About this file
This file is a traffic design index and signing and pavement marking plan document prepared by SLR International Corp. for the Connecticut Department of Transportation (CTDOT) in connection with spot improvements on River Street (Route 313) in the Town of Seymour. The document contains detailed traffic control drawings and specifications for a multi-stage construction project, including vehicle detour plans for Routes 313 (River Street) with both staged construction phases (1A, 1B) and full road closure phases (2, 3), pedestrian detour plans covering all construction stages, and comprehensive signing and pavement marking plans. The project includes installation of traffic control signs, pavement markings using epoxy resin materials, and removal and relocation of existing signs and posts within the project limits. Key technical specifications include 4-inch double yellow centerline markings, 6-inch white edge lines, 4-inch white lane lines, and white dotted extension lines with specific spacing requirements (2-foot line/4-foot spacing). All signs must be positioned at least 10 feet from utility poles and installed in accordance with Connecticut traffic standard sheets TR-1208_01 and TR-1208_02.
The document specifies that pavement markings are to be installed throughout the project to the limit of pavement markings as directed by the engineer, with final pavement markings required to be epoxy resin unless otherwise noted, and longitudinal markings specified as Type I epoxy resin in grooves. Work for removal and relocation of existing signs, including town-owned and private signs within project limits, is payable under item number 1206023A. Temporary signalization implementation is shown at Site No. 1 intersection number 124-201 with temporary pavement markings and sand barrels listed on the Department's Qualified Products List. The plan is dated 7/14/2026 and was designed by W. Francis, checked by D. Tompkins, and prepared by SLR Consulting located at 99 Realty Drive, Cheshire, Connecticut.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INX-05 TRAFFIC DESIGN - INDEX OF DRAWINGS
SIGNING AND PAVEMENT MARKING PLANSPM-01
STAGED CONSTRUCTION STAGES 1A & 1B
SLR INTERNATIONAL CORP.
DESIGNED BY:
NUMBER
DRAWING
NUMBER
DRAWING
INDEX OF DRAWINGS
DRAWING TITLE DRAWING TITLE
DET-01 VEHICLE DETOUR PLAN - ROUTE 313 (RIVER STREET) EAST (SOUTHBOUND) - STAGES 1A & 1B
DET-02 VEHICLE DETOUR PLAN - ROUTE 313 (RIVER STREET) FULL ROAD CLOSURE - STAGES 2 & 3
DET-03 PEDESTRIAN DETOUR PLAN FOR CONSTRUCTION STAGES 1A, 1B, 2, & 3
MPT-01
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
7/14/2026
SIGNATURE BLOCK: DRAWING TITLE:
INX-05
TOWN(S):
SEYMOURSPOT IMPROVEMENTS ON RIVER STREET (ROUTE 313)
PLOTTED DATE:
W:\CADDesign\_CTDOT_Projects\124-165 (Bridge)\Traffic\_Contract_Plans\TR_CP_0124-0165_INX-05.dgn FILE NAME: wkfrancis LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
IO
N
0124-0165
DESIGNER/DRAFTER: W. FRANCIS CHECKED BY: D. TOMPKINS
OF DRAWINGS
TRAFFIC DESIGN INDEX
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
MPT-02 STAGED CONSTRUCTION STAGES 2 & 3
SPM-02 SIGNING AND PAVEMENT MARKING PLAN
TR_GS_01
TR_GS_02
TR_GS_03
TR_GS_04
TR_GS_05
TR_GS_06
TR_GS_07
SIGN FACE SHEET ALUMINUM (X) - R-SERIES TYPICAL SIGNS DETAIL
SIGN FACE SHEET ALUMINUM (Y) - S&W SERIES TYPICAL SIGNS DETAIL
SIGN FACE SHEET ALUMINUM (Z) - D, RS, E, I, & M SERIES TYPICAL SIGNS DETAIL
PAVEMENT MARKINGS LINES AND SYMBOLS
PAVEMENT MARKINGS FOR NON FREEWAYS INTERSECTIONS & CROSSWALKS
SIGNS FOR CONSTRUCTION AND PERMIT OPERATIONS
CONSTRUCTION SIGN SUPPORTS AND CHANNELIZING DEVICES
TR_GS_08 DELINEATION, DELINEATORS, AND ATTENUATOR REFLECTOR DETAILS
05 - TRAFFIC DESIGN
05.01
SIGNATURE BLOCK:
99 REALTY DRIVE
CHESHIRE, CT 06410
203.271.1773
SLRCONSULTING.COM
F
D
C H
D
N F
C H
D
35+00 36+00 37+00
38+00
39+00
RIVER STREET (ROUTE 313)
0835 41-
STA. 38+19
51-6616
51-6610
STA. 38+99
JCT
COORDINATE GRID
A D
SIGNING NOTES
SIGNS SHALL BE AT LEAST 10 FEET FROM UTILITY POLES, UNLESS OTHERWISE DIRECTED.6.
EXACT LOCATIONS OF SIGNS TO BE VERIFIED BY ENGINEER.5.
PLAN OR DIRECTED BY ENGINEER.
ALL EXISTING SIGNS OUTSIDE THE LIMITS OF SIGNING ARE TO REMAIN UNLESS OTHERWISE INDICATED ON THE 4.
REMOVAL AND RELOCATION OF EXISTING SIGNS.
RELOCATED ONTO NEW POSTS AS DIRECTED BY ENGINEER. THIS WORK IS PAYABLE UNDER ITEM NO. 1206023A -
ALL STREET NAME SIGNS, TOWN-OWNED SIGNS AND PRIVATE SIGNS WITHIN THE PROJECT LIMITS SHALL BE 3.
EXCEPT AS OTHERWISE NOTED ON THE PLANS.
AND RETROREFLECTIVE STRIP DETAILS" AND TR-1208_02 "METAL SIGN POSTS AND SIGN MOUNTING DETAILS"
SIGNS SHALL BE INSTALLED IN ACCORDANCE WITH TRAFFIC STANDARD SHEETS TR-1208_01 "SIGN PLACEMENT 2.
"REMOVAL AND RELOCATION OF EXISTING SIGNS"
BY THE ENGINEER OR INDICATED ON THE PLANS. THIS WORK WILL BE PAID FOR UNDER ITEM NO. 1206023A
ALL SIGNS AND POSTS LOCATED WITHIN THE SIGNING LIMITS ARE TO BE REMOVED UNLESS OTHERWISE DIRECTED 1.
PAVEMENT MARKING NOTES
PAVEMENT MARKINGS ARE TO BE INSTALLED THROUGHOUT THE PROJECT TO THE LIMIT OF PAVEMENT MARKINGS OR AS DIRECTED BY ENGINEER.4.
AND TR_GS_05 "PAVEMENT MARKINGS FOR NON FREEWAYS" EXCEPT AS OTHERWISE DIMENSIONED OR NOTED ON THE PLANS.
PAVEMENT MARKINGS SHALL BE INSTALLED IN ACCORDANCE WITH TRAFFIC GUIDE SHEETS TR_GS_04 "PAVEMENT MARKING LINES AND SYMBOLS"3.
LONGITUDINAL MARKINGS TO BE TYPE I EPOXY RESIN IN GROOVES.2.
FINAL PAVEMENT MARKINGS ARE TO BE EPOXY RESIN UNLESS OTHERWISE NOTED.1.
= EXISTINGEX
DOUBLE POST-MOUNTED SIGN
SINGLE POST-MOUNTED SIGN
LEGEND
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
7/14/2026
SIGNATURE BLOCK: DRAWING TITLE:
SPM-01
W:\CADDesign\_CTDOT_Projects\124-165 (Bridge)\Traffic\_Contract_Plans\TR_CP_0124_0165_SPM.dgn FILE NAME: wkfrancis LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
MARKING PLAN
SIGNING AND PAVEMENT
TRANSPORTATION
(2' LINE / 4' SPACING)
4" WHITE DOTTED EXTENSION LINE
4" DOUBLE YELLOW CENTERLINE
6" WHITE EDGE LINE
M
T C
H M
A R
K S
T A .0
S
E E S
H E E T S
P M
CB
CONC. WALK
MATCH EXISTING
STA. 36+00.00'
PAVEMENT MARKING
LIMIT OF SIGNING AND
11'
11'
CB
CB
CB
CB
1" = 20'
HORIZONTAL SCALE
20' 40'
PRELIMINARY ROW MAP 125-15 SHEET 7 OF 7
PRELIMINARY ROW MAP 125-15 SHEET 7 OF 7
PRELIMINARY ROW MAP 125-15 SHEET 7 OF 7
PRELIMINARY ROW MAP 125-15 SHEET 7 OF 7
05.02
SIGNATURE BLOCK:
99 REALTY DRIVE
CHESHIRE, CT 06410
N F
C H
D
N F
C H
D
N F
C H
D
N F
C H
D
N F
C H
D
40+00 41+00
42+00
43+00
44+00
N F
C H
D
STA. 41+60
RIVER STREET (ROUTE 313)
51-6647
51-6612EAST
2009 51-
2009 51-
0282 31-
0282 31-
STA. 41+74
STA. 41+72
STA. 39+74
COORDI
NATE
G
RI
D
CONNECTI
CUT
River
Little
River
Little
TO
67 67
EAST
B A
N K S
T R
E E T
R O
U T E
B A
N K S
T R
E E T
R O
U T E
WEST
51-5202 R
51-5202 L
51-5202 L
51-5202 L
Beacon Falls
Southbury
Oxford Airport
Oxford
FRA
N
K
LIN
STREET
STA. 39+59
EX
0282 31-
51-2626 (R)
51-6616
51-6620
51-6616
51-6612
51-2626 (L)
51-6616
51-6614
SIGNS SHALL NOT BE PLACED WITHIN 10-FEET FROM UTILITY POLES.6.
EXACT LOCATIONS OF SIGNS TO BE VERIFIED BY ENGINEER.5.
PLAN OR DIRECTED BY ENGINEER.
ALL EXISTING SIGNS OUTSIDE THE LIMITS OF SIGNING ARE TO REMAIN UNLESS OTHERWISE INDICATED ON THE 4.
REMOVAL AND RELOCATION OF EXISTING SIGNS.
RELOCATED ONTO NEW POSTS AS DIRECTED BY ENGINEER. THIS WORK IS PAYABLE UNDER ITEM NO. 1206023A -
ALL STREET NAME SIGNS, TOWN-OWNED SIGNS AND PRIVATE SIGNS WITHIN THE PROJECT LIMITS SHALL BE 3.
EXCEPT AS OTHERWISE NOTED ON THE PLANS.
AND RETROREFLECTIVE STRIP DETAILS" AND TR-1208_02 "METAL SIGN POSTS AND SIGN MOUNTING DETAILS"
SIGNS SHALL BE INSTALLED IN ACCORDANCE WITH TRAFFIC STANDARD SHEETS TR-1208_01 "SIGN PLACEMENT 2.
"REMOVAL AND RELOCATION OF EXISTING SIGNS"
BY THE ENGINEER OR INDICATED ON THE PLANS. THIS WORK WILL BE PAID FOR UNDER ITEM NO. 1206023A
ALL SIGNS AND POSTS LOCATED WITHIN THE SIGNING LIMITS ARE TO BE REMOVED UNLESS OTHERWISE DIRECTED 1.
SIGNING NOTES
PAVEMENT MARKINGS ARE TO BE INSTALLED THROUGHOUT THE PROJECT TO THE LIMIT OF PAVEMENT MARKINGS OR AS DIRECTED BY ENGINEER.4.
AND TR_GS_05 "PAVEMENT MARKINGS FOR NON FREEWAYS" EXCEPT AS OTHERWISE DIMENSIONED OR NOTED ON THE PLANS.
PAVEMENT MARKINGS SHALL BE INSTALLED IN ACCORDANCE WITH TRAFFIC GUIDE SHEETS TR_GS_04 "PAVEMENT MARKING LINES AND SYMBOLS"3.
