXISTING PRIMARY HEATING HOT WATER WATER PUMP SHALL BE DEMOLISHED. POWER SHALL BE DISCONNECTED FROM PUMP AND PUMP DISCONNECT. EXISTING HEATING HOT WATER PIPING TO/FROM PUMP SHALL BE DEMOLISHED BACK TO CLOSEST SHUT-OFF VALVE OR FURTHER AS REQUIRED FOR DEMOLITION OF PUMP. EXISTING CONCRETE PAD AND INERTIA BASE TO REMAIN. EXISTING DISCONNECT SWITCH SHALL BE

DEMOLISHED. UNISTRUT SUPPORTING DICONNECT SWITCH SHALL REMAIN.

2. EXISTING SECONDARY HEATING HOT WATER PUMPS TO REMAIN

3. EXISTING HYDRONIC PUMPS TO REMAIN.

1 1 1

2 2 2

M

K.8

K

F

14.3 14y 13.6 13.3 13y13.4

M201

4360 Chamblee Dunwoody Rd.

Suite 210

Atlanta, GA 30341 P 770.451.6757 www.tlc-engineers.com

© Copyright 2022 TLC Engineering Solutions, Inc.

TLC Project No.:

Seal

Drawing No.:

Scale:

Revisions:

Drawing Title:

Approved By:

Issue Date:

Project No.:

Drawn By:

Consultants:

1/8" = 1'-0"

/1

/2

:4 :3

P

M L

-J o b s \8

-G

W C

C P h a s e

I G

A a n d

P re lim D e s ig n \R e v it -C e n tr a l\

M E

P R

.r v t

G W

C C

G E

S P

C I

I

B U

IL

D

IN

G

C C

H

IL

L E

D W

A T

E R

P L

A N

T S

U P

G R

A D

E S

A n d re w

Y o u n g I n te rn a ti o n a l B lv d

N W

A tl a n ta

G

A

824273

07/11/2025

R. COONS

R. PARKINS

MECHANICAL LEVEL

1 OVERALL - NEW

CONSTRUCTION

M200

824273

No. Date Description

1/8" = 1'-0"

LEVEL 1 OVERALL - NEW CONSTRUCTION

ELECTRICAL SCOPE NARRATIVE: (NEW)

1. FOR CHILLERS 11 AND 13, CONTRACTOR SHALL CONNECT THE EXISTING FEEDERS AND ALL ASSOCIATED ELECTRICAL

COMPONENTS BACK TO THE NEW CHILLERS.

2. FOR CHILLERS 9 AND 10 CONTRACTOR SHALL INSTALL NEW BREAKERS AND FEEDERS FROM THE EXISTING 4000A 480V

SWITCHBOARD LOCATED IN THE CHILLER ROOM.

Should be 12 and 13.

Should be Chiller 11

K

14.3 14y 13.6

EXISTING CHILLER

PAD TO REMAIN

ST

6" REFRIGERANT RELIEF

CH-11 CH-12 CH-13

1000 T 1300 T 1300 T

ST

14"CWR

14"CWR UP

14"CWS UP

14"CWS UP

14"CWR UP 14"CWR UP

14"CWS UP

10"CHWR UP10"CHWR UP

10"CHWR UP

10"CHWS UP

10"CHWS UP 10"CHWS UP

EXISTING CHILLER

PAD TO REMAIN

EXISTING ELECTRICAL ON CONCRETE PADS. REFER TO SHEET E101 & E201 FOR ELECTRICAL SCOPE OF WORK

4360 Chamblee Dunwoody Rd.

Suite 210

Atlanta, GA 30341 P 770.451.6757 www.tlc-engineers.com

© Copyright 2022 TLC Engineering Solutions, Inc.

TLC Project No.:

Seal

Drawing No.:

Scale:

Revisions:

Drawing Title:

Approved By:

Issue Date:

Project No.:

Drawn By:

Consultants:

1/4" = 1'-0"

/1

/2

:4 :3

P

M L

-J o b s \8

-G

W C

C P h a s e

I G

A a n d

P re lim D e s ig n \R e v it -C e n tr a l\

M E

P R

.r v t

G W

C C

G E

S P

C I

I

B U

IL

D

IN

G

C C

H

IL

L E

D W

A T

E R

P L

A N

T S

U P

G R

A D

E S

A n d re w

Y o u n g I n te rn a ti o n a l B lv d

N W

A tl a n ta

G

A

824273

07/11/2025

R. COONS

R. PARKINS

MECHANICAL LEVEL

1 CHILLER PLANT

ENLARGED - NEW

CONSTRUCTION

M201

824273

No. Date Description

MECHANICAL NEW CONSTRUCTION KEYNOTES:

1. A NEW 1,300-TON WATER-COOLED CHILLER SHALL BE INSTALLED IN PLACE OF EXISTING. ROUTE NEW 12"CHWS&R PIPING FROM CONNECTION AT EXISTING CHILLER ISOLATION VALVES AND CONNECT TO CHILLER EVAPORATOR OUTLET AND INLET, RESPECTIVELY. EXISTING 14"CWS&R SHALL BE RECONNECTED TO CHILLER CONDENSER INLET AND OUTLET, RESPECTIVELY.

NEW CHILLER'S REFRIGERANT RELIEF PORTS SHALL BE CONNECTED TO EXISTING REFRIGERANT RELIEF MAIN. ELECTRICAL SHALL BE RECONNECTED AS DIRECTED, SEE ELECTRICAL.

2. A NEW 1000-TON WATER-COOLED CHILLER SHALL BE INSTALLED IN PLACE OF EXISTING. THE THICKNESS OF ANY PAD EXTENSIONS SHALL MATCH THE THICKNESS OF THE EXISTING PAD.

EXISTING 10"CHWS&R PIPING SHALL BE RECONNECTED TO CHILLER EVAPORATOR OUTLET AND INLET, RESPECTIVELY. EXISTING 14"CWS&R SHALL BE RECONNECTED TO CHILLER CONDENSER INLET AND OUTLET, RESPECTIVELY. NEW CHILLER'S REFRIGERANT RELIEF PORTS SHALL BE CONNECTED TO EXISTING REFRIGERANT RELIEF MAIN. ELECTRICAL SHALL BE

RECONNECTED AS DIRECTED, SEE ELECTRICAL.

3. INSTALL NEW REFRIGERANT MONITORING PANEL BY GENESIS INTERNATIONAL, INC. OR AN EQUIVALENT. MONITORING SYSTEM SHALL SUPPORT A MINIMUM OF FOUR SENSORS AND SUPPORT AT LEAST THREE USER-SET ALARMS, INCLUDING A SYSTEM FAULT ALARM. THE PANEL SHALL INCLUDE A HORN, STROBE AND 3-WIRE CONNECTION FOR VARIOUS GAS TYPES.

