017419 - Construction Waste Management.doc

DOC document 33 KB Posted

Attached to
Z2DA--520-21-1-7032-0001 - Project 520-22-125 Replace Nurse Call System (VA-21-00015374)
Solicitation number
36C25621R0053
Issued by

About this file

This federal solicitation requests proposals to replace a nurse call system. The Gulf Coast Veterans Health Care System seeks to issue a 100% set-aside contract for service-disabled veteran-owned small businesses through full and open competition procedures. Interested offerors must download the request for proposals from SAM.gov, including all amendments. Proposals are due by March 1, 2021. The contract award date is approximately 30 days after receipt of proposals. The period of performance is 120 days from notice to proceed. The location of work is 400 Veterans Avenue in Biloxi, Mississippi. Offerors must be registered in the Vendor Information Pages database and System for Award Management to be considered. The prime contractor must perform a minimum of 15% of contract costs using own employees or employees of other service-disabled veteran-owned small businesses.

View the file

Other files

File Type Posted
36C25621R0053 0002.docx DOCX document
Register containing all RFI Inquiries _ Responses.docx DOCX document
Site Visit Sign-In Sheets.pdf PDF
36C25621R0053 0001.docx DOCX document
013323 - Shop Drawings.doc DOC document
EXHIBIT B PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx DOCX document
270526 - Grounding and Bonding Communication Systems.doc DOC document
WD General Decision No MS20210050 02-12-2021.pdf PDF
EXHIBIT E SURETY FORM.docx DOCX document
275223 - Nurse Call Code Blue System.doc DOC document
271000 - Control Comm and Signal Wiring.doc DOC document
260533 - Raceway and Boxes for Elec Systems.doc DOC document
270511 - Req Communication Install.doc DOC document
36C25621R0053_1.docx DOCX document
EXHIBIT D CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY.docx DOCX document
SITE VISIT MAP Biloxi VA.pdf PDF
013526 - Safety Requirements.doc DOC document
260511 - Req for Electrical Installation.doc DOC document
262726 - Wiring Devices.doc DOC document
EXHIBIT F REQUEST FOR INFORMATION FORM.docx DOCX document
EXHIBIT A PERFORMANCE RELEVANCY SURVEY.docx DOCX document
010000 - General Requirements.doc DOC document
Drawings for Proj 520-22-125 Replace Nurse Call System.zip ZIP file
260521 - Low Voltage Elec.doc DOC document
260526 - Grounding Bonding Elec.doc DOC document
078400 - Firestopping.doc DOC document
EXHIBIT C SUBCONTRACTOR INFORMATION AND CONSENT.docx DOCX document
ICRA.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

520-22-125

SECTION 01 74 19

CONSTRUCTION WASTE MANAGEMENT

1.1 DESCRIPTION

This specification covers the requirements for management of non-hazardous building construction and demolition waste.

1.2 RELATED WORK

A.

N/A

1.3 GOVERNMENT POLICY

A.

Contractor shall practice efficient waste management when sizing, cutting and installing building construction products.

B.

Contractor shall use all reasonable means to divert construction and demolition waste from landfills and incinerators and facilitate their recycling.

C.

Contractor shall be responsible for implementation of any special programs involving rebates or similar incentives related to recycling and any revenues or savings obtained from salvage or recycling shall accrue to the Contractor.

D.

Contractor shall ensure that facilities used for recycling, reuse and disposal shall be permitted for the intended use to the extent required by federal, state and local regulations.

1.4 PLAN

A.

Conduct a site assessment to estimate the types of materials that will be generated by demolition at the site. The Whole Building Design Guide website (http://www.wbdg.org) has a Construction Waste Management Database that contains information on companies that haul, collect, and process recyclable debris from construction projects

B.

Develop and implement procedures to reuse and recycle materials to the greatest extent feasible based upon the contract, the construction and demolition debris management plan, the estimated quantities of materials, and the availability of recycling facilities.

C.

Prepare and submit to the C.O.T.R. a written demolition debris management plan. The plan shall include, but not be limited to, the following information:

1.

Contractor and project identification information;

2.

Procedures to be used for debris management;

3.

A listing of the materials to be reused, recycled, or taken to the landfill.

4.

The names and locations of reuse and recycling facilities or sites.

1.5 COLLECTION

A.

Provide necessary containers, bins and storage areas to facilitate effective waste management.

B.

Clearly identify so that recyclable materials are separated from trash and can be transported to respective recycling facility for processing.

1.6 DISPOSAL

A.

Contractor shall be responsible for transporting and disposing of materials that cannot be delivered to a source-separated or mixed materials recycling facility to a transfer station or disposal facility that can accept the materials in accordance with state law.

B.

Building or demolition materials with no practical use or that cannot be recycled shall be disposed of at a landfill or incinerator.

1.7 REPORT

With each application for progress payment, the contractor shall submit a summary of construction and demolition debris diversion and disposal, quantifying all materials generated at the work site and disposed of or diverted from disposal through recycling.

- - - E N D - - -