LONGITUDINAL MARKINGS TO BE TYPE I EPOXY RESIN IN GROOVES.2.
FINAL PAVEMENT MARKINGS ARE TO BE EPOXY RESIN UNLESS OTHERWISE NOTED.1.
PAVEMENT MARKING NOTES
LEGEND
= EXISTINGEX
DOUBLE POST-MOUNTED SIGN
SINGLE POST-MOUNTED SIGN
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
7/14/2026
SIGNATURE BLOCK: DRAWING TITLE:
SPM-02
W:\CADDesign\_CTDOT_Projects\124-165 (Bridge)\Traffic\_Contract_Plans\TR_CP_0124_0165_SPM.dgn FILE NAME: wkfrancis LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
MARKING PLAN
SIGNING AND PAVEMENT
TRANSPORTATION
APPROX. STREET LINE
APPROX. STREET LINE
APPROX. STREET LINE
APPROX. STREET LINE
A
PPRO
X. H
IG
H W
A
Y LIN
E
A
PPRO
X. STREET LIN
E
A
PPRO
X. H
IG
H W
A
Y LIN
E
A
PPRO
X. STREET LIN
E
4" DOUBLE YELLOW CENTERLINE
CB
2'
11'
11'
11'
M A
T C
H M
A R
K S
T A . 3
.0
S
E E S
H E E T S
P M
WHITE (TYP.)
LEFT TURN ARROW
CONC. WALK
STA. 42+50
4" WHITE LANE LINE
STA. 45+78.00'
PAVEMENT MARKINGS
LIMIT OF
124-201
INTERSECTION NO.
M A
TC
H M
A
RK
ST
A . 4
5+ .0
M A
TC
H M
A
RK
ST
A . 4
5+ .0
(2' LINE / 4' SPACING)
EXTENSION LINE
4" WHITE DOTTED
1" = 20'
HORIZONTAL SCALE
20' 40'
PRELIM
IN
A
RY RO
W M
A
P 125-15 SH
EET 7 O
F 7
PRELIM
IN
A
RY RO
W M
A
P 125-15 SH
EET 7 O
F 7
P R E L
IM
IN
A
R Y R
O W M
A P
-1
S
H E E T O
F
PRELIM
IN
A
RY RO
W M
A
P 125-15 SH
EET 7 O
F 7
P R E L
IM
IN
A
R Y R
O W M
A P
-1
S
H E E T O
F
05.03
SIGNATURE BLOCK:
99 REALTY DRIVE
CHESHIRE, CT 06410
F
C H
D
N F
C H
D
N F
C H
D
N F
C H
D
N F
C H
D
F N
D C
H D
N F
C H
D
+0
+0
+0
38+
39+00
40+00
41+00
42+00
43+00
N F
C H
D
N F
C H
D
N F
C H
D
N F
C H
D
N F
C H
D
F N
D C
H D
N F
C H
D
C O
C
W
L
K
44+00 45+00
46+00 46+00
STREET
FRANKLIN
(B A
N K
STR
E E T)
R O
U
TE
ROUTE 3
13 (
RIVER S
TREE
T)
TEMPORARY PAVEMENT MARKINGS (SEE NOTE 10)
SITE NO. 1 - INT NO. 124-201
IMPLEMENT TEMPORARY SIGNALIZATION
1:8
C O
L
K
44+00 45+00
46+00 46+00
N F
C H
D
N F
C H
D
N F
C H
D
N F
C H
D
N F
C H
D
F N
D C
H D
N F
C H
D
+0
+0
+0
38+
39+00
40+00
41+00
42+00
43+00
N F
C H
D
N F
C H
D
N F
C H
D
N F
C H
D
N F
C H
D
F N
D C
H D
N F
C H
D
(B A
N K S
T R
E E T
R O
U T E
ROUTE 31
3 (RI
VER ST
REET
80-908048" x 30"
31-022230" x 30"
31-029536" x 30"
31-029036" x 30"
31-021936" x 30"
31-112036" X 36"
80-983436" X 36"
80-960336" X 36"
31-190648" X 42"
80-160860" x 42"
80-970248" x 18"
80-970148" x 18"
(45°)
80-9710 R
80-9919
30" x 24"
30" x 10"
(45°)
80-9710 L
80-9919
30" x 24"
30" x 10"
31-162736" x 36"
31-162936" x 36"
80-907972" X 48"
80-9710
80-9920
30" x 24"
30" x 10"
80-9710 R
80-9919
30" x 24"
30" x 10"
80-9710 L
80-9919
30" x 24"
30" x 10"
80-981036" X 36"
80-970824" x 18"
DESIGNATION
CTDOT SIGN
SIZEMESSAGE
DESIGNATION
PLAN
VEHICULAR DETOUR SIGN LEGEND
(B A
N K
STR
E E T)
R O
U
TE
STREET
FRANKLIN
1:1
SITE NO. 1 - INT NO. 124-201
IMPLEMENT TEMPORARY SIGNALIZATION
TEMPORARY PAVEMENT MARKINGS (SEE NOTE 10)
COORDI
NATE
G
RI
D
CONNECTI
CUT
3. THE ARRAY SHOULD ONLY BE USED FOR TEMPORARY INSTALLATIONS.
2. NUMBER INDICATES MASS OF SAND IN POUNDS PER EACH BARREL.
1. THE SAND BARRELS SHALL BE LISTED ON THE DEPARTMENT’S QUALIFIED PRODUCTS LIST.
35 MPH<IMPACT VELOCITY
1400 1400
1400 2100
BARRIER
MEDIAN
CONCRETE
REFER TO DRAWING NO. DET-03 FOR PEDESTRIAN DETOUR PLAN.14.
REFER TO DRAWING NO. MPT-02 FOR ROUTE 313 (RIVER STREET) EAST (SOUTHBOUND) CLOSURE VEHICLE DETOUR PLAN.13.
REFER TO DRAWING NO. STR-23 AND STR-24 FOR STAGE 1 CONSTRUCTION SEQUENCE.12.
INSTALL DELINEATORS ON TEMPORARY TRAFFIC BARRIER PER GUIDE SHEET TR_GS_08.11.
ERADICATE EXISTING CONFLICTING PAVEMENT MARKINGS BETWEEN STATION 36+00 AND 45+78.10.
ANY EXISTING SIGNING DAMAGED BY THE CONTRACTOR SHALL BE REPLACED AT NO COST TO THE STATE.9.
MEET FIELD CONDITIONS.
EXISTING SIGNS IN CONFLICT WITH TEMPORARY SIGNS SHALL BE COVERED, REMOVED, OR REVISED TO8.
OF THE TRAVEL WAY OR BEYOND THE LIMITS OF CONSTRUCTION AND REPLACED WHEN THE DETOUR IS NO LONGER OPERATIONAL.
EXISTING CONFLICTING PAVEMENT MARKINGS SHALL BE REMOVED OR COVERED, INCLUDING THOSE PAVEMENT MARKINGS OUTSIDE 7.
ALL CONSTRUCTION SIGNS SHALL BE PAID FOR UNDER ITEM NO. 1220027 – CONSTRUCTION SIGNS.6.
POST-MOUNTED CONSTRUCTION SIGNS.
POST-MOUNTED BARRICADE WARNING LIGHTS - HIGH INTENSITY, ITEM NO. 0976002, SHALL BE MOUNTED ON ALL DIAMOND-SHAPED 5.
INSTALL POST-MOUNTED SIGNS IN ACCORDANCE WITH STANDARD SHEETS TR_1208-01, TR_1208-02, AND TR_GS_07.4.
ALL CONSTRUCTION SIGNS SHALL BE MOUNTED ON TEMPORARY BREAKAWAY POSTS, IF FEASIBLE. 3.
BE DETERMINED IN THE FIELD AS DIRECTED BY THE ENGINEER.
TRAFFIC DRUMS AND CONSTRUCTION BARRICADES, SHOWN ON THE PLANS ARE APPROXIMATE. EXACT LOCATIONS SHALL
NOT LIMITED TO, THE LOCATIONS OF CONSTRUCTION SIGNS AND OTHER TRAFFIC CONTROL DEVICES, INCLUDING, BUT2.
ITEM NO. 0971001A – MAINTENANCE AND PROTECTION OF TRAFFIC.AND
ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIAL PROVISIONS FOR SECTION 1.08 – PROSECUTION AND PROGRESS 1.
MAINTENANCE AND PROTECTION OF TRAFFIC PLAN NOTES
LEGEND
DIRECTION OF TRAVEL
TRAFFIC DRUM
TEMPORARY TRAFFIC BARRIER (SEE NOTE 11)
PEDESTRIAN BARRICADE
TYPE III BARRICADE
CONSTRUCTION SIGN
WORK AREA
STAGE 1B
C O
O R
D
IN
A T E G
R
ID
AD
O
N N
E C T
IC
U T
COORDIN
AT
E G
RID
CONNECTIC
UT
O
O R
D
IN
A T E G
R
ID
AD
N N
E C T
IC
T
STAGE 1A
River St
VEHICULAR DETOUR SIGN LEGEND
ID
PLAN
MESSAGE SIZE
DESIGNATION
CTDOT SIGN
24" x 18" 80-9708
30" x 10"
30" x 24"
80-9919
80-9710 L
30" x 10"
30" x 24"
36" x 36" 31-1629
36" x 36" 31-1627
48" X 42" 31-1906
36" X 36" 41-4492
36" X 36" 80-9603
36" X 36" 80-9056
36" X 36" 31-1120
36" x 30" 31-0219
36" x 30" 31-0290
36" x 30" 31-0295
48" x 30" 80-9080
60" x 42" 80-1608
80-9710
80-9919
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
7/14/2026
SIGNATURE BLOCK: DRAWING TITLE:
MPT-01
W:\CADDesign\_CTDOT_Projects\124-165 (Bridge)\Traffic\_Contract_Plans\TR_CP_0124-0165_MPT.dgn FILE NAME: wkfrancis LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
STAGES 1A & 1B
STAGED CONSTRUCTION
TRANSPORTATION
V
L. 6 P
G . 1
R
IV
E R
STR
E E T
C
T STO
R A
G E P
A R
TN
E R
S, LLC
N /F
APPROX. STREET LINEAPPROX. STREET LINE
APPROX. STREET LINE
APPROX. STREET LINEAPPROX. STREET LINE
' (T
YP
' 2
20' TYP.
60' TAPER
APPROX. STREET LINEAPPROX. STREET LINE
APPROX. STREET LINE
APPROX. STREET LINEAPPROX. STREET LINE
3'
12'
2'
12'
2'
12'
20'
O.
C.
60' TAPER
20' TYP.
20'
NARROWS
ROAD
A
PPRO
X. HIG
HW
A
Y LIN
E
A
PPRO
X. HIG
HW
A
Y LIN
E
A
PPRO
X. HIG
HW
A
Y LIN
E
APPROX. STREET LINE
APPROX. STREET LINE
APPROX. STREET LINE
WORK AREA
TYPE III CONSTRUCTION BARRICADE
TEMPORARY WHITE PAVEMENT SYMBOL (TYP.)
P
N
(SEE PLAN STR-24 )
BRIDGE STAGED CONSTRUCTION PLAN 1B
SITE NO. 1 - INT NO. 124-201
IMPLEMENT TEMPORARY SIGNALIZATION
TRAFFIC DRUM O.C. (TYP.)
TEMPORARY 6" WHITE EDGE LINE (TYP.)
TEMPORARY TRAFFIC BARRIER
Q
C T
S
G
X
R
R
R
TEMPORARY 6" YELLOW EDGE LINE (TYP.)
TEMPORARY 6" YELLOW EDGE LINE (TYP.)
A
E
U
P
N
M
H
U
P
(SEE DETAIL)
MASH TL-3 SAND BARREL ARRAY
APPROX. STREET LINE
APPROX. STREET LINE
APPROX. STREET LINE
A
PPRO
X. HIG
HW
A
Y LIN
E
A
PPRO
X. HIG
HW
A
Y LIN
E
A
PPRO
X. HIG
HW
A
Y LIN
E
TRAFFIC DRUM - O.C. (TYP.)