THE PANEL SHALL OFFER A 4-20 MILLIAMP SINGAL OUTPUT, ADDITIONAL RELAYS FOR ISOLATED ALARMS AND DRY CONTACTS FOR MANUAL CONTROL. PENAL SHALL HAVE A NEMA 1 ENCLOSURE AND SHALL BE MODBUS READY. NEW REFRIGERANT MONITORING PANEL AND COMPONENTS SHALL BE CAPABLE OF MONITORING OF R-514A REFRIGERANT. NEW PANEL

SHALL BE INTEGRATED INTO BUILDING CONTROLS SYSTEM.

4. INSTALL NEW REFRIGERANT SENSOR BY GENESIS INTERNATIONAL, INC. OR AN EQUIVALENT. NEW INFRARED REFRIGERANT SENSOR SHALL BE COMPATIBLE WITH THE REFRIGERANT MONITORING PANEL. PROVIDE WIRING AND/OR TUBING BETWEEN SENSOR AND PANEL, AS REQUIRED, TO ALLOW FOR THE APPROPRIATE MONITORING.

R

EF

ER

T

O S

HE

ET

M

2 1 1

NSTALL NEW REMOTE NEMA 1 STROBE/BUZZER COMBINATION

LIGHT TOWER AT ENTRANCE TO MECHANICAL ROOM

NSTALL NEW REMOTE NEMA 1 STROBE/BUZZER COMBINATION

LIGHT TOWER AT ENTRANCE TO MECHANICAL ROOM

1/4" = 1'-0"

LEVEL 1 - CHILLER PLANT ENLARGED - NEW CONSTRUCTION

14.4 12.6

M

K.8

K

F

14.3 14y 13.6 13.3 13y13.4

M203

M204

4360 Chamblee Dunwoody Rd.

Suite 210

Atlanta, GA 30341 P 770.451.6757 www.tlc-engineers.com

© Copyright 2022 TLC Engineering Solutions, Inc.

TLC Project No.:

Seal

Drawing No.:

Scale:

Revisions:

Drawing Title:

Approved By:

Issue Date:

Project No.:

Drawn By:

Consultants:

1/8" = 1'-0"

/1

/2

:4 :4

P

M L

-J o b s \8

-G

W C

C P h a s e

I G

A a n d

P re lim D e s ig n \R e v it -C e n tr a l\

M E

P R

.r v t

G W

C C

G E

S P

C I

I

B U

IL

D

IN

G

C C

H

IL

L E

D W

A T

E R

P L

A N

T S

U P

G R

A D

E S

A n d re w

Y o u n g I n te rn a ti o n a l B lv d

N W

A tl a n ta

G

A

824273

07/11/2025

R. COONS

R. PARKINS

MECHANICAL LEVEL

2- NEW

CONSTRUCTION

M202

824273

No. Date Description

1/8" = 1'-0"

LEVEL 2 - NEW CONSTRUCTION

14.4

M

K.8

K

14.3 14y 13.6 13.4

S

F

S

CWP-4-3 CWP-4-4 CWP-4-5 CWP-4-6

SCHWP-4-1 SCHWP-4-2 SCHWP-4-3 SCHWP-4-4 SCHWP-4-5

PCHWP-4-3 PCHWP-4-4 PCHWP-4-5 PCHWP-4-6

"C

H W

R

20"CHWR 24"CHWR

"C

H W

R

24"CHWS20"CHWS

16"CHWS 10"CHWS20"CHWS24"CHWS

14"CWR 20"CWR 24"CWR 30"CWR

14"CWS

16"CWS20"CWS24"CWS30"CWS

"C

HW

S

"C

H W

R

"H

W R

"H

W R

CWP-4-2CWP-4-1

PCHWP-4-1 PCHWP-4-2

SCHWP-4-6

4360 Chamblee Dunwoody Rd.

Suite 210

Atlanta, GA 30341 P 770.451.6757 www.tlc-engineers.com

© Copyright 2022 TLC Engineering Solutions, Inc.

TLC Project No.:

Seal

Drawing No.:

Scale:

Revisions:

Drawing Title:

Approved By:

Issue Date:

Project No.:

Drawn By:

Consultants:

1/4" = 1'-0"

/1

/2

:4 :5

P

M L

-J o b s \8

-G

W C

C P h a s e

I G

A a n d

P re lim D e s ig n \R e v it -C e n tr a l\

M E

P R

.r v t

G W

C C

G E

S P

C I

I

B U

IL

D

IN

G

C C

H

IL

L E

D W

A T

E R

P L

A N

T S

U P

G R

A D

E S

A n d re w

Y o u n g I n te rn a ti o n a l B lv d

N W

A tl a n ta

G

A

824273

07/11/2025

R. COONS

R. PARKINS

MECHANICAL LEVEL

2 ENLARGED PART A

- NEW

CONSTRUCTION

M203

824273

No. Date Description

R

EF

ER

T

O S

HE

ET

M

MECHANICAL NEW CONSTRUCTION KEYNOTES:

1. NSTALL NEW CONDENSER WATER PUMP ON EXISTING CONCRETE PAD/INERTIA BASE IF EXISTING PAD AND INERTIA BASE IS SUITABLE FOR REUSE. IF UNSUITABLLE, PRIOR TO INSTALLATION OF NEW PUMP, EXISTING CONCRETE PAD SHALL BE EXPANDED AS REQUIRED SUCH THAT PAD EXTENDS NO LESS THAN 6 INCHES BEYOND THE PUMP BASE IN ALL DIRECTIONS. THE THICKNESS OF ANY PAD EXTENSIONS SHALL MATCH THE THICKNESS OF THE EXISTING PAD. PROVIDE NEW INERTIA BASE AS REQUIRED. ONCE NEW PUMP IS INSTALLED, EXTEND NEW CONDENSER WATER PIPING TO PUMP SUCTION AND DISCHARGE CONNECTIONS.

PROVIDE NEW VARIABLE FREQUENCY DRIVE WITH ELECTRONIC BYPASS. AFTER INSTALLATION OF PUMP AND NEW VARIABLE FREQUENCY DRIVE, POWER SHALL BE RECONNECTED TO NEW VFD AND PUMP.

2. INSTALL NEW PRIMARY CHILLED WATER PUMP ON EXISTING CONCRETE PAD/INERTIA BASE IF EXISTING PAD AND INERTIA BASE IS SUITABLE FOR REUSE. IF UNSUITABLLE, PRIOR TO INSTALLATION OF NEW PUMP, EXISTING CONCRETE PAD SHALL BE EXPANDED AS REQUIRED SUCH THAT PAD EXTENDS NO LESS THAN 6 INCHES BEYOND THE PUMP BASE IN ALL DIRECTIONS. THE THICKNESS OF ANY PAD EXTENSIONS SHALL MATCH THE THICKNESS OF THE EXISTING PAD. PROVIDE NEW INERTIA BASE AS REQUIRED. ONCE NEW PUMP IS INSTALLED, EXTEND NEW CHILLED WATER PIPING TO PUMP SUCTION AND DISCHARGE CONNECTIONS.

PROVIDE NEW VARIABLE FREQUENCY DRIVE WITH ELECTRONIC BYPASS. AFTER INSTALLATION OF PUMP AND NEW VARIABLE FREQUENCY DRIVE, POWER SHALL BE RECONNECTED TO NEW VFD AND PUMP.

3. INSTALL NEW ELECTROMAGNETIC INSERTION FLOWMETER AT THE LOCATION INDICATED. FLOWMETER SHALL BE SUITABLE FOR INSTALLATION IN PIPING/PIPING SIZE AT INDICATED LOCATION. FLOWMETER SHALL BE ONICON F-3500 OR EQUAL. INSTALL FLOWMETER IN COMPLIANCE WITH ALL MANUFACTURER RECOMMENDATIONS AND REQUIREMENTS, INCLUDING REQUIRED AMOUNT OF STRAIGHT PIPING UPSTREAM AND DOWNSTREAM OF FLOWMETER. FLOWMETER SHALL BE COMPATIBLE WITH 24V ELECTRICAL SERVICE. FLOWMETER SHALL BE UTILIZED BY ONICON SYSTEM-20 BTU METER.

4. NEW VARIABLE FREQUENCY DRIVE SHALL BE INSTALLED ON EXISTING UNISTRUT STAND.

5. EXISTING HYDRONIC PUMP SHALL REMAIN. EXISTING MEANS OF DISCONNECTION FOR PUMP (ELECTRICAL DISCONNECT OR VARIABLE FREQUENCY DRIVE) SHALL REMAIN.

6. EXISTING HYDRONIC PUMP SHALL REMAIN. EXISTING VARIABLE FREQUENCY DRIVE SERVING PUMP SHALL REMAIN.

7. EXISTING VARIABLE FREQUENCY DRIVES SERVING EXISTING SECONDARY CHILLED WATER PUMPS SHALL REMAIN.

1 1

2 2

INSTALL NEW TEMPERATURE SENSOR IN CHILLED WATER SUPPLY PIPING AT LOCATIONS

INDICATED. SENSORS SHALL BE UTILIZED BY ONICON SYSTEM-20 BTU METER.

INSTALL NEW TEMPERATURE SENSOR IN CHILLED WATER SUPPLY PIPING AT LOCATIONS

INDICATED. SENSORS SHALL BE UTILIZED BY ONICON SYSTEM-20 BTU METER.

INSTALL NEW BTU METER INTERFACE/DISPLAY AT LOCATION INDICATED. BTU METER

SHALL BE ONICON SYSTEM-20 OR EQUAL. FINAL LOCATION OF BTU METER

INTERFACE/DISPLAY SHALL BE COORDINATED WITH ACTUAL FIELD CONDITIONS.

1/4" = 1'-0"

LEVEL 2 - ENLARGED PART A - NEW CONSTRUCTION

4 4 4 4

4 444

7 7 7 7 7 7

M

K.8

K

13.3 13y

16"HWR 14"HWR

10"HWS

"H

W S

"H

W R

16"HWS 14"HWS 12"HWS

8"HWS

8"HWS

10"HWS

16"HWS

"H

W S

"H

W S

8" H

W S

8" H

W S

8" H

W S

8" H

W S

PHWP-4-5

PHWP-4-4

SHWP-4-4

PHWP-4-3

PHWP-4-2

PHWP-4-1

SHWP-4-1 SHWP-4-2 SHWP-4-3 F

S

S

4360 Chamblee Dunwoody Rd.

Suite 210

Atlanta, GA 30341 P 770.451.6757 www.tlc-engineers.com

© Copyright 2022 TLC Engineering Solutions, Inc.

TLC Project No.:

Seal

Drawing No.:

Scale:

Revisions:

Drawing Title:

Approved By:

Issue Date:

Project No.:

Drawn By:

Consultants:

1/4" = 1'-0"

/1

/2

:4 :5

P

M L

-J o b s \8

-G

W C

C P h a s e

I G

A a n d

P re lim D e s ig n \R e v it -C e n tr a l\

M E

P R

.r v t

G W

C C

G E

S P

C I

I

B U

IL

D

IN

G

C C

H

IL

L E

D W

A T

E R

P L

A N

T S

U P

G R

A D

E S

A n d re w

Y o u n g I n te rn a ti o n a l B lv d

N W

A tl a n ta

G

A

824273

07/11/2025

R. COONS

R. PARKINS

MECHANICAL LEVEL

2 ENLARGED PART B

- NEW

CONSTRUCTION

M204

824273

No. Date Description

R

EF

ER

T

O S

HE

ET

M

MECHANICAL NEW CONSTRUCTION KEYNOTES:

1. INSTALL NEW PRIMARY HEATING HOT WATER PUMP ON EXISTING CONCRETE PAD/INERTIA BASE. ONCE NEW PUMP IS INSTALLED, EXTEND NEW HEATING HOT WATER PIPING TO PUMP SUCTION AND DISCHARGE CONNECTIONS. PROVIDE NEW VARIABLE FREQUENCY DRIVE WITH ELECTRONIC BYPASS. AFTER INSTALLATION OF PUMP AND NEW VARIABLE FREQUENCY DRIVE, POWER SHALL BE RECONNECTED TO NEW VFD AND PUMP.

2. NSTALL NEW ELECTROMAGNETIC INSERTION FLOWMETER AT THE LOCATION INDICATED. FLOWMETER SHALL BE SUITABLE FOR INSTALLATION IN PIPING/PIPING SIZE AT INDICATED LOCATION. FLOWMETER SHALL BE ONICON F-3500 OR EQUAL. FLOWMETER SHALL BE COMPATIBLE WITH 24V

ELECTRICAL SERVICE. FLOWMETER SHALL BE UTILIZED BY ONICON SYSTEM-20 BTU METER.