WORK AREA
TYPE III CONSTRUCTION BARRICADE
X
U
A
O
N
(SEE PLAN STR-03)
RETAINING WALL 101
(SEE PLAN STR-23)
BRIDGE STAGED CONSTRUCTION PLAN 1A
H
E
SAND BARREL ARRAY TYP. (SEE DETAIL)
R
L
PEDESTRIAN BARRICADE
R
TEMPORARY 6" YELLOW EDGE LINE (TYP.)
TEMPORARY 6" YELLOW EDGE LINE (TYP.)
S
G
T C
SITE NO. 1 - INT NO. 124-201
IMPLEMENT TEMPORARY SIGNALIZATION
P
T
P
P
N
M
U
R
80'
N.T.S.
MASH TL-3 SAND BARREL ARRAY
NOTES:
1" = 40'
SCALE
40'
A
G
H
S
T
U
E
C
N
P
Q
R
X
O
M
PRE
LIM
INARY
ROW
MAP 1
-15
SH
EE
T 7 O
F 7
PRE
LIM
INARY
ROW
MAP 1
-15
SH
EE
T 7 O
F 7
PRELIM
IN
A
RY RO
W M
A
P 125-15 SHEET 7 O
F 7
P R E
LIM
IN
A
R Y R
O W M
A P
-1
S
H E E T 7 O
F 7
PRE
LIM
INARY
ROW
MAP 1
-15
SH
EE
T 7 O
F 7
PRE
LIM
INARY
ROW
MAP 1
-15
SH
EE
T 7 O
F 7
PRELIM
IN
A
RY RO
W M
A
P 125-15 SHEET 7 O
F 7
P R E
LIM
IN
A
R Y R
O W M
A P
-1
S
H E E T 7 O
F 7
PRE
LIM
INARY
ROW
MAP 1
-15
SH
EE
T 7 O
F 7
PRE
LIM
INARY
ROW
MAP 1
-15
SH
EE
T 7 O
F 7
PRELIM
IN
A
RY RO
W M
A
P 125-15 SHEET 7 O
F 7
P R E
LIM
IN
A
R Y R
O W M
A P
-1
S
H E E T 7 O
F 7
PRELIMINARY ROW MAP 125-15 SHEET 7 OF 7
PRELIM
IN
A
RY RO
W M
A
P 125-15 SH
EET 7 O
F 7
PRELIMINARY ROW MAP 125-15 SHEET 7 OF 7PRELIMINARY ROW MAP 125-15 SHEET 7 OF 7
PRELIM
IN
A
RY RO
W M
A
P 125-15 SH
EET 7 O
F 7
0'
0'
0'
M A
TC
H M
A R K S
TA
.0
M A
TC
H M
A R
K
- S
TA
. 4
.0
100'
100'
100'
PRELIMINARY ROW MAP 125-15 SHEET 7 OF 7
PRELIM
IN
A
RY RO
W M
A
P 125-15 SH
EET 7 O
F 7
PRELIMINARY ROW MAP 125-15 SHEET 7 OF 7PRELIMINARY ROW MAP 125-15 SHEET 7 OF 7
PRELIM
IN
A
RY RO
W M
A
P 125-15 SH
EET 7 O
F 7
PRE
LIM
INARY
ROW
MAP 1
-15
SH
EE
T 7 O
F 7
PRE
LIM
INARY
ROW
MAP 1
-15
SH
EE
T 7 O
F 7
PRELIM
IN
A
RY RO
W M
A
P 125-15 SHEET 7 O
F 7
P R E
LIM
IN
A
R Y R
O W M
A P
-1
S
H E E T 7 O
F 7
PRE
LIM
INARY
ROW
MAP 1
-15
SH
EE
T 7 O
F 7
PRE
LIM
INARY
ROW
MAP 1
-15
SH
EE
T 7 O
F 7
PRELIM
IN
A
RY RO
W M
A
P 125-15 SHEET 7 O
F 7
P R E
LIM
IN
A
R Y R
O W M
A P
-1
S
H E E T 7 O
F 7
PRE
LIM
INARY
ROW
MAP 1
-15
SH
EE
T 7 O
F 7
PRE
LIM
INARY
ROW
MAP 1
-15
SH
EE
T 7 O
F 7
PRELIM
IN
A
RY RO
W M
A
P 125-15 SHEET 7 O
F 7
P R E
LIM
IN
A
R Y R
O W M
A P
-1
S
H E E T 7 O
F 7
0'
165'
0'
M A
TC
H M
A R K S
TA
.0
M A
TC
H M
A R
K
- S
TA
. 4
.0
0'
100'
100'
100'
05.04
SIGNATURE BLOCK:
99 REALTY DRIVE
CHESHIRE, CT 06410
ROAD WORK
END
CONC WALK
CONC WALK
C O
L K
L
K C
O N
C
C O
L K
C O
L K
C O
L K
CONC WALK
CONC WALK
C O
L K
L
K C
O N
C
C O
L K
C O
L K
C O
L K
N/
FC
HD
N/
FC
HD
N/
FC
HD
N/
FC
HD
N/
FC
HD
N/
FC
HD
+0
N/
FC
HD
N/
FC
HD
C O
L K
+0
+0
+0
50'
TA
PER
A S S
U M
E D N
O R
T H
P E
R R
E F E
R E
N C
E N
O
A S S
U M
E D N
O R T
H
P E
R R
E F E
R E
N C
E N
O
A S S
U M
E D N
O R
T H
P E
R R
E F E
R E
N C
E N
O
DETOUR NOTES
LEGEND
TRAFFIC DRUM
TEMPORARY TRAFFIC BARRIER
PEDESTRIAN BARRICADE
TYPE III BARRICADE
CONSTRUCTION SIGN
WORK AREA
STAGES 2 AND 3
STAGES 2 AND 3
FOR (ACTIVE SEWER BYPASS PUMPING)
SUBSTAGE OF STAGE 2 ONLY
REFER TO DRAWING NO. DET-03 FOR PEDESTRIAN DETOUR PLAN.13.
CONTRACTOR TO COVER SIGNS "U" DURING ACTIVE SEWER BYPASS PUMPING OPERATIONS UNDER SUBSTAGE 2.12.
INSTALL SIGN "F" AT CLOSURE LOCATION TWO WEEKS IN ADVANCE OF CLOSURE TO NOTIFY ROAD USERS OF CLOSURE DATES AND TIMES.11.
AND REPLACED WHEN THE DETOUR IS NO LONGER OPERATIONAL.
EXISTING CONFLICTING PAVEMENT MARKINGS SHALL BE COVER OR REMOVED, INCLUDING THOSE PAVEMENT MARKINGS OUTSIDE OF THE TRAVEL WAY OR BEYOND THE LIMITS OF CONSTRUCTION 10.
ACCESS AND EGRESS TO ALL STREETS AND ALL DRIVEWAYS MUST BE MAINTAINED AT ALL TIMES.9.
ANY EXISTING SIGNS DAMAGED BY THE CONTRACTOR SHALL BE REPLACED AT NO COST TO THE STATE.8.
ALL DETOUR SIGNS SHALL BE PAID FOR UNDER ITEM NO. 1220027 - CONSTRUCTION SIGNS.7.
POST-MOUNTED BARRICADE WARNING LIGHTS - HIGH INTENSITY, ITEM NO. 0976002, SHALL BE MOUNTED ON ALL DIAMOND-SHAPED POST-MOUNTED CONSTRUCTION SIGNS.6.
ALL CONSTRUCTION SIGNS TO BE INSTALLED IN ACCORDANCE WITH CTDOT STANDARD SHEETS TR_1208_01, TR_1208_02, AND TR_GS_07.5.
ALL EXISTING CONFLICTING SIGNS TO BE COVERED OR REMOVED WHILE THE DETOUR IS IN EFFECT.4.
DETOUR SIGNS ARE TO ONLY BE POSTED WHILE THE DETOUR IS IN EFFECT. DETOUR SIGNS ARE TO BE COVERED OR REMOVED WHILE THE DETOUR IS NOT OPERATIONAL.3.
ALL SIGN LOCATIONS INDICATED ON THE PLAN ARE APPROXIMATE; AND SHALL BE ADJUSTED TO MEET FIELD CONDITIONS PRIOR TO IMPLEMENTATION OF THE DETOUR.2.
ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIAL PROVISIONS FOR SECTION 1.08 – PROSECUTION AND PROGRESS AND ITEM NO. 0971001A – MAINTENANCE AND PROTECTION OF TRAFFIC.1.
STAGES 1A, 1B, 2, & 3
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
7/14/2026
SIGNATURE BLOCK: DRAWING TITLE:
MPT-02
W:\CADDesign\_CTDOT_Projects\124-165 (Bridge)\Traffic\_Contract_Plans\TR_CP_0124-0165_MPT.dgn FILE NAME: wkfrancis LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
STAGES 2 & 3
STAGED CONSTRUCTION
TRANSPORTATION
APPROX. STREET L
INE
APPROX. STREET L
INE
APPROX. STREET L
INE
APPROX. STREET L
INE
APPROX. STREET L
INE
P
IN
E STR
EET
(D E R
B Y A
V E N
U E
S
TA
TE
R
O U
TE
S
TR
E E T
W E S T
(R
IV
E R S
TR
E E T)
R O
U
TE
(BROAD STREET)
ROUTE 313
(M A
IN
S
TR
E E T)
R O
U
TE
(M A
IN
S
TR
E E T)
R O
U
TE
A
PP
RO
X.
S
TR
EE
T
LI
N E
A
PP
RO
X.
S
TR
EE
T
LI
N E
A
PP
RO
X.
S
TR
EE
T
LI
N E
20' (O.C.)
TRAFFIC DRUMS
R L X L R
G
SA
C
T
R
M
D
A
H
X K
H
C
T
A
N
G S
P
M
T
G
H E
Y E
U
M
SITE NO. 2 - INT NO. 124-207
IMPLEMENT TEMPORARY SIGNALIZATION
INT NO. 124-205
- INT NO. 124-201
IMPLEMENT TEMPORARY SIGNALIZATION SITE NO. 1
- INT NO. 124-201
IMPLEMENT TEMPORARY SIGNALIZATION SITE NO. 1
N P
U
PEDESTRIAN BARRICADE
TEMPORARY TRAFFIC BARRIER
TYPE III BARRICADE
PEDESTRIAN RAMP
TEMPORARY
BARRICADE
PEDESTRIAN
PEDESTRIAN RAMP
TEMPORARY
BARRICADE
PEDESTRIAN
TRAFFIC DRUM (20' O.C.)
MARKING ARROW (SEE NOTE 10)
INSTALL TEMPORARY PAVEMENT
PAVEMENT MARKING ARROWS (TYP.)
INSTALL TEMPORARY
M A
TC
H M
A
RK
- STA
T. 45+
M A
TC
H M
A
RK
- STA
T. 45+
M A
TC
H M
A
RK
- STA
T. 45+
W V
Z
MARKING ARROWS (TYP.)
INSTALL TEMPORARY PAVEMENT
(SEE NOTE 10)
LEFT TURN ARROW
COVER EXISTING EDGE LINE
TEMPORARY 6" WHITE
TEMPORARY 6" WHITE EDGE LINE
PFOR ADDITIONAL SIGNS
SEE "STAGES 2 AND 3" DETAIL
SEE NOTE 10
H
SEE NOTE 12
1" = 40'
SCALE
40' 80'
Z
W
80-9074 R24" x 18"31-190648" X 42"
80-961148" x 30"80-160860" x 42"
80-908030" x 30"80-970248" x 18"
80-9074 L24" x 18"80-970148" x 18"
80-907630" x 18"31-162736" x 36"
31-029536" x 30"31-162936" x 36"
31-029036" x 30" 80-9710 80-9919
30" x 24"
30" x 10"
31-021936" x 30" 80-9710 R 80-9919
30" x 24"
30" x 10"
31-112036" X 36" 80-9710 L 80-9919
30" x 24"
30" x 10"
80-960336" X 36"80-970824" x 18"
DESIGNATION
CTDOT SIGN
SIZEMESSAGE
DESIGNATION
CTDOT SIGN
SIZEMESSAGE
VEHICULAR DETOUR SIGN LEGEND
A
C
E
G
H
K
L
M
N
P
R
S
T
U
V
X
Y
D
PR
EL
IM
IN
A
RY
R
O W M
A P
5- S
H
EE
T
O F
PRELIM
INARY R
OW M
AP 125
-15 S
HEET 7
OF 7
PRELIMINARY ROW MAP 125-15 SHEET 7 OF 7
PR
EL
IM
IN
A
RY
R
O W M
A P
5- S
H
EE
T
O F
PRELIM
INARY R
OW M
AP 125
-15 S
HEET 7
OF 7
PR
EL
IM
IN
A
RY
R
O W M
A P
5- S
H
EE
T
O F
PRELIM
INARY R
OW M
AP 125
-15 S
HEET 7
OF 7
PRELIMINARY ROW MAP 125-15 SHEET 7 OF 7
M A
R
TH
A S
TR
E E T
ROUTE 67 (B
ANK STREE
T)
FRA
NKLI
N S
TRE
ET
ROUTE 67 (BANK STREET)
ROUTE 67 (BANK STREET)
(R
IV
E R S
TR
E E T)
R O
U
TE
165'
100' 100'
100'
05.05
SIGNATURE BLOCK:
99 REALTY DRIVE
CHESHIRE, CT 06410
S TR E E T
B A
N
R E
V I
R
T
S
S T .
B R O A D
R
B
Y
R
S
TS
O O
L
S T
M A
R
T H
A
F A R R E
L L
D AY
S T
R E
E T
W A
K E
L E
Y
S T
S T
S T
D E
F O
R
EST ST .
D E
W O
L F
S T
G R A ND
S E
C O
N D
A V
C ULVER
F
IR
S T
H E N R Y S T .
A V
E
JAMES
ST.
H U
M P
H R
E Y
A V
E N
U E
W A
S H
I N
G T
O N
HULL
S
S T
R E
E T
C E
D A
R
S T
S T
R E
E T
C H
U R
C H
S T
R E
E T
R
ID E R
A V
E
N U
E
P I
N E
S T
T
M A
I N
S T
A T
IO
N
R .R
BANK
ST.
GROVE
NORTH
M A
IN
S T
T S
F R A N K LIN
S T
C H
E R
R Y
SANFORD
BI
R
F I
R S
T
S T
C O
L U
M
B U S
S
T
K
W E
S T
ST.
DETOUR NOTES
REFER TO PEDESTRIAN DETOUR PLAN (DRAWING NO. DET-03) FOR ADDITIONAL SIGNING AND SIDEWALK CLOSURE.13.
COORDINATE CONSTRUCTION ACTIVITIES AND SIGN PLACEMENT WITH PROJECT NO. 0304-0027 (SEYMOUR RAILROAD STATION IMPROVEMENTS).12.
INSTALL "SIGN F" AT CLOSURE LOCATION TWO WEEKS IN ADVANCE OF CLOSURE TO NOTIFY ROAD USERS OF CLOSURE DATES AND TIMES.11.
OR BEYOND THE LIMITS OF CONSTRUCTION AND REPLACED WHEN THE DETOUR IS NO LONGER OPERATIONAL.
EXISTING CONFLICTING PAVEMENT MARKINGS SHAL BE COVER OR REMOVED, INCLUDING THOSE PAVEMENT MARKINGS OUTSIDE OF THE TRAVEL WAY 10.
THE PROPERTY OWNER.
ACCESS AND EGRESS TO ALL STREETS AND ALL DRIVEWAYS MUST BE MAINTAINED AT ALL TIMES. ANY DRIVEWAY CLOSURES SHALL BE COORDINATED WITH 9.
ANY EXISTING SIGNS DAMAGED BY THE CONTRACTOR SHALL BE REPLACED AT NO COST TO THE STATE.8.
ALL DETOUR SIGNS SHALL BE PAID FOR UNDER ITEM NO. 1220027 - CONSTRUCTION SIGNS.7.
POST-MOUNTED BARRICADE WARNING LIGHTS - HIGH INTENSITY, ITEM NO. 0976002, SHALL BE MOUNTED ON ALL DIAMOND-SHAPED POST-MOUNTED CONSTRUCTION SIGNS.6.
ALL CONSTRUCTION SIGNS TO BE INSTALLED IN ACCORDANCE WITH CTDOT STANDARD SHEETS TR_1208_01, TR_1208_02 AND TR_GS_07.5.
ALL EXISTING CONFLICTING SIGNS TO BE COVERED OR REMOVED WHILE THE DETOUR IS IN EFFECT.4.
DETOUR SIGNS ARE TO ONLY BE POSTED WHILE THE DETOUR IS IN EFFECT. DETOUR SIGNS ARE TO BE COVERED OR REMOVED WHILE THE DETOUR IS NOT OPERATIONAL.3.
ALL SIGN LOCATIONS INDICATED ON THE PLAN ARE APPROXIMATE; AND SHALL BE ADJUSTED TO MEET FIELD CONDITIONS PRIOR TO IMPLEMENTATION OF THE DETOUR.2.
ITEM NO. 0971001A – MAINTENANCE AND PROTECTION OF TRAFFIC.
ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIAL PROVISIONS FOR SECTION 1.08 – PROSECUTION AND PROGRESS AND 1.
CONSTRUCTION SIGN
WORK AREA
LEGEND
500 FT
RIVER STREET
CLOSED
FROM 00/00 TO 00/00
TO THRU TRAFFIC
VEHICULAR DETOUR SIGN LEGEND
ID
PLAN
MESSAGE SIZE
DESIGNATION
CTDOT SIGN
36" X 36" 80-9810
30" x 10"
30" x 24"
80-9919
80-9710 L
30" x 10"
30" x 24"
80-9919
80-9710 R
72" X 48" 80-9079
(45°)
60" x 42" 80-1608
River St
River St
30" x 10"
30" x 24"
80-9919
80-9710
River St 30" x 10"
30" x 24"
80-9919
80-9710 L
River St
24" X 18" 80-9708
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
7/14/2026
SIGNATURE BLOCK: DRAWING TITLE:
DET-01
W:\CADDesign\_CTDOT_Projects\124-165 (Bridge)\Traffic\_Contract_Plans\TR_CP_0124_0165_DET.dgn FILE NAME: wkfrancis LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
DESIGNER/DRAFTER: W. FRANCIS CHECKED BY: D. TOMPKINS STAGES 1A & 1B
(RIVER STREET) EAST (SOUTHBOUND) -
VEHICLE DETOUR PLAN - ROUTE 313
TRANSPORTATION
FOR STAGES 1A & 1B
SEE DRAWING NO. MPT-01
INT NO. 124-201
INT NO. 124-205
INT NO. 124-202
SEE NOTE 11
INT NO. 124-216
INT NO. 124-217
F
B
M
I
M F
B
D
(ON ROUTE 67)
C
(ON ROUTE 67)
E
D
F
INT NO. 124-207
A
M
D
B
C
F
E
I
A
05.06
SIGNATURE BLOCK:
99 REALTY DRIVE
CHESHIRE, CT 06410
S TR E E T
B A
N
R E
V I
R
T
S
S T .
R
S
TS
O O
L
S T
M A
R
T H
A
F A R R E
L L
D AY
S T
R E
E T
W A
K E
L E
Y
S T
S T
S T
D E
F O
R
EST ST .
D E
W O
L F
G R A ND
S E
C O
N D
C ULVE
F
IR
S T
H E N R Y S T .
A V
E
JAMES
ST.
H U
M P
H R
E Y
A V
E N
U E
W A
S H
I N
G T
O N
HULL
S T
R E
E T
C E
D A
R
S T
S T
R E
E T
C H
U R
C H
S T
R E
E T
R
ID E R
A V
E
N U
E
P I
N E
S T
M A
I N
S T
A T
IO
N
R .R
BANK
ST.
GROVE
NORTH
M A
IN
S T
T S
F R A N K LIN
S T
C H
E R
R Y
BI
F I
R S
T
S T
C O
L U
M
B U S
S
T
K
W E
S T
ST.
S TR E E T
B A
N
R E
V I
R
T
S
S T .
R
S
TS
O O
L
S T
M A
R
T H
A
F A R R E
L L
D AY
S T
R E
E T
W A
K E
L E
Y
S T
S T
S T
D E
F O
R
EST ST .
D E
W O
L F
G R A ND
S E
C O
N D
C ULVE
F
IR
S T
H E N R Y S T .
A V
E
JAMES
ST.
H U
M P
H R
E Y
A V
E N
U E
W A
S H
I N
G T
O N
HULL
S T
R E
E T
C E
D A
R
S T
S T
R E
E T
C H
U R
C H
S T
R E
E T
R
ID E R
A V
E
N U
E
P I
N E
S T
M A
I N
S T
A T
IO
N
R .R
BANK
ST.
GROVE
NORTH
M A
IN
S T
T S
F R A N K LIN
S T
C H
E R
R Y
BI
F I
R S
T
S T
C O
L U
M
B U S
S
T
K
W E
S T
ST.
LEGEND
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
7/14/2026
SIGNATURE BLOCK: DRAWING TITLE:
DET-02
W:\CADDesign\_CTDOT_Projects\124-165 (Bridge)\Traffic\_Contract_Plans\TR_CP_0124_0165_DET.dgn FILE NAME: wkfrancis LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
DESIGNER/DRAFTER: W. FRANCIS CHECKED BY: D. TOMPKINS - STAGES 2 & 3
(RIVER STREET) FULL ROAD CLOSURE
VEHICLE DETOUR PLAN - ROUTE 313
TRANSPORTATION
REFER TO PEDESTRIAN DETOUR PLAN (DRAWING NO. DET-03) FOR ADDITIONAL SIGNING AND SIDEWALK CLOSURE.13.
COORDINATE CONSTRUCTION ACTIVITIES AND SIGN PLACEMENT WITH PROJECT NO. 0304-0027 (SEYMOUR RAILROAD STATION IMPROVEMENTS).12.
INSTALL "SIGN F" AT CLOSURE LOCATION TWO WEEKS IN ADVANCE OF CLOSURE TO NOTIFY ROAD USERS OF CLOSURE DATES AND TIMES.11.
OR BEYOND THE LIMITS OF CONSTRUCTION AND REPLACED WHEN THE DETOUR IS NO LONGER OPERATIONAL.
EXISTING CONFLICTING PAVEMENT MARKINGS SHAL BE COVER OR REMOVED, INCLUDING THOSE PAVEMENT MARKINGS OUTSIDE OF THE TRAVEL WAY 10.
THE PROPERTY OWNER.
ACCESS AND EGRESS TO ALL STREETS AND ALL DRIVEWAYS MUST BE MAINTAINED AT ALL TIMES. ANY DRIVEWAY CLOSURES SHALL BE COORDINATED WITH 9.
ANY EXISTING SIGNS DAMAGED BY THE CONTRACTOR SHALL BE REPLACED AT NO COST TO THE STATE.8.
ALL DETOUR SIGNS SHALL BE PAID FOR UNDER ITEM NO. 1220027 - CONSTRUCTION SIGNS.7.
POST-MOUNTED BARRICADE WARNING LIGHTS - HIGH INTENSITY, ITEM NO. 0976002, SHALL BE MOUNTED ON ALL DIAMOND-SHAPED POST-MOUNTED CONSTRUCTION SIGNS.6.
ALL CONSTRUCTION SIGNS TO BE INSTALLED IN ACCORDANCE WITH CTDOT STANDARD SHEETS TR_1208_01, TR_1208_02, AND TR_GS_07.5.
ALL EXISTING CONFLICTING SIGNS TO BE COVERED OR REMOVED WHILE THE DETOUR IS IN EFFECT.4.