3. INSTALL NEW VARIABLE FREQUENCY DRIVE ON EXISTING UNISTRUT STAND.

4. INSTALL NEW TEMPERATURE SENSOR IN HEATING HOT WATER RETURN PIPING AT LOCATION INDICATED. SENSOR SHALL BE UTILIZED BY ONICON

SYSTEM-20 BTU METER.

5. INSTALL NEW TEMPERATURE SENSOR IN HEATING HOT WATER SUPPLY PIPING AT LOCATION INDICATED. SENSOR SHALL BE UTILIZED BY ONICON

SYSTEM-20 BTU METER.

6. INSTALL NEW BTU METER INTERFACE/DISPLAY AT LOCATION INDICATED. BTU METER SHALL BE ONICON SYSTEM-20 OR EQUAL. FINAL LOCATION OF

BTU METER INTERFACE/DISPLAY SHALL BE COORDINATED WITH ACTUAL FIELD CONDITIONS.

7. INSTALL NEW ELECTROMAGNETIC INSERTION FLOWMETER AT THE LOCATION INDICATED. FLOWMETER SHALL BE SUITABLE FOR INSTALLATION IN PIPING/PIPING SIZE AT INDICATED LOCATION. FLOWMETER SHALL BE ONICON F-3500 OR EQUAL. INSTALL FLOWMETER IN COMPLIANCE WITH ALL MANUFACTURER RECOMMENDATIONS AND REQUIREMENTS, INCLUDING REQUIRED AMOUNT OF STRAIGHT PIPING UPSTREAM AND DOWNSTREAM OF FLOWMETER. FLOWMETER INSTALLATION SHALL BE DOWNSTREAM OF CONNECTION OF ALL SECONDARY HOT WATER PUMPS (INCLUDING SHWP 4-4) TO SECONDARY HOT WATER SUPPLY MAIN. FLOWMETER SHALL BE COMPATIBLE WITH 24V ELECTRICAL SERVICE. FLOWMETER SHALL BE UTILIZED BY

ONICON SYSTEM-20 BTU METER.

1 1

1 1

1/4" = 1'-0"

LEVEL 2 - ENLARGED PART B - NEW CONSTRUCTION

3 3333

EXISTING 10"CHWS

EXISTING 10"CHWS

EXISTING 10"CHWS

EXISTING 10"CHWS

EXISTING 10"CHWS

EXISTING 10"CHWS

EXISTING 10"CHWS

EXISTING 10"CHWS

EXISTING 10"CHWS

EXISTING 10"CHWS

EXISTING 10"CHWS

EXISTING 10"CHWS

TO SECONDARY

CHILLED WATER

PUMPS

FROM WATER-COOLED

CHILLERS/PRIMARY CHILLED

WATER LOOP

20-INCH TIE-IN TO

CHILLER PLANT B

CHILLED WATER

RETURN FROM

BUILDING

CHILLED WATER

SUPPLY TO

BUILDING

20-INCH TIE-IN TO

CHILLER PLANT B

EXISTING 10"CHWS EXISTING 10"CHWS

EXISTING 20"CHWS

EXISTING 20"CHWS

EXISTING 20"CHWS

EXISTING 20"CHWS

EXISTING 20"CHWS

EXISTING 20"CHWS

EXISTING 24"

EXISTING 24"

EXISTING 10"CHWR

EXISTING 10"CHWREXISTING 10"CHWREXISTING 10"CHWREXISTING 10"CHWREXISTING 10"CHWR

EXISTING 10"CHWREXISTING 10"CHWREXISTING 10"CHWREXISTING 10"CHWREXISTING 10"CHWR

EXISTING 10"CHWS EXISTING 10"CHWS EXISTING 10"CHWS

EXISTING 24"CHWR

EXISTING 20"CHWS

TO SYSTEM

EXPANSION

TANKS

EXISTING 10"CHWR

EXISTING 10"CHWR

EXISTING 10"CHWR

EXISTING 10"CHWREXISTING 10"CHWREXISTING 10"CHWREXISTING 10"CHWREXISTING 10"CHWR

EXISTING 10"CHWREXISTING 10"CHWREXISTING 10"CHWREXISTING 10"CHWR

VFD

PCWP-4-2 PCWP-4-1

SCWP-4-2 SCWP-4-3 SCWP-4-4 SCWP-4-6 SCWP-4-5SCWP-4-1

EXISTING AIR

SEPARATOR

NEW AIR

VENT

VFD VFD VFD VFD VFD

PCWP-4-5 PCWP-4-4 PCWP-4-3

EXISTING CHILLER CH-13

PCWP-4-6

EXISTING CHILLER CH-12 EXISTING CHILLER CH-11 EXISTING CHILLER CH-10 EXISTING CHILLER CH-9

1 1 1 1 1 1

2 2 2 2 2 2

2 2 2 2 2 2

2 2 2 2 2

2 2

4 4 4 4 2 2

3 3 3 9 9

4 4 4 4 4

2 2 2 2 22

2 2 2 2 2 2

2 2 2 2 2

2 2 2 2 2

2 2 2 2 2

2 2 2 2 2

2 2 2 2 2 22

7 7 7 7 7 7

8 8 8 8

6 6 6 6

8 888

EXISTING 24"CHWS EXISTING 24"CHWS

E X

IS

T

IN

G

4"

C H

W S

EXISTING 20"CHWS EXISTING 20"CHWS EXISTING 20"CHWS EXISTING 20"CHWS EXISTING 20"CHWS

EXISTING 20"CHWSEXISTING 20"CHWSEXISTING 20"CHWS

EXISTING 24"CHWSEXISTING 10"CHWS EXISTING 16"CHWS EXISTING 20"CHWS EXISTING 24"CHWS EXISTING 24"CHWS

EXISTING 10"CHWSEXISTING 16"CHWSEXISTING 20"CHWS EXISTING 10"CHWSEXISTING 24"CHWS

EXISTING 24"CHWS

EXISTING 10"CHWSEXISTING 10"CHWSEXISTING 10"CHWSEXISTING 10"CHWS

EXISTING 24"CHWREXISTING 24"CHWREXISTING 24"CHWR

EXISTING 24"CHWR EXISTING 20"CHWR EXISTING 20"CHWR EXISTING 20"CHWR EXISTING 20"CHWR

EXISTING 10"CHWREXISTING 10"CHWREXISTING 10"CHWREXISTING 10"CHWREXISTING 10"CHWR

MECHANICAL

ROOM

MECHANICAL

ROOM

MECHANICAL

ROOM

4360 Chamblee Dunwoody Rd.

Suite 210

Atlanta, GA 30341 P 770.451.6757 www.tlc-engineers.com

© Copyright 2022 TLC Engineering Solutions, Inc.