DETOUR SIGNS ARE TO ONLY BE POSTED WHILE THE DETOUR IS IN EFFECT. DETOUR SIGNS ARE TO BE COVERED OR REMOVED WHILE THE DETOUR IS NOT OPERATIONAL.3.
ALL SIGN LOCATIONS INDICATED ON THE PLAN ARE APPROXIMATE; AND SHALL BE ADJUSTED TO MEET FIELD CONDITIONS PRIOR TO IMPLEMENTATION OF THE DETOUR.2.
ITEM NO. 0971001A – MAINTENANCE AND PROTECTION OF TRAFFIC.
ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIAL PROVISIONS FOR SECTION 1.08 – PROSECUTION AND PROGRESS AND 1.
DETOUR NOTES
CONSTRUCTION SIGN
WORK AREA
River St
500 FT
RIVER STREET
CLOSED
FROM 00/00 TO 00/00
TO THRU TRAFFIC
VEHICULAR DETOUR SIGN LEGEND
ID
PLAN MESSAGE SIZE
DESIGNATION
CTDOT SIGN
36" X 36" 80-9810
30" x 10"
30" x 24"
80-9919
80-9710 L
30" x 10"
30" x 24"
80-9919
80-9710 R
30" x 10"
30" x 24"
80-9919 80-9710
72" X 48" 80-9079
30" x 10"
30" x 24"
80-9919 80-9710 L
(45°)
30" x 10"
30" x 24"
80-9919 80-9710 R
(45°)
60" x 42" 80-1608
River St
River St
River St
LEGEND
AND STAGE 3
FOR STAGE 2, STAGE 2 PUMPING,
SEE DRAWING NO. MPT-02
INT NO. 124-201
INT NO. 124-205
INT NO. 124-202
SEE NOTE 11
INT NO. 124-216
INT NO. 124-217
FOR STAGES 2 AND 3
SEE DRAWING NO. MPT-02
INT NO. 124-207
F
B
M
F
B
M
C
M F
B
E
E
C
M
F
B
C
D
D
F
(ON ROUTE 67)
(ON ROUTE 67)
I
J
D
I
M
E
D
B
C
F
J
05.07
SIGNATURE BLOCK:
99 REALTY DRIVE
CHESHIRE, CT 06410
CONC WALK
L
K
C O
N C
C O
L K
S TR E E T
B A
N
R E
V I
R
T
S
S T .
S T
M A
R
T H
A
F A R R E
L L
D AY
S T
R E
E T
W A
K E
L E
Y
S T
S T
S T
D E
F O
R
EST ST .
D E
W O
L F
S T
G R A ND
S E
C O
N D
A V
C ULVER
F
IR
S T
H E N R Y S T .
A V
E
JAMES
ST.
H U
M P
H R
E Y
A V
E N
U E
S H
I N
G T
O N
S T
R E
E T
E D
A R
S T
E N
U E
P I
N E
M A
I N
S T
A T
IO
N
R .R
BANK
ST.
NORTH
M A
IN
S T
F R A N K LIN
S T
C H
E R
R Y
SANFORD
BI
R
F I
R S
T
S T
C O
L U
M
B U S
S
T
K
ST.
N/F
CHD
N/F
CHD
MBRCONC CURB
MBRCONC CURB
L
K C
O N
C
C O
L K
80-970824" x 18"
80-9074 R24" x 18"
80-9074 L24" x 18"
80-907630" x 18"
80-970630" x 30"
80-9703 R30" x 30"
80-9703 L30" x 30"
80-161948" x 30"
DESIGNATION
CTDOT SIGN
SIZEMESSAGE
DESIGNATION
PLAN
PEDESTRIAN DETOUR SIGN LEGEND
FOR STAGES 2 AND 3
DETAIL "A" - N.T.S.
A S S
U M
E D N
O R T
H
P E
R R
E F E
R E
N C
E N
O
A S
S U
M E
D N
O R
T H
P E
R R
E F
E R
E N
C E
N O
A
S S
U M
E D
N O
R T
H P
E R
R E
F E
R E
N C
E N
O
A S
S U
M E
D N
O R
T H
P E
R R
E F
E R
E N
C E
N O
FOR STAGES 2 AND 3
DETAIL "B" - N.T.S.
FOR STAGES 2 AND 3
DETAIL "C" - N.T.S.
FOR STAGES 1A & 1B
DETAIL "E" - N.T.S.
A
S S
U M
E D
N O
R T
H P
E R
R E
F E
R E
N C
E N
O
FOR STAGES 2 & 3
DETAIL "D" - N.T.S.
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
7/14/2026
SIGNATURE BLOCK: DRAWING TITLE:
DET-03
W:\CADDesign\_CTDOT_Projects\124-165 (Bridge)\Traffic\_Contract_Plans\TR_CP_0124_0165_DET.dgn FILE NAME: wkfrancis LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
CONSTRUCTION STAGES 1A, 1B, 2, & 3
PEDESTRIAN DETOUR PLAN FOR
TRANSPORTATION
11. SEE DETAIL "C" ON SHEET "MPT-02" (STAGE 2 & 3 VEHICLE DETOUR PLAN DETAILS) FOR ADDITIONAL SIGNS.
10. COORDINATE CONSTRUCTION ACTIVITIES AND SIGN PLACEMENT WITH PROJECT NO. 0304-0027 (SEYMOUR RAILROAD STATION IMPROVEMENTS).
9. THE COST OF THE DETOUR SIGNS SHALL BE PAID FOR UNDER ITEM NO. 1220027 - CONSTRUCTION SIGNS.
8. POST-MOUNTED BARRICADE WARNING LIGHTS - HIGH INTENSITY, ITEM NO. 0976002, SHALL BE MOUNTED ON ALL DIAMOND-SHAPED POST-MOUNTED CONSTRUCTION SIGNS.
7. INSTALL POST-MOUNTED SIGNS IN ACCORDANCES WITH STANDARD SHEETS TR_1208-01, TR_1208-02, AND TR_GS_07.
6. EXISTING SIGNS WHICH CONFLICT WITH THE DETOUR SIGNS SHALL BE COVERED, REMOVED, OR REVISED AS DIRECTED BY THE ENGINEER.
5. DETOUR SIGNS ARE TO BE INSTALLED SUCH THAT THEY DO NOT BLOCK OR ARE NOT BLOCKED BY EXISTING SIGNS.
4. DETOUR SIGNS SHALL BE REMOVED WHEN THE DETOUR IS NO LONGER REQUIRED.
3. DETOUR SIGNS ARE ONLY TO BE PLACED WHILE THE DETOUR IS OPERATIONAL, THEY SHALL BE COVERED OR REMOVED WHILE DETOUR IS NOT IN OPERATION.
2. ALL SIGN LOCATIONS INDICATED ON THE PLAN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE DETERMINED IN THE FIELD AS DIRECTED BY THE ENGINEER.
1. PEDESTRIAN DETOUR IS TO BE IN PLACE DURING THE RIVER STREET SOUTHBOUND CLOSURE AND THE RIVER STREET FULL ROAD CLOSURE FOR CONSTRUCTION STAGES 1A, 1B, 2, & 3.
DETOUR NOTES
LEGEND
TRAFFIC DRUM
TEMPORARY TRAFFIC BARRIER
PEDESTRIAN BARRICADE
TYPE III BARRICADE
CONSTRUCTION SIGN
WORK AREA
APP
ROX.
STR
EE
T L
INE
BROAD STREET)
ROUTE 313
S T R E E T
W E S T
D
E R
B Y A
V E
N U
E
S T A
T E R
O U
T E
IN
E S
TR
E E T
SEE DETAIL "A"
INT NO. 124-201
SEE DETAIL "D"
INT NO. 124-205
SEE DETAIL "C"
INT NO. 124-202
SEE NOTE 9.
INT NO. 124-216
SEE DETAIL "B"
INT NO. 124-217
SEE DETAIL "D"
INT NO. 124-207
D
H
A
C
B
D
E
G
F
C
D H
E
D D
B
C
B
E
B
A
B
C
C
D
E B
A
D
D
CB
D D
D
D
INT. NO. 124-217
INT. NO. 124-202
D
AG E A
SEE NOTE 10
INT. NO. 124-201
INT. NO. 124-207
C EA
BARRICADE
PEDESTRIAN
INT. NO. 124-205
SEE NOTE 10
INT. NO. 124-207
BARRICADE
PEDESTRIAN
ADA SIDEWALK RAMP
TEMPORARY
ADA SIDEWALK RAMP
TEMPORARY
PREL
IMI
NARY R
OW
MAP 1
25-
SH
EET
7 O
F 7
PRELIMINARY ROW MAP 125-15 SHEET 7 OF 7
05.08
SIGNATURE BLOCK:
99 REALTY DRIVE
CHESHIRE, CT 06410
BACKGROUND - WHITE
CIRCLE & DIAGONAL - RED
LEGEND - BLACK
R3-1
R1 - SERIES R2 - SERIES
STOP
ALL-WAY
R3-3
R3-4
BACKGROUND - WHITE
CIRCLE & DIAGONAL - RED
LEGEND - BLACK
R3-5
R3-6
31-0222 31-0223
R3 - SERIES
31-0282 31-0283
31-0295 31-0219
R3-8b
31-0307 31-0372
31-0370 31-0371
R4 - SERIES
R4-1
R4-3
R4-7
R4-7c
R5-1
R5-10c
PEDESTRIANS
R5 - SERIES
R6-1
R6 - SERIES R7 - SERIES
(D)
(R)
(L)
R7-1
(D)
(R)
(L)
VARIABLE TIMES
R8 - SERIES
R8-7
EMERGENCY
STOPPING
ONLY
R9 - SERIES R10 - SERIES
R10-6
31-0801 31-0802
R10-11
R11 - SERIES
R11-1
4.00
9.00
36X36
24X24
30-0823
31-0816
.080
AREA
(SQ. FT) (INCHES)
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
5.00
7.50
12.00
36X48
30X36
24X30 31-0828
31-0830
31-0819
1 .080
.100
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
6.00
24X36
SIZE CONN.
D.O.T. #
2.25
6.25 30x30
24x24
18X18
31-1705
31-1769
31-1770
.080
AREA
(SQ. FT) (INCHES)
SIZE CONN.
D.O.T. #
5.00
24X30
31-0806
SIZE CONN.
D.O.T. #
48X36
31-0670
SIZE CONN.
D.O.T. #
31-1775
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
6.25
16.00
48X48
30X30
1 .080
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
31-1119
31-1120
31-1121
8.75
42X30
36X24
SIZE CONN.
D.O.T. #
31-1122
31-1123
2.00
24X12
31-1774
SIZE CONN.
D.O.T. #
31-1502
SIZE CONN.
D.O.T. #
10.00
48X30
31-0302
SIZE CONN.
D.O.T. #
48X30
SIZE CONN.
D.O.T. #
31-0334
SIZE CONN.
D.O.T. #
SIZE CONN.
D.O.T. #
36X30
SIZE CONN.
D.O.T. #
31-0175
SIZE CONN.
D.O.T. #
SIZE CONN.
D.O.T. #
31-0290
SIZE CONN.
D.O.T. #
6.25
SIZE CONN.
D.O.T. #
31-0279
SIZE CONN.
D.O.T. #
SIZE CONN.
D.O.T. #
SIZE CONN.
D.O.T. #
31-1648
31-1647
SIZE CONN.
D.O.T. #
31-1622
31-1632
SIZE CONN.
D.O.T. #
SIZE CONN.
D.O.T. #
1.85
5.17
7.98
13.24 48
18 31-0532
31-0552
31-0553
31-0557 2
1 .080
.080
.080
.080
AREA
(SQ. FT) (INCHES)
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
0.95
3.84
6.77
10.83 60
18 31-0520
31-0523
31-0522
31-0528
.080
.080
.100
.100
AREA
(SQ. FT) (INCHES)
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
0.75
2.50
30X12
18X6
31-0508
31-0509
SIZE CONN.
D.O.T. #
POSTS ALUM.
NO
1.50
12X18
SIZE CONN.
D.O.T. #
31-1702
RETROREFLECTIVE
STRIP
R10-7R7-2a
R10-11b
R5-1a
20.00
48X60
31-1574
SIZE CONN.
D.O.T. #
31-1562
31-1564
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
3.75
5.00
12.00
20.00 48X60
36X48
24X30
18x30 31-1506
31-1526
31-1536
31-1546 2
1 .080
.080
.100
.100
AREA
(SQ. FT) (INCHES)
SIZE CONN.
D.O.T. #
31-1915
31-1918
SIZE CONN.
D.O.T. #
31-0861
31-0862
SIZE CONN.
D.O.T. #
32.00
48X96
31-5510
.125
SIZE CONN.
D.O.T. #
16.00 48X48
.100
AREA
(SQ. FT) (INCHES)
SIZE CONN.
D.O.T. #
31-1604
31-1627
31-1624
16.00 48X48
.100
AREA
(SQ. FT) (INCHES)
SIZE CONN.
D.O.T. #
31-1603
31-1629
31-1623
BACKGROUND - WHITE
CIRCLE & DIAGONAL - RED
LEGEND - BLACK
R3-2
R9-3a
R9-3
BACKGROUND - WHITE
CIRCLE & DIAGONAL - RED
LEGEND - BLACK
R10-11c
R5-10a(CT)R4-16
R5-10a(CT)
31-0183 31-0184
31-0157 31-0158
31-0262 31-0261
R3-7
R3-8
R3-6 (CT)
R3-8R3-8
R3-8 R3-8
R3-8
R3-8b
R3-8b
R3-8b
5.00
7.50
12.00
20.00 48X60
36X48
30X36
24X30 31-5505
31-5504
31-5506
31-5507 2
1 .080
.080
.080
.100
AREA
(SQ. FT) (INCHES)
SIZE CONN.
D.O.T. #
POSTS ALUM.
R3-7
SIZE CONN.
D.O.T. #
31-0117
31-0120
SIZE CONN.
D.O.T. #
31-0118
31-0123
R6-1
3.00
6.75
54X18
36X12
SIZE CONN.
D.O.T. #
31-1177
31-1178
54X18
36X12
SIZE CONN.
D.O.T. #
31-1188
31-1189
R5-11
30X24
31-1790
31-1792
SIZE CONN.
D.O.T. #
1.30
2.66 4X96
4X72
4X48
.080
AREA
(SQ. FT) (INCHES)
SIZE CONN.
D.O.T. #
31-5003
31-5004
31-5005
R10-12a
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
31-1626 31-1625
R10-15
31-0859
SIZE CONN.
D.O.T. #
SIZE CONN.
D.O.T. #
POSTS ALUM.
31-051331-0512
24X36
31-0116
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
ONLY
LANE
CENTER
R3-9b
ONLYONLY00
SPEED
LIMIT
MINIMUM
32.50
60X78
31-1719
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
LIMIT
SPEED
HERE
TO
HERE
TO
R1-1
R1-2
R1-3P
R1-5
R2-1
R2-4a
SIZE CONN.
D.O.T. #
31-0630
SIZE CONN.
D.O.T. #
31-0603
R5-1(CT)
NOT TO SCALE
9. BLACK COLOR ON SIGNS SHALL BE PLAIN (NOT RETROREFLECTIVE).
TURNING VEHICLES YIELD TO PEDESTRIANS.
THIS INCLUDES PARTIAL RED AND YELLOW BACKGROUND SUCH AS YIELD, DO NOT ENTER, AND
8. ALL RED AND YELLOW BACKGROUND SIGNS TO USE TYPE XI RETROREFLECTIVE SHEETING.
7. ALL WHITE BACKGROUND SIDE MOUNTED SIGNS TO USE TYPE IX RETROREFLECTIVE SHEETING.
ATTACHMENT DETAILS, SIGN HANGER, "Y" CLAMP DETAIL."
6. FOR OVERHEAD MOUNTED SIGNS, SEE STANDARD SHEET TR-1114_01 - "BONDING AND UTILITY POLE
SPLICING OF SHEET ALUMINUM WILL NOT BE ACCEPTED.
5. SIGNS SHALL BE FABRICATED OF ONE CONTINUOUS PIECE OF SHEET ALUMINUM.
4. POSTS SHALL BE 4 LBS./FT.
3. POSTS - SEE STANDARD SHEET TR-1208_02 - "METAL SIGN POSTS AND SIGN MOUNTING DETAILS."
MAY REQUIRE SPECIAL BOLT HOLE PATTERNS.
SIGNS OF DIFFERENT DIMENSIONS TO BE ERECTED ON THE SAME POSTS, OR SPAN/MAST ARM MOUNTED, FOR BOLT HOLE PATTERN REFER TO FHWA PUBLICATION "STANDARD HIGHWAY SIGNS".
2. FOR SPECIFIC SIGN DESIGN CONTACT CONN. D.O.T., DIVISION OF TRAFFIC ENGINEERING.
SUFFIXED WITH THE LETTER "Z".
1. THE LEGEND "O.S.T.A." SHALL APPEAR ON ALL R- SERIES SIGNS EXCEPT WHEN
DESIGNER/DRAFTER: CHECKED BY: D. TOMPKINS
NOTES:
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
7/14/2026
SIGNATURE BLOCK: DRAWING TITLE:
TR_GS_01
W:\CADDesign\_CTDOT_Projects\124-165 (Bridge)\Traffic\_Contract_Plans\TR_CP_0124-0165_GS.dgn FILE NAME: wkfrancis LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
DESIGNER/DRAFTER: W.FRANCIS CHECKED BY:
- R-SERIES TYPICAL SIGNS DETAIL
SIGN FACE SHEET ALUMINUM (X)
TRANSPORTATION
YIELD
DO NOT
ENTER
WRONG
WAY
NO
PARKING
ANY
TIME
NO
PARKING
0:00 AM
TO 0:00 PM
STOP
HERE ON
RED
STOP
HERE ON
RED
NO
TURN
ON RED
ONLY ONLY
ONLYONLY
ONLYONLY
ONLY ONLY
ONLY ONLY
ONLY
ONLY
ONLY ONLY
ONLY
ONLY
NO
TURNS
DO
NOT
PASS
SLOWER
TO PASS
NO
YIELDYIELD
VEHICLES
TURNING TURNING
VEHICLES
RIGHT LANE
NO TURN
ON RED
EXCEPT
FROM
NO
PEDESTRIANS
BICYCLES
MOTOR BIKES
MOTOR SCOOTERS
TURN
ON
RED
KEEP
OFF
MEDIAN
LEFT LANE
ARROW
LEFT TURN
YIELD ON
FLASHING
YELLOW
KEEP
RIGHT
TRAFFIC
TO PASS
EXCEPT
RIGHT
KEEP
ONE WAY
MUST
TURN LEFT
TURN RIGHT
MUST
RIGHT LANE
ONE WAY
05.09
SIGNATURE BLOCK:
99 REALTY DRIVE
CHESHIRE, CT 06410
OCTAGON - RED
TRIANGLE - RED & WHITE
BOTTOM CIRCLE - GREEN
SYMBOL & LEGEND - BLACK
BACKGROUND - YELLOW
TOP CIRCLE - RED
LEGEND - BLACK
BACKGROUND - FLUORESCENT YELLOW
LEGEND - BLACK
YELLOW GREEN
BACKGROUND - FLUORESCENT
(LEFT OR RIGHT)
LEGEND - BLACK
BACKGROUND - FLUORESCENT
LEGEND - BLACK
BACKGROUND - FLUORESCENT
LEGEND - BLACK
BACKGROUND - FLUORESCENT YELLOW
LEGEND - N/A
LEGEND - N/A
BACKGROUND - FLUORESCENT YELLOWYELLOW GREEN
BACKGROUND - FLUORESCENT
W1 - SERIES
W1-1L W1-1R W1-6
W1-7
W1-8
(LEFT OR RIGHT)
W2 - SERIES
W2-1
W2-2
(LEFT OR RIGHT)
W3-3
W/ FLASHERS
S - SERIES W4 - SERIES W5 - SERIES
W5-1
W6 - SERIES W7 - SERIES
W6-1 W6-2
W6-3
W7-1
W9 - SERIES
W9-1 W11-2
W11 - SERIES
W11-8
W12 - SERIES
W12-1 W12-2
(SUBPLATE)
W13 - SERIES
W13-1P
W13-2
W13-3
W16 - SERIES
W3-2
W3-1
W1-2
16.00 48
41-4006
41-4031
41-4056 2
.100
AREA
(SQ. FT) (INCHES)
SIZE CONN.
D.O.T. #
16.00 48
41-4005
41-4160
41-4055 2
.100
AREA
(SQ. FT) (INCHES)
SIZE CONN.
D.O.T. #
16.00 48
41-4029
41-4169
41-4068 2
.100
AREA
(SQ. FT) (INCHES)
SIZE CONN.
D.O.T. #
16.00 48
41-4168
41-4032
41-4067 2
.100
AREA
(SQ. FT) (INCHES)
SIZE CONN.
D.O.T. #
8.00
12.50
60X30
48X24
41-4223
41-4262
SIZE CONN.
D.O.T. #
8.00
12.50
48X24
41-4207
41-4208
SIZE CONN.
D.O.T. #
12.00 36X48
18X24
41-3951
41-4211
41-4260 2
.100
AREA
(SQ. FT) (INCHES)
SIZE CONN.
D.O.T. #
16.00 48
41-4226
41-4236
41-4221 2
.100
AREA
(SQ. FT) (INCHES)
SIZE CONN.
D.O.T. #
41-0501
41-0503
SIZE CONN.
D.O.T. #
41-4225
41-4235
SIZE CONN.
D.O.T. #
41-0504
41-0506
SIZE CONN.
D.O.T. #
25.00
41-0534
SIZE CONN.
D.O.T. #
41-4335
41-4330
SIZE CONN.
D.O.T. #
41-4492
41-4493
SIZE CONN.
D.O.T. #
41-4329
41-4331
SIZE CONN.
D.O.T. #
16.00 48
41-4506
41-4530
41-4508 2
.100
AREA
(SQ. FT) (INCHES)
SIZE CONN.
D.O.T. #
SIZE CONN.
D.O.T. #
41-4443
41-4444
41-4829
41-4830
SIZE CONN.
D.O.T. #
41-4680
41-4681
SIZE CONN.
D.O.T. #
41-4213
41-4215
SIZE CONN.
D.O.T. #
41-4706
41-4708
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
2.25
18X18 41-5566
41-5567
41-5574
SIZE CONN.
D.O.T. #
41-5581
SIZE CONN.
D.O.T. #
W3 - SERIES
S1-1
W16-9P
LEGEND - BLACK
YELLOW GREEN
BACKGROUND - FLUORESCENT
W1-2
41-0835
41-0848
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
LEGEND - BLACK
YELLOW GREEN
BACKGROUND - FLUORESCENT
W4-1
W4-2
W4-3
41-4448
41-4452
SIZE CONN.
D.O.T. #
41-4442
41-4446
SIZE CONN.
D.O.T. #
41-4468
41-4435
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
W8 - SERIES
W8-5
16.00 48
41-4519
41-4520
41-4521 2
.100
AREA
(SQ. FT) (INCHES)
SIZE CONN.
D.O.T. #
3.75
30X18
41-6130
41-6134
SIZE CONN.
D.O.T. #
2.19
21X15
41-2604
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
(SUBPLATE)
USE AT ADVANCE SIGN LOCATION
41-6134
41-6130 000 FT
W16-2aP
000 FT
W16-2aP
LEGEND - BLACK
BACKGROUND - FLUORESCENT
W16-7PL
W16-7PR
41-6140
SIZE CONN.