TLC Project No.:

Seal

Drawing No.:

Scale:

Revisions:

Drawing Title:

Approved By:

Issue Date:

Project No.:

Drawn By:

Consultants:

12" = 1'-0"

/1

/2

:4 :5

P

M L

-J o b s \8

-G

W C

C P h a s e

I G

A a n d

P re lim D e s ig n \R e v it -C e n tr a l\

M E

P R

.r v t

G W

C C

G E

S P

C I

I

B U

IL

D

IN

G

C C

H

IL

L E

D W

A T

E R

P L

A N

T S

U P

G R

A D

E S

A n d re w

Y o u n g I n te rn a ti o n a l B lv d

N W

A tl a n ta

G

A

824273

07/11/2025

R. COONS

R. PARKINS

MECHANICAL

HYDRONIC PIPING

DIAGRAM- EXISTING

M300

824273

No. Date Description

MECHANICAL DEMOLITION KEYNOTES:

1. EXISTING SECONDARY CHILLED WATR PUMP SHALL RMAIN

2. EXISTING CHILLED WATER PIPING TO REMAIN

3. EXISTING PRIMARY CHILLED WATER PUMP SHALL BE DEMOLISHED. EXISTING CHILLED

WATER PIPING AND ACCESSORIES SHALL BE DEMOLISHED BACK TO SHUT-OFF VALVES AS

INDICATED. EXISTING CONCRETE HOUSEKEEPING PAD, SUPPORTING PUMP, SHALL REMAIN.

4. EXSITING CHILLED WATER PIPING SHALL BE DEMOLISHED AS INDICATED.

5. EXISTING AIR SEPARATOR SHALL REMAIN.

6. EXISTING WATER-COOLED CHILLER SHALL BE DEMOLISHED. EXISTING CONCRETE

HOUSEKEEPING PAD, SUPPORTING CHILLER, SHAL REMAIN. CHILLED WATER PIPING SHALL

BE REMOVED BACK TO SHUT-OFF VALVES.

7. EXISTING VARIABLE FREQUENCY DRIVE SERVING CHILLED WATER PUMP.

8. POINT OF DISCONNECTION

9. EXISTING PRIMARY CHILLED WATER PUMP SHALL REMAIN.

12" = 1'-0"

HYDRONIC PIPING DIAGRAM- EXISTING

NEW 10"CHWR

NEW 10"CHWR

NEW 10"CHWR

NEW 10"CHWR

NEW 10"CHWR

NEW 10"CHWR

NEW 10"CHWR

NEW 10"CHWR

NEW 10"CHWR

NEW 12"CHWRNEW 12"CHWR

NEW 12"CHWS

F

S

S

TSTS

MODULATING

TSTS

MODULATING

TSTS

MODULATING

NEW 12"CHWS NEW 10"CHWS

EXISTING 10"CHWS

EXISTING 10"CHWS

EXISTING 10"CHWS

EXISTING 10"CHWS

EXISTING 10"CHWS

EXISTING 10"CHWS

EXISTING 10"CHWS

EXISTING 10"CHWS

EXISTING 10"CHWS

EXISTING 10"CHWS

EXISTING 10"CHWS

EXISTING 10"CHWS

TO SECONDARY

CHILLED WATER

PUMPS

FROM WATER-COOLED

CHILLERS/PRIMARY CHILLED

WATER LOOP

20-INCH TIE-IN TO

CHILLER PLANT B

CHILLED WATER

RETURN FROM

BUILDING

CHILLED WATER

SUPPLY TO

BUILDING

20-INCH TIE-IN TO

CHILLER PLANT B

EXISTING 10"CHWS EXISTING 10"CHWS

EXISTING 20"CHWS

EXISTING 20"CHWS

EXISTING 20"CHWS

EXISTING 20"CHWS

EXISTING 20"CHWS

EXISTING 20"CHWS

EXISTING 24"

EXISTING 24"

EXISTING 10"CHWR

EXISTING 10"CHWREXISTING 10"CHWREXISTING 10"CHWREXISTING 10"CHWREXISTING 10"CHWR

EXISTING 10"CHWREXISTING 10"CHWREXISTING 10"CHWREXISTING 10"CHWREXISTING 10"CHWR

EXISTING 10"CHWS EXISTING 10"CHWS EXISTING 10"CHWS

EXISTING 24"CHWR

EXISTING 20"CHWS

TO SYSTEM

EXPANSION

TANKS

NEW CHILLER CH-13 NEW CHILLER CH-12 NEW CHILLER CH-11

PCWP-4-5 PCWP-4-4 PCWP-4-3PCWP-4-6

VFD VFD VFD VFD

VFD

PCWP-4-2 PCWP-4-1

SCWP-4-2 SCWP-4-3 SCWP-4-4 SCWP-4-6 SCWP-4-5SCWP-4-1

EXISTING AIR

SEPARATOR

NEW AIR

VENT

VFD VFD VFD VFD VFD

1 1 1 1 1 1

2 2 2 2 2 2

2 2 2 2 2 2

2 2 2 2 2

2 2

4 4 4 4

3 3 3

4 4 4

2 2 2 2 22

2 2 2 2 2 2

2 2 2 2 2

2 2 2 2 2

2 2 2 2 2

2 2 2 2 2

2 2 2 2 2 22

7 7 7 7 7

8 8 8 8

9 9

10 10

999 9

NEW BTU METER

11 12

151515151515

4 4

EXISTING 24"CHWS EXISTING 24"CHWS

E X

IS

T

IN

G

4"

C H

W S

EXISTING 20"CHWS EXISTING 20"CHWS EXISTING 20"CHWS EXISTING 20"CHWS EXISTING 20"CHWS

EXISTING 20"CHWSEXISTING 20"CHWSEXISTING 20"CHWS

EXISTING 24"CHWSEXISTING 10"CHWS EXISTING 16"CHWS EXISTING 20"CHWS EXISTING 24"CHWS EXISTING 24"CHWS

EXISTING 10"CHWSEXISTING 16"CHWSEXISTING 20"CHWS EXISTING 10"CHWSEXISTING 24"CHWS

EXISTING 24"CHWS

EXISTING 10"CHWSEXISTING 10"CHWSEXISTING 10"CHWSEXISTING 10"CHWS

EXISTING 24"CHWREXISTING 24"CHWREXISTING 24"CHWR

EXISTING 24"CHWR EXISTING 20"CHWR EXISTING 20"CHWR EXISTING 20"CHWR EXISTING 20"CHWR

EXISTING 10"CHWREXISTING 10"CHWREXISTING 10"CHWREXISTING 10"CHWREXISTING 10"CHWR

MECHANICAL

ROOM

MECHANICAL

ROOM

MECHANICAL

ROOM

4360 Chamblee Dunwoody Rd.

Suite 210

Atlanta, GA 30341 P 770.451.6757 www.tlc-engineers.com

© Copyright 2022 TLC Engineering Solutions, Inc.