D.O.T. #
41-2602
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
(SUBPLATE)
USE AT ADVANCE SIGN LOCATION
41-5586
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
USE AT CROSSWALK
(SUBPLATE)
USE AT CROSSWALK
41-4721
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
7. BLACK COLOR ON SIGNS SHALL BE PLAIN (NOT RETROREFLECTIVE).
6. ALL SIGNS TO USE TYPE XI RETROREFLECTIVE SHEETING.
FOR RETROREFLECTIVE STRIP DETAILS AND INSTALLATION.
SEE STANDARD SHEET TR-1208_01 "SIGN PLACEMENT AND RETROREFLECTIVE STRIP DETAILS"
NOT BE INSTALLED ON ADVANCE CROSSING WARNING SIGNS.
POSTS FOR S1-1 AND W11-2 SIGNS LOCATED AT CROSSINGS. RETROREFLECTIVE STRIPS SHOULD
FLUORESCENT YELLOW GREEN RETROREFLECTIVE STRIPS SHALL BE INSTALLED ON ALL SIGN
FOR W1-6 AND W1-8 SIGNS.
5. FLUORESCENT YELLOW RETROREFLECTIVE STRIPS SHALL BE INSTALLED ON ALL SIGN POSTS
SPLICING OF SHEET ALUMINUM WILL NOT BE ACCEPTED.
4. SIGNS SHALL BE FABRICATED OF ONE CONTINUOUS PIECE OF SHEET ALUMINUM.
3. POSTS SHALL BE 4 LBS./FT.
2. POSTS - SEE STANDARD SHEET TR-1208_02 "METAL SIGN POSTS AND SIGN MOUNTING DETAILS."
MOUNTED, MAY REQUIRE SPECIAL BOLT HOLE PATTERNS.
SIGNS OF DIFFERENT DIMENSIONS TO BE ERECTED ON THE SAME POSTS, OR SPAN/MAST ARM
FOR BOLT HOLE PATTERN REFER TO FHWA PUBLICATION "STANDARD HIGHWAY SIGNS".
1. FOR SPECIFIC SIGN DESIGN CONTACT CONN. D.O.T., DIVISION OF TRAFFIC ENGINEERING.
W4-1
W4-2
W4-3
41-4449
41-4459
SIZE CONN.
D.O.T. #
41-4441
41-4447
SIZE CONN.
D.O.T. #
41-4470
41-4434
SIZE CONN.
D.O.T. #
POSTS ALUM.
W9-1
SIZE CONN.
D.O.T. #
41-4440
41-4445
41-4722
SIZE CONN.
D.O.T. #
SIZE CONN.
D.O.T. #
41-5010
1.33
4X48
SIZE CONN.
D.O.T. #
41-5001
41-5006
RETROREFLECTIVE STRIP
OF TRAVEL
DIRECTION
OM3-(L/C/R)
41-4269 41-4270 41-4268
W1-3
16.00 48
41-4103
41-4149
41-4153 2
.100
AREA
(SQ. FT) (INCHES)
SIZE CONN.
D.O.T. #
POSTS ALUM.
W1-3
16.00 48
41-4104
41-4135
41-4154 2
.100
AREA
(SQ. FT) (INCHES)
SIZE CONN.
D.O.T. #
POSTS ALUM.
W1-4
16.00 48
41-4188
41-4189
41-4152 2
.100
AREA
(SQ. FT) (INCHES)
SIZE CONN.
D.O.T. #
POSTS ALUM.
W1-4
16.00 48
41-4178
41-4179
41-4151 2
.100
AREA
(SQ. FT) (INCHES)
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
WHEN
FLASHING
STOP
AHEAD
ROAD
NARROWS
RIGHT
RIGHT
(SQ. FT) (INCHES) D.O.T. #
POSTS
3.00 12X36 1 .080
AREA SIZE CONN. ALUM.
3.75
30X18
41-6126
41-6137
SIZE CONN.
D.O.T. #
41-2112
41-2113
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
0000 FTLANE
LEFT
LANE
LANE
ENDS
ENDS
LANE
LEFT
W12-2P (CT) W12-2P (CT)
USE WITH W16-7P
W1-8
W1-6
USE WITH:
W3-3(CT)
OBJECT MARKERS
OF TRAVEL
DIRECTION
AHEAD
41-4828
41-4827
SIZE CONN.
D.O.T. #
POSTS ALUM.
W11-15
NOTES:
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
7/14/2026
SIGNATURE BLOCK: DRAWING TITLE:
TR_GS_02
W:\CADDesign\_CTDOT_Projects\124-165 (Bridge)\Traffic\_Contract_Plans\TR_CP_0124-0165_GS.dgn FILE NAME: wkfrancis LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
DESIGNER/DRAFTER: CHECKED BY:
S&W SERIES SIGNS TYPICAL DETAILS
SIGN FACE SHEET ALUMINUM (Y) -
TRANSPORTATION
DESIGNER/DRAFTER: W.FRANCIS CHECKED BY: D. TOMPKINS
MPH
MPH
EXIT
RAMP
MPH
(SUBPLATE)
USE AT ADVANCE SIGN LOCATION
05.10
SIGNATURE BLOCK:
99 REALTY DRIVE
CHESHIRE, CT 06410
BACKGROUND - BLUE
LEGEND - WHITE
LEGEND - WHITE
BACKGROUND - RED & BLUE
LEGEND - BLACK
BACKGROUND - WHITE
LEGEND - BLACK
BACKGROUND - WHITE
BACKGROUND - BLUE
LEGEND - WHITE
NOT TO SCALE
D1 - SERIES
& ARROW DIRECTION
VARIABLE LEGEND
51-5202
51-5203
D1-1
D9 - SERIES
D9-2
USE M5 & M6 SERIES
** FOR ARROW SUBPLATES
51-5405
VARIABLE ARROW DIRECTION
51-6714
51-6960
D10 - SERIES
RECREATIONAL
RS-054
51-270651-2705
L or R
51-6802
51-6803
D-7
W or W/O ARROW
VARIABLE ARROW DIRECTION
.0
.0
N N
VARIABLE - N, S, E, W
CARDINAL DIRECTION
E5 - SERIES
E5-1a
I - SERIES
VARIABLE: TOWN / CITY
VARIABLE: RIVER, BROOK, CREEK
M1 - SERIES
M1-1
M1-4
M1-5
M2 - SERIES M3 - SERIES
M3-1
M3-2
NORTH
EAST
SOUTH
M3-3
W EST
M3-4
M4 - SERIES
M4-5
TO
M5 - SERIES M6 - SERIES
M6-1P M6-2P M6-4P
L or R
M6-3
D5 - SERIES
E5-1a
38.50
84X66
51-2082
SIZE CONN.
D.O.T. #
POSTS ALUM.
D3 - SERIES
51-1448
51-6092
SIZE CONN.
D.O.T. #
60X24
60X12
51-5202
51-5203
SIZE CONN.
D.O.T. #
POSTS ALUM.
D1-2
51-6788
51-6787
SIZE CONN.
D.O.T. #
42.25
78X78
51-6901
SIZE CONN.
D.O.T. #
36X9
SIZE CONN.
D.O.T. #
51-6873
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
3.00
12X60
12X48
12X36 51-5103
51-5104
51-5105
1 .080
SIZE CONN.
D.O.T. #
51-2705
51-2706
SIZE CONN.
D.O.T. #
60X24
60X12
51-6802
51-6803
SIZE CONN.
D.O.T. #
30.00
72X60
SIZE CONN.
D.O.T. #
51-6150
32.50
SIZE CONN.
D.O.T. #
78X60
4.50
36X18
18X12 51-2009
51-2007
51-2051
1 .080
SIZE CONN.
D.O.T. #
51-2020
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
4.00
5.00
9.00
11.25 45X36
36X36
30X24
24X24 51-6662
51-6663
51-6666
51-6667 1
1 .080
.080
.080
.100
AREA
(SQ. FT) (INCHES)
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
4.00
5.00
9.00
11.25 45X36
36X36
30X24
24X24 51-6615
51-6644
51-6635
51-6645 2
1 .080
.080
.080
.100
AREA
(SQ. FT) (INCHES)
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
4.00
5.00
9.00
11.25 45X36
36X36
30X24
24X24 51-6616
51-6647
51-6636
51-6646 2
1 .080
.080
.080
.100
AREA
(SQ. FT) (INCHES)
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
2.00
2.00
4.50
4.50 36X18
36X18
24X12
24X12 51-6654
51-6614
51-6658
51-6628
.080
.080
.080
.080
AREA
(SQ. FT) (INCHES)
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
2.00
2.00
4.50
4.50 36X18
36X18
24X12
24X12 51-6651
51-6611
51-6655
51-6625
.080
.080
.080
.080
AREA
(SQ. FT) (INCHES)
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
2.00
2.00
4.50
4.50 36X18
36X18
24X12
24X12 51-6652
51-6612
51-6656
51-6626
.080
.080
.080
.080
AREA
(SQ. FT) (INCHES)
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
2.00
2.00
4.50
4.50 36X18
36X18
24X12
24X12 51-6653
51-6613
51-6657
51-6627
.080
.080
.080
.080
AREA
(SQ. FT) (INCHES)
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
D5-2b
FOR USE AT "NO NUMBERED" EXITS
39.00
78X78
71-6158
SIZE CONN.
D.O.T. #
RS- SERIESD7 - SERIES
.0
18X54
51-5307
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
SHIELD AND NUMERALS ARE VARIABLE
CARDINAL DIRECTION,
D4 - SERIES
51-6006
51-6007
SIZE CONN.
D.O.T. #
51-6033
51-6034
SIZE CONN.
D.O.T. #
51-6043
51-6045
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
D4-2
D4-2
D4-2
6.00
7.50
9.00
10.50 84X18
72X18
60X18
48X18 51-2004
51-2001
51-2002
51-2003 2
2 .100
.100
.125
.125
AREA
(SQ. FT) (INCHES)
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
D3-1 D10-4
RS-117
51-7828
SIZE CONN.
D.O.T. #
POSTS ALUM.
45.00
SIZE CONN.
D.O.T. #
108X60
57.50
SIZE CONN.
D.O.T. #
138X60
I2-2
MANAGEMENT
INCIDENT
VARIABLE ARROW DIRECTION
VARIABLE ARROW DIRECTION
VARIABLE ARROW DIRECTION
51-6662
51-6666
51-6663
51-6667
51-6615
51-6635
51-6644
51-6645
51-6616
51-6636
51-6647
51-6646
1 or 2 DIGITS
VARIABLE:
3 DIGITS
VARIABLE:
1 or 2 DIGITS
VARIABLE:
3 DIGITS
VARIABLE:
1 or 2 DIGITS
VARIABLE:
3 DIGITS
VARIABLE:
51-6125 51-6124
51-6127 51-6126
51-6129 51-6128
51-2630 51-2631
51-2688 51-2689
51-2632 51-2633
VARIABLE EXIT NUMBER
D4-2
51-2095
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
51-2097
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
51-2099
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
VARIABLE EXIT NUMBER
D4-2
51-6705
VARIABLE ARROW DIRECTION
51-6706
51-6708
51-6709
36X9
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
M6-2P
51-262851-2629
M2-1
51-6640
51-6610
SIZE CONN.
D.O.T. #
M5-1P
M5-2P
51-2690 51-2691
SIZE CONN.
D.O.T. #
51-2692 51-2693
I3-7
51-5103
SERVICE I-2(CT)
51-5104
51-5105
51-2682
51-2686
51-2606
51-2626 51-2687
51-2607
51-2627 51-2684
51-2685
51-2605
51-2625
51-6649
51-6650
51-6622
51-6620
51-6628
51-6614
51-6658
51-6654
51-6655
51-6651
51-6625
51-6611
51-6656
51-6652
51-6612
51-6626
51-6657
51-6653
51-6627
51-6613
51-664051-6610
SIZE CONN.
D.O.T. #
51-2683 51-2614
51-260951-2608
SIZE CONN.
D.O.T. #
4.38
30X21
SIZE CONN.
D.O.T. #
PARK-
RIDE
PARK-
RIDE
PARK-
RIDE
M6-1
NOT TO SCALE
PARK-
RIDE
VARIABLE ARROW DIRECTION
51-6050
51-6051
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
2.00
2.00
4.50
4.50 36X18
36X18
24X12
24X12 51-6650
51-6620
51-6622
51-6649
.080
.080
.080
.080
AREA
(SQ. FT) (INCHES)
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
51-2610 51-2611
51-2612 51-2613
M5-1P
M5-2P
51-2679 51-2680
SIZE CONN.
D.O.T. #
51-2678 51-2681
SIZE CONN.
D.O.T. #
4.38
4.38 30X21
30X21
21X15
21X15 51-2626
51-2686
51-2606
51-2682
.080
.080
.080
.080
AREA
(SQ. FT) (INCHES)
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
2.19
2.19
4.38
4.38 30X21
30X21
21X15
21X15 51-2625
51-2685
51-2605
51-2684
.080
.080
.080
.080
AREA
(SQ. FT) (INCHES)
SIZE CONN.
D.O.T. #
POSTS ALUM.
THK.
4.38 30X21
51-2627
51-2687
51-2607
.080
AREA
(SQ. FT) (INCHES)
SIZE CONN.
D.O.T. #
6.BLACK COLOR ON SIGNS SHALL BE PLAIN (NOT RETROREFLECTIVE).
SHEETING.
WHITE BACKGROUND SIDE-MOUNTED SIGNS WHICH SHALL BE TYPE IX RETROREFLECTIVE
5.ALL SIGNS TO USE TYPE XI RETROREFLECTIVE SHEETING EXCEPT FOR:
SPLICING OF SHEET ALUMINUM WILL NOT BE ACCEPTED.
4.SIGNS SHALL BE FABRICATED OF ONE CONTINUOUS PIECE OF SHEET ALUMINUM.
3.POSTS SHALL BE 4 LBS./FT.
DETAILS."
2.POSTS - SEE STANDARD SHEET TR-1208_02 - "METAL SIGN POSTS AND SIGN MOUNTING
MOUNTED, MAY REQUIRE SPECIAL BOLT HOLE PATTERNS.
SIGNS OF DIFFERENT DIMENSIONS TO BE ERECTED ON THE SAME POSTS, OR SPAN/MAST ARM
FOR BOLT HOLE PATTERN REFER TO FHWA PUBLICATION "STANDARD HIGHWAY SIGNS".
1.FOR SPECIFIC SIGN DESIGN CONTACT CONN. D.O.T., DIVISION OF TRAFFIC ENGINEERING.
NOTES:
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
7/14/2026
SIGNATURE BLOCK: DRAWING TITLE:
TR_GS_03
W:\CADDesign\_CTDOT_Projects\124-165 (Bridge)\Traffic\_Contract_Plans\TR_CP_0124-0165_GS.dgn FILE NAME: wkfrancis LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
SIGNS DETAIL
D, RS, E, I, & M SERIES TYPICAL
SIGN FACE SHEET ALUMINUM (Z) -
TRANSPORTATION
INTERSTATE
JCT
Variable St
JCT NORTH
EAST
SOUTH
W EST TO
Variable
Variable
Variable
REST
AREA
PLAZA
SERVICE
Variable
Variable
Variable
DIESEL
FOOD
GAS
LODGING
STATE POLICE
CAMPING
INFO
EXIT
EXIT
EXIT
EXIT
00B
EXIT
00B
Variable
River
EXIT
A-B00
EXIT
A-B00
Town Name
TOWN LINE
INTERSTATE
CONNECTICUTCONNECTICUT
QUANTITIES OF WORK WHICH WILL BE REQUIRED.
AND IS IN NO WAY WARRANTED TO INDICATE THE CONDITIONS OF ACTUAL
THESE SHEETS IS BASED ON THE LIMITED INVESTIGATIONS BY THE STATE
THE INFORMATION, INCLUDING ESTIMATED QUANTITIES OF WORK, SHOWN ON
05.11
9'
3'
2'
4'
30'10'
4'
2'
PAVEMENT ARROW
WHITE WRONG WAY
20°
E D
G
F
P
A V
E M
E N
T
18'
'-5
WHITE PREFERENTIAL
LANE SYMBOL REDUCTION ARROW
WHITE LANE
13.0 S.F. 41.8 S.F. 36.2 S.F.
DIRECTION OF TRAVEL
1'-0" 2'-0"
3'-0"
EDGE OF ROADWAY
VARIES
12.5 S.F.
27.0 S.F.
REFER TO ADJACENT VIEWS FOR DIMENSIONING
PAVEMENT ARROW DETAILS
(WHITE)
ARROWS SHALL BE CENTERED IN TRAVEL LANE
ARROW
DOUBLE LEFT
35 S.F.
COMBO
3 WAY ARROW
38.5 S.F.
ARROW COMBO
LEFT & RIGHT
27.0 S.F.
2'
6'
11'-0" (TYP.)
(WHITE)
YIELD LINE DETAIL
4" DOUBLE YELLOW CENTERLINE
6" WHITE EDGE LINE
BROKEN LANE LINE (BLL)
DOTTED LANE LINE (DLL)
DOTTED EXTENSION LINE (DEL)
DOUBLE YELLOW DOTTED EXTENSION LINE (DYDEL)
SOLID YELLOW AND BROKEN LINE (SYBL)
DOUBLE YELLOW CENTERLINE (DYCL)
DOTTED BICYCLE EXTENSION LINE (D-BIKE-EL)
YELLOW CENTERLINE
EDGE OF DOUBLE
BEGIN LAYOUT AT
CHANNELIZING LINE (CL)
BICYCLE LANE LINE (BIKE-LL)
EDGE LINE (EL)
LANE LINE (LL)
W
45̂
DIRECTION OF TRAVEL
DIRECTION OF TRAVEL
CENTERLINE
4" DOUBLE YELLOW
10'
(YELLOW)
CROSS HATCHED ISLAND DETAIL
10'
30'
TAPER TAPER
LANE SHIFT LANE ADD
MAY BE REDUCED AS NEEDED BASED ON LANE WIDTH.
3. WIDTH OF COMBINATION PAVEMENT MARKING ARROWS
MARKING ARROWS.
MIRROR IMAGE OF LEFT TURN PAVEMENT
2. RIGHT TURN PAVEMENT MARKING ARROWS ARE
IS APPROXIMATE.
1. AREA OF PAVEMENT MARKINGS AS INDICATED
NOTES :
CROSS HATCHED ISLANDS ARE OPTIONAL AND ARE TO BE INSTALLED ONLY WHERE CALLED FOR ON THE PLANS
W IS TO BE 12" WHEN POSTED SPEED > 45 MPH
W IS TO BE 8" WHEN POSTED SPEED < 45 MPH
(WHITE)
8' MIN
12" 16" 24"
CROSSWALK DETAIL
DIRECTION OF TRAVELOF ROADWAY
YELLOW CENTERLINE
EXTENSION OF DOUBLE
BEGIN LAYOUT AT
LC
BUFFER DETAIL
VEHICLE TRAVEL LANE
30'
6" WHITE EDGE LINE 2' MIN
8" WHITE DIAGONAL MARKING
5' MIN
EDGE OF ROAD
1'-8" 1'-8"
3'-4"
" 40°
6'-0" 6'-0" 6'-0"
6'-0"
8"
8" 8"
8"
36"
36"
TYPICAL LONGITUDINAL SPACING
BICYCLE LANE SYMBOL MARKINGS
4.7 S.F.
9.7 S.F.
SYMBOL MARKING
SHARED LANE
3'-4"
9.7 S.F.
OF STALL
ACROSS WIDTH
CENTER SYMBOL
3'-0"
4"
4" typ
2.8 S.F.
ACCESSIBLE PARKING SPACE SYMBOL
SHOULDER/BICYCLE LANE
ALL BICYCLE SYMBOL PAVEMENT MARKINGS TO BE WHITE.
5'-0"
8'-0"
8'-0"
5'-0"
R=3'-4"
R=2'-3"
R=2'-3"
R=3'-4"
1'-0"
3'-0"
4'-0"
5'-0"
6'-4"
R=2'- 3"R
3'-2"
1'-1"
1'-0"
5'-0"
4'-6"
7'-5"
5'-3"
7'-9"
5'-0"
15.5 S.F.
3'-0"
5'-0"
11'-8"
3'-0"
5'-3"
5'-0"
7'-9"
11'-8"
9'-9"
8"
30"
8"
16'-6"
23'-6"
30"3'-0"
6'-6"
6'-6"
6"
13'-0"
NOT TO SCALE
3.
3.
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
7/14/2026
SIGNATURE BLOCK: DRAWING TITLE:
TR_GS_04
W:\CADDesign\_CTDOT_Projects\124-165 (Bridge)\Traffic\_Contract_Plans\TR_CP_0124-0165_GS.dgn FILE NAME: wkfrancis LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
AND SYMBOLS
PAVEMENT MARKINGS LINES
TRANSPORTATION
05.12
SIGNATURE BLOCK:
99 REALTY DRIVE
CHESHIRE, CT 06410
IV
A
T E
D R
IV
E
IN
T
E R
S E
C T
IN
G
R O
A D
VARIES
CL
OF ROADWAY
11' 4"
11'
PAVEMENT MARKINGS FOR
CENTERLINES AND SHOULDER LINES
VARIES
4" DOUBLE YELLOW CENTERLINE
EDGE OF ROAD
EDGE OF ROAD
OTHERWISE DIRECTED
10' OR AS
6" WHITE EDGE LINE
NOTES:
STOP BARS AND YIELD LINES
1. STOP BARS AND YIELD LINES SHALL BE WHITE.
2. STOP BARS SHALL BE 12" MIN. UNLESS OTHERWISE NOTED ON PLANS.
7. FOR YIELD LINE INSTALLATIONS, ONLY FULL TRIANGLES ARE TO BE INSTALLED.
CROSSWALKS
AT LOCATIONS WHERE THE CROSSWALK IS SKEWED, BARS TO BE PARALLEL TO
24" WIDE SPACE TO BE CENTERED ON YELLOW CENTERLINE.
CROSSWALK AND SHOULD BE PLACED 90°TO THE CENTERLINE OF THE ROADWAY.
3. STOP BARS TO BE PLACED A MINIMUM OF 4' IN ADVANCE OF THE NEAREST EDGE OF
5. THE STOP SIGN SHOULD BE PLACED IN LINE WITH THE STOP BAR. HOWEVER, IF THE
THE STOP BAR SHOULD BE PLACED AT THE STOPPING POINT.
STOP SIGN CANNOT BE LOCATED EXACTLY WHERE VEHICLES ARE EXPECTED TO STOP,
THE YIELD LINE SHOULD BE PLACED AT THE YIELDING POINT.
YIELD SIGN CANNOT BE LOCATED EXACTLY WHERE VEHICLES ARE EXPECTED TO YIELD,
ON THE ANGLE OF SKEW.
ENDS OF BARS TO BE PARALLEL. THE LENGTH OF THE BARS WILL VARY DEPENDING
12" WIDE WHITE TRANSVERSE LINE ALONG EACH EDGE.
6. FOR STOP BARS AT RAMPS SEE DETAILS "R", "S", "T", & "U" AND NOTES ON TRAFFIC
12. BARS SHOULD BE NO CLOSER THAN 1' FROM EDGE OF ROAD.
10. CROSSWALK MARKINGS SHALL BE WHITE.
13. ONLY FULL LENGTH BARS ARE TO BE INSTALLED.
14. DECORATIVE CROSSWALKS SHALL BE BANDED FROM CURB TO CURB WITH A MINIMUM
STANDARD SHEET TR-1210 07 "PAVEMENT MARKINGS FOR DIVIDED HIGHWAYS EXIT RAMPS".
9. THE YIELD SIGN SHOULD BE PLACED IN LINE WITH A YIELD LINE. HOWEVER, IF THE
NO MORE THAN 30' FROM THE NEAREST EDGE OF THE…