TLC Project No.:

Seal

Drawing No.:

Scale:

Revisions:

Drawing Title:

Approved By:

Issue Date:

Project No.:

Drawn By:

Consultants:

12" = 1'-0"

/1

/2

:4 :5

P

M L

-J o b s \8

-G

W C

C P h a s e

I G

A a n d

P re lim D e s ig n \R e v it -C e n tr a l\

M E

P R

.r v t

G W

C C

G E

S P

C I

I

B U

IL

D

IN

G

C C

H

IL

L E

D W

A T

E R

P L

A N

T S

U P

G R

A D

E S

A n d re w

Y o u n g I n te rn a ti o n a l B lv d

N W

A tl a n ta

G

A

824273

07/11/2025

R. COONS

R. PARKINS

MECHANICAL

HYDRONIC PIPING

DIAGRAM- NEW

M301

824273

No. Date Description

MECHANICAL NEW CONSTRUCTION KEYNOTES:

1. EXISTING SECONDARY CHILLED WATR PUMP SHALL RMAIN

2. EXISTING CHILLED WATER PIPING TO REMAIN

3. INSTALL NEW CHILLED WATER PUMP ON EXISTING CONCRETE HOUSEKEEPING PAD. INSTALL

NEW CHILLED WATER PIPOING AND ACCESSORIES BETWEEN PUMP AND SHUT-OFF VALVES

AS INDICATED.

4. INSTALL NEW CHILLED WATER PIPING AS INDICATED.

5. EXISTING AIR SEPARATOR SHALL REMAIN.

6. NSTALL NEW WATER-COOLED CHILLER ON EXISTING CONCRETE HOUSEKEEPING PAD.

INSTALL NEW CHILLED WATER PIPNING AND ACCESSORIES BETWEEN CHILLER AND SHUT-

OFF VALVES, AS INDICATED.

7. EXISTING VARIABLE FREQUENCY DRIVE SERVING CHILLED WATER PUMP.

8. NEW PRIMARY CHILLED WATER PUMP SHALL BE PROVIDED WITH VARIABLE FREQUENCY

DRIVE.

9. POINT OF CONNECTION, NEW TO EXISTING.

10. OPERATE SHUT-OFF VALVE TO THE CLOSED POSITION.

11. INSTALL NEW ELECTROMAGNETIC FLOWMETER AT THE LOCATION INDICATED. FLOWMETER

SHALL BE SUITABLE FOR INSTALLATION IN PIPING/PIPING SIZE AT INDICATED LOCATION.

FLOWMETER SHALL BE ONICON F-3500 OR EQUAL. FLOWMETER SHALL BE COMPATIBLE

WITH 24V ELECTRICAL SERVICE.

12. FLOWMETER SHALL BE UTILIZED BY ONICON SYSTEM-20 BTU METER.

13. INSTALL NEW TEMPERATURES SENSOR IN CHILLED WATER SUPPLY AND RETURN PIPING AT

LOCATIONS INDICATED. SENSORS SHALL BE UTILIZED BY ONICON SYSTEM-20 BTU METER.

14. NEW BTU METER INTERFACE/DISPLAY. BTU METER SHALL BE ONICON SYSTEM-20 OR

EQUAL.

15. NEW DDC TEMPERATURE SENSOR.

12" = 1'-0"

HYDRONIC PIPING DIAGRAM- NEW

UNIT INSTALLER: _____________________

INSTALLER'S ADDRESS:_______________

UNIT REGRIGERANT NUMBER: _________

UNIT REFRIGERANT CHARGE: _________ lbs

UNIT LUBRICANT IDENTITY: _____________

UNIT LUBRICANT AMOUNT: ______________

FIELD TEST PRESSURE APPLIED: ________lbs

NOTES :

1.

LOCATE SIGN ON EXTERIOR OF CHILLER CONTROL PANEL FOR EACH CHILLER.

2.

FORMAT FOR WARNING SIGNAL PANEL SHALL BE WHITE LETTERS ON RED BACKGROUND. SIGN

SHALL BE SILKSCREENED ALUMINUM OR ENGRAVED PLASTIC.

3. LARGE PRINT LETTERS SHALL BE 1-3/4" TALL; SMALL PRINT LETTER SHALL BE 1" TALL.

4. CONTRACTOR SHALL FURNISH ALL DATA NEEDED TO FILL IN REQUIRED INFORMATION. ALL DATA TO BE COMPLETED BY CONTRACTOR SHALL BE PERMANENTLY APPLIED IN LETTERING MINIMUM 1/2" TALL

24" MINIMUM

18" MIN.

CH-_REFRIGERANT

DATA

#5 CONT. W/ MATCHING CORNER BAR AT MID DEPTH W/ 4"

EMBEDMENT INTO EXISTING PAD USING HILTI HY200 ADHESIVE

1' -0"

#4 DOWEL @12" O/C WITH MIN 4" CONCRETE EMBEDMENT

DEPTH

FS

P

PP

FS

P

EXISTING CONCRETE

EQUIPMENT PAD

THERMOMETER

(TYPICAL)

CWR

C W

R

PETE'S PLUG

(TYPICAL)

CONDENSER ISOLATION

VALVE, MODULATING

CWR

CWS

C W

S

CWS

CLEANABLE 30

MESH STRAINER

C W

S

DIFFERENTIAL PRESSURE SENSOR (TYPICAL)

BUTTERFLY

VALVE

(TYPICAL)

CLEANABLE 30

MESH STRAINER

PRESSURE

GAUGE

(TYPICAL)

C

HW

R C

HW

R

CHWR

C H

W S

EVAPORATOR

ISOLATION

VALVE, MODULATING

FLEXIBLE CONNECTOR

(TYPICAL) SHALL BE MASON

INDUSTRIES SAFEFLEX

SFDEJ OR EQUAL

CHWS

FLOWSWITCH (TYPICAL),

OMIT IF FLOWSWITCH IS

PROVIDED INTEGRAL TO

CHILLER

DRAIN W/VALVE,

PROVIDE WITH HOSE

CONNECTION (TYPICAL)

EXISTING WATER-COOLED

CHILLER

FINISHED FLOOR

EXISTING

NEW

AUTOMATIC FLOW

CONTROL VALVE

EXISTING

NEW

BOLTED OR WELDED

RECTANGULAR STEEL

CONCRETE FORM

ANCHOR BOLTS IN

SLEEVES, AS REQUIRED

STEEL REINFORCEMENT

HEIGHT SAVING

BRACKET

INERTIA BASE SPECIFICATIONS :

1. VIBRATION ISOLATION MANUFACTURER SHALL FURNISH

STEEL CONCRETE POURING FORMS FOR FLOATING

CONCRETE BASES. GEOMETRY OF THE BASE SHALL BE

SUITABLE FOR THE PUMP BEING SERVED. THE BASE

DEPTH SHALL NOT EXCEED 12 INCHES, UNLESS

SPECIFICALLY RECOMMENDED BY THE BASE

MANUFACTURER FOR MASS OR RIGIDITY. FORMS

SHALL INCLUDE MINIMUM CONCRETE REINFORCING

CONSISTING OF 1/2" BARS WELDED IN PLACE ON SIX

INCH CENTERS RUNNING BOTH WAYS IN A LAYER 1-1/2"

ABOVE THE BOTTOM. FORMS SHALL BE FURNISHED

WITH STEEL TEMPLATES TO HOLD THE ANCHOR BOLT

SLEEVES AND ANCHOR BOLTS WHILE CONCRETE IS

BEING POURED. HEIGHT SAVING BRACKETS SHALL BE

EMPLOYED IN ALL MOUNTING LOCATIONS TO MAINTAIN

A 1-INCH CLEARANCE BELOW THE BASE. WOODEN

FORMED BASES LEAVING A CONCRETE RATHER THAN A

STEEL FINISH ARE NOT ACCEPTABLE. INERTIA BASE

SHALL BE BMK CONCRETE BOLTED BASE, BY MASON

INDUSTRIES, INC., OR EQUAL.

2. SPRING ISOLATORS SHALL BE FREE STANDING AND

LATERALLY STABLE WITHOUT ANY HOUSING AND

COMPLETE WITH A MOLDED NEOPRENE CUP OR 1/4"

NEOPRENE ACOUSTICAL FRICTION PAD BETWEEN THE

BASEPLATE AND THE SUPPORT. ALL MOUNTINGS

SHALL HAVE LEVELING BOLTS THAT MUST BE RIGIDLY

BOLTED TO THE EQUIPMENT. INSTALLED AND

OPERATING HEIGHTS SHALL BE EQUAL. THE RATIO OF

THE SPRING DIAMETER DIVIDED BY THE COMPRESSED

SPRING HEIGHT SHALL BE NO LESS THAN 0.8. SPRINGS

SHALL HAVE A MINIMUM ADDITIONAL TRAVEL TO SOLID

EQUAL TO 50% OF THE RATED DEFLECTION.

SUBMITTALS SHALL INCLUDE SPRING DIAMETERS,

DEFLECTION, COMPRESSED SPRING HEIGHT AND

SOLID SPRING HEIGHT. MOUNTINGS SHALL BE TYPE

SLF, AS MANUFACTURED BY MASON INDUSTRIES, INC.,

OR EQUAL.

FREE STANDING

SPRING

ISOLATORS

NOTES :

1. INERTIA BASES SHALL BE PROVIDED FOR ALL NEW

BASE MOUNTED HYDRONIC PUMPS.

HYDRONIC PIPING

PIPE INSULATION

CAP, PROVIDE WITH CHAIN ATTACHED TO

THERMOWELL

THERMOWELL WITH EXTENSION, AS SPECIFIED.

THERMOWELL SHALL BE INSTALLED SO THAT

WELL IS INSTALLED NO DEEPER THAN CENTER

OF PIPE.

45°

CONCRETE

HOUSEKEEPING

PAD

VIBRATION ISOLATION PAD (TYPICAL)

FLANGED JOINT OR

UNION TO PERMIT

PIPING DISASSEMBLY

DIRT LEG

CAP HAND-TIGHT TO PERMIT

CLEANOUT, PROVIDE 1/4" DRAIN

VALVE AT CAP

EXISTING REFRIGERANT RELIEF PIPING

VENTED TO THE OUTSIDE OF THE BUILDING.

UNION (TYPICAL)

PIPING CONNECTION TO RELIEF VALVE AND ALL PIPING TO

OUTDOORS PROVIDED BY CONTRACTOR

FLEXIBLE STEEL CONNECTION

4-INCH REFRIGERANT RELIEF PIPING ATTACHED TO

REFRIGERANT RELIEF CONNECTION WATER-COOLED CHILLER

EVAPORATOR

CONDENSER

RUPTURE DISK ASSEMBLY

NOTES:

1. SEE STRUCTURAL DRAWING S401 FOR ADDITIONAL

INFORMATION ON REQUIRED SEISMIC BRACING OF HYDRONIC

PIPING.

ALL THREAD

ROD

NUT (TOP

& BOTTOM)

WASHER (TOP

& BOTTOM)

CLEVIS

HANGER

INSULATION

PIPE

INSULATION

PROTECTIVE

SHEETMETAL SHIELD

THREADED ROD CUT TO LENGTH

CLEVIS TYPE PIPE HANGER

CARRIER PIPE

INSULATION

A) SHIELD FOR INSULATION PROTECTION

ON INSULATED LINES - LENGTH 1.5

TIMES INSULATION DIAMETER

B) ELASTOMERIC PAD FOR NONMETALLIC

CARRIER PIPE

C) OMIT FOR BARE STEEL CARRIER PIPE

NOTES:

1. SEE STRUCTURAL DRAWING S401 FOR ADDITIONAL

INFORMATION ON REQUIRED SEISMIC BRACING OF HYDRONIC

PIPING.

HANGER ROD

WEB MEMBERS

O.W.S.J.WELDS

HANGER

NUT

BAR JOIST

BENT STRAP

1 1/2"X3/16"

OVER VERT LEGS

OF ANGLES

BOTTOM CHORD

OF O.W.S.J.

ONE ANGLE EACH SIDE OF WEB

MEMBERS REST ON TOP OF BOTTOM

CHORD OF O.W.S.J. BETWEEN PANEL

POINTS. SIZE FOR LOAD.

CONCRETE HOUSE

KEEPING PADFINISHED FLOOR

NOTES:

1. SHIM/LEVEL BED PLATE & TIGHTEN HOLD DOWN BOLTS. GROUT BED PLATE AFTER LEVELING. GROUT SHALL BE THE NON-SHRINKING

TYPE.

2. PROVIDE SNUBBERS AT EACH PRESSURE GAUGE. SEE PROJECT SPECIFICATIONS FOR REQUIREMENTS FOR SNUBBERS.

CONCRETE HOUSE

KEEPING PAD

FINISHED FLOOR

BUTTERFLY VALVE

3/4" DRAIN WITH

FULL PORT BALL

VALVE AND

THREADED OUTLET

FLANGED

REDUCER

CHECK VALVE

3/4" DRAIN WITH

FULL PORT BALL

VALVE AND

THREADED OUTLET

FLEXIBLE CONNECTION: DOUBLE

SPHERE RUBBER CONNECTOR

MANUFACTURED WITH KEVLAR

REINFORCED HIGH TEMPERATURE

PEROXIDE CURED EPDM, EQUAL

TO MASON SAFEFLEX, TYPICAL

GROUTABLE

FABRICATED

STEEL BASE PLATE

HORIZONTAL SPLIT

CASE PUMP

OSHA/ANSI

COUPLER GUARD

INERTIA BASE, SEE

INERTIA BASE DETAIL

STRAINER

12" SPOOL

12" SPOOL

MULT-PORT

PRESSURE GAUGE

SNUBBER

NEEDLE VALVE

(TYPICAL)

SIDE VIEW FRONT VIEW

BALL VALVE

(TYPICAL)

AUTOMATIC

AIR VENT

NEEDLE VALVE

1/2" x 4"

NIPPLE

FULL PIPE

SIZE

FLOW DIRECTION

PIPE TO FLOOR OR

INDIRECT DRAIN, FULL

SIZE OF CONNECTION

6"

PROVIDE BALL

VALVE IN

ACCESSIBLE

LOCATION WHERE

DISCHARGE FROM

TUBING CAN BE

OBSERVED.

1/2" STEEL

PIPE

1/2" HARD

COPPER 1/2" HARD

COPPER

NOTES :

1. IF MAIN BRANCH PIPING IS COPPER, ALL SUBSEQUENT

PIPING IS COPPER.

2. ALL HIGH POINTS, WHERE AIR POCKETS MAY DEVELOP,

SHALL BE VENTED.

3. PROVIDE BALL VALVE IN ACCESSIBLE LOCATION WHERE

DISCHARGE FROM TUBING CAN BE OBSERVED.

V

STRUCTURAL MEMBER

MALLEABLE

IRON BEAM

CLAMP

MALLEABLE IRON

EXTENSION PIECE

SUPPORT ROD -

SEE SPECS FOR

SIZE

BOLT

STRUCTURAL MEMBER

CARBON STEEL BEAM

CLAMP

BOLT

MALLEABLE

IRON

EXTENSION

PIECE

SLEEVE OVER BOLT FOR

SPACER SUPPORT ROD- SEE

SPECS FOR SIZE

4360 Chamblee Dunwoody Rd.

Suite 210

Atlanta, GA 30341 P 770.451.6757 www.tlc-engineers.com

© Copyright 2022 TLC Engineering Solutions, Inc.

TLC Project No.:

Seal

Drawing No.:

Scale:

Revisions:

Drawing Title:

Approved By:

Issue Date:

Project No.:

Drawn By:

Consultants:

As indicated

/1

/2

:4 :0

P

M L

-J o b s \8

-G

W C

C P h a s e

I G

A a n d

P re lim D e s ig n \R e v it -C e n tr a l\

M E

P R

.r v t

G W

C C

G E

S P

C I

I

B U

IL

D

IN

G

C C

H

IL

L E

D W

A T

E R

P L

A N

T S

U P

G R

A D

E S

A n d re w

Y o u n g I n te rn a ti o n a l B lv d

N W

A tl a n ta

G

A

824273

07/11/2025

R. COONS

R. PARKINS

MECHANICAL-

DETAILS

M400

824273

No. Date Description

NOT TO SCALE

CHILLER REFRIGERANT DATA SIGN

NOT TO SCALE

EXISTING CONCRETE PAD EXPANSION DETAIL

NOT TO SCALE

WATER-COOLED CHILLER PIPING DETAIL

NOT TO SCALE

BASE-MOUNTED END SUCTION PUMP INERTIA BASE DETAIL

NOT TO SCALE

THERMOWELL INSTALLATION DETAIL

NOT TO SCALE

REFRIGERANT RELIEF DETAIL

NOT TO SCALE

TYPICAL CLEVIS HANGER DETAIL

NOT TO SCALE

CLEVIS PIPE HANGER DETAIL

NOT TO SCALE

STEEL BAR JOIST PIPE SUPPORT

NOT TO SCALE

HORIZONTAL SPLIT CASE PUMP DETAIL

1/2" = 1'-0"

AUTOMATIC AIR VENT DETAIL

1/2" = 1'-0"

BEAM CLAMPS FOR PIPE OR EQUIPMENT SUPPORT

DN

UP

NOTE: SOME SYMBOLS SHOWN ON THIS LEGEND MAY NOT PERTAIN TO THIS PROJECT.

SYMBOL DESCRIPTION

DDC

VFD

ELECTRICAL SYMBOL LEGEND

AUTOMATIC TRANSFER SWITCH

TRANSFORMERT

DIRECT DIGITAL CONTROL PANEL

VARIABLE FREQUENCY DRIVE

MOTOR CONNECTION

NEW (HEAVY, SOLID LINE)

EXISTING TO REMAIN (LIGHT, SOLID LINE)

EXISTING TO BE REMOVED (HEAVY, DASHED LINE)

FLEXIBLE CONDUIT

CONDUIT CONTINUED

CONDUIT STUBBED OUT OR UP

CONDUIT TURNING DOWN

CONDUIT TURNING UP

GROUND OR GROUND ROD AS NOTED

CONDUIT EXPOSED

CONDUIT CONCEALED IN SLAB, UNDERGROUND OR UNDER FLOOR

CONDUIT CONCEALED ABOVE CEILING OR IN WAL

BRANCH CIRCUIT PANELBOARD, OVER 240 VOLTS, SURFACE MOUNTED

MULTI-SERVICE RACEWAY WITH 5-20R RECEPTACLES, 18" O.C. UNLESS

OTHERWISE NOTED

SPECIAL PURPOSE RECEPTACLE, NEMA CONFIGURATION AS NOTED

NOTE: DIAGONAL MARKS INDICATED ON ANY DEVICE REPRESENTS DEVICE

CONNECTED TO EMERGENCY CIRCUIT (RED DEVICE FOR RECEPTACLE);

TYPICAL FOR ANY DEVICE IN LEGEND

TWO…